CASE NO: 16PR0253 STATUS: APPROVED - ADMIN
PROJECT NAME: THE VILLAS AT ASHLAK - LAST INTERNET UPDATE: 11/21/17
SUBMITTAL TYPE: COMMERCIAL
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ASSESSOR----: 01 10/06/16 10/27/16 ******** ********
ENVIR.ENGR.-: 03 02/28/17 03/21/17 ******** 11/01/16 DLD 706-2031
FIRE DEPT.--: 03 02/28/17 03/21/17 COMPLETE 03/03/17 AWB 717-6167
GEN.SERVC.--: 01 10/06/16 10/27/16 ******** ********
MAPPING/GIS-: 03 02/28/17 03/21/17 COMPLETE 03/20/17 AMJ 768-7549
POLICE DEPT.: 01 10/06/16 10/27/16 ******** ********
PLANNING----: 03 02/28/17 03/21/17 COMPLETE 03/14/17 SCP 751-4321
TRANSPORT.--: 03 02/28/17 03/21/17 COMPLETE 03/09/17 SJA 751-4461
UTIL.PLAN.--: 03 02/28/17 03/21/17 ******** ********
UTILITIES---: 03 02/28/17 03/21/17 AMENDED* 03/07/17 M L 748-1338
UTIL.R.O.W.-: 03 02/28/17 03/21/17 ******** ********
VDOT--------: 03 02/28/17 03/21/17 ******** ********
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : MIKE LARSON, P.E./748-1338
NAME OF PLAN : THE VILLAS AT ASHLAKE
ADDRESS : 7501 ASHLAKE PARKWAY
SUBMISSION DATE : 5/25/16
PLAN DATED : 5/24/16
REVIEW DATE : 6/10/16
SITE PLAN NO. : 16PR0253
COMMENTS : 1ST REVIEW-NOT APPROVED
TABLE REVIEW : NO
PLAT PROCESS :
1. UTILITIES PROJECT NUMBER 15-0057 SHALL BE PLACED ON
THE LOWER RIGHT HAND CORNER OF EACH SHEET.
2. PLEASE PUT UTILITIES CONTACT MIKE LARSON, P.E. 748-
1338, LARSONM@CHESTERFIELD.GOV ON THE COVER SHEET.
3. THE COVER SHEET SHOULD INCLUDE A MATERIALS LIST OF
UTILITIES ITEMS BROKE OUT BY PRIVATE AND PUBLIC FOR WATER
AND SEWER.
4. SHOW AND LABEL THE EXISTING WATER AND SEWER MAINS WITH
SIZE, MATERIAL, AND COUNTY PROJECT NUMBER ON ALL APPLICABL
PLAN AND PROFILE SHEETS THAT DEPICT EXISTING CONDITIONS OR
A CONNECTION. YOU MAY EMAIL
SWAVAILABILITY@CHESTERFIELD.GOV TO OBTAIN AS BUILT
INFORMATION.
5. PROVIDE A BAR SCALE ON SHEET C02.0.
6. PROVIDE A NOTE THAT THE WELL FOR THE EXISTING HOUSE IS
TO BE ABANDONED IN ACCORDANCE WITH VDH REQUIREMENTS.
7. PROVIDE AN ANALYSIS OF THE UPSTREAM SEWER SHED TO
ENSURE THE PROPOSED SEWER HAS ADEQUATE CAPACITY.
8. PROVIDE JUSTIFICATION FOR UPSIZING THE SEWER ON
ASHBROOK PARKWAY TO 10".
9. A BENCH MARK COULD NOT BE LOCATED ON THE PLANS.
10. THERE IS A DOUBLE 48" CULVERT CROSSING ASHBROOK
PARKWAY SHOWN ON THE PLANS FOR CLOVERHILL ESTATES, COUNTY
PROJECT 97-0246 THAT IS NOT SHOWN ON SHEET C02.1.
11. SHEET C02.1 SHOULD SHOW THE EXISTING 12" WATER MAIN,
FUTURE WEST BOUND LANES OF ASHBROOK PARKWAY, AND LIMITS OF
THE JURISDICTIONAL WETLANDS.
12. CLAY DAMS PER DETAIL SEW-09 ARE REQUIRED ON SEWER
LINES ON EITHER SIDE OF THE WETLAND CROSSING.
13. WHY ARE ONLY ODD NUMBERS USED FOR NUMBERING THE
MANHOLES? THE NUMBERING SHOULD BE SEQUENTIAL.
14. THE ALIGNMENT OF THE SEWER MANHOLES IN THE FUTURE
MEDIAN OF ASHBROOK PARKWAY IS NOT DESIRABLE. THE SEWER
SHOULD BE PLACED 8 FT FROM THE NORTHERN RIGHT OF WAY LINE
AND OUTSIDE OF THE FUTURE PAVEMENT.
15. DOGHOUSE OR CUT-IN MANHOLES MUST BE AVOIDED WHEREVER
POSSIBLE. THE SANITARY SEWER SHOULD CONNECT TO EXISTING
MH-4 BY KOR-N-SEAL.
16. ON SHEET C04.0, THE VALVE TO BE USED FOR THE WATER
CONNECTION NEEDS TO BE CALLED OUT.
17. THE TEE AT THE MAIN ENTRANCE ON ASHLAKE PARKWAY SHOULD
BE A 12 X 12 TEE WITH TWO 12" GATE VALVES, ONE 20 FT OF
RESTRAINED PIPE, PLUG, AND FLUSHING HYDRANT.
18. ON THE WATER PROFILE FOR SHEET C04.1, LABEL THE
EXITING PROJECT NUMBER FOR THE WATERLINE CONNECTION
19. SHEET C04.1, 12" PVC IS NOT AN APPROVED MATERIAL FOR
WATERLINE; CHANGE IT TO DUCTILE IRON.
20. CORRECT THE WATER FITTINGS AND VALVES FOR THE
CONNECTION AT THE MAIN ENTRANCE ON C04.1.
21. THE WATER PROFILE ON C04.1 MUST SHOW 3.5 FT COVER.
THE GRADE LINE SHOULD ALSO BE LABELED AS TO THE LOCATION
I.E. CENTERLINE OF ROAD, OFFSET, PROPOSED VS EXISTING, ETC
22. WILL THE WATERLINE CROSSING OF ASHLAKE PARKWAY BE OPE
CUT? IF SO, SHOW THE EXTENT OF PAVEMENT REPAIR AND A
DETAIL.
23. THIS DEVELOPMENT IS EFFECTIVELY A RESIDENTIAL
DEVELOPMENT WITH MORE THAN 25 UNITS. A SECOND WATER FEED
IS REQUIRED WHERE PRACTICAL. IN ORDER TO PROVIDE A TRUE
REDUNDANT FEED, A CONNECTION SHOULD BE MADE TO THE 12"
WATER LINE ON ASHBROOK PARKWAY WITH A CUT-IN TEE, THEN THE
WATER LINE SHOULD FOLLOW THE SEWER LINE WITH 10 FT
SEPARATION TO THE CUL-DE-SAC ON ROAD A.
24. THE SIZE OF THE BORE AND RECEIVING PITS FOR THE SEWER
SHOULD BE SHOWN. THE STANDARD SIZE IS 20' X 40' FOR THE
BORE PIT AND 20' X 20' FOR THE RECEIVING PIT.
25. THE MANHOLES SHOULD BE SET AT LEAST 25 FT AWAY FROM
THE EDGE OF THE EDGE OF THE CASING PIPE SO THAT IT IS
POSSIBLE TO REMOVE AN ENTIRE JOINT OF PIPE AFTER IT IS
PULLED OUT.
26. PLEASE NOTE THAT A SEPARATE WATER METER SIZING FORM
MUST BE SUBMITTED FOR EACH INDIVIDUAL BUILDING. BUILDING
14 HAS ONLY 2 UNITS SO IS NOT TYPICAL. IN REVIEW OF THE
CLUBHOUSE FORM, WILL THERE BE ANY HOSE BIBS WITH WHICH TO
FILL THE POOL? THE CONNECTION FEE WILL BE CALCULATED FOR
CONDOMINIUMS, WHICH MAY BE HIGHER THAN THE FEE FOR A SINGL
1" METER. PLEASE REFER TO WWW.CHESTERFIELD.GOV/UTILITIES
FOR INFORMATION ON THE CURRENT CONNECTION FEE RATES.
27. IT APPEARS THAT THE FIR-1B DETAIL MAY BE INTENDED FOR
THE WATER SERVICE TO EACH BUILDING. IF SO, PLEASE CLARIFY
THAT ON THE LEGEND AND ALSO SPECIFY THE SIZE OF THE TAP,
WHICH IS NOT NECESSARILY THE SAME SIZE AS THE METER. IN
ADDITION, THE WAY IT IS DRAWN ON THE PLANS IS MORE LIKE TH
FIR-1B SHEET 2 OF 5 WITH A SINGLE LINE THROUGH A METER
FOLLOWED BY DOUBLE CHECK. PLEASE VERIFY WHICH DETAIL IS
INTENDED AND ADJUST THE PLANS AS NECESSARY TO REFLECT THE
ACTUAL DESIGN.
28. BE ADVISED THAT IF IRRIGATION IS DESIRED, A COMPANIO
METER CANNOT BE SET ON THIS TYPE OF COMMERCIAL WATER
SERVICE. A SEPARATE WATER METER WOULD BE REQUIRED FOR EAC
IRRIGATION METER WITH A SEPARATE METER SIZING FORM AND
CONNECTION FEE PAID. IF IRRIGATION METERS ARE DESIRED, WE
RECOMMEND THAT THEY BE SHOWN ON THE SITE PLAN NOW TO AVOID
COSTLY RESTORATION DURING THE LATE STAGES OF CONSTRUCTION.
29. PROVIDE CALCULATIONS FOR THE BACKWASH RATE FOR THE
FILTER IN THE POOL TO ENSURE THAT THE RECEIVING SANITARY
SEWER HAS ADEQUATE CAPACITY.
30. THE WATER SERVICE TO THE CLUBHOUSE MUST HAVE A PRIVAT
REDUCED PRESSURE BACKFLOW PREVENTER SHOWN ON THE PLANS.
31. LABEL THE ROAD AS "PROPOSED ROAD A" ON SHEET C05.1.
32. THE TEE AT THE MAIN ENTRANCE AND ROAD A SHOULD BE AN
8" X 8" TEE WITH A 12" X 8" REDUCER.
33. FOR THE WATER LINE AT THE CUL-DE-SAC ON ROAD B,
INSTEAD OF A PLUG, THE FIRE HYDRANT COULD BE SET AT THE EN
OF THE LINE WITH A 90 DEGREE BEND TO ALLOW THE WHOLE LINE
TO BE FLUSHED.
34. EXTEND THE SEWER ON ROAD B TO OUTSIDE OF THE PAVEMENT
ENSURE THE SEWER IS 6 FT DEEP AT THAT LOCATION. PROVIDE A
16 FT SANITARY SEWER EASEMENT AND 20 FT CONSTRUCTION
EASEMENT OUTSIDE OF THE 20 FT BUFFER TO CONNECT TO THE
PARCEL TO THE SOUTH.
35. PROVIDE A NODE MAP AND TABLE FOR THE WATER MODEL
RESULTS SIMILAR TO DETAIL DES-4.
36. ON THE PROFILE SHEETS, LABEL THE CLEARANCE BETWEEN
EACH WATER AND STORM/SANITARY SEWER CROSSING.
37. FOR THE WATER LINE PROFILE FROM APPROXIMATELY STA 9+50
TO 12+00 ON ROAD A, SHOW THE WATER LINE GOING UNDER
STRUCTURE 5 WITH VERTICAL BENDS AND COMING BACK TO 3.5 FT
COVER AS QUICKLY AS POSSIBLE. THE WATERLINE SHOULD BE ABL
TO GO OVER STRUCTURE 3. THE EXTENT OF RESTRAINED JOINTS
FOR THE VERTICAL BENDS MUST BE CALCULATED AND SHOWN ON THE
PLANS IN TERMS OF FEET.
38. WE DO NOT NORMALLY SHOW SEWER LINES AS BEING SHADED.
WATER AND SEWER LINES THAT ARE DUCTILE IRON SHOULD BE SHOW
AS HATCHED.
39. THE 12" WATER LINE FOR THE MAIN ENTRANCE ROAD PROFILE
SHOULD BE CALLED OUT AS DUCTILE IRON. ALSO, CORRECT THE TE
TO BE A 12 X 12 TEE WITH 12 X 8 REDUCER.
40. THE VALVE FOR THE HYDRANT AT APPROXIMATELY STA 3+30 O
ROAD A CANNOT BE MORE THAN 6 FT DEEP. USE VERTICAL BENDS
AS NEEDED TO GO UNDER THE STORM DRAIN.
41. THE SANITARY PROFILE FOR STRUCTURE 1-11 DOES NOT SHOW
ANY OF THE STORM SEWER CROSSINGS (PROPOSED OR EXISTING).
42. THE 8" SEWER IN MUST MATCH CROWNS WITH THE 10" SEWER
OUT ON MH 5.
43. THE INVERTS FOR MH 1 ARE NOT LABELED CORRECTLY, THE
INVERT OUT IS HIGHER THAN THE INVERT IN.
44. SHOW THE CORRECT LENGTH (ADJUSTED PER PREVIOUS
COMMENT) AND LABEL THE SIZE OF THE CASING PIPE FOR THE
SANITARY SEWER BORE. CALL OUT THAT THIS PIPE MUST BE
RESTRAINED JOINT.
45. THE TERMINAL RUN OF SEWER FROM 19-21 19-23 MUST BE AT
LEAST 0.52% SLOPE PER COUNTY STANDARDS.
46. THE OWNER SHALL BE REQUIRED TO ENTER INTO A COUNTY
UTILITIES CONTRACT PRIOR TO THE START OF CONSTRUCTION.
PRIOR TO THE PREPARATION OF THE UTILITIES CONTRACT,
UTILITIES MUST BE IN RECEIPT OF THE "ACCEPTED" BID PROPOSA
BETWEEN THE DEVELOPER AND THE COUNTY APPROVED UTILITIES
CONTRACTOR AS WELL AS THE PROJECT'S INFORMATIONAL SHEET
FOUND ON THE "DEVELOPER'S CHECKLIST". PLEASE SEND THOSE TW
ITEMS TO THE ATTENTION OF MIKE LARSON
(LARSONM@CHESTERFIELD.GOV). THE BID PROPOSAL MUST BE BASED
ON THE APPROVED SITE PLAN. BE ADVISED THAT IF THE SITE PLA
IS REVISED AND REAPPROVED SUBSEQUENT TO THE PREPARATION OR
RECORDATION OF THE UTILITIES CONTRACT, THE BID PROPOSAL
SHALL BE REVISED ACCORDINGLY AND A REVISED UTILITIES
CONTRACT MAY BE NECESSARY.
47. AFTER FINAL SITE PLAN APPROVAL, SUBMIT THREE SETS OF
THE APPROVED PLANS DIRECTLY TO THE UTILITIES DEPARTMENT FO
OUR USE DURING CONSTRUCTION INSPECTION. THIS IS IN
ADDITION TO THE ONE APPROVED SET FROM PLANNING (4 TOTAL
SETS). ONE ADDITIONAL ROLLED SET WILL BE REQUESTED AFTER
THE PROJECT IS RELEASED TO CONSTRUCTION TO BE USED FOR AS-
BUILTS.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : MIKE LARSON, P.E./748-1338
NAME OF PLAN : THE VILLAS AT ASHLAKE
ADDRESS : 7501 ASHLAKE PARKWAY
SUBMISSION DATE : 5/25/16
PLAN DATED : 10/6/16
REVIEW DATE : 10/13/16
SITE PLAN NO. : 16PR0253
COMMENTS : 2ND REVIEW-NOT APPROVED
TABLE REVIEW : NO
PLAT PROCESS :
1. THERE IS A REVISION DATE OF 8/5/16 SHOWN ON THE PLANS;
HOWEVER, WE HAVE NO RECORD OF A PLAN SUBMISSION THAT DATE.
PLEASE EXPLAIN.
2. FOR NOTE 4 UNDER THE STANDARD DES-2 DESIGN NOTES, THE
ELEVATION BELOW WHICH INDIVIDUAL PRVS ARE REQUIRED IS 225.
THIS APPEARS TO APPLY TO EVERY BUILDING ON THE PLAN. PLEAS
NOTE THIS CONDITION ON THE PLANS.
3. MOST OF THE ITEMS LISTED AS "PRIVATE" ON THE MATERIALS
LIST ARE ACTUALLY PUBLIC. EVERYTHING WITHIN THE EASEMENT
OR RIGHT OF WAY UP TO AND INCLUDING THE METER IS PUBLIC.
ADDITIONALLY, THERE ARE A NUMBER OF ERRORS SUCH AS 5/8"
METERS, 12" PVC WATERLINE, ETC. PLEASE REVIEW AND UPDATE.
4. ON SHEET C02.0, SHOW THE STREET NAMES.
5. SHEET C02.0 SHOWS TEXT FOR THE SEWER CONNECTION ON
ASHBROOK DR THAT IS PROBABLY A LAYER LEFT ON.
6. THE EXISTING WATER LINES ON ASHBROOK PARKWAY AND ASHLA
PARKWAY ARE 12" PVC BECAUSE THEY WERE INSTALLED BEFORE THE
STANDARD CHANGED. PLEASE UPDATE THE APPLICABLE
PLAN AND PROFILE SHEETS. NEW 12" WATER LINE MUST BE D.I.
7. SHOW THE MANHOLE ANGLES FOR STRUCTURES EX MH-4 TO MH-4
8. NOTE ON THE PLANS THAT THE INVERT FOR EXISTING MH 4 IS
FIELD LOCATED.
9. CALL OUT THE VALVE ON SHEET C0.40 TO BE OPERATED FOR T
WATER TIE-IN.
10. THE OPEN CUT CROSSING OF ASHLAKE PARKWAY REFERS TO A
DETAIL ON SHEET C06.5. THIS SHEET DOES NOT HAVE A DETAIL
FOR THE RESTORATION OF PAVEMENT WITH AN OPEN CUT CROSSING.
12. LABEL THE MAIN ENTRANCE AS "ASHLAKE VILLAS DR" ON SHE
C04.0
13. THE EASEMENT ON SHEET C0.50 SHOULD BE LABELED AS A 30
FT "WATER AND SEWER" EASEMENT.
14. THE CONNECTION TO THE EXISTING WATER LINE ON ASHBROOK
PARKWAY CAN EASILY BE ISOLATED WITHOUT DISRUPTING SERVICE
EXISTING CUSTOMERS, THEREFORE SHOULD BE A CUT-IN TEE WITH
TWO VALVES RATHER THAN A TAPPING SLEEVE AND VALVE AS
SHOWN.
15. FOR SITUATIONS LIKE THIS WHERE THERE IS A 3 FT STRIP
BETWEEN THE CURB AND SIDEWALK, OUR OPERATIONS DEPARTMENT
PREFERS THAT THE FIRE HYDRANTS BE SET 3 FT BEHIND THE
SIDEWALK WITHIN A 10' X 10' PERMANENT EASEMENT IN ORDER TO
FACILITATE MAINTENANCE. PLEASE RELOCATE THE FIRE HYDRANTS
AND ALSO MOVE THEM CLOSER TO A BUILDING CORNER AND AWAY FR
THE PATIOS IF POSSIBLE. COORDINATE WITH THE LANDSCAPE PLA
SO THAT TREES ARE NOT LOCATED WITHIN THE EASEMENT.
16. AS PREVIOUSLY REQUESTED, PROVIDE CALCULATIONS TO SHOW
THAT THE SANITARY SEWER HAS SUFFICIENT CAPACITY TO
ACCOMMODATE THE BACKWASH FROM THE POOL FILTER.
17. A SEPARATE METER SIZING FORM MUST BE PROVIDED FOR EAC
INDIVIDUAL BUILDING, PLUS THE 1" IRRIGATION METER (23 TOTA
FORMS). THESE DO NOT NEED TO BE INCLUDED ON THE PLAN SET;
IT IS PREFERRED THAT A PDF FILE BE EMAILED DIRECTLY TO MIK
LARSON AT LARSONM@CHESTERFIELD.GOV.
18. FOR THE EASEMENT ON SHEET C05.3, THE INTENT WAS TO AS
FOR A 16 FT PERMANENT EASEMENT WITH A 10 FT CONSTRUCTION
EASEMENT ON EACH SIDE. THE CONSTRUCTION EASEMENT DOES NOT
HAVE TO EXTEND PAST MH 13.
19. PLEASE PROVIDE AN 8" STUB WITH PLUG AT 0.4% FROM MH
UNDER STORM PIPE 87 TO FACILITATE FUTURE EXTENSION.
20. THE PROFILE LABELED "PROPOSED ROAD A" SHOULD BE LABEL
"ASHLAKE COMMONS".
21. THE PROFILE LABELED "MAIN ENTRANCE ROAD" SHOULD BE
LABELED "ASHLAKE VILLAS DR.
22. WHEN A SUITABLE NAME IS DECIDED FOR "ROAD B", MAKE
SURE TO UPDATE THE LABEL FOR THE PROFILE
23. SHOW 12 INCHES OF STONE ABOVE THE SEWER FOR THE
SECTIONS BETWEEN MH 8 AND 9 WHERE COVER EXCEEDS 14 FT.
24. A PROFILE FOR MH-10 TO MH-11 COULD NOT BE LOCATED ON
THE PLANS.
25. SHOW 3.5 FT MINIMUM COVER FOR THE WATERLINE PROFILE O
MH-B.
26. ON SHEET C07.3, THE FOLLOWING CORRECTION ARE NEEDED
FOR THE SANITARY PROFILE:
A. THE PROFILE SHOULD BE LABELED FROM STRUCTURE 1-6
(NOT 1-11)
B. HALF OF THE EXISTING GRADE IS NOT SHOWN
C. THE STORM CULVERTS ARE NOT LABELED
D. CLEARANCE IS NOT SHOWN BETWEEN THE STORM ANDARY A
SANITARY AS WELL AS THE STORM AND WATER.
E. IT APPEARS THE CLEARANCE UNDER THE STORM PIPE A
APPROXIMATELY STATION 4+40 BETWEEN MH 2 AND MH 3 IS
LESS THAN 1.5 FT.
F. THE DUCTILE IRON SEWER PIPE ON THE PROFILE SHOULD
BE SHOWN AS HATCHED, NOT SHADED (SHADING DOESN'T SCA
WELL).
G. THE SECTION OF PIPE FROM MH 5 TO MH 6 IS PVC AND
SHOULD NOT BE HATCHED OR SHADED.
H. THE CASING PIPE IS NOT RESTRAINED JOINT, IT IS
WELDED STEEL. THE CARRIER PIPE INSIDE THE CASING
PIPE IS RESTRAINED JOINT.
I. THE LENGTH OF THE CASING PIPE SHOULD BE CALLED OU
ON THE PROFILE AS WELL AS THE MATERIALS LIST.
