Pending Site Plan Case Status

Pending Site Plan Cases

The pending site plan cases are updated weekly on Friday with current status information. You can find more information about each case by selecting a case number. View case status descriptions.

  1. Site Plan Subdivisions - In Review

    23PM0035 - CARPOOL 10310 Hull Street Road

    Posted on October 26, 2023

    Current Status: In Review
    Applicant: CARPOOL 10310 Hull Street Road
    Staff: Luigi Mignardi
    Project Type: Commercial
    District: Cloverhill Learn More
  2. Site Plan Subdivisions - In Review

    23PM0033 - Car Pool 9850 Midlothian Turnpike

    Posted on October 26, 2023

    Current Status: In Review
    Applicant: Car Pool 9850 Midlothian Turnpike
    Staff: Luigi Mignardi
    Project Type: Commercial
    District: Midlothian Learn More
  3. Site Plan Subdivisions - In Review

    23PM0031 - Robious Hall Shopping Center

    Posted on October 26, 2023

    Current Status: In Review
    Applicant: Robious Hall Shopping Center
    Staff: Luigi Mignardi
    Project Type: Commercial
    District: Midlothian Learn More
  4. Site Plan Subdivisions - In Review

    23PM0030 - JES Chester

    Posted on October 26, 2023

    Current Status: In Review
    Applicant: JES Chester
    Staff: James Dopp
    Project Type: Commercial
    District: Bermuda Learn More
  5. Site Plan Subdivisions - In Review

    23PM0029 - McDonald's Side by Side at 10201 Hull St Rd

    Posted on October 26, 2023

    Current Status: In Review
    Applicant: McDonald's Side by Side at 10201 Hull St Rd
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Dale Learn More
  6. Site Plan Subdivisions - In Review

    23PM0028 - Woolridge Rd and Hull Street Rd Median Landscape Plans

    Posted on October 26, 2023

    Current Status: In Review
    Applicant: Woolridge Rd and Hull Street Rd Median Landscape Plans
    Staff: Jeff Lamson
    Project Type: Agricultural
    District: Cloverhill Learn More
  7. Site Plan Subdivisions - In Review

    23PM0026 - CD Building - Chilled Water System Replacement

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: CD Building - Chilled Water System Replacement
    Staff: Luigi Mignardi
    Project Type: Public
    District: Dale Learn More
  8. Site Plan Subdivisions - In Review

    23PM0011 - Superior Signs Warehouse Addition

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Superior Signs Warehouse Addition
    Staff: James Dopp
    Project Type: Commercial
    District: Bermuda Learn More
  9. Site Plan Subdivisions - In Review

    23PM0008 - Shady Hill Mobile Home Center-Sewer Improvements

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Shady Hill Mobile Home Center-Sewer Improvements
    Staff: Luigi Mignardi
    Project Type: Multi Family
    District: Bermuda Learn More
  10. Site Plan Subdivisions - In Review

    23PR0075 - 360 Solar - Phase 2

    Posted on November 21, 2023

    Current Status: In Review
    Applicant: 360 Solar - Phase 2
    Staff: Steve Prusik
    Project Type: Commercial
    District: Matoaca Learn More
  11. Site Plan Subdivisions - In Review

    23PR0074 - LaPrade Library Renovations

    Posted on November 21, 2023

    Current Status: In Review
    Applicant: LaPrade Library Renovations
    Staff: Steve Prusik
    Project Type: Public/Semi-Public
    District: Cloverhill Learn More
  12. Site Plan Subdivisions - In Review

    23PR0073 - The Villas at Swift Creek Phase 2

    Posted on November 21, 2023

    Current Status: In Review
    Applicant: The Villas at Swift Creek Phase 2
    Staff: James Dopp
    Project Type: Multi-Family
    District: Matoaca Learn More
  13. Site Plan Subdivisions - In Review

    23PR0072 - Pocono Drive Restaurant

    Posted on November 21, 2023

    Current Status: In Review
    Applicant: Pocono Drive Restaurant
    Staff: James Dopp
    Project Type: Commercial
    District: Cloverhill Learn More
  14. Site Plan Subdivisions - In Review

