CASE NO: 17PR0101 STATUS: APPROVED - ADMIN
PROJECT NAME: VA CREDIT UNION WATE - LAST INTERNET UPDATE: 11/20/17
SUBMITTAL TYPE: COMMERCIAL
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ASSESSOR----: 00 07/05/16 07/26/16 ******** ********
ENVIR.ENGR.-: 01 08/16/16 08/30/16 AMENDED* 08/26/16 DLD 706-2031
FIRE DEPT.--: 01 08/16/16 08/30/16 COMPLETE 08/18/16 AWB 717-6167
HOUSE NUMBER: 01 08/16/16 08/30/16 ******** 07/15/16 AMJ 768-7549
MAPPING/GIS-: 01 08/16/16 08/30/16 COMPLETE 08/22/16 AMJ 768-7549
POLICE DEPT.: 00 07/05/16 07/26/16 ******** ********
PLANNING----: 01 08/16/16 08/30/16 ******** 08/02/16 JHL 751-4158
TRANSPORT.--: 01 08/16/16 08/30/16 COMPLETE 08/23/16 SJA 751-4461
UTIL.PLAN.--: 01 08/16/16 08/30/16 ******** ********
UTILITIES---: 01 08/16/16 08/30/16 AMENDED* 08/19/16 A B 768-7450
UTIL.R.O.W.-: 01 08/16/16 08/30/16 ******** ********
VDOT--------: 01 08/16/16 08/30/16 ******** ********
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : MIKE LARSON, P.E. / 804-748-1338
NAME OF PLAN : VA CREDIT UNION - WATERFORD PARKING
ADDRESS : 13505 TREDEGAR LAKE PKWY, MIDLOTHIAN
SUBMISSION DATE : 07/05/16
PLAN DATED : 06/17/16
REVIEW DATE : 07/13/16
SITE PLAN NO. : 17PR0101
COMMENTS : 1ST REVIEW-NOT APPROVED
TABLE REVIEW : NO
PLAT PROCESS :
1. UTILITIES PROJECT NUMBER 16-0187 SHALL BE PLACED ON
THE LOWER RIGHT HAND CORNER OF EACH SHEET.
2. PLEASE PUT UTILITIES CONTACT: MIKE LARSON, P.E. 748-
1338, LARSONM@CHESTERFIELD.GOV ON THE COVER SHEET.
3. SHOW AND LABEL THE EXISTING WATER AND SEWER MAINS WITH
MATERIAL, AND COUNTY PROJECT NUMBER ON ALL APPLICABLE PLAN
PROFILE SHEETS THAT DEPICT EXISTING CONDITIONS OR A CONNEC
YOU MAY EMAIL SWAVAILABILITY@CHESTERFIELD.GOV TO OBTAIN
AS-BUILT INFORMATION.
4. IF THE EXISTING IRRIGATION METER IS TO BE USED FOR THE
EXPANDED IRRIGATION SYSTEM, SUBMIT A METER SIZING FORM
VERIFYING THE ADEQUACY OF THE EXISTING METER.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE #: MIKE LARSON, P.E. / 804-748-1338
NAME OF PLAN : VA CREDIT UNION - WATERFORD PARKING
ADDRESS : 13505 TREDEGAR LAKE PKWY, MIDLOTHIAN
SUBMISSION DATE : 08/16/16
PLAN DATED : 08/15/16
REVIEW DATE : 08/19/16
SITE PLAN NO. : 17PR0101
COMMENTS : 2ND REVIEW- APPROVED
TABLE REVIEW : YES
PLAT PROCESS :
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: WATERFORD FITECH
SITE PLAN NUMBER: 17PR0101
LATEST PLAN DATE: 06/17/16
DEPT. REC'D. DATE: 07/06/16
SUBMITTAL NUMBER: ONE
REVIEW DATE: 07/19/16
RECOMMENDATION: APPROVED
LABEL THE COUNTY'S CLASSIFICATION FOR CHARTER COLONY PKY
(MAJOR ARTERIAL) ON THE PLANS.
ADVISORY COMMENT: WITH FUTURE DEVELOPMENT, SIDEWALK WILL B
REQUIRED ALONG THE PROPERTY'S ENTIRE FRONTAGE TO CHARTER
COLONY PARKWAY.