J. THE MATERIAL IS NOT CALLED OUT FOR THE WATER LINE
K. THE PROJECT NUMBER AND EXISTING MATERIAL FOR THE
WATER LINE AND SEWER LINE WHERE THE CONNECTION IS
BEING MADE IS NOT SHOWN.
L. THE EXISTING INVERTS IN AND OUT FOR MH EX-4 ARE
NOT SHOWN.
M. THE SYMBOL FOR THE EXISTING MANHOLE SHOULD BE A
DASHED LINE, NOT A GRAY SHADED LINE AS SHOWN. GRAY
SHADED LINES DO NOT SCAN WELL.
27. ON SHEET C07.4, THE SANITARY PROFILE SHOULD BE LABELE
FROM 12-13. IT IS NOT NECESSARY TO SHOW THE SECTION FROM
10-12 AS IT IS SHOWN ON ANOTHER SHEET. THE STORM SEWER
LABELED "#XX-#XX" SHOULD ALSO BE CORRECTED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : MIKE LARSON, P.E./748-1338
NAME OF PLAN : THE VILLAS AT ASHLAKE
ADDRESS : 7501 ASHLAKE PARKWAY
SUBMISSION DATE : 1/3/17
PLAN DATED : 12/28/16
REVIEW DATE : 1/5/17
SITE PLAN NO. : 16PR0253
COMMENTS : 3RD REVIEW-NOT APPROVED
TABLE REVIEW : YES
PLAT PROCESS :
1. THE ENGINEER'S ADDRESS ON EACH TITLE BLOCK IS
OBSCURED, THERE MAY BE PRINT DRIVER ERROR.
2. LABEL MANHOLE 1 AS A DOGHOUSE MANHOLE ON BOTH THE PLAN
AND PROFILE. THIS SHOULD ALSO BE INCLUDED ON THE MATERIAL
LIST.
3. THE CASING PIPE IS SOLD IN INCREMENTS OF 10 FT AND
THEREFORE 40 FT SHOULD BE SPECIFIED INSTEAD OF 38 FT.
4. ON SHEET C04.0, THE INTERSECTION OF BROADREACH DRIVE
THAT IS CALLED OUT FOR THE VALVE OPERATED ON THE TIE IN
DOES NOT HAVE A 12" MAIN LINE VALVE, IT IS A 6" VALVE. TH
OTHER VALVE TO BE OPERATED IS LOCATED AT APPROXIMATELY
STATION 0+80 ON ASHLAKE PARKWAY.
5. AFTER FURTHER REVIEW OF THE CUT-IN TEE ON ASHBROOK
PARKWAY, THE TWO 12" VALVES MAY BE DELETED. THE CUT IN
WILL NEED TO BE ACCOMPLISHED BY PROVIDING 2 SHORT PIECES O
12" D.I. AND APPROVED COUPLINGS.
6. WE HAVE OBSERVED THE STORM SEWER ON ASHLAKE COMMONS HA
BEEN LOWERED. THIS HAS RESULTED IN SEVERAL APPARENT
SANITARY LATERAL VERTICAL CONFLICTS. PLEASE CALCULATE THE
INVERT OF EACH LATERAL, SHOW THE CLEARANCE ON THE PROFILE
AND ADJUST THE ELEVATION AS NECESSARY TO ACHIEVE 18 INCHES
VERTICAL CLEARANCE.
7. THERE IS ALSO A VERTICAL CONFLICT WITH THE WATER LINE
AT APPROXIMATELY STATION 10+50 ON ASHLAKE COMMONS. RESOLV
THIS CONFLICT BY ADDING VERTICAL BENDS TO BRING THE WATER
MAIN BACK UP TO 3.5 FT COVER.
8. WE HAVE OBSERVED THAT THE STORM SEWER PIPES ON ASHBROO
PARKWAY DO NOT MATCH THE LOCATION AND INVERT SHOWN ON THE
AS-BUILT PLANS (EMAILED TO AARON BREED 1/5/17). WE SUSPEC
THE ACTUAL LOCATION MAY ELIMINATE SOME OF THE CONFLICTS.
PLEASE VERIFY AND CORRECT
9. THE PROFILE ON SHEET C07.4 NEEDS THE FOLLOWING
CORRECTIONS:
A. LABEL SHOULD BE FROM MH 1 TO MH 6, NOT STRUCTURE 6 TO
B. STRUCTURE E4.
B. CENTER THE CASING PIPE ON THE CARRIER PIPE.
C. LABEL THE CASING PIPE AS 40 FT 20" STEEL
D. SHOW AND LABEL THE 8" VALVE ON THE WATER LINE.
E. LABEL MH 1 AS A DOGHOUSE MANHOLE
F. LABEL THE EXISTING SANITARY SEWER WITH SIZE,
MATERIAL, AND COUNTY PROJECT NUMBER.
G. CORRECT THE INVERTS OF THE STORM SEWER PIPE CROSSI
S AS APPLICABLE.
H. CLARIFY THAT THE CROSSING OF STORM PIPES 80 AND 14
ARE AS SHOWN UNDER THE SANITARY SEWER. DUE TO THE ANGLE
THE DISTANCE BETWEEN THOSE PIPES UNDER THE WATER LINE IS
ONLY ABOUT 20 FT. PERHAPS SHOW THE STORM PIPES UNDER TH
WA NE USING A DIFFERENT LINETYPE.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : MIKE LARSON, P.E./748-1338
NAME OF PLAN : THE VILLAS AT ASHLAKE
ADDRESS : 7501 ASHLAKE PARKWAY
SUBMISSION DATE : 2/28/17
PLAN DATED : 2/27/17
REVIEW DATE : 3/3/17
SITE PLAN NO. : 16PR0253
COMMENTS : 4TH REVIEW- APPROVED
TABLE REVIEW : YES
PLAT PROCESS :
PLEASE SUBMIT 3 SETS OF PLANS TO THE UTILITIES DEPT FOR US
DURING CONSTRUCTION ONCE ALL OTHER APPROVALS HAVE BEEN
OBTAINED.
.
AS A REMINDER, THE ON SITE EASEMENTS MUST BE SIGNED PRIOR
THIS PROJECT BEING RELEASED TO CONSTRUCTION.
.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: VILLAS AT ASHLAKE
SITE PLAN NUMBER: 16PR0253
LATEST PLAN DATE: 05/24/16
DEPT. REC'D. DATE: 05/31/16
SUBMITTAL NUMBER: ONE
REVIEW DATE: 06/15/16
RECOMMENDATION: NOT APPROVED
PLAT PROCESSING: R/W DEDICATION
1. PRIOR TO ANY SITE PLAN APPROVAL, DEDICATE THE
NORTH/SOUTH MAJOR ARTERIAL ("ASHLAKE PARKWAY EXTENDED") IN
ACCORDANCE WITH PROFFERED CONDITION 17 OF CASE 16SN0558.
2. PRIOR TO ANY SITE PLAN APPROVAL, DEDICATE 30' FROM CENT
CENTERLINE ALONG BETHIA ROAD, A LOCAL ROAD.
3. NOTE ON PLANS ROAD A AND ROAD B WILL BE PUBLIC ROADS.
IN ACCORDANCE WITH PROFFERED CONDITION 5 OF SAME CASE, THE
SHALL BE DESIGNED AND CONSTRUCTED TO VDOT STANDARDS AND
TAKEN INTO THE STATE SYSTEM. COORDINATE WITH ENVIRONMENTA
ENGINEERING ON APPROPRIATE PERFORMANCE BONDS FOR ROADS TO
ENSURE STATE ACCEPTANCE.
4. CLARIFY THE DESIGN AND CONSTRUCTION OF THE ASHLAKE
PARKWAY EXTENDED. ON THE OVERALL PLAN (C3.0) AND PLAN
SHEET (C5.2) IT SHOWS WHAT APPEARS TO BE A PRIVATE DRIVEWA
IN THE DEDICATED MAJOR ARTERIAL RIGHT-OF-WAY. ON SHEET
C4.0 IT SHOWS FULL 2-LANE CONSTRUCITON OF THE ASHLAKE
EXTENSION.
5. CONSTRUCTION OF ROAD IMPROVEMENTS IN ACCORDANCE WITH
PROFFERED CONDITION 18 ARE SHOWN ON THIS PLAN WITH NO
PHASING. IS IT THE DEVELOPER'S PLAN TO BUILD ALL ROAD
IMPROVEMENTS PRIOR TO ISSUANCE OF ANY CERTIFICATE OF
OCCUPANCY?
PROFFERED CONDITION 19 PROVIDED FOR PHASING OF ROAD
IMPROVEMENTS. IF DEVELOPER PLANS TO PHASE IMPROVEMENTS PE
CONDITION, THEN THIS NEEDS TO BE ADDRESSED ON PLAN SHEETS
IN ORDER TO ENSURE IT IS CLEAR TO THE DEVELOPER AND COUNTY
PERSONNEL DURING CONSTRUCTION.
6. EITHER LOCATE THE 12" WATERLINE OUTSIDE OF THE ASHLAKE
PARKWAY EXTENDED RIGHT-OF-WAY OR PROVIDE SUPPORTING
DOCUMENTATION FROM ENGINEER AND UTILITIES THAT WATERLINE
WILL NOT HAVE TO BE RELOCATED WITH FUTURE WIDENING OF
ASHLAKE PARKWAY EXTENDED, A MAJOR ARTERIAL.
IF WATERLINE IS TO REMAIN IN PROPOSED LOCATION, PROVIDE AN
ULTIMATE TYPICAL SECTION SHOWING WHERE THIS LINE WILL BE
LOCATED AND PROVIDE DEPTHS THAT WILL ENSURE IT MAY REMAIN.
7. PROVIDE A PRELIMINARY PAVEMENT DESIGN FOR ASHLAKE PKY
EXTENDED AND THE LOCAL ROADS. TYPICALLY, A 3-LAYER
PAVEMENT SECTION IS REQUIRED. A 2-LAYER SYSTEM IS SHOWN
FOR THE LOCAL ROADS AND NO SECTION IS SHOWN FOR ASHLAKE PK
EXTENDED. ASHLAKE PKY EXTENDED NEEDS TO BE DESIGNED TO
ACCOMMODATE A MINIMUM 4,000 ADT.
8. NOTE COUNTY ROAD CLASSIFICATIONS ON PLAN SHEETS.
ASHLAKE PARKWAY AND ASHBROOK PARKWAY ARE MAJOR ARTERIALS
AND ALL OTHER ARE LOCAL ROADS.
==========================================================
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: VILLAS AT ASHLAKE
SITE PLAN NUMBER: 16PR0253
LATEST PLAN DATE: 10/06/16
DEPT. REC'D. DATE: 10/07/16
SUBMITTAL NUMBER: TWO
REVIEW DATE: 10/28/16
RECOMMENDATION: NOT APPROVED
PLAT PROCESSING: R/W DEDICATION
1. PRIOR TO ANY SITE PLAN APPROVAL, DEDICATE THE
NORTH/SOUTH MAJOR ARTERIAL ("ASHLAKE PARKWAY EXTENDED") IN
ACCORDANCE WITH PROFFERED CONDITION 17 OF CASE 16SN0558.
2. PRIOR TO ANY SITE PLAN APPROVAL, DEDICATE 30' FROM
CENTERLINE ALONG BETHIA ROAD, A LOCAL ROAD.
3. SHOW PHASING OF ROAD IMPROVEMENTS ON PLAN VIEW SO IT IS
UNDERSTOOD HOW PROJECT WILL BE BUILT IN ACCORDANCE WITH
PROFFERED CONDITON 19.
PROFFERED CONDITION 19 SHALL BE RESTATED IN APPROVAL LETTE
TO ENSURE PROPER ENFORCEMENT AT ISSUANCE OF OCCUPANCY AND
BUILDING PERMITS.
4. BUILDING 18, PUBLIC STUB ROAD SHALL BE BUILT AND
ACCEPTED INTO STATE SYSTEM. CDOT WILL NOT SUPPORT THE
DEDICATION OF UNIMPROVED RIGHT-OF-WAY AND PLACING A PRIVAT
DRIVEWAY IN THE AREA.
5. SHOW THAT LOCATING THE 12" WATERLINE WITHIN THE ASHLAKE
PKY RIGHT-OF-WAY WILL NOT NEED TO BE RELOCATED WITH FUTURE
WIDENING OF ROAD TO 4-LANE DIVIDED.
IF WATERLINE IS TO REMAIN IN PROPOSED LOCATION, PROVIDE AN
ULTIMATE TYPICAL SECTION SHOWING WHERE THIS LINE WILL BE
LOCATED AND PROVIDE DEPTHS THAT WILL ENSURE IT MAY REMAIN.
==========================================================
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
NAME OF PLAN: VILLAS AT ASHLAKE
SITE PLAN NUMBER: 16PR0253
LATEST PLAN DATE: 12/28/16
DEPT. REC'D. DATE: 01/04/17
SUBMITTAL NUMBER: THREE
REVIEW DATE: 01/27/17
RECOMMENDATION: APPROVED
.
SHEET C3.0, UNDER PHASING PLAN FOR ROAD IMPROVEMENTS,
ADD THE FOLLOWING TO CORRESPONDING NOTES:
.
NOTE A, AT THE END: (ROAD IMPROVEMENT IDENTIFIED AS ASHLAK
PARKWAY PHASE I ROAD IMPROVEMENTS ON PLANS.)
.
NOTE B, AT THE END, ADD: (ROAD IMPROVEMENT IDENTIFIED AS
ASHLAKE PARKWAY PHASE III ROAD IMPROVEMENTS ON PLANS.)
.
PROFFERED CONDITION 19 SHALL BE RESTATED IN APPROVAL LETTE
TO ENSURE PROPER ENFORCEMENT AT ISSUANCE OF OCCUPANCY AND
BUILDING PERMITS.
==========================================================
==========================================================
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
NAME OF PLAN: VILLAS AT ASHLAKE
SITE PLAN NUMBER: 16PR0253
LATEST PLAN DATE: 02/27/17
DEPT. REC'D. DATE: 03/02/17
SUBMITTAL NUMBER: FOUR
REVIEW DATE: 03/09/17
RECOMMENDATION: APPROVED
.
STEVE PRUSIK (PLANNING MANAGER), PLEASE RESTATE PROFFERED
CONDITION 19 IN THE APPROVAL LETTER TO ENSURE PROPER
ENFORCEMENT AT BUILDING PERMIT AND OCCUPANCY ISSUANCE.
==========================================================
==========================================================
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #: STEVE PRUSIK/ 751-4321
PLAN NAME: THE VILLAS AT ASHLAKE
PLAN NUMBER: 16PR0253
ORIGINAL PLAN DATE: 05/24/16
REVIEW DATE: 06/16/16
LATEST SUBMISSION DATE: 05/24/16
SUBMITTAL NUMBER: 1
STATUS: NOT APPROVED
1. PLEASE PLACE THE COUNTY SITE PLAN NUMBER (16PR0253)
ON THE LOWER RIGHT CORNER OF EACH SHEET.
2. ELEVATIONS/EXTERIOR FACADES. DEVELOPMENT OF THE
PROPERTY SHALL BE IN GENERAL CONFORMANCE WITH
THE ARCHITECTURAL APPEARANCE PER PROFFERED
CONDITIONS FROM THE MARCH 9, 2016 BOS HEARING.
ANY SUBSTANTIAL MODIFICATIONS SHALL BE APPROVED
BY THE PLANNING COMMISSION IN CONJUNCTION
WITH PLANS REVIEW.
A. ROOF MATERIALS SHALL BE 30 YEAR ARCHITECTURAL/
DIMENSIONAL ASPHALT COMPOSITION SHINGLE.
B. FACADES OF EACH BUILDING, IN THE AGGREGATE,
SHALL HAVE A MINIMUM OF SIXTY (60) PERCENT BRICK
OR STONE MASONRY, BUT IN NO EVENT SHALL A FAÇADE
HAVE LESS THAN TEN (10) PERCENT BRICK OR STONE
MASONRY. THE HEIGHT OF THE BRICK AND STONE SHALL
BE PERMITTED TO VARY TO ALLOW FOR A MIXTURE OF
DESIGN FEATURES. MEASUREMENT OF THE REQUIREMENT FOR
MASONRY FAÇADE TREATMENT SHALL BE EXCLUSIVE OF
FACADES WITHIN COURTYARDS SCREENED WITH A MINIMUM
SIX (6) FOOT VINYL FENCE, AS WELL AS WINDOWS, GABLE
VENTS, DORMERS, DOORS, TRIM, SOFFIT, FASCIA, BALCONIES
AND PORCHES.
ADDITIONAL SIDING REQUIREMENTS:
I. A VARIETY OF FACING MATERIALS SHALL BE USED
ON ANY ONE FAÇADE OF ANY BUILDING. A MINIMUM
OF TWO (2) FACING MATERIALS SHALL BE USED ON ANY
ONE FAÇADE OF ANY UNIT.
II. BUILDINGS WITH THE SAME COLOR PALETTE,
PERCENTAGES OF SIDING MATERIALS, AND LANDSCAPING
SHALL NOT BE PERMITTED SIDE-BYSIDE TO CREATE
DIVERSITY AND INTEREST ALONG THE STREETSCAPES.
3. PER SEC. 19.1-317 (A) AND (B), PROVIDE 2 COPIES OF
RENDERINGS/ELEVATIONS OF THE BUILDINGS WITH ALL
BUILDING MATERIALS AND COLORS IDENTIFIED.
4. SIDEWALKS SHALL BE PROVIDED ON BOTH SIDES OF
THE INTERIOR STREET RIGHTS OF WAY. THE TREATMENT
AND LOCATION OF THESE SIDEWALKS SHALL BE
APPROVED BY THE PLANNING DEPARTMENT AT THE TIME
OF SITE PLAN REVIEW.
5. MAKE SURE ALL SETBACKS FROM PUBLIC ROADS ARE
MEASURED FROM THE ULTIMATE RIGHT OF WAY. LABEL
THE EXISTING RIGHT OF WAY AND THE ULTIMATE RIGHT
OF WAY ON ALL PUBLIC ROADS ON THE SITE PLAN, EVEN
IF THE ULTIMATE AND EXISTING RIGHT OF WAY IS THE SAME.
6. PLEASE LABEL THE TYPE OF LANDSCAPING REQUIRED
(TYPE C) FOR EACH PEIMETER BUFFER ON THE LAYOUT AND
LANDSCAPE PLANS.
7. PER SEC. 19.1-246, AT LEAST A CONCEPTUAL LANDSCAPING
PLAN SHALL BE APPROVED PRIOR TO RELEASE OF FINAL SITE
PLAN APPROVAL. WHETHER THE PLAN SUBMITTED IS A
CONCEPTUAL OR DETAILED LANDSCAPE PLAN, THE PLAN
SHALL MEET ALL REQUIREMENTS OF SEC. 19.1-246.
8. PROVIDE STANDARD COUNTY LANDSCAPE NOTES ON THE
DETAILED LANDSCAPE PLAN.
9. SUPPLEMENTAL LANDSCAPING SHALL BE PROVIDED
AROUND THE PERIMETER OF ALL BUILDINGS, BETWEEN
BUILDINGS AND DRIVEWAYS, WITHIN MEDIANS, AND
WITHIN COMMON AREAS. SUCH LANDSCAPING SHALL
BE DESIGNED TO: MINIMIZE THE PREDOMINANCE OF
BUILDING MASS AND PAVED AREAS; DEFINE PRIVATE
SPACES; AND ENHANCE THE RESIDENTIAL CHARACTER
OF THE DEVELOPMENT. THE PLANNING DEPARTMENT,
AT THE TIME OF SITE PLAN REVIEW, SHALL APPROVE
THE LANDSCAPING PLAN WITH RESPECT TO THE EXACT
NUMBERS, SPACING, ARRANGEMENT AND SPECIES OF
PLANTINGS.
10. EACH REVIEW OF DETAILED LANDSCAPE PLANS AFTER
APPROVAL OF THE SITE PLAN INCURS A RESUBMITTAL FEE
AND IS TRACKED AS A SITE PLAN REVIEW UNTIL APPROVED.
APPROVAL MUST BE OBTAINED PRIOR TO TEMPORARY
OCCUPANCY OF THE BUILDING.
11. PER SEC. 19.1-246, THE LANDSCAPE PLAN SHALL IDENTIFY
THE STATE REGISTERED LANDSCAPE ARCHITECT,
NURSERYMAN, OR LANDSCAPE DESIGNER PREPARING
THE PLAN.
12. PER SEC. 19.1-205, SHOW ON THE LANDSCAPE PLAN OR
ADDITIONALLY ON A SEPARATE LIGHTING PLAN THE LOCATION
OF ALL EXTERIOR SITE LIGHTING MOUNTED ON POLES,
BUILDINGS, OR ON THE GROUND AND HAVE THEM KEYED
TO CUT SHEETS FOR EACH LIGHT FIXTURE SHOWN ON THE PLAN.
13. A DECORATIVE "WROUGHT IRON-STYLE" FENCE SHALL BE
PROVIDED ALONG THE ASHLAKE PARKWAY AND ASHBROOK
PARKWAY FRONTAGES OF THE PROPERTY. A SIX (6) FOOT HIGH
BOARD OR SOLID VINYL PRIVACY FENCE SHALL BE PROVIDED
AND MAINTAINED ALONG THE PROPERTY LINES ADJACENT TO
CLOVERHILL ESTATES SUBDIVISION FROM ASHBROOK
PARKWAY TO THE SOUTHWEST CORNER OF TAX ID
721- 668-1879. PLEASE SHOW FENCING ON PLAN.
14. THE FIRST SUBMITTAL SHALL INCLUDE A PLAN DATE
(MONTH, DAY & YEAR), AND EACH REVISED SET OF PLANS
SHALL SHOW A REVISION DATE.
1. PLEASE PLACE THE COUNTY SITE PLAN NUMBER (16PR0253)
ON THE LOWER RIGHT CORNER OF EACH SHEET.
1) ANY CHANGE IN THE CURRENT PLAN, WHETHER IT STEMS
FROM DEPARTMENT COMMENTS OR AN ENGINEERING CHANGE
REQUESTED BY THE APPLICANT, MAY GENERATE ADDITIONAL
COMMENTS FROM THE REVIEWING DEPARTMENTS, RESULTING IN
REQUIRED REVISIONS.
**********************************************************
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #: STEVE PRUSIK/ 751-4321
PLAN NAME: THE VILLAS AT ASHLAKE
PLAN NUMBER: 16PR0253
ORIGINAL PLAN DATE: 05/24/16
REVIEW DATE: 06/16/16
LATEST SUBMISSION DATE: 05/24/16
SUBMITTAL NUMBER: 1
STATUS: NOT APPROVED
ARCHITECTURAL ELEVATIONS: NOT YET SUBMITTED
LANDSCAPE PLAN: NOT YET SUBMITTED
LIGHTING PLAN: NOT YET SUBMITTED
1. PLEASE PLACE THE COUNTY SITE PLAN NUMBER (16PR0253)
ON THE LOWER RIGHT CORNER OF EACH SHEET.