    23PR0071 - Wawa - Iron Bridge & Beulah

    Posted on November 21, 2023

    Current Status: In Review
    Applicant: Wawa - Iron Bridge & Beulah
    Staff: Luigi Mignardi
    Project Type: Commercial
    District: Dale Learn More
  15. Site Plan Subdivisions - In Review

    23PR0070 - CMA's Colonial Chevrolet

    Posted on November 21, 2023

    Current Status: In Review
    Applicant: CMA's Colonial Chevrolet
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Bermuda Learn More
  16. Site Plan Subdivisions - In Review

    23PR0069 - Chester Solar Technology Park

    Posted on November 9, 2023

    Current Status: In Review
    Applicant: Chester Solar Technology Park
    Staff: Luigi Mignardi
    Project Type: Industrial
    District: Bermuda Learn More
  17. Site Plan Subdivisions - In Review

    23PR0066 - Haley Buick-GMC Expansion

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Haley Buick-GMC Expansion
    Staff: Jeff Dopp
    Project Type: Commercial
    District: Cloverhill Learn More
  18. Site Plan Subdivisions - In Review

    23PR0064 - Carter Machinery (Bellwood Road)

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Carter Machinery (Bellwood Road)
    Staff: Steve Tugwell
    Project Type: Industrial
    District: Bermuda Learn More
  19. Site Plan Subdivisions - In Review

    23PR0062 - 360 Solar - Phase 1

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: 360 Solar - Phase 1
    Staff: Steve Prusik
    Project Type: Commercial
    District: Matoaca Learn More
  20. Site Plan Subdivisions - In Review

    23PR0061 - Chick-fil-A #5416 Hull Street at Brandermill

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Chick-fil-A #5416 Hull Street at Brandermill
    Staff: Chris Hale
    Project Type: Commercial
    District: Midlothian Learn More
  21. Site Plan Subdivisions - In Review

    23PR0059 - Otterdale Pet Wellness Center

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Otterdale Pet Wellness Center
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Matoaca Learn More
  22. Site Plan Subdivisions - In Review

    23PR0058 - Bank of America - Hull Street

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Bank of America - Hull Street
    Staff: Chris Hale
    Project Type: Commercial
    District: Midlothian Learn More
  23. Site Plan Subdivisions - In Review

    23PR0057 - SHEETZ - Route 10 and Omo Rd

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: SHEETZ - Route 10 and Omo Rd
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Dale Learn More
  24. Site Plan Subdivisions - In Review

    23PR0056 - Parke at Cold Creek Recreational Center

    Posted on October 4, 2023

    Current Status: In Review
    Applicant: Parke at Cold Creek Recreational Center
    Staff: Bradley Morrison
    Project Type: Mixed Use
    District: Matoaca Learn More
  25. Site Plan Subdivisions - In Review

    23PR0055 - Tommy's Express Car Wash

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Tommy's Express Car Wash
    Staff: Bradley Morrison
    Project Type: Commercial
    District: Matoaca Learn More
  26. Site Plan Subdivisions - In Review

    23PR0054 - Magnolia Green Apartments Parcel 7

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Magnolia Green Apartments Parcel 7
    Staff: Luigi Mignardi
    Project Type: Multi-Family
    District: Matoaca Learn More
  27. Site Plan Subdivisions - In Review

    23PR0052 - Iglesia De Cristo Miel

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Iglesia De Cristo Miel
    Staff: Luigi Mignardi
    Project Type: Mixed-Use
    District: Clover Hill Learn More
  28. Site Plan Subdivisions - In Review

    23PR0050 - Sheetz - Old Otterdale Rd & Midlothian Tpk

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Sheetz - Old Otterdale Rd & Midlothian Tpk
    Staff: Chris Hale
    Project Type: Commercial
    District: Midlothian Learn More
  29. Site Plan Subdivisions - In Review

    23PR0049 - Otterdale at Westerleigh Improvements

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Otterdale at Westerleigh Improvements
    Staff: Bradley Morrison
    Project Type: Commercial
    District: Matoaca Learn More
  30. Site Plan Subdivisions - In Review