==========================================================
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
NAME OF PLAN: VA CREDIT UNION WATERFORD PARKING
SITE PLAN NUMBER: 17PR0101
LATEST PLAN DATE: 08/15/16
DEPT. REC'D. DATE: 08/18/16
SUBMITTAL NUMBER: TWO
REVIEW DATE: 08/23/16
RECOMMENDATION: APPROVED
ADVISORY: WITH FUTURE DEVELOPMENT, SIDEWALK WILL BE
REQUIRED ALONG THE PROPERTY'S ENTIRE FRONTAGE TO CHARTER
COLONY PKY.
==========================================================
==========================================================
**********************************************************
REVIEW DEPARTMENT------PLANNING
REVIEWER / PHONE #-----JEFF LAMSON/ 751-4158
NAME OF PLAN-----------VA CREDIT UNION - WATERFORD PARKING
SITE PLAN NUMBER-------17PR0101
ADDRESS----------------
LATEST PLAN DATE-------6-17-16
DEPT. REC'D. DATE------6-22-16
SUBMITTAL NUMBER-------ONE
REVIEW DATE------------8-2-16
RECOMMENDATION---------NOT APPROVED
TABLE REVIEW-----------YES
PLAT PROCESSING--------
LANDSCAPE PLAN STATUS--REVISIONS REQUESTED
ARCHITECTURAL ELEVATIONS--N/A
LIGHTING PLAN/CUTSHEETS---REVISIONS REQUESTED
IRRIGATION/HOSEBIB PLAN---NOT YET SUBMITTED
1. PUT A REVISION DATE ON THE RESUBMITTED PLANS. RESUBMIT
10 FULL SETS AND ONE COPY OF THE SITE PLAN SHEET TO THE
PLANNING DEPARTMENT FOR YOUR NEXT REVIEW. PROVIDE A COMPLE
RESPONSE TO COMMENTS FOR ALL DEPARTMENTS TO THE PLANNING
DEPARTMENT.
BELOW EACH COMMENT TO DESCRIBE HOW YOU HAVE ADDRESSED EACH
REVIEW COMMENT. BE SURE TO INDICATE WHICH SHEETS SHOW THE
REQUIRED CHANGES. PROVIDE A TRANSMITTAL LETTER TO DESCRIBE
ANY CHANGES TO THE PLANS NOT CAUSED BY THE STAFF REVIEW
COMMENTS.
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : AMY JOHANSON 768-7549
NAME OF PLAN : VA CREDIT UNION - WATERFORD PARKING
PLAN NO. : 17PR0101
LATEST PLAN DATE : 6/17/16
RECEIVED DATE : 7/7/16
SUBMITTAL NUMBER : 1
REVIEW DATE : 7/15/16
RECOMMENDATION : NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNING
THE COMMENTS BELOW.
1. COORDINATE POINTS BASED ON THE VIRGINIA STATE PLANE
COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM 1983
ARE NOT PRESENT. TWO POINTS MUST BE SHOWN ON THE PARCEL
BOUNDARY.
2. THE PARCEL BOUNDARY SURVEY ISN'T SHOWN. PLEASE
SUPPLY THE METES AND BOUNDS FOR EVERY SEGMENT ALONG THE
TRAVERSE TO INCLUDE CHORD BEARING AND DISTANCE FOR ALL
NON-TANGENT CURVES. IF THE PARCEL IS TOO LARGE TO
CONVENIENTLY FIT ON ONE SHEET, A LARGER SCALE DRAWING
OF THE BOUNDARY IS ACCEPTABLE.
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : AMY JOHANSON 768-7549
NAME OF PLAN : VA CREDIT UNION - WATERFORD PARKING
PLAN NO. : 17PR0101
LATEST PLAN DATE : 8/15/16
RECEIVED DATE : 8/19/16
SUBMITTAL NUMBER : 2
REVIEW DATE : 8/22/16
RECOMMENDATION : NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNING
THE COMMENTS BELOW.
1. PLEASE FIX THE L DATA FOR ALL CURVES.
2. THE TRAVERSE DOESN'T CLOSE. ONE OF THE CURVES IS
MISSING ALONG TREDEGAR LAKE PKWY WEST OF N3691410.65
E11729651.22. TIE LINES ARE MISSING ON WATER BOUNDARIES.
PLEASE SUPPLY THE BEARINGS AND DISTANCES OF THE TIE
LINES.