2. ELEVATIONS/EXTERIOR FACADES. DEVELOPMENT OF THE
PROPERTY SHALL BE IN GENERAL CONFORMANCE WITH
THE ARCHITECTURAL APPEARANCE PER PROFFERED
CONDITIONS FROM THE MARCH 9, 2016 BOS HEARING.
ANY SUBSTANTIAL MODIFICATIONS SHALL BE APPROVED
BY THE PLANNING COMMISSION IN CONJUNCTION
WITH PLANS REVIEW.
A. ROOF MATERIALS SHALL BE 30 YEAR ARCHITECTURAL/
DIMENSIONAL ASPHALT COMPOSITION SHINGLE.
B. FACADES OF EACH BUILDING, IN THE AGGREGATE,
SHALL HAVE A MINIMUM OF SIXTY (60) PERCENT BRICK
OR STONE MASONRY, BUT IN NO EVENT SHALL A FAÇADE
HAVE LESS THAN TEN (10) PERCENT BRICK OR STONE
MASONRY. THE HEIGHT OF THE BRICK AND STONE SHALL
BE PERMITTED TO VARY TO ALLOW FOR A MIXTURE OF
DESIGN FEATURES. MEASUREMENT OF THE REQUIREMENT FOR
MASONRY FAÇADE TREATMENT SHALL BE EXCLUSIVE OF
FACADES WITHIN COURTYARDS SCREENED WITH A MINIMUM
SIX (6) FOOT VINYL FENCE, AS WELL AS WINDOWS, GABLE
VENTS, DORMERS, DOORS, TRIM, SOFFIT, FASCIA, BALCONIES
AND PORCHES.
ADDITIONAL SIDING REQUIREMENTS:
I. A VARIETY OF FACING MATERIALS SHALL BE USED
ON ANY ONE FAÇADE OF ANY BUILDING. A MINIMUM
OF TWO (2) FACING MATERIALS SHALL BE USED ON ANY
ONE FAÇADE OF ANY UNIT.
II. BUILDINGS WITH THE SAME COLOR PALETTE,
PERCENTAGES OF SIDING MATERIALS, AND LANDSCAPING
SHALL NOT BE PERMITTED SIDE-BYSIDE TO CREATE
DIVERSITY AND INTEREST ALONG THE STREETSCAPES.
3. PER SEC. 19.1-317 (A) AND (B), PROVIDE 2 COPIES OF
RENDERINGS/ELEVATIONS OF THE BUILDINGS WITH ALL
BUILDING MATERIALS AND COLORS IDENTIFIED.
4. MAKE SURE ALL SETBACKS FROM PUBLIC ROADS ARE
MEASURED FROM THE ULTIMATE RIGHT OF WAY. LABEL
THE EXISTING RIGHT OF WAY AND THE ULTIMATE RIGHT
OF WAY ON ALL PUBLIC ROADS ON THE SITE PLAN, EVEN
IF THE ULTIMATE AND EXISTING RIGHT OF WAY IS THE SAME.
5. PLEASE LABEL THE TYPE OF LANDSCAPING REQUIRED
(TYPE C) FOR EACH PEIMETER BUFFER ON THE LAYOUT AND
LANDSCAPE PLANS.
6. STREET TREES SHALL BE PLANTED ALONG BOTH SIDES OF
THE INTERIOR ROADS AND THE ENTRANCE ROAD FROM
ASHLAKE PARKWAY INTO THE DEVELOPMENT IN
ACCORDANCE WITH ZONING ORDINANCE REQUIREMENTS.
7. SUPPLEMENTAL LANDSCAPING SHALL BE PROVIDED
AROUND THE PERIMETER OF ALL BUILDINGS, BETWEEN
BUILDINGS AND DRIVEWAYS, WITHIN MEDIANS, AND
WITHIN COMMON AREAS. SUCH LANDSCAPING SHALL
BE DESIGNED TO: MINIMIZE THE PREDOMINANCE OF
BUILDING MASS AND PAVED AREAS; DEFINE PRIVATE
SPACES; AND ENHANCE THE RESIDENTIAL CHARACTER
OF THE DEVELOPMENT. THE PLANNING DEPARTMENT,
AT THE TIME OF SITE PLAN REVIEW, SHALL APPROVE
THE LANDSCAPING PLAN WITH RESPECT TO THE EXACT
NUMBERS, SPACING, ARRANGEMENT AND SPECIES OF
PLANTINGS.
8. EACH REVIEW OF DETAILED LANDSCAPE PLANS AFTER
APPROVAL OF THE SITE PLAN INCURS A RESUBMITTAL FEE
AND IS TRACKED AS A SITE PLAN REVIEW UNTIL APPROVED.
APPROVAL MUST BE OBTAINED PRIOR TO TEMPORARY
OCCUPANCY OF THE BUILDING.
9. PROVIDE STANDARD COUNTY LANDSCAPE NOTES ON THE
DETAILED LANDSCAPE PLAN.
10. PER SEC. 19.1-246, THE LANDSCAPE PLAN SHALL IDENTIFY
THE STATE REGISTERED LANDSCAPE ARCHITECT,
NURSERYMAN OR LANDSCAPE DESIGNER PREPARING THE PLAN.
11. STREET LIGHTS SHALL BE DECORATIVE AND RESIDENTIAL
IN CHARACTER WITH A NON-GLARE DESIGN. LIGHT POLES
SHALL HAVE A MAXIMUM HEIGHT OF FIFTEEN (15) FEET AND
SHALL BE LOCATED GENERALLY ALONG THE INTERIOR ROADS
AS APPROVED BY THE PLANNING DEPARTMENT DURING PLANS
REVIEW. PER SEC. 19.1-205, SHOW ON THE LANDSCAPE PLAN OR
ADDITIONALLY ON A SEPARATE LIGHTING PLAN THE LOCATION
OF ALL EXTERIOR SITE LIGHTING MOUNTED ON POLES,
BUILDINGS, OR ON THE GROUND AND HAVE THEM KEYED
TO CUT SHEETS FOR EACH LIGHT FIXTURE SHOWN ON THE PLAN.
12. A MINIMUM OF TWO (2) ACRES SHALL BE PROVIDED IN THE
CLUBHOUSE AREA, THE ENTRANCE AREA, POCKET PARKS AND
OTHER NATURAL AREAS. THE CLUBHOUSE SHALL SERVE AS A
FOCAL POINT. PART OF THESE AREAS SHALL BE "HARDSCAPED"
(CONCRETE, ASPHALT OR PAVERS) AND HAVE A COMBINATION
OF OTHER AMENITIES SUCH AS BENCHES, A PERGOLA, A GAZEBO
AND PAVERS THAT ACCOMMODATE AND FACILITATE
GATHERINGS. THE EXACT DESIGN AND LOCATION SHALL BE
APPROVED BY THE PLANNING DEPARTMENT AT THE TIME OF SITE
PLAN REVIEW. THE CLUBHOUSE SHALL HAVE A MINIMUM OF 2,500
SQUARE FEET OF GROSS FLOOR AREA AND SHALL INCLUDE A
POOL. THE CLUBHOUSE SHALL BE CONSTRUCTED DURING THE
FIRST PHASE OF DEVELOPMENT AND SHALL BE COMPLETED
BEFORE THE ISSUANCE OF THE TWENTIETH CERTIFICATE OF
OCCUPANCY IN THE DEVELOPMENT. THE UNDEVELOPED
SOUTHEASTERN PORTION OF THE PROPERTY WHICH ABUTS THE
SOUTHERN PROPERTY LINES OF LOTS 46 THROUGH 56 OF
CLOVERHILL ESTATES SUBDIVISION SHALL BE UTILIZED FOR
PASSIVE RECREATION AND/OR PEDESTRIAN TRAILS ONLY.
PLEASE PROVIDE PLANS AND DETAILS THAT ADDRESS ALL
REQUIREMENTS OF THIS CONDITION.
13. A DECORATIVE "WROUGHT IRON-STYLE" FENCE SHALL BE
PROVIDED ALONG THE ASHLAKE PARKWAY AND ASHBROOK
PARKWAY FRONTAGES OF THE PROPERTY. LABEL THE FENCING
ON THE PLAN AND PROVIDE A DETAIL.
14. A SIX (6) FOOT HIGH BOARD OR SOLID VINYL PRIVACY
FENCE SHALL BE PROVIDED AND MAINTAINED ADJACENT
TO CLOVERHILL ESTATES SUBDIVISION FROM ASHBROOK
PARKWAY TO THE SOUTHWEST CORNER OF TAX ID 721- 668-1879.
THE FENCE SHALL BE ERECTED AS HIGH AS POSSIBLE ON THE
TOP OF SLOPE AND AS FEASIBLE AS POSSIBLE TO MAINTAIN
PEDESTRIAN CIRCULATION AROUND EACH UNIT. LABEL THE
FENCING ON THE PLAN AND PROVIDE A DETAIL.
15. THE FIRST SUBMITTAL SHALL INCLUDE A PLAN DATE
(MONTH, DAY & YEAR), AND EACH REVISED SET OF PLANS
SHALL SHOW A REVISION DATE.
16. THE RETAINING WALLS ALONG THE PROPOSED MAIN ROAD
(BLDGS. 7-10, 17 AND 19-21) NEED TO BE RE-CONFIGURED. THE
PROPOSED WALLS AND GRADING SHOULD TIE INTO RAISED
FOUNDATIONS ALONG THE FACE OF THESE BUILDINGS
FRONTING THE ROAD. STREET TREES NEED TO BE PROVIDED
IN THE AREAS BETWEEN THE BUILDINGS AND SIDEWALKS AS
A CONDITION OF ZONING.
17. THERE ARE CONCERNS WITH GRADING IN THE VICINITY OF
BOTH BMP'S. THE GRADING CREATES POTENTIAL ACCIDENT
ZONES AND GUARDRAIL WILL NEED TO BE INSTALLED AS A
PREVENTATIVE MEASURE.
18. ALL DWELLING UNITS ON THE PROPERTY SHALL BE
CONDOMINIUMS AS DEFINED AND REGULATED BY THE
VIRGINIA CONDOMINIUM ACT, AND ALL COMMON AREAS
AND IMPROVEMENTS THEREIN SHALL BE MAINTAINED BY A
CONDOMINIUM ASSOCIATION.
19. DUE TO THE PROPOSED GRADING AND SLOPE, A
CONSTRUCTION EASEMENT MAY BE REQUIRED ON EACH
SIDE OF THE MAIN ROAD WHERE THE STUB TIES INTO THE
ADJACENT PROPERTY TO THE SOUTH.
NOTES:
1) ANY CHANGE IN THE CURRENT PLAN, WHETHER IT STEMS
FROM DEPARTMENT COMMENTS OR AN ENGINEERING CHANGE
REQUESTED BY THE APPLICANT, MAY GENERATE ADDITIONAL
COMMENTS FROM THE REVIEWING DEPARTMENTS, RESULTING IN
REQUIRED REVISIONS.
********************************************
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #: STEVE PRUSIK/ 751-4321
PLAN NAME: THE VILLAS AT ASHLAKE
PLAN NUMBER: 16PR0253
ORIGINAL PLAN DATE: 05/24/16
REVIEW DATE: 10/26/16
LATEST SUBMISSION DATE: 10/06/16
SUBMITTAL NUMBER: 2
STATUS: NOT APPROVED
TABLE REVIEW: NO
ARCHITECTURAL ELEVATIONS: NOT YET SUBMITTED
LANDSCAPE PLAN: PARTIALY SUBMITTED
LIGHTING PLAN: SUBMITTED
COMMENTS:
1. PER SEC. 19.1-317 (A) AND (B), PROVIDE 2 COPIES OF
RENDERINGS/ELEVATIONS OF THE BUILDINGS WITH ALL
BUILDING MATERIALS AND COLORS IDENTIFIED. BUILDING
ELEVATIONS SHALL BE APPROVED PRIOR TO FULL SITE
PLAN APPROVAL.
2. STREET TREES SHALL BE PLANTED ALONG THE
ENTRANCE ROAD FROM ASHLAKE PARKWAY INTO
THE DEVELOPMENT IN ACCORDANCE WITH ZONING
ORDINANCE REQUIREMENTS.
3. SUPPLEMENTAL LANDSCAPING SHALL BE PROVIDED
AROUND THE PERIMETER OF ALL BUILDINGS, BETWEEN
BUILDINGS AND DRIVEWAYS, WITHIN MEDIANS, AND
WITHIN COMMON AREAS. SUCH LANDSCAPING SHALL
BE DESIGNED TO: MINIMIZE THE PREDOMINANCE OF
BUILDING MASS AND PAVED AREAS; DEFINE PRIVATE
SPACES; AND ENHANCE THE RESIDENTIAL CHARACTER
OF THE DEVELOPMENT. THE PLANNING DEPARTMENT,
AT THE TIME OF SITE PLAN REVIEW, SHALL APPROVE
THE LANDSCAPING PLAN WITH RESPECT TO THE EXACT
NUMBERS, SPACING, ARRANGEMENT AND SPECIES OF
PLANTINGS.
4. PLEASE INDICATE WHAT TYPE OF PLANT MATERIAL IS
PROPOSED FOR THE BUFFERS, STREET TREES AND
SUPPLEMNTAL LANDSCAPING AND PROVIDE A DETAILED
PLANT LIST ON THE LANDSCAPE PLAN.
5. PROVIDE STANDARD COUNTY LANDSCAPE NOTES AND
DETAILS ON THE LANDSCAPE PLAN.
CONDITIONS:
1. ELEVATIONS/EXTERIOR FACADES. DEVELOPMENT OF THE
PROPERTY SHALL BE IN GENERAL CONFORMANCE WITH
THE ARCHITECTURAL APPEARANCE PER PROFFERED
CONDITIONS FROM THE MARCH 9, 2016 BOS HEARING.
ANY SUBSTANTIAL MODIFICATIONS SHALL BE APPROVED
BY THE PLANNING COMMISSION IN CONJUNCTION
WITH PLANS REVIEW.
2. ROOF MATERIALS SHALL BE 30 YEAR ARCHITECTURAL/
DIMENSIONAL ASPHALT COMPOSITION SHINGLE.
3. FACADES OF EACH BUILDING, IN THE AGGREGATE,
SHALL HAVE A MINIMUM OF SIXTY (60) PERCENT BRICK
OR STONE MASONRY, BUT IN NO EVENT SHALL A FAÇADE
HAVE LESS THAN TEN (10) PERCENT BRICK OR STONE
MASONRY. THE HEIGHT OF THE BRICK AND STONE SHALL
BE PERMITTED TO VARY TO ALLOW FOR A MIXTURE OF
DESIGN FEATURES. MEASUREMENT OF THE REQUIREMENT FOR
MASONRY FAÇADE TREATMENT SHALL BE EXCLUSIVE OF
FACADES WITHIN COURTYARDS SCREENED WITH A MINIMUM
SIX (6) FOOT VINYL FENCE, AS WELL AS WINDOWS, GABLE
VENTS, DORMERS, DOORS, TRIM, SOFFIT, FASCIA, BALCONIES
AND PORCHES.
4. A VARIETY OF FACING MATERIALS SHALL BE USED
ON ANY ONE FAÇADE OF ANY BUILDING. A MINIMUM
OF TWO (2) FACING MATERIALS SHALL BE USED ON ANY
ONE FAÇADE OF ANY UNIT.
5. BUILDINGS WITH THE SAME COLOR PALETTE,
PERCENTAGES OF SIDING MATERIALS, AND LANDSCAPING
SHALL NOT BE PERMITTED SIDE-BYSIDE TO CREATE
DIVERSITY AND INTEREST ALONG THE STREETSCAPES.
6. ALL DWELLING UNITS ON THE PROPERTY SHALL BE
CONDOMINIUMS AS DEFINED AND REGULATED BY THE
VIRGINIA CONDOMINIUM ACT, AND ALL COMMON AREAS
AND IMPROVEMENTS THEREIN SHALL BE MAINTAINED BY A
CONDOMINIUM ASSOCIATION.
7. A MINIMUM OF TWO (2) ACRES SHALL BE PROVIDED IN THE
CLUBHOUSE AREA, THE ENTRANCE AREA, POCKET PARKS AND
OTHER NATURAL AREAS. THE CLUBHOUSE SHALL SERVE AS A
FOCAL POINT. PART OF THESE AREAS SHALL BE "HARDSCAPED"
(CONCRETE, ASPHALT OR PAVERS) AND HAVE A COMBINATION
OF OTHER AMENITIES SUCH AS BENCHES, A PERGOLA, A GAZEBO
AND PAVERS THAT ACCOMMODATE AND FACILITATE
GATHERINGS. THE CLUBHOUSE SHALL BE CONSTRUCTED
DURING THE FIRST PHASE OF DEVELOPMENT AND SHALL
BE COMPLETED BEFORE THE ISSUANCE OF THE TWENTIETH
CERTIFICATE OF OCCUPANCY IN THE DEVELOPMENT. THE
UNDEVELOPED SOUTHEASTERN PORTION OF THE PROPERTY
WHICH ABUTS THE SOUTHERN PROPERTY LINES OF LOTS 46
THROUGH 56 OF CLOVERHILL ESTATES SUBDIVISION SHALL
BE UTILIZED FOR PASSIVE RECREATION AND/OR PEDESTRIAN
TRAILS ONLY.
NOTES:
1. ANY CHANGE IN THE CURRENT PLAN, WHETHER IT STEMS
FROM DEPARTMENT COMMENTS OR AN ENGINEERING CHANGE
REQUESTED BY THE APPLICANT, MAY GENERATE ADDITIONAL
COMMENTS FROM THE REVIEWING DEPARTMENTS, RESULTING IN
REQUIRED REVISIONS.
2. EACH REVIEW OF DETAILED LANDSCAPE PLANS AFTER
APPROVAL OF THE SITE PLAN INCURS A RESUBMITTAL FEE
AND IS TRACKED AS A SITE PLAN REVIEW UNTIL APPROVED.
APPROVAL MUST BE OBTAINED PRIOR TO TEMPORARY
OCCUPANCY OF THE BUILDING.
********************************************
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #: STEVE PRUSIK/ 751-4321
PLAN NAME: THE VILLAS AT ASHLAKE
PLAN NUMBER: 16PR0253
ORIGINAL PLAN DATE: 05/24/16
REVIEW DATE: 10/26/16
LATEST SUBMISSION DATE: 10/06/16
SUBMITTAL NUMBER: 2
STATUS: NOT APPROVED
TABLE REVIEW: NO
ARCHITECTURAL ELEVATIONS: NOT YET SUBMITTED
LANDSCAPE PLAN: SUBMITTED - DETAILED PLAN REQUESTED
LIGHTING PLAN: SUBMITTED
COMMENTS:
1. RETAINING WALLS ARE NOT PERMITTED IN BUFFERS.
PLEASE SHOW THE 25' LANDSCAPE BUFFER SETBACK
ALONG THE EASTERN PROPERTY LINE OFFSET FROM THE
BACK OF THE RETAINING WALL(S), EVEN IF IT OVERLAPS
THE STORMPIPE EASEMENT. HOWEVER, NO PLANTINGS
SHALL BE ALLOWED IN THE STORMPIPE EASEMENT.
2. ADD A NOTE TO THE PLAN STATING: COORDINATE
REAR PRIVACY FENCE POST HOLE LOCATIONS WITH
FENCE CONTRACTOR TO AVOID AUGER DAMAGE TO
RETAINING WALL GEOGRID.
3. PER SEC. 19.1-317 (A) AND (B), PROVIDE 2 COPIES OF
RENDERINGS/ELEVATIONS OF THE BUILDINGS WITH ALL
BUILDING MATERIALS AND COLORS IDENTIFIED. BUILDING
ELEVATIONS SHALL BE APPROVED PRIOR TO FULL SITE
PLAN APPROVAL.
4. STREET TREES SHALL BE PLANTED ALONG THE
ENTRANCE ROAD FROM ASHLAKE PARKWAY INTO
THE DEVELOPMENT IN ACCORDANCE WITH ZONING
ORDINANCE REQUIREMENTS.
5. SUPPLEMENTAL LANDSCAPING SHALL BE PROVIDED
AROUND THE PERIMETER OF ALL BUILDINGS, BETWEEN
BUILDINGS AND DRIVEWAYS, WITHIN MEDIANS, AND
WITHIN COMMON AREAS. SUCH LANDSCAPING SHALL
BE DESIGNED TO: MINIMIZE THE PREDOMINANCE OF
BUILDING MASS AND PAVED AREAS; DEFINE PRIVATE
SPACES; AND ENHANCE THE RESIDENTIAL CHARACTER
OF THE DEVELOPMENT. THE PLANNING DEPARTMENT,
AT THE TIME OF SITE PLAN REVIEW, SHALL APPROVE
THE LANDSCAPING PLAN WITH RESPECT TO THE EXACT
NUMBERS, SPACING, ARRANGEMENT AND SPECIES OF
PLANTINGS.
6. PLEASE INDICATE WHAT TYPE OF PLANT MATERIAL IS
PROPOSED FOR THE BUFFERS, STREET TREES AND
SUPPLEMNTAL LANDSCAPING AND PROVIDE A DETAILED
PLANT LIST ON THE LANDSCAPE PLAN.
7. PER SECT. 19.1-211 OF THE COUNTY ZONING ORDIANCE,
PLEASE PROVIDE A LANDSCAPE PLAN TO ENHANCE THE
VISUAL APPEAL OF THE BMP'S.
8. PLEASE ENSURE THAT NO TREES ARE PLANTED IN ANY
UTILITY OR MAINTENANCE EASEMENTS ON THE
LANDSCAPE PLAN.
9. PROVIDE STANDARD COUNTY LANDSCAPE NOTES AND
DETAILS ON THE LANDSCAPE PLAN.
10. PLANNING SUGGESTS USING A BROWN BAKED ENAMEL
GUARDRAIL OR SIMILAR TO BETTER BLEND THE GUARDRAIL
INTO THE SURROUNDING BACKGROUND.
CONDITIONS:
1. ELEVATIONS/EXTERIOR FACADES. DEVELOPMENT OF THE
PROPERTY SHALL BE IN GENERAL CONFORMANCE WITH
THE ARCHITECTURAL APPEARANCE PER PROFFERED
CONDITIONS FROM THE MARCH 9, 2016 BOS HEARING.
ANY SUBSTANTIAL MODIFICATIONS SHALL BE APPROVED
BY THE PLANNING COMMISSION IN CONJUNCTION
WITH PLANS REVIEW.
2. ROOF MATERIALS SHALL BE 30 YEAR ARCHITECTURAL/
DIMENSIONAL ASPHALT COMPOSITION SHINGLE.