    23PR0048 - Threads Uniforms-Sommerville Court

    Posted on October 4, 2023

    Current Status: In Review
    Applicant: Threads Uniforms-Sommerville Court
    Staff: Steve Prusik
    Project Type: Industrial
    District: Midlothian Learn More
  31. Site Plan Subdivisions - In Review

    23PR0047 - Otterdale at Westerleigh Improvements

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Otterdale at Westerleigh Improvements
    Staff: Bradley Morrison
    Project Type: Commercial
    District: Midlothian Learn More
  32. Site Plan Subdivisions - In Review

    23PR0046 - Chesterfield County Animal Shelter

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Chesterfield County Animal Shelter
    Staff: Steve Prusik
    Project Type: Public
    District: Dale Learn More
  33. Site Plan Subdivisions - In Review

    23PR0045 - Royal Farms Store #522

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Royal Farms Store #522
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Bermuda Learn More
  34. Site Plan Subdivisions - In Review

    23PR0044 - Euroclassics of Richmond-Porsche

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Euroclassics of Richmond-Porsche
    Staff: James Dopp
    Project Type: Commercial
    District: Midlothian Learn More
  35. Site Plan Subdivisions - In Review

    23PR0043 - Attain at Swift Creek Apartments

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Attain at Swift Creek Apartments
    Staff: Luigi Mignardi
    Project Type: Multi Family
    District: Dale Learn More
  36. Site Plan Subdivisions - In Review

    23PR0042 - Lego LMR Manufacturing Campus - Solar

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Lego LMR Manufacturing Campus - Solar
    Staff: James Dopp
    Project Type: Industrial
    District: Bermuda Learn More
  37. Site Plan Subdivisions - In Review

    23PR0041 - Living Hope Lutheran Church Expansion

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Living Hope Lutheran Church Expansion
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Clover Hill Learn More
  38. Site Plan Subdivisions - In Review

    23PR0040 - Sycamore Place Section 2 - Tract B Condos

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Sycamore Place Section 2 - Tract B Condos
    Staff: Chris Hale
    Project Type: Multi Family
    District: Midlothian Learn More
  39. Site Plan Subdivisions - In Review

    23PR0038 - Route 618 Improvements

    Posted on October 4, 2023

    Current Status: In Review
    Applicant: Route 618 Improvements
    Staff: James Dopp
    Project Type: Industrial
    District: Bermuda Learn More
  40. Site Plan Subdivisions - In Review

    23PR0037 - Mike Devers Construction

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Mike Devers Construction
    Staff: Bradley Morrison
    Project Type: Industrial,
    District: Bermuda Learn More
  41. Site Plan Subdivisions - In Review

    23PR0036 - Old Stage Road Office Building and Warehouse

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Old Stage Road Office Building and Warehouse
    Staff: Steve Tugwell
    Project Type: Industrial
    District: Bermuda Learn More
  42. Site Plan Subdivisions - In Review

    23PR0035 - Noble Academy Multi-Purpose Building

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Noble Academy Multi-Purpose Building
    Staff: Bradley Morrison
    Project Type: Commercial
    District: Dale Learn More
  43. Site Plan Subdivisions - In Review

    23PR0034 - Tidal Wave Auto Spa - Chesterfield, VA

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Tidal Wave Auto Spa - Chesterfield, VA
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Bermuda Learn More
  44. Site Plan Subdivisions - In Review

    23PR0033 - Proposed Sheetz Pad Site

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Proposed Sheetz Pad Site
    Staff:Chris Hale
    Project Type: Commercial
    District: Midlothian Learn More
  45. Site Plan Subdivisions - In Review

    23PR0032 - Kiddie Academy @ Rivers Bend

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Kiddie Academy @ Rivers Bend
    Staff: Steve Prusik
    Project Type: Commercial
    District: Bermuda Learn More
  46. Site Plan Subdivisions - In Review

    23PR0031 - Khan Medical Office Complex

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Khan Medical Office Complex
    Staff: Luigi Mignardi
    Project Type: Commercial
    District: Bermuda Learn More
  47. Site Plan Subdivisions - In Review

