CASE NO: 16PR0145 STATUS: PENDING APPROVAL
PROJECT NAME: MAGN MARKET AVE SITE - LAST INTERNET UPDATE: 11/22/17
SUBMITTAL TYPE: PUBLIC-SEMI-PUB
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ASSESSOR----: 02 06/02/16 06/23/16 ******** ********
ENVIR.ENGR.-: 02 06/02/16 06/23/16 ******** 03/11/16 DLD 706-2031
FIRE DEPT.--: 02 06/02/16 06/23/16 COMPLETE 06/02/16 AWB 717-6167
HOUSE NUMBER: 02 06/02/16 06/23/16 COMPLETE 06/24/16 AMJ 768-7549
MAPPING/GIS-: 02 06/02/16 06/23/16 COMPLETE 06/24/16 AMJ 768-7549
PLANNING----: 02 06/02/16 06/23/16 COMPLETE 07/26/16 JHL 751-4158
TRANSPORT.--: 02 06/02/16 06/23/16 COMPLETE 06/16/16 SJA 751-4461
UTIL.PLAN.--: 02 06/02/16 06/23/16 ******** ********
UTILITIES---: 02 06/02/16 06/23/16 AMENDED* 06/06/16 M L 748-1338
UTIL.R.O.W.-: 02 06/02/16 06/23/16 ******** ********
VDOT--------: 02 06/02/16 06/23/16 ******** ********
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : RACHAEL LUMPKIN, P.E./751-4778
NAME OF PLAN : MG COMMERCIAL ROAD D PH 2
ADDRESS :
SUBMISSION DATE : 09/16/15
PLAN DATED : 09/11/15
REVIEW DATE : 10/14/15
SITE PLAN NO. : 16PR0145
COMMENTS : 1ST REVIEW-NOT APPROVED
TABLE REVIEW :
PLAT PROCESS :
1. THE COUNTY UTILITIES PROJECT NUMBER IS 15-0295.
2. ON SHEET C2.4, WATER & SEWER NOTE #6, REMOVE CONCRETE
AS AN APPROVED MATERIAL FOR GRAVITY SEWER. ALSO, THE FIRS
5 UTILITY GENERAL NOTES ARE A REPEAT OF NOTES ALREADY
STATED UNDER WATER & SEWER NOTES.
3. ON SHEETS C4.1 AND C4.2, MOVE THE WATERLINE TO 6' OFF
THE FACE OF CURB TO REDUCE THE CHANCE THAT CURB AND
UNDERDRAINS WILL BE DISTURBED IF FUTURE EXCAVATION OF THE
WATERLINE IS NECESSARY.
4. ON SHEET C4.1, LABEL WHAT THE 20" CASING AT STA. 18+75
IS INTENDED FOR.
5. ON SHEETS C4.1 AND C4.2, IT WOULD APPEAR THAT THERE IS
SUFFICIENT COVER TO KEEP THE WATERLINE SHALLOWER AND GO
OVER STORM PIPES 1-36, 1-48 AND 1-54.
6. SINCE THERE IS 30" PIPE SHOW ON THIS PLAN, IT MUST ALS
BE SUBMITTED TO THE VIRGINIA DEPARTMENT OF HEALTH FOR
REVIEW.
7. THE OWNER SHALL BE REQUIRED TO ENTER INTO A COUNTY
UTILITIES CONTRACT PRIOR TO THE START OF CONSTRUCTION.
PRIOR TO THE PREPARATION OF THE UTILITIES CONTRACT,
UTILITIES MUST BE IN RECEIPT OF THE "ACCEPTED" BID PROPOSA
BETWEEN THE DEVELOPER AND THE COUNTY APPROVED UTILITIES
CONTRACTOR AS WELL AS THE PROJECT'S INFORMATIONAL SHEET
FOUND ON THE "DEVELOPER'S CHECKLIST". PLEASE SEND THOSE TW
ITEMS TO THE ATTENTION OF JACQUE HYDEN
(HYDENJ@CHESTERFIELD.GOV OR 804-318-8437). THE BID PROPOSA
MUST BE BASED ON THE APPROVED SITE PLAN. BE ADVISED THAT I
THE SITE PLAN IS REVISED AND REAPPROVED SUBSEQUENT TO THE
PREPARATION OR RECORDATION OF THE UTILITIES CONTRACT, THE
BID PROPOSAL SHALL BE REVISED ACCORDINGLY AND A REVISED
UTILITIES CONTRACT MAY BE NECESSARY.