3. FACADES OF EACH BUILDING, IN THE AGGREGATE,
SHALL HAVE A MINIMUM OF SIXTY (60) PERCENT BRICK
OR STONE MASONRY, BUT IN NO EVENT SHALL A FAÇADE
HAVE LESS THAN TEN (10) PERCENT BRICK OR STONE
MASONRY. THE HEIGHT OF THE BRICK AND STONE SHALL
BE PERMITTED TO VARY TO ALLOW FOR A MIXTURE OF
DESIGN FEATURES. MEASUREMENT OF THE REQUIREMENT FOR
MASONRY FACADE TREATMENT SHALL BE EXCLUSIVE OF
FACADES WITHIN COURTYARDS SCREENED WITH A MINIMUM
SIX (6) FOOT VINYL FENCE, AS WELL AS WINDOWS, GABLE
VENTS, DORMERS, DOORS, TRIM, SOFFIT, FASCIA, BALCONIES
AND PORCHES.
4. A VARIETY OF FACING MATERIALS SHALL BE USED
ON ANY ONE FAÇADE OF ANY BUILDING. A MINIMUM
OF TWO (2) FACING MATERIALS SHALL BE USED ON ANY
ONE FAÇADE OF ANY UNIT.
5. BUILDINGS WITH THE SAME COLOR PALETTE,
PERCENTAGES OF SIDING MATERIALS, AND LANDSCAPING
SHALL NOT BE PERMITTED SIDE-BYSIDE TO CREATE
DIVERSITY AND INTEREST ALONG THE STREETSCAPES.
6. ALL DWELLING UNITS ON THE PROPERTY SHALL BE
CONDOMINIUMS AS DEFINED AND REGULATED BY THE
VIRGINIA CONDOMINIUM ACT, AND ALL COMMON AREAS
AND IMPROVEMENTS THEREIN SHALL BE MAINTAINED BY A
CONDOMINIUM ASSOCIATION.
7. A MINIMUM OF TWO (2) ACRES SHALL BE PROVIDED IN THE
CLUBHOUSE AREA, THE ENTRANCE AREA, POCKET PARKS AND
OTHER NATURAL AREAS. THE CLUBHOUSE SHALL SERVE AS A
FOCAL POINT. PART OF THESE AREAS SHALL BE "HARDSCAPED"
(CONCRETE, ASPHALT OR PAVERS) AND HAVE A COMBINATION
OF OTHER AMENITIES SUCH AS BENCHES, A PERGOLA, A GAZEBO
AND PAVERS THAT ACCOMMODATE AND FACILITATE
GATHERINGS. THE CLUBHOUSE SHALL BE CONSTRUCTED
DURING THE FIRST PHASE OF DEVELOPMENT AND SHALL
BE COMPLETED BEFORE THE ISSUANCE OF THE TWENTIETH
CERTIFICATE OF OCCUPANCY IN THE DEVELOPMENT. THE
UNDEVELOPED SOUTHEASTERN PORTION OF THE PROPERTY
WHICH ABUTS THE SOUTHERN PROPERTY LINES OF LOTS 46
THROUGH 56 OF CLOVERHILL ESTATES SUBDIVISION SHALL
BE UTILIZED FOR PASSIVE RECREATION AND/OR PEDESTRIAN
TRAILS ONLY.
NOTES:
1. ANY CHANGE IN THE CURRENT PLAN, WHETHER IT STEMS
FROM DEPARTMENT COMMENTS OR AN ENGINEERING CHANGE
REQUESTED BY THE APPLICANT, MAY GENERATE ADDITIONAL
COMMENTS FROM THE REVIEWING DEPARTMENTS, RESULTING IN
REQUIRED REVISIONS.
2. EACH REVIEW OF DETAILED LANDSCAPE PLANS AFTER
APPROVAL OF THE SITE PLAN INCURS A RESUBMITTAL FEE
AND IS TRACKED AS A SITE PLAN REVIEW UNTIL APPROVED.
APPROVAL MUST BE OBTAINED PRIOR TO TEMPORARY
OCCUPANCY OF THE BUILDING.
*************************************************
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #: STEVE PRUSIK/ 751-4321
PLAN NAME: THE VILLAS AT ASHLAKE
PLAN NUMBER: 16PR0253
ORIGINAL PLAN DATE: 05/24/16
REVIEW DATE: 01/27/17
LATEST SUBMISSION DATE: 12/28/16
SUBMITTAL NUMBER: 3
STATUS: APPROVED WITH CONDITIONS
TABLE REVIEW: YES
ARCHITECTURAL ELEVATIONS: SUBMITTED
LANDSCAPE PLAN: SUBMITTED
LIGHTING PLAN: SUBMITTED
CONDITIONS:
1. ELEVATIONS/EXTERIOR FACADES. DEVELOPMENT OF THE
PROPERTY SHALL BE IN GENERAL CONFORMANCE WITH
THE ARCHITECTURAL APPEARANCE PER PROFFERED
CONDITIONS FROM THE MARCH 9, 2016 BOS HEARING.
ANY SUBSTANTIAL MODIFICATIONS SHALL BE APPROVED
BY THE PLANNING COMMISSION IN CONJUNCTION
WITH PLANS REVIEW.
2. ROOF MATERIALS SHALL BE 30 YEAR ARCHITECTURAL/
DIMENSIONAL ASPHALT COMPOSITION SHINGLE.
3. FACADES OF EACH BUILDING, IN THE AGGREGATE,
SHALL HAVE A MINIMUM OF SIXTY (60) PERCENT BRICK
OR STONE MASONRY, BUT IN NO EVENT SHALL A FAÇADE
HAVE LESS THAN TEN (10) PERCENT BRICK OR STONE
MASONRY. THE HEIGHT OF THE BRICK AND STONE SHALL
BE PERMITTED TO VARY TO ALLOW FOR A MIXTURE OF
DESIGN FEATURES. MEASUREMENT OF THE REQUIREMENT FOR
MASONRY FACADE TREATMENT SHALL BE EXCLUSIVE OF
FACADES WITHIN COURTYARDS SCREENED WITH A MINIMUM
SIX (6) FOOT VINYL FENCE, AS WELL AS WINDOWS, GABLE
VENTS, DORMERS, DOORS, TRIM, SOFFIT, FASCIA, BALCONIES
AND PORCHES.
4. A VARIETY OF FACING MATERIALS SHALL BE USED
ON ANY ONE FAÇADE OF ANY BUILDING. A MINIMUM
OF TWO (2) FACING MATERIALS SHALL BE USED ON ANY
ONE FAÇADE OF ANY UNIT.
5. BUILDINGS WITH THE SAME COLOR PALETTE,
PERCENTAGES OF SIDING MATERIALS, AND LANDSCAPING
SHALL NOT BE PERMITTED SIDE-BYSIDE TO CREATE
DIVERSITY AND INTEREST ALONG THE STREETSCAPES.
6. ALL DWELLING UNITS ON THE PROPERTY SHALL BE
CONDOMINIUMS AS DEFINED AND REGULATED BY THE
VIRGINIA CONDOMINIUM ACT, AND ALL COMMON AREAS
AND IMPROVEMENTS THEREIN SHALL BE MAINTAINED BY A
CONDOMINIUM ASSOCIATION.
7. A MINIMUM OF TWO (2) ACRES SHALL BE PROVIDED IN THE
CLUBHOUSE AREA, THE ENTRANCE AREA, POCKET PARKS AND
OTHER NATURAL AREAS. THE CLUBHOUSE SHALL SERVE AS A
FOCAL POINT. PART OF THESE AREAS SHALL BE "HARDSCAPED"
(CONCRETE, ASPHALT OR PAVERS) AND HAVE A COMBINATION
OF OTHER AMENITIES SUCH AS BENCHES, A PERGOLA, A GAZEBO
AND PAVERS THAT ACCOMMODATE AND FACILITATE
GATHERINGS. THE CLUBHOUSE SHALL BE CONSTRUCTED
DURING THE FIRST PHASE OF DEVELOPMENT AND SHALL
BE COMPLETED BEFORE THE ISSUANCE OF THE TWENTIETH
CERTIFICATE OF OCCUPANCY IN THE DEVELOPMENT. THE
UNDEVELOPED SOUTHEASTERN PORTION OF THE PROPERTY
WHICH ABUTS THE SOUTHERN PROPERTY LINES OF LOTS 46
THROUGH 56 OF CLOVERHILL ESTATES SUBDIVISION SHALL
BE UTILIZED FOR PASSIVE RECREATION AND/OR PEDESTRIAN
TRAILS ONLY.
NOTES:
1. ANY CHANGE IN THE CURRENT PLAN, WHETHER IT STEMS
FROM DEPARTMENT COMMENTS OR AN ENGINEERING CHANGE
REQUESTED BY THE APPLICANT, MAY GENERATE ADDITIONAL
COMMENTS FROM THE REVIEWING DEPARTMENTS, RESULTING IN
REQUIRED REVISIONS.
2. EACH REVIEW OF DETAILED LANDSCAPE PLANS AFTER
APPROVAL OF THE SITE PLAN INCURS A RESUBMITTAL FEE
AND IS TRACKED AS A SITE PLAN REVIEW UNTIL APPROVED.
APPROVAL MUST BE OBTAINED PRIOR TO TEMPORARY
OCCUPANCY OF THE BUILDING.
*************************************************
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #: STEVE PRUSIK/ 751-4321
PLAN NAME: THE VILLAS AT ASHLAKE
PLAN NUMBER: 16PR0253
ORIGINAL PLAN DATE: 05/24/16
REVIEW DATE: 03/14/17
LATEST SUBMISSION DATE: 02/27/17
SUBMITTAL NUMBER: 4
STATUS: APPROVED WITH CONDITIONS
TABLE REVIEW: YES
ARCHITECTURAL ELEVATIONS: SUBMITTED
LANDSCAPE PLAN: SUBMITTED
LIGHTING PLAN: SUBMITTED
CONDITIONS:
1. ELEVATIONS/EXTERIOR FACADES. DEVELOPMENT OF THE
PROPERTY SHALL BE IN GENERAL CONFORMANCE WITH
THE ARCHITECTURAL APPEARANCE PER PROFFERED
CONDITIONS FROM THE MARCH 9, 2016 BOS HEARING.
ANY SUBSTANTIAL MODIFICATIONS SHALL BE APPROVED
BY THE PLANNING COMMISSION IN CONJUNCTION
WITH PLANS REVIEW.
2. ROOF MATERIALS SHALL BE 30 YEAR ARCHITECTURAL/
DIMENSIONAL ASPHALT COMPOSITION SHINGLE.
3. FACADES OF EACH BUILDING, IN THE AGGREGATE,
SHALL HAVE A MINIMUM OF SIXTY (60) PERCENT BRICK
OR STONE MASONRY, BUT IN NO EVENT SHALL A FAÇADE
HAVE LESS THAN TEN (10) PERCENT BRICK OR STONE
MASONRY. THE HEIGHT OF THE BRICK AND STONE SHALL
BE PERMITTED TO VARY TO ALLOW FOR A MIXTURE OF
DESIGN FEATURES. MEASUREMENT OF THE REQUIREMENT FOR
MASONRY FACADE TREATMENT SHALL BE EXCLUSIVE OF
BE PERMITTED TO VARY TO ALLOW FOR A MIXTURE OF
DESIGN FEATURES. MEASUREMENT OF THE REQUIREMENT FOR
MASONRY FACADE TREATMENT SHALL BE EXCLUSIVE OF
FACADES WITHIN COURTYARDS SCREENED WITH A MINIMUM
SIX (6) FOOT VINYL FENCE, AS WELL AS WINDOWS, GABLE
VENTS, DORMERS, DOORS, TRIM, SOFFIT, FASCIA, BALCONIES
AND PORCHES.
4. A VARIETY OF FACING MATERIALS SHALL BE USED
ON ANY ONE FAÇADE OF ANY BUILDING. A MINIMUM
OF TWO (2) FACING MATERIALS SHALL BE USED ON ANY
ONE FAÇADE OF ANY UNIT.
5. BUILDINGS WITH THE SAME COLOR PALETTE,
PERCENTAGES OF SIDING MATERIALS, AND LANDSCAPING
SHALL NOT BE PERMITTED SIDE-BYSIDE TO CREATE
DIVERSITY AND INTEREST ALONG THE STREETSCAPES.
6. ALL DWELLING UNITS ON THE PROPERTY SHALL BE
CONDOMINIUMS AS DEFINED AND REGULATED BY THE
VIRGINIA CONDOMINIUM ACT, AND ALL COMMON AREAS
AND IMPROVEMENTS THEREIN SHALL BE MAINTAINED BY A
CONDOMINIUM ASSOCIATION.
7. A MINIMUM OF TWO (2) ACRES SHALL BE PROVIDED IN THE
CLUBHOUSE AREA, THE ENTRANCE AREA, POCKET PARKS AND
OTHER NATURAL AREAS. THE CLUBHOUSE SHALL SERVE AS A
FOCAL POINT. PART OF THESE AREAS SHALL BE "HARDSCAPED"
(CONCRETE, ASPHALT OR PAVERS) AND HAVE A COMBINATION
OF OTHER AMENITIES SUCH AS BENCHES, A PERGOLA, A GAZEBO
AND PAVERS THAT ACCOMMODATE AND FACILITATE
GATHERINGS. THE CLUBHOUSE SHALL BE CONSTRUCTED
DURING THE FIRST PHASE OF DEVELOPMENT AND SHALL
BE COMPLETED BEFORE THE ISSUANCE OF THE TWENTIETH
CERTIFICATE OF OCCUPANCY IN THE DEVELOPMENT. THE
UNDEVELOPED SOUTHEASTERN PORTION OF THE PROPERTY
WHICH ABUTS THE SOUTHERN PROPERTY LINES OF LOTS 46
THROUGH 56 OF CLOVERHILL ESTATES SUBDIVISION SHALL
BE UTILIZED FOR PASSIVE RECREATION AND/OR PEDESTRIAN
TRAILS ONLY.
NOTES:
1. ANY CHANGE IN THE CURRENT PLAN, WHETHER IT STEMS
FROM DEPARTMENT COMMENTS OR AN ENGINEERING CHANGE
REQUESTED BY THE APPLICANT, MAY GENERATE ADDITIONAL
COMMENTS FROM THE REVIEWING DEPARTMENTS, RESULTING IN
REQUIRED REVISIONS.
2. EACH REVIEW OF DETAILED LANDSCAPE PLANS AFTER
APPROVAL OF THE SITE PLAN INCURS A RESUBMITTAL FEE
AND IS TRACKED AS A SITE PLAN REVIEW UNTIL APPROVED.
APPROVAL MUST BE OBTAINED PRIOR TO TEMPORARY
OCCUPANCY OF THE BUILDING.
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : AMY JOHANSON 768-7549
NAME OF PLAN : THE VILLAS AT ASHLAKE
PLAN NO. : 16PR0253
LATEST PLAN DATE : 5/24/16
RECEIVED DATE : 5/26/16
SUBMITTAL NUMBER : 1
REVIEW DATE : 6/14/16
RECOMMENDATION : NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNING
THE COMMENTS BELOW.
1. MORE THAN ONE DIRECTION OF TRAVERSE IS SHOWN.
PLEASE REVISE THE SURVEY TO SHOW ONLY ONE PATH OF
TRAVERSE.
2. NON-TANGENT CURVES EXIST ALONG THE TRAVERSE OF THE
SITE. PLEASE SUPPLY THE CHORD BEARING AND DISTANCE FOR
THESE CURVES ON THE SITE PLAN.
==========================================================
==========================================================
REVIEW DEPARTMENT: GIS + HOUSE NUMBERING
REVIEWER : AMY JOHANSON 768-7549
PROJECT NAME : THE VILLAS AT ASHLAKE
CASE NUMBER : 16PR0253
LATEST PLAN DATE : 10/06/16
RECEIVED DATE : 10/10/16
SUBMITTAL NUMBER : 2
REVIEW DATE : 10/28/16
ADDRESS :
STATUS : NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNING
THE COMMENTS BELOW.
1. MORE THAN ONE DIRECTION OF TRAVERSE IS SHOWN. PLEASE
REVISE THE SURVEY TO SHOW ONLY ONE PATH OF TRAVERSE.
2. THE PARCEL BOUNDARY SURVEY IS INCOMPLETE. FOR
S08-11-35W THE DISTANCE OF 309.49 IS TOO SHORT.
3. SHOW THE LOCATION OF THE MAIL BOX KIOSKS OR
CLUSTER BOXES ON THE PLAN SHEET OR INDICATE IN WHICH
BUILDING THEY ARE LOCATED.
4. ALL STREETS NEED TO BE NAMED.
5. STREET NAMES MUST BE APPROVED THROUGH RICHMOND
REGIONAL PLANNING DISTRICT COMMISSION STREET NAME
CLEARINGHOUSE AND/OR CRATER PLANNING DISTRICT
COMMISSION STREET NAME CLEARING HOUSE WITH
VERIFICATION SUBMITTED TO JOHANSONA@CHESTERFIELD.GOV
PRIOR TO SUBSTANTIAL APPROVAL.
6. A STREET SIGN FEE OF $150.00 PER INTERSECTION (3)
NEEDS TO BE PAID TO ENVIRONMENTAL ENGINEERING PRIOR
TO SUBSTANTIAL APPROVAL SO THAT STREET SIGNS CAN BE
MANUFACTURED. PAYMENT SHOULD BE SUBMITTED TO CAROLE
CLIBORNE IN ENVIRONMENTAL ENGINEERING AND REFERENCED
TO SITE PLAN NUMBER 16PR0253. PLEASE PROVIDE A COPY
OF THE RECEIPT TO JOHANSONA@CHESTERFIELD.GOV.
7. THE ABOVE COMMENTS ARE APPEARING AGAIN BECAUSE
THEY HAVE NOT YET BEEN CORRECTED.
==========================================================
REVIEW DEPARTMENT: GIS + HOUSE NUMBERING
REVIEWER : AMY JOHANSON 768-7549
PROJECT NAME : THE VILLAS AT ASHLAKE
CASE NUMBER : 16PR0253
LATEST PLAN DATE : 12/28/16
RECEIVED DATE : 1/4/17
SUBMITTAL NUMBER : 3
REVIEW DATE : 1/25/17
ADDRESS : NOT ASSIGNED YET
STATUS : NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNING
THE COMMENTS BELOW.
1. A STREET SIGN FEE OF $150.00 PER INTERSECTION (3)
NEEDS TO BE PAID TO ENVIRONMENTAL ENGINEERING PRIOR
TO SUBSTANTIAL APPROVAL SO THAT STREET SIGNS CAN BE
MANUFACTURED. PAYMENT SHOULD BE SUBMITTED TO CAROLE
CLIBORNE IN ENVIRONMENTAL ENGINEERING AND REFERENCED
TO SITE PLAN NUMBER 16PR0253. PLEASE PROVIDE A COPY
OF THE RECEIPT TO JOHANSONA@CHESTERFIELD.GOV
2. ADDRESSES WILL BE ASSIGNED WHEN THE SITE PLAN IS
APPROVED.
==========================================================
REVIEW DEPARTMENT: GIS + HOUSE NUMBERING
REVIEWER : AMY JOHANSON 768-7549
PROJECT NAME : THE VILLAS AT ASHLAKE
CASE NUMBER : 16PR0253
LATEST PLAN DATE : 2/27/17
RECEIVED DATE : 3/2/17
SUBMITTAL NUMBER : 4
REVIEW DATE : 3/20/17
ADDRESS : ADDRESS PLAN COMPLETE
STATUS : APPROVED
==========================================================
==========================================================
DEPARTMENT REVIEW: IST / HOUSE NUMBERING SECTION
REVIEWER: AMY JOHANSON
PHONE NUMBER: 768-7549
CASE NUMBER: 16PR0253
NAME OF PLAN: THE VILLAS AT ASHLAKE
ADDRESS:
DATE OF REVIEW: 6/14/16 REVIEW # 1
STATUS: HOUSE NUMBERING NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS
CONCERNING THE COMMENTS BELOW.
1) SHOW THE LOCATION OF THE MAIL BOX KIOSKS OR CLUSTER
BOXES ON THE PLAN SHEET OR INDICATE IN WHICH BUILDING
THEY ARE LOCATED.
2) STREETS NEED TO BE NAMED.
3) STREET NAMES MUST BE APPROVED THROUGH RICHMOND
REGIONAL PLANNING DISTRICT COMMISSION STREET NAME
CLEARINGHOUSE AND/OR CRATER PLANNING DISTRICT
COMMISSION STREET NAME CLEARING HOUSE WITH
VERIFICATION SUBMITTED TO
JOHANSONA@CHESTERFIELD.GOV PRIOR TO SUBSTANTIAL APPROVAL.
4) A STREET SIGN FEE OF $150.00 PER INTERSECTION (3) NEEDS
TO BE PAID TO ENVIRONMENTAL ENGINEERING PRIOR TO
SUBSTANTIAL APPROVAL SO THAT STREET SIGNS CAN BE
MANUFACTURED. PAYMENT SHOULD BE SUBMITTED TO ENVIRONMENTA
TO SITE PLAN NUMBER 16PR0253. PLEASE PROVIDE A COPY
OF THE RECEIPT TO JOHANSONA@CHESTERFIELD.GOV.
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: THE VILLAS AT ASHLAKE
SITE PLAN NUMBER: 16PR0253
ADDRESS: 7501 ASHLAKE PARKWAY
LATEST PLAN DATE: 5/24/16
DEPT. REC'D. DATE: 5/26/16
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 5/27/16
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: NO
PLAT PROCESSING: NO
COMMENTS:
1. PROVIDE THE CHESTERFIELD COUNTY STANDARD FIRE LANE
DETAIL ON THE PLAN.
2. PROVIDE THE GATE DETAIL TO BE USED ON THE EMERGENCY
ACESSS ON THE PLAN.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: THE VILLAS AT ASHLAKE
SITE PLAN NUMBER: 16PR0253
ADDRESS: 7501 ASHLAKE PARKWAY
LATEST PLAN DATE: 10/6/16/16
DEPT. REC'D. DATE: 10/11/16
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 10/11/16
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. PROVIDE THE CHESTERFIELD COUNTY STANDARD FIRE LANE
DETAIL ON THE PLAN.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: THE VILLAS AT ASHLAKE
SITE PLAN NUMBER: 16PR0253
ADDRESS: 7501 ASHLAKE PARKWAY
LATEST PLAN DATE: 12/28/16
DEPT. REC'D. DATE: 1/10/17
SUBMITTAL NUMBER: 3RD REVIEW
REVIEW DATE: 1/13/17
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE REVISED SITE PLAN IS APPROVED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: THE VILLAS AT ASHLAKE
SITE PLAN NUMBER: 16PR0253
ADDRESS: 7501 ASHLAKE PARKWAY
LATEST PLAN DATE: 2/27/17
DEPT. REC'D. DATE: 3/3/17
SUBMITTAL NUMBER: 4TH REVIEW
REVIEW DATE: 3/3/17
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE REVISED SITE PLAN IS APPROVED.