    23PR0030 - The Aire at Westchester Section 1

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: The Aire at Westchester Section 1
    Staff: Luigi Mignardi
    Project Type: Condominium
    District: Midlothian Learn More
  48. Site Plan Subdivisions - In Review

    23PR0029 - Goodes Bridge Flex Office

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Goodes Bridge Flex Office
    Staff: James Dopp
    Project Type: Commercial
    District: Midlothian Learn More
  49. Site Plan Subdivisions - In Review

    23PR0027 - The Lake - PH 2B: Genito Road Intersection

    Posted on October 4, 2023

    Current Status: In Review
    Applicant: The Lake - PH 2B: Genito Road Intersection
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Cloverhill Learn More
  50. Site Plan Subdivisions - In Review

    23PR0026 - Cloverleigh Condominiums

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Cloverleigh Condominiums
    Staff: Steve Prusik
    Project Type: Mixed Use
    District: Clover Hill Learn More
  51. Site Plan Subdivisions - In Review

    23PR0025 - LEGO LMR Manufacturing Campus

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: LEGO LMR Manufacturing Campus
    Staff: James Dopp
    Project Type: Industrial
    District: Bermuda Learn More
  52. Site Plan Subdivisions - In Review

    23PR0024 - Rockwood Square Section 1

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Rockwood Square Section 1
    Staff: Steve Prusik
    Project Type: Multi Family
    District: Dale Learn More
  53. Site Plan Subdivisions - In Review

    23PR0023 - Impreg & AFP

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Impreg & AFP
    Staff: Chris Hale
    Project Type: Industrial
    District: Dale Learn More
  54. Site Plan Subdivisions - In Review

    23PR0021 - Starbucks - Courthouse Road, Chesterfield

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Starbucks - Courthouse Road, Chesterfield
    Staff: James Dopp
    Project Type: Commercial
    District: Clover Hill Learn More
  55. Site Plan Subdivisions - In Review

    23PR0020 - Whitepine Logistics Center

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Whitepine Logistics Center
    Staff: Steve Prusik
    Project Type: Industrial
    District: Dale Learn More
  56. Site Plan Subdivisions - In Review

    23PR0018 - Construct Southeast Hangar Site Preparation

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Construct Southeast Hangar Site Preparation
    Staff: Jeffrey Lamson
    Project Type: Industrial
    District: Dale Learn More
  57. Site Plan Subdivisions - In Review

    23PR0008 - Civica Scale-Up Center

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Civica Scale-Up Center
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Bermuda Learn More
  58. Site Plan Subdivisions - In Review

    23PR0006 - Coyote Drive Access

    Posted on September 20, 2023

    Current Status: In Review (Case on hold)
    Applicant: Coyote Drive Access
    Staff: Bradley Morrison
    Project Type: Public
    District: Bermuda Learn More
  59. Site Plan Subdivisions - In Review

    23PR0004 - Chester Range USA

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Chester Range USA
    Staff: Bradley Morrison
    Project Type: Commercial
    District: Bermuda Learn More
  60. Site Plan Subdivisions - In Review

    23PR0003 - Waldrop – Wilfong

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Waldrop – Wilfong
    Staff: Steve Prusik
    Project Type: Industrial
    District: Cloverhill Learn More
  61. Site Plan Subdivisions - In Review

    22PM0019 - Leonard's - Chesterfield

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Leonard's - Chesterfield
    Staff: Christopher Hale
    Project Type: Mixed Use
    District: Bermuda Learn More
  62. Site Plan Subdivisions - In Review

    22PM0013 - McDonald's at 13170 Midlothian tpke Midlothian, VA

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: McDonald's at 13170 Midlothian tpke Midlothian, VA
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Midlothian Learn More
  63. Site Plan Subdivisions - In Review

    22PR0106 - Addison Evans Water Production - Floodwall

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Addison Evans Water Production - Floodwall
    Staff: Steve Prusik
    Project Type: Public
    District: Cloverhill Learn More
  64. Site Plan Subdivisions - In Review

    22PR0105 - Monster Self Storage

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Monster Self Storage
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Dale Learn More
  65. Site Plan Subdivisions - In Review