8. AFTER FINAL SITE PLAN APPROVAL, SUBMIT THREE SETS OF TH
APPROVED PLANS DIRECTLY TO THE UTILITIES DEPARTMENT FOR OU
USE DURING CONSTRUCTION INSPECTION.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : MIKE LARSON, P.E./748-1338
NAME OF PLAN : MG COMMERCIAL ROAD D PH 2
ADDRESS :
SUBMISSION DATE : 03/10/16
PLAN DATED : 02/05/16
REVIEW DATE : 02/29/16
SITE PLAN NO. : 16PR0145
COMMENTS : 2ND REVIEW-NOT APPROVED
TABLE REVIEW : NO
PLAT PROCESS :
1. PLEASE UPDATE THE FOR PHASE 1 OF THE ROAD PROJECT ON
THE VICINITY MAP TO COUNTY PROJECT 15-0265.
2. THERE IS A CONFLICT BETWEEN THE WATER LINE AND STORM
PIPE AT APPROXIMATELY STATION 15+30 AND 16+55. LOWER THE
WATER MAIN ON THE PROFILE AND CALL OUT 1.5' MINIMUM
CLEARANCE.
3. THERE IS A CONFLICT BETWEEN THE STORM PIPE AND THE
WESTERN 8" GATE VALVE AT APPROXIMATELY STATION 15+30.
SINCE THE WATER MAIN MUST GO UNDER THE STORM PIPE, IT MAY
RESULT IN THE VALVE BEING DEEPER THAN 6 FT, WHICH IS NOT
ALLOWED. THE VALVE MAY NEED TO BE SHIFTED FURTHER WEST AND
THE PIPE RAISED USING RESTRAINED VERTICAL BENDS. IF THIS
IS NEEDED, A PROFILE FOR THIS SECTION OF WATER LINE SHOULD
BE PROVIDED WITH THE EXTENT OF PIPE RESTRAINT SHOWN ON THE
PROFILE.
4. CALL OUT THE WATER MAIN FROM STATION 18+00 TO 18+50 AS
HAVING RESTRAINED JOINTS ON THE PROFILE. WATER MAIN COMES
IN 20 FOOT LENGTHS, THEREFORE YOU MAY CONSIDER SHOWING 60
FT OF RESTRAINED LENGTH.
5. A 2 INCH FLUSHING HYDRANT IS NOT CAPABLE OF PROVIDING
SCOURING VELOCITY FOR A 12 INCH WATER MAIN. THE FLUSHING
HYDRANT AT THE 12 INCH STUB AT STATION 22+00 SHOULD BE
CHANGED TO A 4-INCH HYDRANT. PLEASE SHOW THE FLANGED
STUBOUT TO BE EXTENDED TO THE SOUTH OF THE SIDEWALK ON THE
PLANS.
6. CHESTERFIELD COUNTY CANNOT ASSUME OWNERSHIP OF THE 20
INCH CASING PIPE FOR SANITARY SEWER WITHOUT EASEMENT
DEDICATED. PLEASE SHOW THE FUTURE SEWER LINES LABELED AS
"NOT IN CONTRACT" AND DEDICATE EASEMENT UP TO THE FIRST
MANHOLE ON EACH SIDE. THIS COMMENT WILL ALSO BE APPLICABL
TO THE CASING PIPE ON THE PHASE 1 PLANS, 15-0265. THE
PREVIOUS REVIEWER HAD MISUNDERSTOOD THE EXTENT OF THE WATE
RIGHT-OF-WAY.
7. CORRECT THE COUNTY PROJECT NUMBER FOR THE PHASE 1 WATE
ON SHEET C4.2 TO 15-0265 ON BOTH THE PLAN AND PROFILE.
8. SHOW THE COUNTY PROJECT NUMBER FOR THE 30" WATER MAIN O
HULL STREET RD BY OTHER.
9. PLEASE PROVIDE A PROFILE FOR THE 30" WATER MAIN.
10. THE LOCATION OF THE BLIND FLANGES FOR THE 4-INCH BLOW
OFFS ON THE 30-INCH WATER MAIN SHOULD BE SHOWN ON THE
PLANS.
