Stratton Park Trail System

About the Project

Design work is underway for a trail system at Mary B. Stratton Park, adjacent to the Richmond Kickers youth soccer complex off of Ridgedale Parkway. The trail head will be located at the parking area adjacent to the new synthetic turf fields, and connect to a large loop trail in the central part of the property. 

The Stratton Trail is being constructed in conjunction with VDOT and is at 60% design phase. This project is limited to pedestrian improvements along Ridgedale Parkway and within Stratton Park. A sidewalk constructed along Ridgedale Parkway will be within VDOT Right of Way. Within Stratton Park, the proposed shared-use path identified in the County Bikeways and Trails plan will be maintained by Chesterfield County Parks and Recreation.