==========================================================
==========================================================
DEPARTMENT REVIEW: IST / HOUSE NUMBERING SECTION
REVIEWER: AMY JOHANSON
PHONE NUMBER: 768-7549
CASE NUMBER: 17PR0101
NAME OF PLAN: VA CREDIT UNION - WATERFORD PARKING
ADDRESS:
DATE OF REVIEW:7/15/16 REVIEW # 1
STATUS: HOUSE NUMBERING REVIEW NOT NECESSARY
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: VA CREDIT UNION - WATERFORD PARKING
SITE PLAN NUMBER: 17PR0101
ADDRESS: 13505 TREDEGAR LAKE PARKWAY
LATEST PLAN DATE: 6/17/16
DEPT. REC'D. DATE: 7/6/16
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 7/7/16
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE PLAN IS APPROVED AS SUBMITTED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: VA CREDIT UNION - WATERFORD PARKING
SITE PLAN NUMBER: 17PR0101
ADDRESS: 13505 TREDEGAR LAKE PARKWAY
LATEST PLAN DATE: 8/18/16
DEPT. REC'D. DATE: 7/6/16
SUBMITTAL NUMBER: 2ND REVIEW
REVIEW DATE: 8/18/16
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE PLAN IS APPROVED AS SUBMITTED.
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : DUSTIN DUNNAGAN / 706-2061
NAME OF PLAN : VA CREDIT UNION - WATERFORD PARKING
ADDRESS : 13505 TREDEGAR LAKE PARKWAY
SITE PLAN NO. : 17PR0101
LATEST PLAN DATE : JUNE 17,2016
DEPT. REC'D DATE : JULY 05, 2016
SUBMITTAL NUMBER : 1
REVIEW DATE : JULY 26, 2016
RECOMMENDATION : NOT APPROVED
TABLE REVISION : NO
PLAT PROCESSING : NO
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL
FEATURES INCLUDING BUT NOT LIMITED TO WETLANDS,
SURFACE WATERS (E.G. VSMP PERMIT FOR CONSTRUCTION
SITES, GROUND WATER AND AIR QUALITY) FINAL APPROVAL
OF THESE PLANS WILL NOT RELIEVE YOU OF YOUR
RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE
LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. EFFECTIVE JULY 1, 2014, ENFORCEMENT OF THE VIRGINIA
STORMWATER REGULATIONS BECAME THE RESPONSIBILITY OF
THE COUNTY FOR DEVELOPMENT PROJECTS WITHIN
CHESTERFIELD COUNTY. ADDITIONALLY, NEW STATE
STORMWATER REGULATIONS ALSO BECAME EFFECTIVE ON
JULY 1, 2014. LAND DISTURBING ACTIVITIES THAT
OBTAINED A VSMP PERMIT PRIOR TO JULY 1, 2014 MAY
USE THE STORMWATER MANAGEMENT CRITERIA SPECIFIED
IN PART II C (9VAC25-870-93 ET SEQ) FOR TWO PERMIT
CYCLES. PROJECTS GRANDFATHERED UNDER THE PROVISIONS
OF 9VAC25-870-48 MAY FOLLOW THE REQUIREMENTS LISTED
UNDER PART IIC FOR ONE PERMIT CYCLE. ALL OTHER NEW
DEVELOPMENT WILL BE SUBJECT TO THE REQUIREMENTS OF
PART IIB (9VAC25-870-62 TO 9VAC25-870-92).
03. PROVIDE THE FOLLOWING INFORMATION ON THE COVER SHEET:
A. TOTAL ON-SITE IMPERVIOUS COVER IN SQUARE FEET (NOT
INCLUDING VDOT RIGHTS-OF-WAY).
04. THE PROPOSED RIP-RAP LINED CHANNELS MUST SPECIFY A
MINIMUM OF 24" OF VDOT CL.I RIP-RAP PLACED OVER A
LAYER OF FILTER CLOTH. (CL-G&D 4)
05. ALL EXISTING AND PROPOSED DRAINAGE EASEMENTS MUST BE
SHOWN. (CL-G&D 27)
06. THE DEED BOOK AND PAGE NUMBER OF ALL EXISTING DRAINAGE
EASEMENTS MUST BE SHOWN ON THE PLAN. (CL-G&D 28)
07. IF PHASING IS DESIRED, PHASE LINES MUST BE SHOWN AND
A PHASED EROSION CONTROL PLAN AND NARRATIVE MUST BE
PROVIDED. (CL-G&D 31)
08. BITUMINOUS CURBING (STD. MC-3A) IS REQUIRED ALONG THE
EDGE OF PAVEMENT SEPARATING THE DIFFERENT PHASES OF TH
PROJECT. (CL-G&D 32)
09. APPROVAL OF THE SITE PLAN BY THE PRIVATE UTILITY
COMPANY IN RELATION TO ITS EASEMENT AND FACILITIES
THEREIN MUST BE PROVIDED PRIOR TO SITE PLAN APPROVAL.
