Route 1 (Falling Creek Avenue - Food Lion) Bike, Pedestrian and Transit Improvements

About

A trail on the east side of Route 1 and a sidewalk on the west side of Route 1 will be constructed between Falling Creek Avenue and the Food Lion, north of Chippenham Parkway. The project also includes the construction of five bus stops with landing pads: four with benches and trash cans and one with a shelter. A pedestrian signal will be installed at Cogbill Road. Ornamental streetlights will be installed along with landscaping. This project will complete a section of the Fall Line Trail.

Traffic Impacts

To be determined.

Project Timeline

Design of the project is underway. Construction is anticipated to begin summer 2026.