    22PR0103 - Inline Asphalt Solutions

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Inline Asphalt Solutions
    Staff: Steve Prusik
    Project Type: Industrial
    District: Dale Learn More
  66. Site Plan Subdivisions - In Review

    22PR0102 - Abberly at Carter's Farm

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Abberly at Carter's Farm
    Staff: Bradley Morrison
    Project Type: Multifamily
    District: Matoaca Learn More
  67. Site Plan Subdivisions - In Review

    22PR0101 - Elevate Apartment Homes

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Elevate Apartment Homes
    Staff: Steve Tugwell
    Project Type: Multifamily
    District: Bermuda Learn More
  68. Site Plan Subdivisions - In Review

    22PR0098 - Take 5 - 12101 Route 1

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Take 5 - 12101 Route 1
    Staff: Steve Tugwell
    Project Type: Commercial
    District: Bermuda Learn More
  69. Site Plan Subdivisions - In Review

    22PR0097 - Moseley Hermon Solar

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Moseley Hermon Solar
    Staff: Steve Prusik
    Project Type: Industrial
    District: Midlothian Learn More
  70. Site Plan Subdivisions - In Review

    22PR0096 - Coalfield Station Phase 3

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Coalfield Station Phase 3
    Staff: Christopher Hale
    Project Type: Mixed Use
    District: Midlothian Learn More
  71. Site Plan Subdivisions - In Review

    22PR0093 - Magnolia Green - Hammock Creek Bridge

    Posted on October 4, 2023

    Current Status: In Review
    Applicant: Magnolia Green - Hammock Creek Bridge
    Staff: Luigi Mignardi
    Project Type: Public/Semi-Public
    District: Matoaca Learn More
  72. Site Plan Subdivisions - In Review

    22PR0091 - Kingsland Car Wash

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Kingsland Car Wash
    Staff: Christopher Hale
    Project Type: Commercial
    District: Dale Learn More
  73. Site Plan Subdivisions - In Review

    22PR0090 - ICV Musalla

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: ICV Musalla
    Staff: Steve Prusik
    Project Type: Public
    District: Midlothian Learn More
  74. Site Plan Subdivisions - In Review

    22PR0085 - Winterpock Crossing Grocery Store

    Posted on October 4, 2023

    Current Status: In Review
    Applicant: Winterpock Crossing Grocery Store
    Staff: Steve Prusik
    Project Type: Commercial
    District: Cloverhill Learn More
  75. Site Plan Subdivisions - In Review

    22PR0084 - Midlothian Depot

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Midlothian Depot
    Staff: Luigi Mignardi
    Project Type: Mixed Use
    District: Midlothian Learn More
  76. Site Plan Subdivisions - In Review

    22PR0082 - Green's Tree Services

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Green's Tree Services
    Staff: Steve Prusik
    Project Type: Industrial
    District: Dale Learn More
  77. Site Plan Subdivisions - In Review

    22PR0081 - Charter Park Drive Phase 1

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Charter Park Drive Phase 1
    Staff: Brad Morrison
    Project Type: Public
    District: Midlothian Learn More
  78. Site Plan Subdivisions - In Review

    22PR0079 - Voice of Christ Church

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Voice of Christ Church
    Staff: Luigi Mignardi
    Project Type: Commercial
    District: Midlothian Learn More
  79. Site Plan Subdivisions - In Review

    22PR0078 - Winterpock Solar

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Winterpock Solar
    Staff: Whit Kirtley
    Project Type: Industrial
    District: Matoaca Learn More
  80. Site Plan Subdivisions - In Review

    22PR0077 - Moores Lake Apartments Phase III

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Moores Lake Apartments Phase III
    Staff: Steve Tugwell
    Project Type: Multifamily
    District: Bermuda Learn More
  81. Site Plan Subdivisions - In Review

    22PR0074 - Vida on the Lake

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Vida on the Lake
    Staff: Jeff Lamson
    Project Type: Multifamily
    District: Cloverhill Learn More
  82. Site Plan Subdivisions - In Review

    22PR0073 - Madison Crossing Tract A

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Madison Crossing Tract A
    Staff: Steve Prusik
    Project Type: Multifamily
    District: Matoaca Learn More
  83. Site Plan Subdivisions - In Review