10. IF TIMBERING IS REQUIRED ON THE PROJECT, IT SHOULD BE
INCORPORATED INTO THE EROSION CONTROL PLAN / NARRATIVE
AND SHOULD NOT BEGIN UNTIL AFTER THE ISSUANCE OF A
LAND DISTURBANCE PERMIT AND THE INSTALLATION OF THE
APPROVED EROSION CONTROL DEVICES. (CL-EC 2)
11. A NOTE MUST BE ADDED TO THE SEQUENCE OF CONSTRUCTION
STATING THAT THE VSMP CONSTRUCTION ACTIVITY OPERATOR
AND THE ENVIRONMENTAL INSPECTOR (OR AUTHORIZED
REPRESENTATIVE) MUST ATTEND THE PRE-CONSTRUCTION
MEETING.
12. A MINIMUM 10' BREAK MUST BE PROVIDED IN THE LOW AREA O
THE SILT FENCE . THE BREAK MUST BE BACKFILLED WITH
STONE TO WITHIN 1' OF THE TOP OF THE SILT FENCE TO
SERVE AS AN OVERFLOW. A DETAIL MUST BE SHOWN.
(CL-EC 16)
13. A DETAIL MUST BE SHOWN WHICH PROVIDES FOR PLACEMENT OF
EXCAVATED TRENCH MATERIAL ON THE UPHILL SIDE OF THE
TRENCH WHILE SILT FENCE AND STOCKPILED MATERIALS ARE
PLACED ON THE DOWNSTREAM SIDE. (CL-EC 37)
14. A CBPA COMPLIANCE SHEET(S) IS REQUIRED FOR PROJECTS
UTILIZING PART IIC OF THE CURRENT VSMP REGULATIONS.
(CL-CBPA 3) THE FOLLOWING INFORMATION IS REQUIRED TO B
SHOWN ON THE SHEET(S):
A. THE CBPA/MS-4 COMPLIANCE TABLE. (SEE APPENDIX D OF TH
CHESAPEAKE BAY CHAPTER IN THE ENVIRONMENTAL ENGINEERIN
REFERENCE MANUAL) (CL-CBPA 3A)
15. ON THE COVER SHEET IN THE CBPA NOTE, PROVIDE THE SITE
PLAN AND SITE PLAN NUMBER UNDER WHICH THIS SITE IS
GRANDFATHERED.
16. SHOW THE PHASING IN THE OVERALL PLAN.
17. ON THE OVERALL EXISTING CONDITIONS PLAN, SHOW MORE OF
THE OFFSITE CONTOURS AND LAND COVERS/PLANIMETRICS.
18. SHEET C2.0:
A) SHOW THE STOCKPILE GRADING ON ALL APPLICABLE SHEETS
B) PROVIDE SEDIMENT TRAPS FOR THE PROJECT.
C) SHOW AND LABEL SILT FENCE OUTLETS.
D) PROVIDE TEMPORARY SEEDING FOR THE STOCKPILES.
E) PROVIDE INLET PROTECTION ON ALL RECEIVING INLETS.
F) THE PROPOSED WORK APPEARS TO CROSS LOD LINES.
G) CLARIFY HOW SILT FENCE WILL BE INSTALLED AND
FUNCTION ON PAVEMENT.
19. SHEET C2.1:
A) PROVIDE MS-19 TABLE.
B) IT IS SUGGESTED TO REMOVE THE PROPOSED DITCH AND
PROVIDE HENRICO COUNTY LEVEL SPREADING DEVICES AT
THE END OF THE CURB CUTS.
C) IF PROPOSED DITCH IS KEPT, PROVIDE EC-2 LINING.
20. ON SHEET C2.3, THE STORMWATER CONSIDERATION SECTION OF
THE EROSION CONTROL NARRATIVE REFERENCES SHEET C6.1.
THIS PLAN SHEET WAS NOT INCLUDED IN THE PLAN SET.