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : DUSTIN DUNNAGAN / 706-2061
NAME OF PLAN : VILLAS AT ASHLAKE
ADDRESS : 7501 ASHLAKE PKWY
SITE PLAN NO. : 16PR0253
LATEST PLAN DATE : MAY 24, 2016
DEPT. REC'D DATE : MAY 26, 2016
SUBMITTAL NUMBER : 1
REVIEW DATE : JUNE 16, 2016
RECOMMENDATION : NOT APPROVED
TABLE REVISION : NO
PLAT PROCESSING : NO
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL
FEATURES INCLUDING BUT NOT LIMITED TO WETLANDS,
SURFACE WATERS (E.G. VSMP PERMIT FOR CONSTRUCTION
SITES, GROUND WATER AND AIR QUALITY) FINAL APPROVAL
OF THESE PLANS WILL NOT RELIEVE YOU OF YOUR
RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE
LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. EFFECTIVE JULY 1, 2014, ENFORCEMENT OF THE VIRGINIA
STORMWATER REGULATIONS BECAME THE RESPONSIBILITY OF
THE COUNTY FOR DEVELOPMENT PROJECTS WITHIN
CHESTERFIELD COUNTY. ADDITIONALLY, NEW STATE
STORMWATER REGULATIONS ALSO BECAME EFFECTIVE ON
JULY 1, 2014. LAND DISTURBING ACTIVITIES THAT
OBTAINED A VSMP PERMIT PRIOR TO JULY 1, 2014 MAY
USE THE STORMWATER MANAGEMENT CRITERIA SPECIFIED
IN PART II C (9VAC25-870-93 ET SEQ) FOR TWO PERMIT
CYCLES. PROJECTS GRANDFATHERED UNDER THE PROVISIONS
OF 9VAC25-870-48 MAY FOLLOW THE REQUIREMENTS LISTED
UNDER PART IIC FOR ONE PERMIT CYCLE. ALL OTHER NEW
DEVELOPMENT WILL BE SUBJECT TO THE REQUIREMENTS OF
PART IIB (9VAC25-870-62 TO 9VAC25-870-92).
03. CURSORY REVIEW WAS PROVIDED DUE TO DESIGN INFORMATION
MISSING FROM PLAN. IN ADDITION, A STAND-ALONE MEETING
WITH EE IS RECOMMENDED TO REVIEW THE SWM APPROACH TO
THIS PROJECT.
04. PROVIDE THE FOLLOWING INFORMATION ON THE COVER SHEET:
A. LATITUDE AND LONGITUDE FOR THE PROJECT SITE (IN
DEGREES, MINUTES, SECONDS, TO THE NEAREST 15 SECONDS)
B. NAME OF RECEIVING CHANNEL/WATERS
C. VAHU6 FOUR DIGIT WATERSHED CODE
05. A BENCHMARK MUST BE SHOWN WITH REFERENCE TO
MEAN SEA LEVEL. (CL-GENERAL 11)
06. ALL ROOF WATER AND DOWNDRAINS MUST BE COLLECTED AND
DISCHARGED IN A NON-ERODIBLE MANNER. (CL-G&D 6)
07. UNLESS FUTURE EXTENSION IS SHOWN, AN ENDWALL IS
REQUIRED ON THE OUTLET END. (CL)
08. A VDOT STANDARD ENDWALL IS REQUIRED ON ALL
MULTI-LINE STRUCTURES, STRUCTURES WITH DIAMETERS
30" AND LARGER, AND WHEN THE STRUCTURE IS PROPOSED
ON A SLOPE OF 15% OR GREATER. (CL-G&D 7)
09. THE LIMITS OF THE 100-YEAR FLOOD PLAIN MUST BE SHOWN.
(CL-G&D 8)
10. PROFILES MUST BE SHOWN FOR ALL PROPOSED STORM SEWERS
AND OUTFALL CHANNELS. (CL-G&D 13)
11. INLET SHAPING IS RESTRICTED TO PIPE DIAMETERS OF 30"
OR LESS AND TO SITUATIONS WHERE ONE PIPE ENTERS THE
CHAMBER AND ONE PIPE EXITS THE CHAMBER. STORM SEWERS
WITH PIPE DIAMETERS OF 30" AND ABOVE SHALL QUALIFY FOR
THE 50 PERCENT REDUCTION IN JUNCTION LOSSES ONLY WHEN
PRE-CAST TEES AND ELBOWS ARE USED. (CL-G&D 18)
12. A DETAIL MUST BE SHOWN ON THE PLANS FOR INLET SHAPING
STD. IS-1. IF INLET SHAPING CANNOT BE ACCOMPLISHED
WITHIN THE STANDARD STRUCTURE, THEN DETAILS MUST BE
PROVIDED FOR THE MODIFICATIONS NECESSARY TO THE
STRUCTURE TO ACCOMPLISH INLET SHAPING. (CL-G&D 19)
13. BOOT CONNECTORS MUST BE SPECIFIED IN THE TABULAR
DRAINAGE DESCRIPTION FOR ALL PLASTIC PIPES THAT TIE
INTO A CONCRETE STRUCTURE. (CL-G&D 21)
14. THE FINISHED FLOOR ELEVATION OF ALL STRUCTURES MUST BE
SHOWN. (CL-G&D 26)
15. DRAINAGE EASEMENTS MUST BE SHOWN ALONG ANY STORMWATER
CONVEYANCE SYSTEM WHICH RECEIVES RUNOFF FROM OFFSITE,
FROM A PUBLIC RIGHT OF WAY OR REQUIRES IMPROVEMENTS ON
A DOWNSTREAM PROPERTY OWNER. (CL-G&D 29)
16. A SEPARATE PLAN SHEET MUST BE ADDED WHICH ONLY SHOWS
ALL PROPOSED EASEMENTS AND RIGHT OF WAY TO BE
DEDICATED. METES AND BOUNDS MUST BE PROVIDED.
(CL-G&D 30)
17. ENSURE ALL STREET NAMES HAVE BEEN APPROVED BY THE
RICHMOND REGIONAL PLANNING DISTRICT COMMISION (RRPDC)
STREET NAME CLEARINGHOUSE.
18. THE RADIUS OF ALL RADIAL CURBING MUST BE SHOWN.
(CL-G&D 35)
19. A STREET SIGN FEE OF $150 PER ROAD INTERSECTION MUST B
PROVIDED PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
20. STREETLIGHTING:
A. STREETLIGHTS SHALL BE PROVIDED AT THE DEVELOPER'S
EXPENSE AT ANY AND ALL ENTRANCES AND EXITS OF
COMMERCIAL/INDUSTRIAL DEVELOPMENTS. LIGHTING SHALL BE
PROVIDED AS SPECIFIED IN THIS PARAGRAPH REGARDLESS OF
ANY OTHER LIGHTING CONSIDERATIONS, E.G., PARKING LOT
LIGHTING, SIGNAGE, OR TRAFFIC CONTROL LIGHTING.
B. IN ADDITION TO THE ACTUAL INSTALLATION COST OF ANY SUC
LIGHT(S), THE DEVELOPER SHALL PAY TO THE COUNTY AN
OPERATIONAL OFFSET FEE EQUIVALENT TO THE COST OF FIVE
YEARS OPERATION AND MAINTENANCE FOR EACH REQUIRED
STREETLIGHT INSTALLED BASED UPON THE SUPPLYING
UTILITY'S MONTHLY CHARGE FOR SAME PER LIGHT AT TIME OF
INSTALLATION, PLUS A $50 ADMINISTRATION FEE. REFER TO
THE STREETLIGHT POLICY FOR ACCEPTABLE LIGHTING
TYPES/STYLES (FOUND IN APPENDIX B OF THE ENVIRONMENTAL
ENGINEERING REFERENCE MANUAL).
C. ADDITIONAL, NON-REQUIRED STREETLIGHTS, BEYOND ANY
SPECIFICALLY REQUIRED IN PARAGRAPH A. ABOVE, SHALL BE
COST ESTIMATED, FUNDED, AND OPERATED AT THE DEVELOPER'
EXPENSE. NON-REQUIRED LIGHTING SHALL BE STRICTLY
LIMITED TO INTERNAL INTERSECTIONS WHERE ROADS ARE
IDENTIFIED AS INTENDED TO BE ACCEPTED INTO AND
MAINTAINED THROUGH THE STATE SECONDARY ROAD SYSTEM.
SUCH NON-REQUIRED INSTALLATIONS WILL NOT BE CONSIDERED
FOR FUTURE INCLUSION INTO THE COUNTY STREETLIGHT
PROGRAM.
D. PAYMENT OF THE OPERATIONAL OFFSET FEE, AS DESCRIBED
ABOVE, WILL BE REQUIRED AT A TIME NOT LATER THAN PLAN
APPROVAL. PAYMENT FOR THE COSTS OF STREETLIGHT
INSTALLATION AND THE $50 ADMINISTRATIVE FEE WILL BE
REQUIRED AT TIME OF RECEIPT OF THE PROJECT COST FROM
THE SUPPLYING UTILITY.
21. IF TIMBERING IS REQUIRED ON THE PROJECT, IT SHOULD BE
INCORPORATED INTO THE EROSION CONTROL PLAN / NARRATIVE
AND SHOULD NOT BEGIN UNTIL AFTER THE ISSUANCE OF A
LAND DISTURBANCE PERMIT AND THE INSTALLATION OF THE
APPROVED EROSION CONTROL DEVICES. (CL-EC 2)
22. STEPS MUST BE INCLUDED IN THE SEQUENCE OF CONSTRUCTION
EVENTS FOR BUILDING CONSTRUCTION. (CL-EC 6)
23. PROVISIONS MUST BE MADE IN THE SEQUENCE OF CONSTRUCTIO
TO ALLOW ALL PROPOSED SEDIMENT TRAPS AND BASINS TO
REMAIN IN PLACE UNTIL ALL ONSITE CONTRIBUTING AREAS AR
STABILIZED. (CL-EC 7)
24. THE CONSTRUCTION ENTRANCE MUST BE GRAPHICALLY SHOWN ON
THE PLANS AND CONSTRUCTED AS WIDE AS THE PROPOSED
PERMANENT ENTRANCE. (CL-EC 9)
25. THE SEDIMENT BASIN(S) MUST BE DESIGNED IN ACCORDANCE
WITH STD.& SPEC. 3.14 OF THE VESCH. SEDIMENT BASIN
DESIGN CALCULATION SHEETS MUST BE SUBMITTED WITH ALL
DESIGN DATA ADDRESSED AND SHOWN ON CONSTRUCTION DETAIL
INCLUDED ON THE PLANS. (CL-EC 11)
26. THE DRAINAGE AREA, SPILLWAY LENGTH, AND DIMENSIONS
NECESSARY TO ACHIEVE THE REQUIRED STORAGE VOLUMES IN
ACCORDANCE WITH STD. & SPEC. 3.13 MUST BE SHOWN. THE
ELEVATIONS OF THE TRAP BOTTOM, TOP OF WET VOLUME, TOP
OF DRY VOLUME, AND TOP OF EMBANKMENT MUST BE SHOWN
ON THE SEDIMENT TRAP DETAIL. (CL-EC 12)
27. SAFETY FENCE (STD. & SPEC 3.01) IS REQUIRED AROUND ALL
SEDIMENT TRAPS AND SEDIMENT BASINS. (CL-EC 15)
28. A MINIMUM 10' BREAK MUST BE PROVIDED IN THE LOW AREA O
THE SILT FENCE . THE BREAK MUST BE BACKFILLED WITH
STONE TO WITHIN 1' OF THE TOP OF THE SILT FENCE TO
SERVE AS AN OVERFLOW.
(CL-EC 16)
29. THE FOLLOWING NOTES MUST BE ADDED TO THE PLANS:
A. "ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT
CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED
ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF
THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND
VIRGINIA REGULATION 9 VAC 25-840-40." (CL-EC 18)
B. "THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL
MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING
RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO
MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL
DEVICES SHALL BE MADE IMMEDIATELY. (CL-EC 22)
C. "ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT
CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING
ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL
STABILIZATION IS ACHIEVED." (CL-EC 23)
D. "THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF
ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO
PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT". (CL-EC 24)
30. THE MOST RECENT VERSION OF EROSION CONTROL MINIMUM
STANDARD # 1, (SEE THE VIRGINIA EROSION AND SEDIMENT
CONTROL LAW AND REGULATIONS FOR FY 2013) MUST BE ADDED
TO THE PLANS AND ALL OTHER NOTES WHICH ARE IN CONFLICT
MUST BE ADJUSTED OR REMOVED. (CL-EC 25)
31. THE EXACT LIMITS OF LAND DISTURBANCE MUST BE SHOWN.
(CL-EC 27)
32. A TEMPORARY SLOPE DRAIN (STD. & SPEC. #3.15) MUST BE
PROVIDED TO CONVEY RUNOFF FROM THE TOP OF THE FINISHED
SLOPE TO THE BOTTOM AND THEN INTO A SEDIMENT TRAPPING
FACILITY WHERE FILL SECTIONS ARE GREATER THAN 4 FEET.
(CL-EC 32)
33. THE OFF-SITE UTILITY LINE(S) MUST BE SHOWN ON THE
EROSION CONTROL PLAN SHEETS WITH SILT FENCE ON THE
DOWNSTREAM SIDE. (CL-EC 38)
34. ANY SOIL STOCKPILE AREA MUST BE LOCATED ON THE PLANS.
SILT FENCE MUST BE PROVIDED AROUND THE PERIMETER.
(CL-EC 39)
35. BLANKET AND MATTING MUST BE SPECIFIED ON ALL EXPOSED
SLOPES 3:1 OR GREATER THAT ARE 5 FEET OR GREATER IN
HEIGHT.
36. EACH SEDIMENT BASIN MUST BE ASSIGNED AN ALPHA OR
NUMERIC DESIGNATION AND THEIR INSTALLATION SEQUENCE
INDIVIDUALLY NOTED IN THE EROSION CONTROL NARRATIVE.
(CL-EC 40)
37. ALL SILT MUST BE CLEANED FROM THE SEDIMENT BASIN PRIOR
TO CONVERSION TO THE SWM/BMP. A NOTE MUST BE PROVIDED
IN THE EROSION CONTROL NARRATIVE. (CL-EC 41)
38. THE FOLLOWING NOTE(S) MUST BE ADDED TO OR ADJACENT TO
THE SEQUENCE OF CONSTRUCTION: (CL-EC 42)
A. ALL OFFSITE DRAINAGE EASEMENTS MUST BE RECORDED PRIOR
TO ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS
PROJECT. (CL-EC 42A)
B. A CONSTRUCTION PERFORMANCE BOND MUST BE PROVIDED FOR
THE IMPROVEMENTS WITHIN THE PROPOSED RIGHT OF WAY PRIO
TO ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS
PROJECT.
C. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER/BMP
DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO ISSUANCE
OF A BUILDING PERMIT FOR THIS PROJECT. (CL-EC 42B)
D. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A
SURETY FOR THE CONSTRUCTION OF THE PERMANENT BMP MUST
BE POSTED WITH ENVIRONMENTAL ENGINEERING. (COUNTY CODE
PART II, CHAPTER 8, SEC. 8-16)
E. THE BMP MUST BE CERTIFIED PRIOR TO RELEASE OF THE BMP
PERFORMANCE BOND.
F. A VDOT LAND USE PERMIT IS REQUIRED FOR THIS PROJECT
PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT.
(CL-EC 42D)
G. THE RISER AND BARREL PIPE ASSOCIATED WITH THE SEDIMENT
BASIN MUST BE ON-SITE PRIOR TO ISSUANCE OF A LAND
DISTURBANCE PERMIT. (CL-EC 42F)
H. THE LIMITS OF THE WETLANDS MUST BE FLAGGED IN THE FIEL
(SURVEY LOCATED) WITH OPTIC ORANGE SAFETY FENCE PRIOR
TO ISSUANCE OF A LAND DISTURBANCE PERMIT. (CL-EC 42G)
39. A STORMWATER COMPLIANCE SHEET(S) IS REQUIRED FOR
PROJECTS UTILIZING PART IIB OF THE CURRENT VIRGINIA
STORMWATER REGULATIONS. THE FOLLOWING INFORMATION IS
REQUIRED TO BE SHOWN ON THE SHEET(S):
A. THE CHESTERFIELD COUNTY STORMWATER COMPLIANCE AND
STORMWATER OUTFALL TABLES (FOUND ON THE COUNTY'S
ENVIRONMENTAL ENGINEERING WEBPAGE, UNDER "DOCUMENTS AN
FORMS")
B. ENERGY BALANCE AND OUTFALL ANALYSIS FOR EACH OUTFALL
FOR THE PROJECT
C. DELINEATION OF THE SOIL TYPES (INCLUDE HYDROLOGIC SOIL
GROUP) AND THE THREE LAND COVER CONDITIONS
(FORESTED/OPEN SPACE, MANAGED TURF, IMPERVIOUS)
D. NATURAL VEGETATED AREA EASEMENTS FOR AREAS CLAIMED AS
FORESTED/OPEN SPACE IN THE VRRM SPREADSHEET, THAT ARE
NOT ENCOMPASSED BY A BMP EASEMENT, RPA OR WITHIN A
PLANNING BUFFER/TREE SAVE AREA
E. BMP SIZE, LOCATION, AND GRADING PLAN (1"=20')
F. BMP AND OUTLET STRUCTURE PROFILE AND DETAILS. THE
PROFILE MUST SPECIFY THE WATER QUALITY, 2 YEAR,
10 YEAR,AND 100 YEAR WATER SURFACE ELEVATIONS WITH
THEIR RESPECTIVE VOLUMES. (CL-CBPA 4F)
G. INCREMENTAL DRAINAGE AREAS TO EACH BMP, AND THE LAND
COVER TYPES WITHIN EACH DRAINAGE AREA (CL-CBPA 4H)
I. DRAINAGE AREA MAP SHOWING:
1) DRAINAGE AREA(S) TO WHERE THE SITE OUTFALL(S) MEET
ENERGY BALANCE FOR THE CHANNEL PROTECTION ANALYSIS
AND WHERE THE SITE MEETS 10-YEAR POST TO 10-YEAR
PRE FOR FLOOD PROTECTION
2) WHERE THE SITE IS 1% OR LESS THAN THE ENTIRE
DRAINAGE AREA, OR;
3) WHERE THE UNATTENUATED FLOW IS 1% OR LESS THAN THE
FLOW AT THAT POINT, OR;
4) WHERE THE FLOW FROM THE SITE AND ITS DOWNSTREAM ARE
REACHES A NATURAL STORMWATER CONVEYANCE SYSTEM FOR
THE 2-YEAR STORM, AND WHERE THE FLOW FROM THE SITE
AND ITS DOWNSTREAM AREA REACHES A DOCUMENTED
FLOODPLAIN (COUNTY OR FEMA) FOR THE 10-YEAR STORM
H. PROVIDE CHANNEL AND FLOOD PROTECTION CALCULATIONS
I. PROPOSED EASEMENT LOCAITONS
J. ALL SWM/BMP AREAS THAT ARE TO UTILIZE RUNOFF REDUCTION
IN THE DESIGN SHALL BE PROTECTED FROM CONSTRUCTION
TRAFFIC FOR THE DURATION OF THE PROJECT. IF
CONSTRUCTION TRAFFIC IS TO IMPACT THE SWM/BMP AREA,
THEN COMPOST AMENDMENTS OR UNDERDRAINS SHALL BE USED.
THESE AREAS SHALL BE MARKED ON THE PLANS AND IN THE
FIELD TO PREVENT CONSTRUCTION TRAFFIC IMPACTS.
40. THE EROSION CONTROL AND CBPA COMPLIANCE SHEET(S) MUST
SPECIFY THE PLACEMENT OF PLASTIC OPTIC ORANGE SAFETY
FENCE (STD. & SPEC. 3.01 OF THE VESCH) ALONG THE
WETLANDS LIMITS. THE LIMITS OF THE WETLANDS AND
PLACEMENT OF THE SAFETY FENCE SHALL BE SURVEY LOCATED.
(CL-CBPA 9)
41. VEHICULAR SAFETY MEASURES ARE REQUIRED ALONG PARKING
SPACES AND DRIVE AISLES ADJACENT TO RETENTION AND
DETENTION FACILITIES. (CL-CBPA 10)
42. ALL POINTS OF CONCENTRATED INFLOW TO THE SWM/BMP
FACILITY MUST TIE INTO THE BASIN AT THE NORMAL WATER
SURFACE OR BELOW. IF THE OUTFALL IS SUBMERGED, A
MINIMUM OF 3 FEET IS REQUIRED BETWEEN THE INVERT OF TH
INFLOW STRUCTURE AND THE BOTTOM OF THE BASIN.
(CL-CBPA 12)
43. THE ENTIRE BASIN MUST BE ENCLOSED WITHIN AN SWM/BMP
EASEMENT WHICH EXTENDS 8 FT. BEYOND THE 100-YEAR WSE.
OR DOWNSTREAM TOE OF DAM, WHICHEVER APPLIES.
(CL-CBPA 14)
44. A MINIMUM 20' WIDE ACCESS EASEMENT MUST BE PROVIDED
FROM THE SWM/BMP EASEMENT TO A PUBLIC RIGHT-OF-WAY FOR
FUTURE MAINTENANCE. (CL-CBPA 15)
45. THE EASEMENT ENCLOSING THE BIORETENTION FACILITY MUST
BE LABELED "BIORETENTION BMP EASEMENT".
46. METES AND BOUNDS MUST BE PROVIDED ON THE PLAN SHEET FO
SWM/BMP EASEMENTS AND ACCESS EASEMENTS. (CL-CBPA 16)
47. A MINIMUM 12 FOOT WIDE RAMP MUST BE PROVIDED FROM THE
ACCESS GATE TO THE BOTTOM OF THE SWM/BMP FACILITY. TH
SLOPE CANNOT EXCEED 6:1. (CL-CBPA 17)
48. ALL SWM/BMP FACILITIES WHICH ARE 4 FEET OR LESS IN
DEPTH AND ONE ACRE FEET OR LESS IS SURFACE AREA MUST
PROVIDE A SAFETY BENCH OR BE ENCLOSED WITHIN A 6 FOOT
HIGH PERIMETER FENCE. A VEGETATIVE BARRIER MAY BE
SUBSTITUTED FOR THE FENCE, HOWEVER A PERFORMANCE BOND
MUST BE PROVIDED FOR THE COST AND INSTALLATION OF THE
PLANT MATERIALS. A GATE MUST ALSO BE PROVIDED WHICH
ALIGNS WITH THE 20 FOOT ACCESS EASEMENT. (CL-CBPA 18)
49. ALL SWM/BMP FACILITIES WHICH ARE MORE THAN 4 FEET IN
DEPTH OR MORE THAN ONE ACRE FEET IN SURFACE AREA MUST
PROVIDE BOTH A SAFETY BENCH AND AN AQUATIC BENCH, OR B
ENCLOSED WITHIN A 6-FOOT HIGH PERIMETER FENCE. A
VEGETATIVE BARRIER MAY BE SUBSTITUTED FOR THE FENCE,
HOWEVER A PERFORMANCE BOND MUST BE PROVIDED FOR THE
COST AND INSTALLATION OF THE PLANT MATERIALS. A GATE
MUST ALSO BE PROVIDED WHICH ALIGNS WITH THE 20 FOOT
ACCESS EASEMENT. (CL-CBPA 19)
50. A 50' VEGETATIVE PERIMETER YARD IS REQUIRED AROUND
THE BASIN MEASURED FROM THE 100 YEAR WATER SURFACE
ELEVATION OR THE DOWNSTREAM TOE OF DAM, WHICHEVER
APPLIES, BETWEEN THE BASIN AND ANY RESIDENTIAL PARCEL.