    22PR0048 - Westerleigh Parkway Extension

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Westerleigh Parkway Extension
    Staff: Bradley Morrison
    Project Type: Public
    District: Matoaca Learn More
  84. Site Plan Subdivisions - In Review

    22PR0044 - Forest View Rescue Squad

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Forest View Rescue Squad
    Staff: Christopher Hale
    Project Type: Public
    District: Midlothian Learn More
  85. Site Plan Subdivisions - In Review

    22PR0041 - Hamlet at Falling Creek

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Hamlet at Falling Creek
    Staff: Steve Prusik
    Project Type: Multifamily
    District: Cloverhill Learn More
  86. Site Plan Subdivisions - In Review

    22PR0037 - FC Richmond

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: FC Richmond
    Staff: Whit Kirtley
    Project Type: Commercial
    District: Matoaca Learn More
  87. Site Plan Subdivisions - In Review

    22PR0031 - Ironbridge Apartments

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Ironbridge Apartments
    Staff: Luigi Mignardi
    Project Type: Mixed Use
    District: Bermuda Learn More
  88. Site Plan Subdivisions - In Review

    22PR0030 - Centric Development

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Centric Development
    Staff: Christopher Hale
    Project Type: Multifamily
    District: Midlothian Learn More
  89. Site Plan Subdivisions - In Review

    22PR0026 - Barahona Sales Lot

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Barahona Sales Lot
    Staff: Steve Prusik
    Project Type: Commercial
    District: Midlothian Learn More
  90. Site Plan Subdivisions - In Review

    22PR0015 - Royal Farms Store #503-Warbro Road

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Royal Farms Store #503-Warbro Road
    Staff: Christopher Hale
    Project Type: Commercial
    District: Cloverhill Learn More
  91. Site Plan Subdivisions - In Review

    22PR0013 - Madison Crossing Apartments

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Madison Crossing Apartments
    Staff: Steve Prusik
    Project Type: Multifamily
    District: Matoaca Learn More
  92. Site Plan Subdivisions - In Review

    22PR0009 - Corporate Village Parkway Extended - Phase 2

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Corporate Village Parkway Extended - Phase 2
    Staff: Jeff Dopp
    Project Type: Public
    District: Bermuda Learn More
  93. Site Plan Subdivisions - In Review

    22PR0007 - James River Exteriors

    Posted on September 20, 2023

    Current Status: In Review (Case on Hold)
    Applicant: James River Exteriors
    Staff: Christopher Hale
    Project Type: Commercial
    District: Dale Learn More
  94. Site Plan Subdivisions - In Review

    22PR0001 - The Villas at Swift Creek, Sec. 1

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: The Villas at Swift Creek, Sec. 1
    Staff: Jeff Dopp
    Project Type: Multi Family
    District: Matoaca Learn More
  95. Site Plan Subdivisions - In Review

    21PM0216 - 5030 Jefferson Davis Hwy minor site plan

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: 5030 Jefferson Davis Hwy minor site plan
    Staff: James Dopp
    Project Type: Commercial
    District: Bermuda Learn More
  96. Site Plan Subdivisions - In Review

    21PR0334 - Winterfield Crossing Tier 4

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Winterfield Crossing Tier 4
    Staff: Jeffrey Lamson
    Project Type: Commercial
    District: Midlothian Learn More
  97. Site Plan Subdivisions - In Review

    21PR0326 - Panda Express - Courthouse Landing

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Panda Express - Courthouse Landing
    Staff: Jeffrey Lamson
    Project Type: Commercial
    District: Dale Learn More
  98. Site Plan Subdivisions - In Review

    21PR0312 - Cottage Glen Roads Phase I

    Posted on October 4, 2023

    Current Status: In Review
    Applicant: Cottage Glen Roads Phase I
    Staff: Gregory Kirkley
    Project Type: Public/Semi-Public
    District: Cloverhill Learn More
  99. Site Plan Subdivisions - In Review