CLARIFY.
21. ON SHEET C3.0, CLARIFY THE MILL AND OVERLAY DEPTH
REQUIREMENTS.
22. SHEET C4.0:
A) IF THE DITCHES ARE TO STAY, PROVIDE PROFILES.
B) LABEL THE OUTLET PROTECTION TO BE AT 0% GRADE WITH
2' DEPTH OF CLASS 1 RIP-RAP WITH FILTER FABRIC.
C) PROVIDE SPOT SHOTS AT OUTFALL.
D) SHOW MORE OF THE RECEIVING DRAINAGE SYSTEM.
E) CLARIFY HOW WATER IS TO DISCHARGE AROUND THE
PROPOSED STOCK PILE.
23. SHEET C4.1:
A) SHOW FULL SITE BOUNDARY.
B) THE PARCEL AREA DOES NOT MATCH THE GIS SITE AREA.
C) THE DRAINAGE AREA MAP APPEARS TO HAVE GAPS IN THE
DRAINAGE AREA LIMITS.
D) PROVIDE THE SITE PLAN AND LAND DISTURBANCE PERMIT
NUMBERS FOR THE SITE PLAN FROM WHICH THE INFORMATIO
ON THIS SHEET WAS OBTAINED.
24. CALCULATIONS:
A) PROVIDE SPREAD CALCULATIONS FOR ALL INLETS RECEIVIN
DISCHARGE FROM THE SITE.
B) CLARIFY IF THE DITCH CALCULATIONS ARE FOR THE 2-YEA
OR 10-YEAR.
C) THE DITCH CALCULATIONS ROUGHNESS VALUES INDICATE A
CONCRETE LINED DITCH; HOWEVER, FROM THE PLANS IT
APPEARS TO BE GRASSED LINE. PLEASE CLARIFY THE
LINING TYPE.
D) PROVIDE INCREMENTAL DRAINAGE AREAS AND FLOWS FOR TH
DITCH DISCHARGES.
E) LABEL THE STRUCTURES IN THE PIPE SIZING CALCULATION
AS EXISTING.
25. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL
ENGINEERING DEPARTMENT AND OBTAIN AN "APPROVED FOR
CONSTRUCTION" STAMP ON TWO ADDITIONAL SETS FOR THE
OWNER TO KEEP ON-SITE.
26. PERMISSION MUST BE OBTAINED FROM THE ADJACENT PROPERTY
OWNER(S) ALLOWING FOR GRADING ON THE PROPERTY AS
PROPOSED PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
27. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD FILE MUST BE SUBMITTED TO CAROLE
CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE AUTOCAD
FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD VERSIO
2009 OR EARLIER AND REFERENCED DIRECTLY TO THE VIRGINI
STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN THE NAD83
DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD
OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH THE SITE
PLAN NAME, SITE PLAN NUMBER, ENGINEERING FIRM AND CAD
FILE PREPARER'S NAME AND PHONE NUMBER. THE FILE MUST
CONTAIN THE FOLLOWING, EACH CLEARLY LABELED IN SEPARAT
LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. PARKING LOTS AND DRIVEWAYS;
