Riverway Road at Beach Road and River Road Intersection Evaluation

About

This study will evaluate the intersections of Riverway Road with Beach Road and River Road to determine what improvements (interim and long-term) are needed to address existing and projected traffic.

Project Timeline

Anticipated study completion date: January 2023.

Contact

Barb Smith
Phone: 804-748-1037
Email Barb Smith