Nash Road Extension (Beach Road to Route 10)

About

Revenue Sharing funds (50% state funds and 50% county funds) will be used to extend Nash Road from Beach Road to Route 10 to relieve area congestion. The design public hearing scheduled for March 26, 2020 was canceled, and will be rescheduled as soon as possible.

Traffic Impacts

To be determined.

Project Timeline

Preliminary engineering is underway.

Contact

Call  804-748-1037 or email Chessa Faulkner for more information.

Related Information