THIS AREA MUST BE INCLUDED WITHIN THE LIMITS OF THE
SWM/BMP EASEMENT. (CL-CBPA 20)
51. PERFORATIONS IN THE RISER MUST BE PRECAST, NOT FIELD
MADE. PLEASE ADD A NOTE TO THE RISER DETAIL.
(CL-CBPA 26)
52. A MINIMUM OF 1 FOOT OF FREEBOARD IS REQUIRED BETWEEN
THE TOP OF THE EMBANKMENT AND THE STAGED 100-YEAR
WATER SURFACE ELEVATION IF AN EMERGENCY SPILLWAY IS
SPECIFIED. TWO FEET OF FREEBOARD IS REQUIRED IF THERE
IS NO EMERGENCY SPILLWAY. (CL-CBPA 27)
53. A DETAIL MUST BE PROVIDED ON THE PLAN SHOWING THE
METHOD OF SECURING THE METAL TRASH RACK / ANTI VORTEX
DEVICE TO THE CONCRETE RISER PIPE. (CL-CBPA 31)
54. THE EMBANKMENT MUST HAVE AN IMPERMEABLE CLAY CORE KEYE
INTO THE NATURAL GROUND. PLEASE SHOW A DETAIL.
(CL-CBPA 32)
55. SWM/BMP FACILITIES WHICH ARE GREATER THAN 8 FEET IN
DEPTH MUST HAVE A SURFACE AREA OF AT LEAST 1 ACRE.
WATER QUALITY VOLUMES FOR CBPA COMPLIANCE APPLIES ONLY
TO THOSE AREAS WHICH ARE LESS THAN 8 FEET IN DEPTH.
(CL-CBPA 38)
56. PROVISIONS MUST BE MADE IN THE EROSION CONTROL
NARRATIVE FOR CONVERSION OF THE SEDIMENT BASIN INTO A
SWM/BMP FACILITY AFTER THE UPSTREAM AREAS ARE FULLY
STABILIZED. ALL EXISTING SILT MUST BE REMOVED FROM TH
BASIN. (CL-CBPA 39)
57. PROVISIONS MUST BE MADE IN THE EROSION CONTROL
NARRATIVE FOR THE SWM/BMP FACILITY TO BE OBSERVED
BY A PROFESSIONAL ENGINEER DURING CONSTRUCTION. "AS
BUILT" INFORMATION WILL BE REQUIRED FOR FUTURE
CERTIFICATION OF THE FACILITY. CERTIFICATION IS
REQUIRED PRIOR TO RELEASE OF THE SWM/BMP PERFORMANCE
BOND AND ANY CERTIFICATE OF OCCUPANCY. (CL-CBPA 42)
58. CONDOMINIUM PROJECTS REQUIRE A BMP MAINTENANCE FEE OF
$100 PER UNIT PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT. (CL-CBPA 43)
59. PROVIDE LANDSCAPE PLAN.
60. SHEET C01.0:
A) INDICATE LEVELS OF BMP PRACTICES IN THE COMPLIANCE
NOTE.
B) ENSURE LIMITS OF DISTURBANCE AND SITE AREA INCLUDES
WORK WITHIN ROW AND OFFSITE.
61. SHEET C03.0:
A) SHOW AND LABEL THE COUNTY FLOODPLAIN ON ALL
APPLICABLE SHEETS.
B) SHOW AND LABEL THE 35' SETBACK FROM THE FLOODPLAIN
FOR ALL RESIDENTIAL STRUCTURES AND THE 25' SETBACK
FOR NON-RESIDENTIAL STRUCTURES.
C) PROVIDE VPD FOR THE PROPOSED AND EXISTING ROADWAYS.
D) LABEL THE INTERMITTENT STREAM ON ALL APPLICABLE
SHEETS.
62. ON SHEET C4.0, PROVIDE MC-3 AT THE END OF THE PROPOSED
ROADWAY EXTENSION.
63. SHEET C06.5:
A) RELABEL SHEET TO BMP DETAILS.
B) CHANGE THE BMP/SWM PROFILE TITLE TO "WET POND LEVEL
2 PROFILE"
C) SHOW AND LABEL THE REQUIRED SAFETY AND AQUATIC
BENCHES.
D) IN THE BMP/SWM PROFILE THE 1-YEAR IS SHOWN HIGHER
THAN THE CREST OF RISER.
E) PROVIDE CORRESPONDING SECTION LOCATION IN PLAN VIEW
FOR THE TWO PROFILES.
F) THE TRASH RACKS SHALL BE STAINLESS STEEL.
G) THE DEBRIS CAGE INDICATES A DETAIL ON THIS SHEET,
BUT THE DETAIL IS MISSING. PROVIDE DETAIL OR
CORRECT NOTE.
H) THE ELEVATIONS LABELED FOR THE STORM EVENTS IN THE
BIORETENTION PROFILE ARE BELOW THE BOTTOM OF THE
BASIN.
I) IN THE BIORETENTION PROFILE, THE LABEL FOR THE RISE
CREST SHOULD POINT TO THE RISER CREST.
J) PROVIDE TV ELEVATION FOR THE BIORETENTION PROFILE.
64. ENSURE ALL UTILITY LINE CROSSINGS ARE SHOWN IN THE
STORM SEWER PROFILES WITH SEPARATIONS LABELED.
65. SHEET C08-C08.3:
A) ALL PIPES WITHIN PROPOSED EASEMENTS AND RIGHTS-OF-
WAY MUST BE RCP.
B) 12" PIPE IS ONLY ALLOWED FOR THE FIRST RUN OF STORM
SEWER WHEN LESS THAN 50' IN LENGTH.
C) PROVIDE MORE DETAIL AND INFORMATION FOR THE AREA
DOWNSTREAM FROM THE POND.
D) THE REQUIRED FOR BMP DESIGN SPECIFICATION APPEARS T
HEAVILY ENCROACH INTO THE BUFFER REQUIRED. VERIFY
WITH PLANNING THIS IS ACCEPTABLE TO THE INTENT OF
THE BUFFER.
E) CLARIFY HOW THE RUNOFF FROM THE BACK OF THE
CONDOMINIUMS INTO CLOVERHILL ESTATES IS HANDLED AND
HOW IT MEETS COMPLIANCE WITH STORMWATER QUANTITY AN
ZONING REQUIREMENTS.
F) PROVIDE SPOT SHOTS ALONG DRIVEWAYS TO VERIFY
GRADING.
G) IT IS SUGGESTED TO PROVIDE CURB OR EDGE TREATMENT
FOR THE BACK OF DRIVEWAYS/PARKING TO DIRECT THE FLO
INTO THE ADJACENT INLET.
H) ENSURE ALL DRAINAGE STRUCTURES AND PIPES ARE
INCLUDED IN TABLE.
I) ENSURE ALL STRUCTURES REQUIRING IS-1 ARE LABELED IN
THE TABLE.
J) DI-3B/C BY STANDARD ALLOW UP TO A 30" PIPE SIZE.
STRUCTURES CONTAINING 36" PIPES OR LARGER SHALL BE
DI-4B/C.
K) PROVIDE DETAIL FOR DI-11.
66. C09:
A) PROVIDE A LEGEND.
B) SHOW AND LABEL SITE OUTFALL/ANALYSIS POINTS.
C) LABEL DRAINAGE AREAS AND LAND USE.
D) INCLUDE DRAINAGE AREAS FOR OFFSITE WORK.
E) PROVIDE OVERALL DRAINAGE AREA TO EXISTING CULVERT.
F) LABEL CONTOURS
67. SHEET C09.1:
A) SOME OF THE DRAINAGE AREA LINES ARE OBSCURED BY
BUILDING FOOT PRINTS.
B) LABEL DRAINAGE AREAS WITH CORRESPONDING STRUCTURES.
C) ENSURE ALL DRAINAGE AREAS ARE CORRECT. IN ADDITION
IT APPEARS SOME STRUCTURES AND AREAS DO NOT HAVE AN
ASSOCIATED DRAINAGE AREA.
D) LABEL CONTOURS
E) PROVIDE DRAINAGE AREA FOR POND.
F) PROVIDE MORE INFORMATION ON OFFSITE AREAS AND
RESIDENTIAL PARCELS.
68. SHEET C09.2:
A) SIDEWALKS APPEAR TO BE MISSING FROM IMPERVIOUS
AREAS.
B) SHOW AND LABEL SITE AREA.
C) PROVIDE HATCHING FOR MANAGED TURF.
D) THERE APPEARS TO BE TWO HATCHINGS LABELED B SOILS
IMPERVIOUS AREAS.
69. SHEET C10.0:
A) LABEL CONTOURS EXISTING AND FOR PROPOSED SEDIMENT
TRAPPING STRUCTURES.
B) CLARIFY RECEIVING AREAS FOR THE SEDIMENT TRAPPING
PRACTICES. MANY APPEAR TO BE HEADING TOWARD HOMES
AND PROPERTIES.
C) PROVIDE MORE INFORMATION FOR THE SEDIMENT BASINS.
D) SHOW LIMITED LIMITS OF DISTURBANCE FOR INSTALLING
PHASE 1 PRACTICES ONLY.
E) PROVIDE STABILIZED CONSTRUCTION ROADS TO THE
PRACTICES.
F) LABEL DRAINAGE AREAS FOR PRACTICES.
G) USE SUPER SILT FENCE FOR ALL BOUNDARY SILT FENCE AN
PROVIDE DETAIL.
H) PROVIDE TEMPORARY SEEDING FOR ALL DIVERSION DIKES,
STOCKPILES, TRAPS AND BASINS.
I) PROVIDE SILT FENCE OUTLET LOCATIONS.
70. SHEET C10.1:
A) USE USC SIZING OF 1.25 TIMES THE DRAINAGE AREA FOR
ALL BASINS AND TRAPS.
B) COMPLETE THE BASIN TABLE.
71. SHEET C11.0-11.1:
A) PROVIDE CIP IF APPLICABLE FOR THE CULVERT UNDER
ASHBROOK PARKWAY.
B) LABEL CONTOURS.
C) SHOW FOREBAY ARMOR PROTECTION.
D) ENSURE ESC REGULATIONS REFER TO CURRENT REGULATIONS
72. SHEET C12.0:
A) ENSURE ESC REGULATIONS REFER TO CURRENT REGULATIONS
B) THE PROJECT NARRATIVE DOES NOT APPEAR TO MATCH THE
PLANS.
73. BMP AND SWM DESIGN:
A) WET POND LEVEL 2:
1) PROVIDE ANTI-FLOATATION CALCULATIONS.
2) THE 36" OUTFALL PIPE WILL HAVE DIFFICULTY BEING
INSTALLED INTO THE 42" RISER. PROVIDE LARGER
RISER OR SMALLER OUTFALL PIPES.
3) PROVIDE AND LABEL BOTTOM SLOPE FOR THE POND.
4) THE WETLAND CELL SHALL BE DESIGNED AS A
CONSTRUCTED WETLAND IN ACCORDANCE WITH
SPECIFICATIONS 13 AND 14.
5) IDENTIFY AND PROVIDE DETAIL FOR BIRD PROOFING TH
FACILITY.
6) SHOW THE HARD ARMORING FOR THE FOREBAY.
7) SHOW THE WEIR LOCATIONS IN PLAN VIEW FOR THE
SEPARATION BETWEEN CELLS. THE WEIR FROM THE
FOREBAY INTO THE WETLAND SHALL BE LOWER THAN THE
WEIR INTO THE MAIN POND.
8) PROVIDE OUTLET WORKS AND LOCATIONS ON ALL
APPLICABLE PLAN SHEETS.
9) ENSURE ACCESS IS PROVIDED TO EACH CELL OF THE
FACILITY.
10) THE RECEIVING CHANNEL/AREA FOR THE PRINCIPAL
SPILLWAY MUST BE DESIGNED TO BE STABILIZED FOR
THE 10-YEAR STORM EVENT.
B) BIORETENTION / EXTENDED DETENTION:
1) INCLUDE THE REQUIRED SAND IN THE CHOKER LAYER.
2) PROVIDE FILTER FABRIC PER SPECIFICATION.
3) PROVIDE AND LABEL BOTTOM SLOPE FOR DETENTION.
4) PROVIDE MATERIAL SPECIFICATIONS FOR THE
BIORETENTION MEDIA.
5) PROVIDE FENCE AROUND BIORETENTION AREA.
6) IT APPEARS THE TREE CLEARING AREA EXTENDS TO THE
ADJACENT PROPERTY. THIS AREA SHALL BE CLEARED
AND THE EASEMENT SHALL EXTEND ONTO THIS PROPERTY
TO ENSURE IT STAYS CLEARED. IN ADDITION, OFFSIT
PERMISSION TO REMOVE THE WOODY VEGETATION IN THI
AREA WILL BE REQUIRED.
7) IN PLAN VIEW, THERE IS AN AREA LABELED WITH
REQUIRED WETLAND AREA. THIS DOES NOT APPLY TO
BIORETENTION.
8) PROVIDE DETAIL AND DESIGN FOR THE GRAVEL FLOW
SPREADER.
9) PROVIDE A GEOENVIRONMENTAL REPORT INDICATING THE
SEASONAL HIGH GROUND WATER AND THE 2' OF
SEPARATION REQUIRED FOR THE BIORETENTION
PRACTICE. THE BORING SHALL BE DONE IN THE
LOCATION OF THE BIORETENTION, PROVIDE A MINIMUM
OF 2 BORINGS.
10) PROVIDE ACCESS TO BOTH CELLS.
11) PROVIDE FLOW PATH AND LENGTH TO WIDTH RATIO
CALCULATIONS.
12) PROVIDE OUTLET PROTECTION FOR THE DISCHARGE PIPE
13) CLARIFY WHERE THE RECEIVING CHANNEL IS FOR THE
PROPERTY. DRAINAGE EASEMENTS MAY BE REQUIRED.
C) GENERAL:
1) PROVIDE CONSTRUCTION SEQUENCING AND INSTALLATION
NOTES.
2) FOREBAYS SHALL BE 15% OF THE TREATMENT VOLUME OR
0.25" PER IMPERVIOUS ACRE, WHICHEVER IS GREATER.
3) THE DIFFERENT CELLS IN THE PRACTICES SHOULD BE
HARD ARMORED TO PREVENT EROSION. PROVIDE DETAIL
FOR ARMORING AND INSTALLATION.
4) PROVIDE BREACH ROUTINGS FOR THE 100-YEAR STORM.
5) PROVIDE CROSS-SECTIONS IN ADDITION TO THE
PROFILES FOR CONSTRUCTION AND INSTALLATION.
6) SHOW AND LABEL A "NO MOW ZONE" FROM THE NWSE TO
THE TOP OF THE FACILITY. INCLUDE SIGN AND
DETAIL.
7) REMOVE ALL WOODY VEGETATION FROM WITHIN 15' OF
THE TOE OF SLOPE FOR THE IMPOUNDMENT AND 25' OF
THE PRINCIPAL SPILLWAY OUTLET.
8) CLARIFY HOW THE RUNOFF FROM THE BACK OF THE
CONDOMINIUMS INTO CLOVERHILL ESTATES IS HANDLED
AND HOW IT MEETS COMPLIANCE WITH STORMWATER
QUANTITY AND ZONING REQUIREMENTS.
9) INCLUDE AN ANALYSIS POINT FOR THE DRAINAGE GOING
TOWARD THE INTERSECTION OF ASHBROOK AND ASHLAKE
PARKWAYS AND ITS COMPLIANCE WITH STORMWATER
QUANTITY CRITERIA.
74. CALCULATIONS:
A) PROVIDE PONDING DEPTHS FOR DI-1 INLETS.
B) PROVIDE 100-YEAR STORM SEWER AND HGL CALCULATIONS.
C) PROVIDE 6.5" CHECK STORMS FOR ALL INLETS.
D) IN THE ROUTINGS IT APPEARS THE ENERGY BALANCE
CALCULATIONS ARE USING AN EQUIVALENT DRAINAGE AREA
FOR THE PRE AND POST. THE PRE SHOULD BE THE AREA
DRAINING TO THE POINTS OF ANALYSIS PRIOR TO
DEVELOPMENT. THE ENERGY BALANCE SHOULD BE
CALCULATED USING THE RV AND Q FROM THE PRE WITH AN
IMPROVEMENT FACTOR AND THE TOTAL POST SITE AREA
DRAINING TO THAT ANALYSIS POINT. IT DOES NOT APPEA
BASED ON THE INFORMATION PROVIDED THAT ALL OF THE
POST AREA DRAINS TO THE ANALYSIS POINTS AS INDICATE
IN THE ROUTINGS. REVISE.
E) THE VRRM SPREADSHEET SHOULD BE FOR THE ENTIRE SITE,
INCLUDING WORK WITHIN ROW AND OFFSITE, AND CONTAINE
WITHIN ONE SPREADSHEET
F) THE OPEN AREA NOT PERMANENTLY INUNDATED WITHIN THE
BMPS MAY BE CONSIDERED OPEN SPACE.
G) CLARIFY HOW A ONE-YEAR RATIONAL WAS USED. VDOT OR
DEQ DOES NOT HAVE SUPPORTING INFORMATION FOR A ONE-
YEAR RATIONAL.
75. CONDOMINIUM AND APARTMENT PROJECTS REQUIRE A BMP
MAINTENANCE FEE OF $100/UNIT. PAYMENT MUST BE RECEIVE
PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT.
(CL-USC 2)
76. ADDITIONAL EROSION CONTROL MEASURES OTHER THAN THE
MINIMUM STANDARDS CONTAINED IN THE VIRGINIA EROSION AN
SEDIMENT CONTROL HANDBOOK WILL BE REQUIRED IF IT IS
DETERMINED THAT SUCH MEASURES ARE NECESSARY FOR
PROTECTION OF SENSITIVE ENVIRONMENTAL FEATURES AND/OR
WATER RESOURCES. (CL-USC 3)
77. ENHANCED PERIMETER PROTECTION MEASURES ARE REQUIRED.
(SUPER SILT FENCE, SEDIMENT BASINS AND TRAPS SIZED 25
PERCENT LARGER THAN MINIMUM STANDARDS, ETC.) (CL-USC 4
78. ANY UTILITY RELOCATIONS MUST BE INCORPORATED INTO THE
EROSION AND SEDIMENT CONTROL PLAN AND NARRATIVE.
(CL-USC 5)
79. FOR SITES OVER FIVE ACRES, A MONTHLY EROSION AND
SEDIMENT CONTROL REPORT FROM THE CRLD MUST BE SUBMITTE
TO ENVIRONMENTAL ENGINEERING BY THE FIRST OF EACH
MONTH. (CL-USC 6)
80. ALL NEW CONSTRUCTION AND SUBSTANTIAL IMPROVEMENTS OF
NONRESIDENTIAL STRUCTURES AND ACCESSORY BUILDINGS SHAL
BE LOCATED OUTSIDE THE FLOODWAY FRINGE AND SHALL BE SE
BACK AT LEAST 25 FEET HORIZONTAL DISTANCE FROM THE
OUTERMOST BOUNDARY OF THE BASE FLOOD AREA, WETLANDS,
RESOURCE PROTECTION AREAS AND 100-YEAR FLOODPLAINS
WHERE THE CONTRIBUTING DRAINAGE AREA EXCEEDS 100 ACRES
PROVIDED HOWEVER, THAT WHEN LID PRACTICES AS DETERMINE
BY THE DIRECTOR OF ENVIRONMENTAL ENGINEERING ARE USED
ADJACENT TO WETLANDS, FLOODPLAINS, AND RESOURCE
PROTECTION AREAS THE SETBACK MAY BE REDUCED TO 5 FEET.
(CL-USC 7)
81. AN ALTERNATIVE MEANS OF DEFINING PAVEMENT EDGES AS
DETERMINED BY THE DIRECTOR OF ENVIRONMENTAL ENGINEERIN
MAY BE SUBSTITUTED FOR CURB AND GUTTER WHEN LOW IMPACT
DEVELOPMENT PRACTICES ARE USED. (CL-USC 8)
82. THE DESIGN AND CONSTRUCTION OF THE SWM/BMP WHICH WILL
BE A COUNTY MAINTAINED FACILITY WILL BE SUBJECT TO
INDEPENDENTLY DOCUMENTED GEOTECHNICAL APPROVAL. THE
SERVICES WHICH MUST BE PROVIDED BY THE INDEPENDENT
GEOTECHNICAL ENGINEERING FIRM SHALL INCLUDE FULL TIME
GEOTECHNICAL INSPECTION PAID FOR BY THE DEVELOPER.
THAT FULL TIME INSPECTION SHALL INCLUDE BUT NOT BE
LIMITED TO THE FOLLOWING (CL-USC 9):
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS
NECESSARY TO FACILITATE THE APPROVAL PROCESS OF THE
INDEPENDENT GEOTECHNICAL CONSULTANT. (CL-USC 9A)
OBSERVATION, TESTING AND DOCUMENTATION OF:
B. SUITABLE SUBGRADES TO RECEIVE COMPACTED STRUCTURAL FIL
FOR EARTH DAM CONSTRUCTION. (CL-USC 9B)
C. THE CUT OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE AND CONCRETE CHUTE SPILLWAY SUBGRADES
AS APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS
PRESENT AT BEARING GRADE TO VERIFY PROPER INSTALLATION
(CL-USC 9C)
D. FILL PLACEMENT AND FIELD DENSITY TESTING TO EVALUATE/
VERIFY PROPER COMPACTION. (CL-USC 9D)
E. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
(CL-USC 9E)
83. THE FACILITY CERTIFICATION PROCESS SHALL BE PERFORMED
BY AN ENGINEERING/SURVEYING PROFESSIONAL CHOSEN BY THE
COUNTY AT THE OWNERS EXPENSE. (CL-USC 10)
84. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL OF THE SWM/BMP WILL
BE FURNISHED ON THE LAND DISTURBANCE PERMIT.(CL-USC 11
85. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL
ENGINEERING DEPARTMENT AND OBTAIN AN "APPROVED FOR
CONSTRUCTION" STAMP ON TWO ADDITIONAL SETS FOR THE
OWNER TO KEEP ON-SITE.