    21PR0298 - Royal Farms Store #453 - Rivers Bend

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Royal Farms Store #453 - Rivers Bend
    Staff: Steve Prusik
    Project Type: Commercial
    District: Bermuda Learn More
  100. Site Plan Subdivisions - In Review

    21PR0289 - Leete Tire and Auto

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Leete Tire and Auto
    Staff: Steve Prusik
    Project Type: Commercial
    District: Midlothian Learn More
  101. Site Plan Subdivisions - In Review

    21PR0280 - 7-Eleven Hull & Baldwin

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: 7-Eleven Hull & Baldwin
    Staff: Christopher Hale
    Project Type: Commercial
    District: Matoaca Learn More
  102. Site Plan Subdivisions - In Review

    21PR0268 - Madison Crossing

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Madison Crossing
    Staff: Steve Prusik
    Project Type: Multi-Family
    District: Matoaca Learn More
  103. Site Plan Subdivisions - In Review

    21PR0253 - Bailey Park - Office / Warehouse

    Posted on October 4, 2023

    Current Status: In Review
    Applicant: Bailey Park - Office / Warehouse
    Staff: Christopher Hale
    Project Type: Commercial
    District: Cloverhill Learn More
  104. Site Plan Subdivisions - In Review

    21PR0245 - JES Southland Drive Lot Expansion

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: JES Southland Drive Lot Expansion
    Staff: James Dopp
    Project Type: Commercial
    District: Bermuda Learn More
  105. Site Plan Subdivisions - In Review

    21PR0241 - Ashton Industrial Park Grading & Erosion Control Plan

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Ashton Industrial Park Grading & Erosion Control Plan
    Staff: Bradley Morrison
    Project Type: Industrial
    District: Bermuda Learn More
  106. Site Plan Subdivisions - In Review

    21PR0240 - Sheetz at Courthouse Landing

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Sheetz at Courthouse Landing
    Staff: Jeffrey Lamson
    Project Type: Commercial
    District: Dale Learn More
  107. Site Plan Subdivisions - In Review

    21PR0239 - Courthouse Landing Apartments

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Courthouse Landing Apartments
    Staff: Jeffrey Lamson
    Project Type: Multi-Family
    District: Dale Learn More
  108. Site Plan Subdivisions - In Review

    21PR0232 - Talley Old Stage Road Truck Lot Expansion

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Talley Old Stage Road Truck Lot Expansion
    Staff: Steve Tugwell
    Project Type: Industrial
    District: Bermuda Learn More
  109. Site Plan Subdivisions - In Review

    21PR0229 - Chester Village Retail

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Chester Village Retail
    Staff: Jeffrey Lamson
    Project Type: Commercial
    District: Bermuda Learn More
  110. Site Plan Subdivisions - In Review

    21PR0222 - New Mid Atlantic Steel

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: New Mid Atlantic Steel
    Staff: Luigi Mignardi
    Project Type: Commercial
    District: Cloverhill Learn More
  111. Site Plan Subdivisions - Submittal

    21PR0186 - Clover Hill Church-Hull St Rd

    Posted on September 20, 2023

    Current Status: Submittal
    Applicant: Clover Hill Church-Hull St Rd
    Staff: Jeffrey Lamson
    Project Type: Commercial
    District: Matoaca Learn More
  112. Site Plan Subdivisions - Submittal

    21PR0138 - Millwood Sigora

    Posted on September 20, 2023

    Current Status: Submittal
    Applicant: Millwood Sigora
    Staff: Steve Prusik
    Project Type: Commercial
    District: Matoaca Learn More
  113. Site Plan Subdivisions - In Review

    21PR0001 - Courthouse Landing Infrastructure Plan

    Posted on September 20, 2023

    Current Status: In Review
    Applicant: Courthouse Landing Infrastructure Plan
    Staff: Jeffrey Lamson
    Project Type: Commercial
    District: Dale Learn More
  114. Site Plan Subdivisions - Submittal

    21PS0171 - Midatlantic Bus Center Schematic

    Posted on September 20, 2023

    Current Status: Submittal
    Applicant: Midatlantic Bus Center Schematic
    Staff: Steve Prusik
    Project Type: Industrial
    District: Dale Learn More
View All