11. THE WESTERN 30-INCH BUTTERFLY VALVE IS SHOWN IN
CONFLICT WITH THE CURB AND GUTTER. THESE VALVES ARE LARGE
AND THERE IS LESS FLEXIBILITY IN THE FIELD. THE WESTERN
VALVE WILL NEED TO BE SHIFTED WEST BEYOND THE SIDEWALK AND
AT LEAST 2 STICKS OF PIPE PROVIDED AT THE STUBOUT. THE PIP
BETWEEN THE TEE AND THE VALVE MUST BE RESTRAINED TO ALLOW
FOR A FUTURE CONNECTION AND SHOWN AS RESTRAINED ON THE
PROFILE.
12. UPDATE THE ESTIMATED MATERIALS QUANTITIES TO SHOW 4-
INCH FLUSHING HYDRANTS AND SEWER CASING PIPE.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : MIKE LARSON, P.E./748-1338
NAME OF PLAN : MG COMMERCIAL ROAD D PH 2
ADDRESS :
SUBMISSION DATE : 5/27/16
PLAN DATED : 6/2/16
REVIEW DATE : 6/6/16
SITE PLAN NO. : 16PR0145
COMMENTS : 3RD REVIEW-NOT APPROVED
TABLE REVIEW : YES
PLAT PROCESS :
1. THE PLANS SHOW 122 FT OF 12" CLASS 52 PIPE, 3-8" GATE
VALVES, AND 3-4" BLOW OFFS. PLEASE REVIEW THE MATERIALS
QUANTITIES AND UPDATE AS NEEDED.
2. AS DISCUSSED, PLEASE RELOCATE THE HYDRANT NEAR STA
16+55 TO JUST SOUTH OF STORM STRUCTURE 1-45 IN ORDER TO
AVOID THE CONFLICT WITH THE STORM SEWER. ANTHONY BATTEN
WITH FIRE HAS APPROVED THIS REVISION.
3. THE MAINLINE 12" GATE VALVE AT THE CROSS NEAR STA 21+7
SHOULD BE MOVED TO THE SOUTH SIDE OF THE CROSS.
4. SHEET C4.2 AT APPROXIMATELY STA 23+50, THE WATERLINE I
LABELED AS "SHOWN FOR INFORMATIONAL PURPOSES ONLY", WHICH
WE BELIEVE TO BE A REMNANT FROM THE PHASE 1 PLANS.
5. THE COUNTY PROJECT NUMBER FOR THE 30" WATER MAIN ON
HULL STREET (DESIGNED BY BALZER) IS 15-0051. PLEASE LABEL
THE PLAN AND PROFILE WITH THIS INFORMATION.
6. ON SHEET C6.2, THE 30" WATER MAIN, 8" COMMERCIAL
ENTRANCE WATERLINE WEST OF THE CROSS, AND EAST-WEST
COLLECTOR 12" WATER MAIN IN FILL ARE REQUIRED TO BE CALLED
OUT AS WITH RESTRAINED JOINTS ON THE PROFILE.
7. IF A TABLE REVIEW IS GRANTED, PLEASE SUBMIT A PDF
REVIEW COPY OF EACH REVISED SHEET TO
LARSONM@CHESTERFIELD.GOV AT LEAST 48 HOURS PRIOR TO THE
SCHEDULED TABLE REVIEW.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: MAG GREEN COMMERCIAL RD D PHASE II
SITE PLAN NUMBER: 16PR0145
LATEST PLAN DATE: 09/11/15
DEPT. REC'D. DATE: 09/17/15
SUBMITTAL NUMBER: ONE
REVIEW DATE: 10/06/15
RECOMMENDATION: NOT APPROVED
PLAT PROCESSING: R/W DEDICATION
1. PRIOR TO SITE PLAN APPROVAL, DEDICATE THE RIGHTS-0F-WAY
FOR SITE ROAD D AND ROUTE 360, FREE & UNRESTRICTED, TO
CHESTERFIELD COUNTY.