86. PERMISSION MUST BE OBTAINED FROM THE ADJACENT PROPERTY
OWNER(S) ALLOWING FOR GRADING ON THE PROPERTY AS
PROPOSED PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
87. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, THE
NAME, "WALK-IN" ADDRESS, AND TELEPHONE NUMBER OF
A LOCAL REGISTERED AGENT REPRESENTING THE OWNER FOR
SERVICE OF PROCESS MUST BE PROVIDED ON THE "APPOINTMEN
OF AGENT FOR SERVICE OF PROCESS" FORM FOUND ON THE
CHESTERFIELD COUNTY ENVIRONMENTAL ENGINEERING WEBPAGE.
(CL-GENERAL 12)
88. ALL OFFSITE DRAINAGE EASEMENTS MUST BE RECORDED PRIOR
TO ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS
PROJECT.
89. A CONSTRUCTION PERFORMANCE BOND MUST BE PROVIDED FOR
THE IMPROVEMENTS WITHIN THE PROPOSED RIGHT OF WAY PRIO
TO ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS
PROJECT.
90. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER /
BMP DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO
ISSUANCE OF A BUILDING PERMIT FOR THIS PROJECT.
91. THE POLLUTION PREVENTION PLAN MUST BE PROVIDED TO THE
ENVIRONMENTAL ENGINEERING INSPECTOR PRIOR TO ISSUANCE
OF A LAND DISTURBANCE PERMIT. THE CHESTERFIELD COUNTY
POLLUTION PREVENTION PLAN SHEET MAY BE PROVIDED IN THE
CONSTRUCTION PLANS (THIS IS AVAILABLE ON THE
ENVIRONMENTAL ENGINEERING DOCUMENTS AND FORMS WEBPAGE)
92. AS-BUILT BMP INFORMATION WILL BE REQUIRED FOR EACH
BMP FACILITY AS PART OF ITS FUTURE CERTIFICATION.
93. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A
SURETY FOR THE CONSTRUCTION OF THE PERMANENT BMP MUST
BE POSTED WITH ENVIRONMENTAL ENGINEERING. (COUNTY CODE
PART II, CHAPTER 8, SEC. 8-16)
94. THE BMP MUST BE CERTIFIED PRIOR TO RELEASE OF THE BMP
PERFORMANCE BOND.
95. CONDOMINIUM PROJECTS REQUIRE A BMP MAINTENANCE FEE OF
$100/UNIT PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
96. THE RISER AND BARREL PIPE ASSOCIATED WITH THE SEDIMENT
BASIN MUST BE ON-SITE PRIOR TO ISSUANCE OF A LAND
DISTURBANCE PERMIT.
97. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD FILE MUST BE SUBMITTED TO CAROLE
CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE AUTOCAD
FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD VERSIO
2009 OR EARLIER AND REFERENCED DIRECTLY TO THE VIRGINI
STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN THE NAD83
DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD
OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH THE SITE
PLAN NAME, SITE PLAN NUMBER, ENGINEERING FIRM AND CAD
FILE PREPARER'S NAME AND PHONE NUMBER. THE FILE MUST
CONTAIN THE FOLLOWING, EACH CLEARLY LABELED IN SEPARAT
LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. PARKING LOTS AND DRIVEWAYS;
C. ROADS;
D. SIDEWALKS;
E. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE; AND
F. FLOODPLAINS.
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
98. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
99. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A VDOT LAND USE PERMIT
C. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
D. THE VIRGINIA STORMWATER MANAGEMENT PERMIT (VSMP)
REGISTRATION STATEMENT AND FEE OF $4,500
E. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BOOK
F. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)
G. A STREET SIGN FEE OF $150 PER ROAD INTERSECTION MUST B
PROVIDED
==========================================================
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : DUSTIN DUNNAGAN / 706-2061
NAME OF PLAN : VILLAS AT ASHLAKE
ADDRESS : 7501 ASHLAKE PKWY
SITE PLAN NO. : 16PR0253
LATEST PLAN DATE : OCTOBER 06, 2016
DEPT. REC'D DATE : OCTOBER 10, 2016
SUBMITTAL NUMBER : 2
REVIEW DATE : NOVEMBER 1, 2016
RECOMMENDATION : NOT APPROVED
TABLE REVISION : NO
PLAT PROCESSING : NO
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL
FEATURES INCLUDING BUT NOT LIMITED TO WETLANDS,
SURFACE WATERS (E.G. VSMP PERMIT FOR CONSTRUCTION
SITES, GROUND WATER AND AIR QUALITY) FINAL APPROVAL
OF THESE PLANS WILL NOT RELIEVE YOU OF YOUR
RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE
LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. EFFECTIVE JULY 1, 2014, ENFORCEMENT OF THE VIRGINIA
STORMWATER REGULATIONS BECAME THE RESPONSIBILITY OF
THE COUNTY FOR DEVELOPMENT PROJECTS WITHIN
CHESTERFIELD COUNTY. ADDITIONALLY, NEW STATE
STORMWATER REGULATIONS ALSO BECAME EFFECTIVE ON
JULY 1, 2014. LAND DISTURBING ACTIVITIES THAT
OBTAINED A VSMP PERMIT PRIOR TO JULY 1, 2014 MAY
USE THE STORMWATER MANAGEMENT CRITERIA SPECIFIED
IN PART II C (9VAC25-870-93 ET SEQ) FOR TWO PERMIT
CYCLES. PROJECTS GRANDFATHERED UNDER THE PROVISIONS
OF 9VAC25-870-48 MAY FOLLOW THE REQUIREMENTS LISTED
UNDER PART IIC FOR ONE PERMIT CYCLE. ALL OTHER NEW
DEVELOPMENT WILL BE SUBJECT TO THE REQUIREMENTS OF
PART IIB (9VAC25-870-62 TO 9VAC25-870-92).
03. CURSORY REVIEW WAS PROVIDED DUE TO DESIGN CALCULATIONS
MISSING FROM PLAN. IN ADDITION, A STAND-ALONE MEETING
WITH EE IS RECOMMENDED TO REVIEW THE APPROACH TO
THIS PROJECT.
*** THE FOLLOWING COMMENTS FROM THE PREVIOUS REVIEW WERE
NOT ADEQUATELY ADDRESSED WITH SUBMITTAL***
04. PROVIDE THE FOLLOWING INFORMATION ON THE COVER SHEET:
A. LATITUDE AND LONGITUDE FOR THE PROJECT SITE (IN
DEGREES, MINUTES, SECONDS, TO THE NEAREST 15 SECONDS)
THE LATITUDE AND LONGITUDE SHOWN WERE IN MAGNOLIA
GREEN.
08. A VDOT STANDARD ENDWALL IS REQUIRED ON ALL
MULTI-LINE STRUCTURES, STRUCTURES WITH DIAMETERS
30" AND LARGER, AND WHEN THE STRUCTURE IS PROPOSED
ON A SLOPE OF 15% OR GREATER. (CL-G&D 7)
17. ENSURE ALL STREET NAMES HAVE BEEN APPROVED BY THE
RICHMOND REGIONAL PLANNING DISTRICT COMMISION (RRPDC)
STREET NAME CLEARINGHOUSE.
27. SAFETY FENCE (STD. & SPEC 3.01) IS REQUIRED AROUND ALL
SEDIMENT TRAPS AND SEDIMENT BASINS. (CL-EC 15)
35. BLANKET AND MATTING MUST BE SPECIFIED ON ALL EXPOSED
SLOPES 3:1 OR GREATER THAT ARE 5 FEET OR GREATER IN
HEIGHT.
39. A STORMWATER COMPLIANCE SHEET(S) IS REQUIRED FOR
PROJECTS UTILIZING PART IIB OF THE CURRENT VIRGINIA
STORMWATER REGULATIONS. THE FOLLOWING INFORMATION IS
REQUIRED TO BE SHOWN ON THE SHEET(S):
D. NATURAL VEGETATED AREA EASEMENTS FOR AREAS CLAIMED AS
FORESTED/OPEN SPACE IN THE VRRM SPREADSHEET, THAT ARE
NOT ENCOMPASSED BY A BMP EASEMENT, RPA OR WITHIN A
PLANNING BUFFER/TREE SAVE AREA
J. ALL SWM/BMP AREAS THAT ARE TO UTILIZE RUNOFF REDUCTION
IN THE DESIGN SHALL BE PROTECTED FROM CONSTRUCTION
TRAFFIC FOR THE DURATION OF THE PROJECT. IF
CONSTRUCTION TRAFFIC IS TO IMPACT THE SWM/BMP AREA,
THEN COMPOST AMENDMENTS OR UNDERDRAINS SHALL BE USED.
THESE AREAS SHALL BE MARKED ON THE PLANS AND IN THE
FIELD TO PREVENT CONSTRUCTION TRAFFIC IMPACTS.
45. THE EASEMENT ENCLOSING THE BIORETENTION FACILITY MUST
BE LABELED "BIORETENTION BMP EASEMENT".
50. A 50' VEGETATIVE PERIMETER YARD IS REQUIRED AROUND
THE BASIN MEASURED FROM THE 100 YEAR WATER SURFACE
ELEVATION OR THE DOWNSTREAM TOE OF DAM, WHICHEVER
APPLIES, BETWEEN THE BASIN AND ANY RESIDENTIAL PARCEL.
THIS AREA MUST BE INCLUDED WITHIN THE LIMITS OF THE
SWM/BMP EASEMENT. (CL-CBPA 20)
59. PROVIDE LANDSCAPE PLAN.
60. SHEET C01.0:
B) ENSURE LIMITS OF DISTURBANCE AND SITE AREA INCLUDES
WORK WITHIN ROW AND OFFSITE.
61. SHEET C03.0:
B) SHOW AND LABEL THE 35' SETBACK FROM THE FLOODPLAIN
FOR ALL RESIDENTIAL STRUCTURES AND THE 25' SETBACK
FOR NON-RESIDENTIAL STRUCTURES.
C) PROVIDE VPD FOR THE PROPOSED AND EXISTING ROADWAYS.
63. SHEET C06.5:
A) RELABEL SHEET TO BMP DETAILS
J) PROVIDE TV ELEVATION FOR THE BIORETENTION PROFILE.
64. ENSURE ALL UTILITY LINE CROSSINGS ARE SHOWN IN THE
STORM SEWER PROFILES WITH SEPARATIONS LABELED.
65. SHEET C08-C08.3:
B) 12" PIPE IS ONLY ALLOWED FOR THE FIRST RUN OF STORM
SEWER WHEN LESS THAN 50' IN LENGTH.
C) PROVIDE MORE DETAIL AND INFORMATION FOR THE AREA
DOWNSTREAM FROM THE POND.
H) ENSURE ALL DRAINAGE STRUCTURES AND PIPES ARE
INCLUDED IN TABLE.
I) ENSURE ALL STRUCTURES REQUIRING IS-1 ARE LABELED IN
THE TABLE.
K) PROVIDE DETAIL FOR DI-11.
66. C09:
B) SHOW AND LABEL SITE OUTFALL/ANALYSIS POINTS.
E) PROVIDE OVERALL DRAINAGE AREA TO EXISTING CULVERT.
F) LABEL CONTOURS
67. SHEET C09.1:
F) PROVIDE MORE INFORMATION ON OFFSITE AREAS AND
RESIDENTIAL PARCELS.
69. SHEET C10.0:
A) LABEL CONTOURS EXISTING AND FOR PROPOSED SEDIMENT
TRAPPING STRUCTURES.
B) CLARIFY RECEIVING AREAS FOR THE SEDIMENT TRAPPING
PRACTICES. MANY APPEAR TO BE HEADING TOWARD HOMES
AND PROPERTIES.
D) SHOW LIMITED LIMITS OF DISTURBANCE FOR INSTALLING
PHASE 1 PRACTICES ONLY.
H) PROVIDE TEMPORARY SEEDING FOR ALL DIVERSION DIKES,
STOCKPILES, TRAPS AND BASINS.
I) PROVIDE SILT FENCE OUTLET LOCATIONS.
71. SHEET C11.0-11.1:
B) LABEL CONTOURS.
73. BMP AND SWM DESIGN:
A) WET POND LEVEL 2:
1) PROVIDE ANTI-FLOATATION CALCULATIONS.
4) THE WETLAND CELL SHALL BE DESIGNED AS A
CONSTRUCTED WETLAND IN ACCORDANCE WITH
SPECIFICATIONS 13 AND 14.
10) THE RECEIVING CHANNEL/AREA FOR THE PRINCIPAL
SPILLWAY MUST BE DESIGNED TO BE STABILIZED FOR
THE 10-YEAR STORM EVENT.
B) BIORETENTION / EXTENDED DETENTION:
3) PROVIDE AND LABEL BOTTOM SLOPE FOR DETENTION.
4) PROVIDE MATERIAL SPECIFICATIONS FOR THE
BIORETENTION MEDIA.
8) PROVIDE DETAIL AND DESIGN FOR THE GRAVEL FLOW
SPREADER.
9) PROVIDE A GEOENVIRONMENTAL REPORT INDICATING THE
SEASONAL HIGH GROUND WATER AND THE 2' OF
SEPARATION REQUIRED FOR THE BIORETENTION
PRACTICE. THE BORING SHALL BE DONE IN THE
LOCATION OF THE BIORETENTION, PROVIDE A MINIMUM
OF 2 BORINGS.
13) CLARIFY WHERE THE RECEIVING CHANNEL IS FOR THE
PROPERTY. DRAINAGE EASEMENTS MAY BE REQUIRED.
C) GENERAL:
4) PROVIDE BREACH ROUTINGS FOR THE 100-YEAR STORM.
74. CALCULATIONS:
A) PROVIDE PONDING DEPTHS FOR DI-1 INLETS.
B) PROVIDE 100-YEAR STORM SEWER AND HGL CALCULATIONS.
C) PROVIDE 6.5" CHECK STORMS FOR ALL INLETS.
D) IN THE ROUTINGS IT APPEARS THE ENERGY BALANCE
CALCULATIONS ARE USING AN EQUIVALENT DRAINAGE AREA
FOR THE PRE AND POST. THE PRE SHOULD BE THE AREA
DRAINING TO THE POINTS OF ANALYSIS PRIOR TO
DEVELOPMENT. THE ENERGY BALANCE SHOULD BE
CALCULATED USING THE RV AND Q FROM THE PRE WITH AN
IMPROVEMENT FACTOR AND THE TOTAL POST SITE AREA
DRAINING TO THAT ANALYSIS POINT. IT DOES NOT APPEA
BASED ON THE INFORMATION PROVIDED THAT ALL OF THE
POST AREA DRAINS TO THE ANALYSIS POINTS AS INDICATE
IN THE ROUTINGS. REVISE.
E) THE VRRM SPREADSHEET SHOULD BE FOR THE ENTIRE SITE,
INCLUDING WORK WITHIN ROW AND OFFSITE, AND CONTAINE
WITHIN ONE SPREADSHEET
G) CLARIFY HOW A ONE-YEAR RATIONAL WAS USED. VDOT OR
DEQ DOES NOT HAVE SUPPORTING INFORMATION FOR A ONE-
YEAR RATIONAL.
*** END PREVIOUS COMMENTS ***
04. A STREET SIGN FEE OF $150 PER ROAD INTERSECTION MUST B
PROVIDED PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
05. STREETLIGHTING:
A. STREETLIGHTS SHALL BE PROVIDED AT THE DEVELOPER'S
EXPENSE AT ANY AND ALL ENTRANCES AND EXITS OF
COMMERCIAL/INDUSTRIAL DEVELOPMENTS. LIGHTING SHALL BE
PROVIDED AS SPECIFIED IN THIS PARAGRAPH REGARDLESS OF
ANY OTHER LIGHTING CONSIDERATIONS, E.G., PARKING LOT
LIGHTING, SIGNAGE, OR TRAFFIC CONTROL LIGHTING.
B. IN ADDITION TO THE ACTUAL INSTALLATION COST OF ANY SUC
LIGHT(S), THE DEVELOPER SHALL PAY TO THE COUNTY AN
OPERATIONAL OFFSET FEE EQUIVALENT TO THE COST OF FIVE
YEARS OPERATION AND MAINTENANCE FOR EACH REQUIRED
STREETLIGHT INSTALLED BASED UPON THE SUPPLYING
UTILITY'S MONTHLY CHARGE FOR SAME PER LIGHT AT TIME OF
INSTALLATION, PLUS A $50 ADMINISTRATION FEE. REFER TO
THE STREETLIGHT POLICY FOR ACCEPTABLE LIGHTING
TYPES/STYLES (FOUND IN APPENDIX B OF THE ENVIRONMENTAL
ENGINEERING REFERENCE MANUAL).
C. ADDITIONAL, NON-REQUIRED STREETLIGHTS, BEYOND ANY
SPECIFICALLY REQUIRED IN PARAGRAPH A. ABOVE, SHALL BE
COST ESTIMATED, FUNDED, AND OPERATED AT THE DEVELOPER'
EXPENSE. NON-REQUIRED LIGHTING SHALL BE STRICTLY
LIMITED TO INTERNAL INTERSECTIONS WHERE ROADS ARE
IDENTIFIED AS INTENDED TO BE ACCEPTED INTO AND
MAINTAINED THROUGH THE STATE SECONDARY ROAD SYSTEM.
SUCH NON-REQUIRED INSTALLATIONS WILL NOT BE CONSIDERED
FOR FUTURE INCLUSION INTO THE COUNTY STREETLIGHT
PROGRAM.
D. PAYMENT OF THE OPERATIONAL OFFSET FEE, AS DESCRIBED
ABOVE, WILL BE REQUIRED AT A TIME NOT LATER THAN PLAN
APPROVAL. PAYMENT FOR THE COSTS OF STREETLIGHT
INSTALLATION AND THE $50 ADMINISTRATIVE FEE WILL BE
REQUIRED AT TIME OF RECEIPT OF THE PROJECT COST FROM
THE SUPPLYING UTILITY.
06. SHEET C01.0:
A) PROVIDE TOTAL ON-SITE IMPERVIOUS COVER IN SQUARE
FEET (EXCLUDING VDOT RIGHTS-OF-WAY AND GRAVELED
AREAS) BROKEN UP BY PHASES AND PARCELS.
B) NOTE 22 LISTS THE APPROXIMATE AREA AS "XXX ACRES".
COMPLETE THE NOTE TO INDICATE DISTURBANCE.
07. SHEET C02.0:
A) SHOW THE 100-YEAR FLOODPLAIN ON THE ADJACENT
PROPERTIES.
08. SHEET C03.1:
A) LABEL EASEMENT TYPES. FORESTED/OPEN SPACE EASEMENT
SHALL BE LABELED AS A VSMP EASEMENT.
B) INCLUDE ACCESS EASEMENT TO ANY VSMP EASEMENTS.
09. SHEET C04.0:
A) CLARIFY HOW THE LOW AREA BY THE INTERSECTION OF
ASHLAKE AND ASHBROOK NEAR THE EXISTING CULVERT
DRAINS. IT APPEARS A MANHOLE IS BEING PLACED ON TH
END OF THE CULVERT EXTENSION PREVENTING THE AREA
FROM DRAINING.
B) STRUCTURES 43-44 DOES NOT APPEAR IN THE STRUCTURE
TABLE.
C) THE DETAILS REFERENCED FOR MC-3 ASPHALT CURB, FIRE
LANE STRIPING, AND KNOX LOCK DO NOT APPEAR ON THE
SHEETS INDICATED. VERIFY SHEET REFERENCES.
10. SHEET C05.0:
A) THE RETAINING WALL APPEARS TO BE PLACED IN THE
FLOODPLAIN IN SOME LOCATIONS, PROVIDE UPDATED
FLOODPLAIN CALCULATIONS FOR THE EXISTING FLOODPLAIN
ON SITE.
11. ON SHEET C05.3, ENSURE ANY FUTURE EXTENSION OF THE
SEWER FROM STRUCTURE 13 TO THE EAST CAN CLEAR THE STOR
SEWER WITH THE PROPER CLEARANCE.
12. SHEET C06.7:
A) LABEL THE BOTTOM SLOPE FOR THE RETENTION AREA.
B) PROVIDE SHEET REFERENCE FOR THE CONCRETE WALL
DETAIL.
C) PROVIDE CLAY LINER FOR POND OR GEOTECHNICAL REPORT
FOR WHY IT IS NOT NEEDED.
D) PROVIDE DETAIL FOR CONCRETE CRADLE.
E) LABEL ELEVATIONS FOR THE CLAY CORE AND PROVIDE
DETAIL.
F) IN THE CONSTRUCTION NARRATIVE:
1) INDICATE THAT THE PRETREATMENT CELL IS TO BE
INSTALLED FIRST PRIOR TO WORKING ON OTHER ASPECT
OF THE BASIN.
2) THE SAFETY FENCE CALLED OUT IN NOTE 10 IS TO BE
MINIMUM OF 6' IN HEIGHT.
3) PROVIDE NOTES THAT THE FLOW TO THE WETLAND CELL
IS TO BE DIVERTED DURING CONSTRUCTION OF THE
WETLAND CELL.
G) PROVIDE THE FOLLOWING NOTES:
BMP CERTIFICATION DOCUMENTATION MUST INCLUDE THE
FOLLOWING:
A. AS-BUILT SURVEY OF THE FACILITY.
B. CERTIFICATION FORM PROVIDING AS-BUILT
ELEVATIONS/DIMENSIONS OF BMP ELEMENTS (INCLUDING,
BUT NOT LIMITED TO: UNDERDRAINS, GRAVEL LAYER,
MEDIA LAYER, MULCH, OUTFALL STRUCTURE, GRAVEL
DIAPHRAGM, UNDERGROUND DETENTION STRUCTURES, ETC.)
C. CERTIFICATION FORM PROVIDING AS-BUILT VOLUMES FOR
STORMWATER QUALITY AND QUANTITY (1-, 2-, 10-, AND
100-YEAR, AS APPLICABLE)
D. PHOTOGRAPHIC DOCUMENTATION SHALL BE PROVIDED WHICH
COVERS THE CONSTRUCTION/INSTALLATION PROCESS
E. THE CERTIFICATION DOCUMENTATION MUST BE STAMPED
AND SIGNED BY A PROFESSIONAL ENGINEER, CERTIFIED
LAND SURVEYOR, OR ARCHITECT.
13. SHEET C06.8:
A) LABEL THE SLOPE FOR THE DETENTION AREA.
B) SPECIFY THE OUTLET PROTECTION TO BE INSTALLED AT 0%
C) REFERENCE DETAIL FOR THE DEBRIS CAGE FOR THE 3"
ORIFICE IN THE RISER DETAIL.
D) THE SWM/BMP CONSTRUCTION NARRATIVE APPEARS TO BE TH
SAME FROM THE WET POND. THESE SHOULD BE PRACTICE
SPECIFIC. REVISE THE CONSTRUCTION NARRATIVE.
E) PROVIDE THE BMP MEDIA REQUIREMENTS AND INCLUDE THE
TESTING REQUIREMENTS.