C. ROADS;
D. SIDEWALKS;
E. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE; AND
F. FLOODPLAINS.
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
28. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
29. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
C. THE VIRGINIA STORMWATER MANAGEMENT PERMIT (VSMP)
REGISTRATION STATEMENT AND FEE OF $2,700
D. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BOOK
E. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)
==========================================================
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : DUSTIN DUNNAGAN / 706-2061
NAME OF PLAN : VA CREDIT UNION - WATERFORD PARKING
ADDRESS : 13505 TREDEGAR LAKE PARKWAY
SITE PLAN NO. : 17PR0101
LATEST PLAN DATE : AUGUST 15, 2016
DEPT. REC'D DATE : AUGUST 16, 2016
SUBMITTAL NUMBER : 2
REVIEW DATE : AUGUST 26, 2016
RECOMMENDATION : NOT APPROVED
TABLE REVISION : YES, SEE COMMENT 03
PLAT PROCESSING : YES
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL
FEATURES INCLUDING BUT NOT LIMITED TO WETLANDS,
SURFACE WATERS (E.G. VSMP PERMIT FOR CONSTRUCTION
SITES, GROUND WATER AND AIR QUALITY) FINAL APPROVAL
OF THESE PLANS WILL NOT RELIEVE YOU OF YOUR
RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE
LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. EFFECTIVE JULY 1, 2014, ENFORCEMENT OF THE VIRGINIA
STORMWATER REGULATIONS BECAME THE RESPONSIBILITY OF
THE COUNTY FOR DEVELOPMENT PROJECTS WITHIN
CHESTERFIELD COUNTY. ADDITIONALLY, NEW STATE
STORMWATER REGULATIONS ALSO BECAME EFFECTIVE ON
JULY 1, 2014. LAND DISTURBING ACTIVITIES THAT
OBTAINED A VSMP PERMIT PRIOR TO JULY 1, 2014 MAY
USE THE STORMWATER MANAGEMENT CRITERIA SPECIFIED
IN PART II C (9VAC25-870-93 ET SEQ) FOR TWO PERMIT
CYCLES. PROJECTS GRANDFATHERED UNDER THE PROVISIONS
OF 9VAC25-870-48 MAY FOLLOW THE REQUIREMENTS LISTED
UNDER PART IIC FOR ONE PERMIT CYCLE. ALL OTHER NEW
DEVELOPMENT WILL BE SUBJECT TO THE REQUIREMENTS OF
PART IIB (9VAC25-870-62 TO 9VAC25-870-92).
03. APPROVAL OF THE SITE PLAN BY THE PRIVATE UTILITY
COMPANY IN RELATION TO ITS EASEMENT AND FACILITIES
THEREIN MUST BE PROVIDED PRIOR TO SITE PLAN APPROVAL.
04. SHEET C2.0:
A) PROVIDE NOTE FOR THE STOCKPILE TO BE FREE OF WOODY
AND CONSTRUCTION DEBRIS.
B) PROVIDE BLANKET AND MATTING FOR THE STOCKPILE.
C) ENSURE THE SILT FENCE BY THE STOCKPILE IS 5' OFF OF
THE BASE OF THE STOCKPILE.
D) IT APPEARS THERE ARE DIVERSIONS BY THE DIVERSION
DIKES. LABEL THE DIVERSIONS AND PROVIDE STABILITY
AND CAPACITY CALCULATIONS.
E) PROVIDE DIVERSION TO THE NORTH OF THE STOCKPILE TO
CONVEY RUNOFF TO THE TRAP.
F) IT IS SUGGESTED TO INSTALL THE TRAP TO PHASE 2
GRADING INCLUDING DITCHES DURING PHASE 1 TO MINIMIZ
REGRADING NEEDED AND ALLOW FOR EARLIER
STABILIZATION.
05. SHEET C2.1:
A) CLARIFY THE NEED FOR THE SOIL STABILIZATION
BLANKETING IN ADDITION TO THE SODDING.
B) PROVIDE MS-19 LOCATION JUST DOWNSTREAM OF THE LEVEL
SPREADER AS SITUATION E.
06. SHEET C4.3:
A) LABEL THE LENGTHS OF THE LEVEL SPREADER SECTIONS IN
THE PROFILE.
07. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL
ENGINEERING DEPARTMENT AND OBTAIN AN "APPROVED FOR
CONSTRUCTION" STAMP ON TWO ADDITIONAL SETS FOR THE
OWNER TO KEEP ON-SITE.
08. PERMISSION MUST BE OBTAINED FROM THE ADJACENT PROPERTY
OWNER(S) ALLOWING FOR GRADING ON THE PROPERTY AS
PROPOSED PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
09. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD FILE MUST BE SUBMITTED TO CAROLE
CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE AUTOCAD
FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD VERSIO
2009 OR EARLIER AND REFERENCED DIRECTLY TO THE VIRGINI
STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN THE NAD83
DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD
OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH THE SITE
PLAN NAME, SITE PLAN NUMBER, ENGINEERING FIRM AND CAD
FILE PREPARER'S NAME AND PHONE NUMBER. THE FILE MUST
CONTAIN THE FOLLOWING, EACH CLEARLY LABELED IN SEPARAT
LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. PARKING LOTS AND DRIVEWAYS;
C. ROADS;
D. SIDEWALKS;
E. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE; AND
F. FLOODPLAINS.
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
10. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
11. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
C. THE VIRGINIA STORMWATER MANAGEMENT PERMIT (VSMP)
REGISTRATION STATEMENT AND FEE OF $2,700
D. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BOOK
E. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)
==========================================================