PRIOR TO RIGHT-OF-WAY DEDICATION, A PERFORMANCE BOND WILL
NEED TO BE POSTED WITH ENVIRONMENTAL ENGINEERING FOR SITE
ROAD D. ROUTE 360 WORK WILL NEED TO BE BONDED WITH VDOT
THROUGH THE VDOT LAND USE PERMIT.
2. PER CASE 89SN0343, TEXTUAL STATEMENT 3.C.4.D, PROVIDE
THREE (3) OUTBOUND/SOUTHBOUND LANES FROM SITE ROAD D TO 36
(LEFT, THRU, RIGHT). CONDITION STATES "ALL INTERSECTION
IMPROVEMENTS AS GENERALLY IDENTIFIED IN WILBUR SMITH
ASSOCIATES 9/27/91, FIGURE 4-1(R-1). . . ."
3. HOW WILL THE THIRD LANE WIDENING AS PROPOSED WORK WITH
THE WIDENING THAT WAS DONE IN THE MEDIAN WITH PREVIOUS
MAGNOLIA GREEN WORK TO THE EAST?
PER TEXTUAL STATEMENT 3.C.4.C, PROVIDE ADDITIONAL LANE OF
PAVEMENT (THIRD THRU LANE) ALONG WESTBOUND 360 FROM THE
EXISTING TERMINUS OF THE THIRD LANE IN THE MEDIAN TO
APPROXIMATELY 1,000 FEET WEST OF SITE ROAD D.
IN LIEU OF TRANSITIONING THE 3RD LANE AND REDUCING ITS
WIDTH, PROVIDE THE FULL LANE WIDTH AND SHOULDER TO THE
PROPERTY LINES. IF REQUIRED BY VDOT, PROVIDE TAPERING
THROUGH THE USE OF THE PAVEMENT STRIPING.
4. 360/SITE ROAD D INTERSECTION: PROVIDE A SEPARATE RIGHT
TURN LANE (200' STORAGE/200' TAPER) FROM WESTBOUND 360 INT
SITE ROAD D. THE THIRD THROUGH LANE CANNOT SERVE AS THE
RIGHT TURN LANE.
5. PROVIDE SIDEWALK ALONG THE ROUTE 360 FRONTAGE. PER THE
PEDESTRIAN ACCESS PLAN, PART OF APPROVED CONCEPT PLAN DATE
6/19/13, ROADSIDE PUBLIC/PRIVATE PEDESTRIAN SIDEWALKS ARE
TO BE PROVIDED.
6. SHEET C4.1, FOR THE FIRST ACCESS LOCATION NORTH OF 360
INTERSECTION, REVISE NOTE TO READ: "FUTURE COMMERCIAL
ENTRANCE (RIGHT-IN/RIGHT-OUT)". ACCESS WILL REQUIRE
DEDICATION OF RIGHT-OF-WAY AND CONSTRUCTION OF SEPARATE
RIGHT TURN LANES.
7. FUTURE EAST/WEST COLLECTOR:
A. SHOW THE FUTURE EAST/WEST COLLECTOR ON THE COVER SHEET
LAYOUT AND PAVEMENT MARKING & SIGNAGE PLAN (C2.2).
B. AS SHOWN ON SHEETS C4.1 & C4.2, A RIGHT TURN LANE AND
RIGHT-OF-WAY DEDICATION WILL BE REQUIRED WHEN THE EAST/WES
COLLECTOR IS DESIGN/CONSTRUCTED. THIS WILL REQUIRE THE
REPLACEMENT OF THE SIDEWALK AND GUARDRAIL PROPOSED WITH
SITE ROAD D.
8. ADVISORY COMMENTS:
A. WITH DEVELOPMENT OF THE PARCELS ADJACENT TO SITE ROAD D
TRAFFIC SIGNALIZATION MAY BE REQUIRED BY THE DEVELOPER
ALONG WITH THE EVALUATION OF DUAL LEFT TURN LANES FROM
EASTBOUND 360 TO SITE ROAD D.
B. SITE ROAD D/FUTURE EAST/WEST COLLECTOR INTERSECTION,
DEVELOPMENT OF THE PROPERTY ON THE WEST SIDE OF THE
INTERSECTION WILL REQUIRE THE DESIGN AND CONSTRUCTION OF A
RIGHT TURN LANE INTO THE DEVELOPMENT (200' STORAGE/200'
TAPER).