F) SINCE THIS WILL BE A COUNTY MAINTAINED FACILITY AND
IS AN ON-LINE FACILITY, PROVIDE COVER OTHER THAN
MULCH. THE HIGHER STORMS HAS THE POTENTIAL TO CAUS
THE MULCH TO FLOAT AND POTENTIALLY CLOG THE RISER
FOR THE EXTENDED DETENTION.
G) PROVIDE THE FOLLOWING NOTES:
BMP CERTIFICATION DOCUMENTATION MUST INCLUDE THE
FOLLOWING:
A. AS-BUILT SURVEY OF THE FACILITY.
B. CERTIFICATION FORM PROVIDING AS-BUILT
ELEVATIONS/DIMENSIONS OF BMP ELEMENTS (INCLUDING,
BUT NOT LIMITED TO: UNDERDRAINS, GRAVEL LAYER,
MEDIA LAYER, MULCH, OUTFALL STRUCTURE, GRAVEL
DIAPHRAGM, UNDERGROUND DETENTION STRUCTURES, ETC.)
C. CERTIFICATION FORM PROVIDING AS-BUILT VOLUMES FOR
STORMWATER QUALITY AND QUANTITY (1-, 2-, 10-, AND
100-YEAR, AS APPLICABLE)
D. PHOTOGRAPHIC DOCUMENTATION SHALL BE PROVIDED WHICH
COVERS THE CONSTRUCTION/INSTALLATION PROCESS
E. THE CERTIFICATION DOCUMENTATION MUST BE STAMPED
AND SIGNED BY A PROFESSIONAL ENGINEER, CERTIFIED
LAND SURVEYOR, OR ARCHITECT.
14. ON SHEET C06.9, THE BMP ACCESS GATE SHALL BE 6' TO
MATCH THE FENCING UNLESS AN EXCEPTION IS APPLIED FOR
AND APPROVED PRIOR TO PLAN APPROVAL.
15. SHEETS C07.0 TO C07.5:
A) ENSURE ALL PIPES HAVE A PROFILE.
B) ENSURE ALL UTILITY CROSSINGS ARE SHOWN IN STORM
PROFILES WITH CLEARANCES LABELED.
C) IN THE SANITARY PROFILE STR #1 - STR#11:
1) SHOW BOTH STORM SEWER CROSSINGS BETWEEN 5 AND 6
2) SHOW THE EXISTING GRADE FROM STRUCTURE 4 TO E4
3) LABEL STORM SEWER SIZES AND CLEARANCE FROM
SANITARY.
4) PROFILE ONLY APPEARS TO GO TO STRUCTURE 6.
D) ENSURE THE LABELS FOR THE PROFILES ACCURATELY
REPRESENT THE STRUCTURES CONTAINED IN THE PROFILE.
E) IT DOES NOT APPEAR THAT THE BYPASS SYSTEM (182) TO
(184) MEETS PC-1 COVER REQUIREMENTS.
F) SHOW EXISTING STRUCTURES IN THE PROFILE FOR STR #43
TO EX1.
16. SHEET C08.0:
A) SHOW UTILITIES.
B) EXTEND THE OUTFALL PROTECTION FOR THE WET POND
ACROSS THE STREAM CHANNEL.
C) CLARIFY THE TYPE OF VEHICULAR PROTECTION BEING
PROVIDED (GR-2, WOODEN GUARDRAIL, BOLLARDS, ETC.)
D) REMOVE MANHOLES FROM WITHIN THE POND EMBANKMENT AND
EASEMENT.
E) STRUCTURES 15-78 WERE NOT IN THE STRUCTURE TABLE ON
SHEET C08.3.
F) PROVIDE ENDWALL AT THE END OF PIPE 78.
G) THE PIPES SHOULD DISCHARGE AT THE EDGE OF THE
RIP-RAP FOR THE SEDIMENT FOREBAY INSTEAD OF AT THE
TOP OF THE AQUATIC BENCH.
H) SUGGEST DIVIDING THE POND CELLS WITH A PRACTICE
OTHER THAN GABION BASKETS. AS THIS WILL BE A
RESIDENTIAL COMMUNITY AND IS ADJACENT TO OTHER
RESIDENTIAL COMMUNITIES IT MAY NOT BE AS
AESTHETICALLY PLEASING AS OTHER PRACTICES.
I) PROVIDE PLANTING PLAN FOR WETLAND CELL, AQUATIC
BENCH, AND OTHER PARTS OF THE WET POND.
J) THE CALL OUT FOR THE 6' AQUATIC BENCH STATES
195 - 193; HOWEVER, IT ONLY APPEARS TO BE 1' WIDE.
CLARIFY AQUATIC BENCH SIZE.
K) PROVIDE END WALL FOR POND OUTFALL PIPE.
L) LABEL AND NUMBER STRUCTURES AND PIPES FOR THE POND
OUTFALL.
M) IT APPEARS THAT A SIGNIFICANT PORTION OF THE PIPE
DOWNSTREAM OF THE EMBANKMENT WILL BE EXPOSED AFTER
IT'S INSTALLED WHICH COULD LEAD TO FAILURE.
N) POND DOES NOT APPEAR TO MEET 50' SETBACK FROM
RESIDENTIAL PARCEL ON THE TOE OF EMBANKMENT.
O) PROVIDE GRAVEL FOR THE ACCESS DOWN TO THE BASIN.
17. SHEET C08.1 AND SHEET C08.2:
A) IT IS SUGGESTED TO TRY AND MINIMIZE THE PARALLEL
RUNS OF PIPES AND HAVE ONE SYSTEM ALONG THE MAIN
ROAD THROUGH THE DEVELOPMENT. THIS WILL ALSO HELP
TO MINIMIZE OUTFALLS INTO THE POND.
B) ENSURE ALL DITCHES AND SWALES HAVE CALCULATIONS FOR
THE CAPACITY AND EROSIVENESS.
C) IT APPEARS THE GRADING TOWARD THE REAR IS
SIGNIFICANTLY ENCROACHING INTO THE PLANNING AND
WETLANDS BUFFER. CLARIFY IF THIS IS OKAY WITH
PLANNING AND MINIMIZE IMPACTS TO BUFFERS.
18. SHEET C08.3:
A) CLARIFY WHERE THE DITCH TO THE SOUTH DISCHARGES AND
IS CONVEYED.
B) STORM SEWER SYSTEM (89) TO (87) ARE NOT IN THE
STRUCTURE TABLE.
C) INCLUDE EXISTING PIPES AND STRUCTURES IN THE
STRUCTURE TABLE.
D) ENSURE THE LANDSCAPE PLAN DOES NOT HAVE TREES WITHI
ANY DRAINAGE OR BMP EASEMENT. A LICENSE AGREEMENT
WILL BE REQUIRED FOR ANY LANDSCAPE PLANTINGS WITHIN
A DRAINAGE EASEMENT.
E) THE DETENTION/BIORETENTION FACILITY DOES NOT APPEAR
TO MEET THE 50' SETBACK FROM RESIDENTIAL PARCELS.
F) THE STRUCTURES AND PIPES FOR THE BYPASS SYSTEM
SHOULD BE OUTSIDE OF THE DETENTION BASIN AND ITS
EMBANKMENT.
G) PROVIDE DESIGN AND DETAILS FOR THE GRAVEL FLOW
SPREADER.
H) MATERIALS IN THE STRUCTURE TABLE DO NOT MATCH THE
SIZE. ALSO ENSURE ANY STORM SEWER PIPES WITHIN A
COUNTY OR VDOT EASEMENT ARE RCP.
I) IT APPEARS THERE IS A SUMP AT THE OUTFALL OF THE
BASIN. CLARIFY HOW THIS AREA IS TO DRAIN AND
PROVIDE AN ADEQUATE OUTFALL FOR THE BASIN.
J) ENSURE THE MICROPOOL FOR THE EXTENDED DETENTION IS
AT LEAST 15% OF THE REQUIRED VOLUME FOR THE
DETENTION FACILITY.
K) CLARIFY WHERE THE ROOFTOP DISCONNECT IS BEING USED.
L) MOVE THE OUTFALL FOR STRUCTURE 120 AWAY FROM THE
CORNER OF THE BIORETENTION.
M) SHOW CLEANOUT AND OBSERVATION WELL LOCATIONS FOR TH
BIORETENTION.
N) PROVIDE OUTLET PROTECTION FOR THE UNDERDRAIN INTO
THE EXTENDED DETENTION AREA.
O) PROVIDE GRAVEL FOR THE ACCESS DOWN TO THE BOTTOM OF
THE BASIN.
P) REMOVE THE CONCRETE WALL AND GRADE THE FOREBAY AREA
OR PROVIDE AN EXCEPTION REQUEST FOR THE VERTICAL
WALL WITHIN THE DETENTION AREA.
Q) PROVIDE DETAIL FOR THE CONCRETE SPILLWAY.
R) FOR THE ROOFTOP DISCONNECT:
1) SHOW DRAINAGE AREA FOR EACH DISCONNECTION POINT.
2) SHOW AND LABEL THE LONGEST FLOW PATH FOR EACH
DISCONNECTION DRAINAGE AREA.
3) LABEL DISCONNECTION AREA AND SLOPE.
4) LABEL THE DISCONNECTION DISTANCE FROM BUILDINGS
AND/OR FOUNDATIONS.
5) PROVIDE NOTES FOR EXTERNAL PRETREATMENT.
6) PROVIDE ENDTREATMENT TO PREVENT EROSION.
7) PROVIDE CONSTRUCTION NOTES.
8) PROVIDE EASEMENT FOR LENGTH AND WIDTH OF
PRACTICE.
9) PROVIDE REQUIREMENTS FOR CERTIFICATION.
10) DRAINAGE AREAS FOR EACH DISCONNECTION SHALL BE
1000 SF OR LESS.
11) LONGEST FLOW PATH (ROOF/GUTTER) IS 75' OR LESS.
12) DISCONNECTION LENGTH OF 40' OR LONGEST FLOW PATH
WHICHEVER IS GREATER.
13) DISCONNECTION SLOPE IS LESS THAN 2%.
14) PROVIDE SOIL COMPOST AMENDMENTS SINCE THIS AREA
WILL LIKELY BE DISTURBED DURING CONSTRUCTION.
S) PROVIDE DESIGN CALCULATIONS FOR BIORETENTION BASIN.
T) PROVIDE DESIGN CALCULATIONS FOR EXTENDED DETENTION
BASIN.
U) IF THIS AREA IS TO BE USED AS A SEDIMENT TRAP, THE
TRAP MUST BE AT LEAST 1' ABOVE THE POST-CONSTRUCTIO
BOTTOM OF THE BASIN.
19. SHEET C08.4:
A) ENSURE THE 5' IN FRONT OF THE WALL PROVIDED IS
ENOUGH ROOM TO CONSTRUCT THE WALL. TEMPORARY
CONSTRUCTION EASEMENTS MAY BE NEEDED.
20. SHEET C09.0:
A) LABEL THE OUTFALL LOCATIONS.
B) LABEL THE CONTOURS.
21. SHEET C09.1:
A) SHOW THE ROOFTOP DISCONNECTION AREA.
B) REMOVE THE B/D OPEN SPACE HATCHING AND INCLUDE IN
THE D OPEN SPACE (THIS APPLIES TO THE VRRM
SPREADSHEET AS WELL).
22. SHEET C09.3:
A) COMPLETE THE TOTALS ROW IN THE STORMWATER COMPLIANC
TABLES.
B) CORRECT THE HEADER FOR "OUTFALL 2" TO BE FOR THE
CORRECT OUTFALL.
C) CLARIFY HOW THE RV VALUE WAS OBTAINED AND WHAT UNIT
ARE BEING USED FOR RV. AS SHOWN IT IS DIFFICULT TO
FOLLOW THE ENERGY BALANCE CALCULATIONS.
D) THE DESIGN REMOVAL EFFICIENCY FOR BIORETENTION
APPEARS LOW.
23. SHEET C09.4:
A) PROVIDE DRAINAGE AREA AND INFORMATION FOR AREA
DRAINING TO BYPASS PIPE. THIS AREA APPEARS TO BE A
FARM POND. CLARIFY HOW THE SITE IS BEING DESIGNED
TO ACCOMMODATE A BREACH OF THIS POND AND ENSURE THE
BUILDINGS DO NOT FLOOD.
B) PROVIDE DRAINAGE AREA TO THE DITCH TO THE SOUTH
EAST.
C) THE C-VALUE FOR THE POND APPEARS TO BE HIGH.
D) CLARIFY THE SMALL TEXT LOCATED THROUGHOUT THE SHEET
SUCH AS "SOIL DIVIDE TYPICAL".
E) LABEL DRAINAGE AREA FOR THE WET POND.
F) SHOW THE BASIN BREACH FLOODING LIMITS.
24. CLARIFY THE NEED FOR SHEET C09.5, IT APPEARS TO BE CBP
WHICH IS NOT APPLICABLE TO THIS PROJECT.
25. SHEET C10.0:
A) THE PHASE 1 AND 2 CONSTRUCTION NARRATIVES REFERENCE
SHEETS THAT WERE NOT INCLUDED IN THE PROJECT.
26. SHEET C10.1:
A) THE LIMITS OF DISTURBANCE SHOULD BE REDUCED FOR WHA
IS REQUIRED TO BE CLEARED TO INSTALL THE PHASE 1 ES
PRACTICES.
B) CLARIFY THE WETLANDS HATCHING OVER THE ENTIRE AREA.
C) SHOW WHERE THE OPTIC ORANGE SAFETY/SILT FENCE IS TO
BE PLACED IN PLAN VIEW.
D) SOME OF THE DIVERSION PRACTICES APPEAR TO BE RUNNIN
UPHILL.
E) VERIFY THE STOCKPILE AREA IS ADEQUATELY SIZED FOR
THE PROJECT.
F) THE WETLAND AREA UPSTREAM OF SB2 DOES NOT APPEAR TO
BE ABLE TO ENTER THE BASIN. VERIFY THAT ALL
CONTRIBUTING DRAINAGE AREAS ARE ABLE TO ENTER THE
FACILITY. THIS APPLIES TO ST1 AS WELL.
G) PROVIDE DETAIL FOR TEMPORARY CONSTRUCTION ROAD.
H) IT IS PREFERRED THAT ONLY ONE CONSTRUCTION ENTRANCE
BE USED FOR THE PROJECT.
I) REMOVE SUPER SILT FENCE FROM THE FLOW PATH FOR THE
TRAP AND BASIN OUTFALLS.
27. SHEET C10.2:
A) SHOW THE BYPASS SYSTEM TO THE SOUTHEAST.
B) LABEL CONTOURS AND PRACTICES.
C) REMOVE SUPER SILT FENCE FROM THE FLOW PATH FOR THE
TRAP AND BASIN OUTFALLS.
28. SHEET C10.3:
A) CLARIFY WHERE SB3 IS LOCATED IN PLAN VIEW AND
INCLUDE IN THE BASIN TABLE.
B) REMOVE THE "PAGE 3" FROM THE SEDIMENT BASIN DETAILS
C) SHOW THE RISER AND OUTFALL BARREL IN PLAN VIEW FOR
THE SEDIMENT BASINS.
D) LABEL CONTOURS FOR THE PRACTICES BOTH EXISTING AND
PROPOSED.
29. SHEET C10.4:
A) PROVIDE CHAIN-LINK-BACKED SUPER SILT FENCE DETAIL.
B) EROSION CONTROL NOTE 3 STATES STABILIZATION WITHIN
30 DAYS, THIS SHOULD BE REVISED TO BE WITHIN 14 DAY
IN ACCORDANCE WITH STATE REGULATIONS.
C) EROSION CONTROL NOTE 13, THE LIMITS OF DISTURBANCE
DOES NOT MATCH THE COVER SHEET.
30. SHEET C11 REFERENCES HENRICO COUNTY. UPDATE TO
CHESTERFIELD.
31. CONDOMINIUM AND APARTMENT PROJECTS REQUIRE A BMP
MAINTENANCE FEE OF $100/UNIT. PAYMENT MUST BE RECEIVE
PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT.
(CL-USC 2)
32. ADDITIONAL EROSION CONTROL MEASURES OTHER THAN THE
MINIMUM STANDARDS CONTAINED IN THE VIRGINIA EROSION AN
SEDIMENT CONTROL HANDBOOK WILL BE REQUIRED IF IT IS
DETERMINED THAT SUCH MEASURES ARE NECESSARY FOR
PROTECTION OF SENSITIVE ENVIRONMENTAL FEATURES AND/OR
WATER RESOURCES. (CL-USC 3)
33. ENHANCED PERIMETER PROTECTION MEASURES ARE REQUIRED.
(SUPER SILT FENCE, SEDIMENT BASINS AND TRAPS SIZED 25
PERCENT LARGER THAN MINIMUM STANDARDS, ETC.) (CL-USC 4
34. ANY UTILITY RELOCATIONS MUST BE INCORPORATED INTO THE
EROSION AND SEDIMENT CONTROL PLAN AND NARRATIVE.
(CL-USC 5)
35. FOR SITES OVER FIVE ACRES, A MONTHLY EROSION AND
SEDIMENT CONTROL REPORT FROM THE CRLD MUST BE SUBMITTE
TO ENVIRONMENTAL ENGINEERING BY THE FIRST OF EACH
MONTH. (CL-USC 6)
36. ALL NEW CONSTRUCTION AND SUBSTANTIAL IMPROVEMENTS OF
NONRESIDENTIAL STRUCTURES AND ACCESSORY BUILDINGS SHAL
BE LOCATED OUTSIDE THE FLOODWAY FRINGE AND SHALL BE SE
BACK AT LEAST 25 FEET HORIZONTAL DISTANCE FROM THE
OUTERMOST BOUNDARY OF THE BASE FLOOD AREA, WETLANDS,
RESOURCE PROTECTION AREAS AND 100-YEAR FLOODPLAINS
WHERE THE CONTRIBUTING DRAINAGE AREA EXCEEDS 100 ACRES
PROVIDED HOWEVER, THAT WHEN LID PRACTICES AS DETERMINE
BY THE DIRECTOR OF ENVIRONMENTAL ENGINEERING ARE USED
ADJACENT TO WETLANDS, FLOODPLAINS, AND RESOURCE
PROTECTION AREAS THE SETBACK MAY BE REDUCED TO 5 FEET.
(CL-USC 7)
37. AN ALTERNATIVE MEANS OF DEFINING PAVEMENT EDGES AS
DETERMINED BY THE DIRECTOR OF ENVIRONMENTAL ENGINEERIN
MAY BE SUBSTITUTED FOR CURB AND GUTTER WHEN LOW IMPACT
DEVELOPMENT PRACTICES ARE USED. (CL-USC 8)
38. THE DESIGN AND CONSTRUCTION OF THE SWM/BMP WHICH WILL
BE A COUNTY MAINTAINED FACILITY WILL BE SUBJECT TO
INDEPENDENTLY DOCUMENTED GEOTECHNICAL APPROVAL. THE
SERVICES WHICH MUST BE PROVIDED BY THE INDEPENDENT
GEOTECHNICAL ENGINEERING FIRM SHALL INCLUDE FULL TIME
GEOTECHNICAL INSPECTION PAID FOR BY THE DEVELOPER.
THAT FULL TIME INSPECTION SHALL INCLUDE BUT NOT BE
LIMITED TO THE FOLLOWING (CL-USC 9):
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS
NECESSARY TO FACILITATE THE APPROVAL PROCESS OF THE
INDEPENDENT GEOTECHNICAL CONSULTANT. (CL-USC 9A)
OBSERVATION, TESTING AND DOCUMENTATION OF:
B. SUITABLE SUBGRADES TO RECEIVE COMPACTED STRUCTURAL FIL
FOR EARTH DAM CONSTRUCTION. (CL-USC 9B)
C. THE CUT OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE AND CONCRETE CHUTE SPILLWAY SUBGRADES
AS APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS
PRESENT AT BEARING GRADE TO VERIFY PROPER INSTALLATION
(CL-USC 9C)
D. FILL PLACEMENT AND FIELD DENSITY TESTING TO EVALUATE/
VERIFY PROPER COMPACTION. (CL-USC 9D)
E. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
(CL-USC 9E)
39. THE FACILITY CERTIFICATION PROCESS SHALL BE PERFORMED
BY AN ENGINEERING/SURVEYING PROFESSIONAL CHOSEN BY THE
COUNTY AT THE OWNERS EXPENSE. (CL-USC 10)
40. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL OF THE SWM/BMP WILL
BE FURNISHED ON THE LAND DISTURBANCE PERMIT.(CL-USC 11
41. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL
ENGINEERING DEPARTMENT AND OBTAIN AN "APPROVED FOR
CONSTRUCTION" STAMP ON TWO ADDITIONAL SETS FOR THE
OWNER TO KEEP ON-SITE.
42. PERMISSION MUST BE OBTAINED FROM THE ADJACENT PROPERTY
OWNER(S) ALLOWING FOR GRADING ON THE PROPERTY AS
PROPOSED PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
43. ALL OFFSITE DRAINAGE EASEMENTS MUST BE RECORDED PRIOR
TO ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS
PROJECT.
44. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER /
BMP DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO
ISSUANCE OF A BUILDING PERMIT FOR THIS PROJECT.
45. AS-BUILT BMP INFORMATION WILL BE REQUIRED FOR EACH
BMP FACILITY AS PART OF ITS FUTURE CERTIFICATION.
46. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A
SURETY FOR THE CONSTRUCTION OF THE PERMANENT BMP MUST
BE POSTED WITH ENVIRONMENTAL ENGINEERING. (COUNTY CODE
PART II, CHAPTER 8, SEC. 8-16)
47. THE BMP MUST BE CERTIFIED PRIOR TO RELEASE OF THE BMP
PERFORMANCE BOND.
48. CONDOMINIUM PROJECTS REQUIRE A BMP MAINTENANCE FEE OF
$100/UNIT PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
49. THE RISER AND BARREL PIPE ASSOCIATED WITH THE SEDIMENT
BASIN MUST BE ON-SITE PRIOR TO ISSUANCE OF A LAND
DISTURBANCE PERMIT.
50. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD FILE MUST BE SUBMITTED TO CAROLE
CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE AUTOCAD
FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD VERSIO
2009 OR EARLIER AND REFERENCED DIRECTLY TO THE VIRGINI
STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN THE NAD83
DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD
OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH THE SITE
PLAN NAME, SITE PLAN NUMBER, ENGINEERING FIRM AND CAD
FILE PREPARER'S NAME AND PHONE NUMBER. THE FILE MUST
CONTAIN THE FOLLOWING, EACH CLEARLY LABELED IN SEPARAT
LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. PARKING LOTS AND DRIVEWAYS;
C. ROADS;
D. SIDEWALKS;
E. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE; AND
F. FLOODPLAINS.
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
51. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
52. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A VDOT LAND USE PERMIT
C. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
D. THE VIRGINIA STORMWATER MANAGEMENT PERMIT (VSMP)
REGISTRATION STATEMENT AND FEE OF $4,500
E. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BOOK
F. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)