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
NAME OF PLAN: MAG GREEN COMMERCIAL RD D PHASE II
SITE PLAN NUMBER: 16PR0145
LATEST PLAN DATE: 02/05/16
DEPT. REC'D. DATE: 02/24/16
SUBMITTAL NUMBER: TWO
REVIEW DATE: 03/21/16
RECOMMENDATION: NOT APPROVED
PLAT PROCESSING: R/W DEDICATION
1. PRIOR TO SITE PLAN APPROVAL, PHASING PLAN FOR ROUTE 360
WIDENING AND MAGNOLIA MARKET AVE (SITE ROAD D)THIRD
SOUTHBOUND LANE SHALL BE APPROVED BY CDOT. RED-LINE
COMMENTS ARE BEING PROVIDED TO ENGINEER UNDER SEPARATE
REVIEW.
2. PRIOR TO ANY SITE PLAN APPROVAL, DEDICATE THE RIGHTS-0F
WAY FOR SITE ROAD D AND ROUTE 360, FREE & UNRESTRICTED, TO
COUNTY. (PER DISCUSSIONS, PERFORMANCE BOND WILL BE REQUIRE
FOR SITE ROAD D WITH FIRST SITE PLAN/SUBDIVISION WITH
ACCESS TO ROAD.)
3. THREE (3) SOUTHBOUND LANES ARE REQUIRED FROM SITE ROAD
TO 360 PER CASE 89SN0343, TEXTUAL STATEMENT 3.C.4.D. CDOT
CAN SUPPORT PHASING OF LEFT TURN LANE PROVIDED A NOTE IS
ADDED TO PLAN AS FOLLOWS: "ADDITIONAL SOUTHBOUND LANE (LEF
TURN LANE) SHALL BE CONSTRUCTED PRIOR TO ISSUANCE OF ANY
CERTIFICATE OF OCCUPANCY FOR CC PARCEL 4 OR 5.
4. SHEET C4.1, ACCESS LOCATIONS NORTH OF 360 INTERSECTION,
REVISE NOTE TO READ: "FUTURE COMMERCIAL ENTRANCE (RIGHT-
IN/RIGHT-OUT), INCLUDES CONSTRUCTION OF SEPARATE RIGHT TUR
LANE AND DEDICATION OF RIGHT-OF-WAY".
5. LABEL COMMUNITY CENTER PARCELS 4 AND 5 ON PLAN SHEETS.
6. ADVISORY COMMENTS:
A. WITH DEVELOPMENT OF THE PARCELS ADJACENT TO SITE ROAD D
TRAFFIC SIGNALIZATION MAY BE REQUIRED BY THE DEVELOPER
ALONG WITH THE EVALUATION OF DUAL LEFT TURN LANES FROM
EASTBOUND 360 TO SITE ROAD D.
B. CONSTRUCTION OF THIRD THRU LANE ALONG WB 360 WILL
REQUIRE THE REPLACEMENT OF THE WB 360 RIGHT TURN LANE INTO
SITE ROAD D.
==========================================================
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
NAME OF PLAN: MAG GREEN COMMERCIAL RD D PHASE II
SITE PLAN NUMBER: 16PR0145
LATEST PLAN DATE: 05/27/16
DEPT. REC'D. DATE: 06/06/16
SUBMITTAL NUMBER: THREE
REVIEW DATE: 06/16/16
RECOMMENDATION: NOT APPROVED
PLAT PROCESSING: R/W DEDICATION
1. TYPICALLY, VDOT DOES NOT ALLOW OPEN CUT ALONG
PRIMARY/PRNICIPAL ARTERIALS AS SHOWN. ENSURE VDOT HAS
AGREED TO THIS PROPOSAL AS PART OF THIS PLAN.
2. PRIOR TO SITE PLAN APPROVAL,
A. PHASING PLAN FOR ROUTE 360 WIDENING & MAGNOLIA MARKET
AVE (SITE ROAD D)THIRD SOUTHBOUND LANE SHALL BE APPROVED B
CDOT. RED-LINE COMMENTS ARE BEING PROVIDED TO ENGINEER
UNDER SEPARATE REVIEW.
3. THREE SOUTHBOUND LANES ARE REQUIRED FROM SITE ROAD D
TO 360 PER CASE 89SN0343, TEXTUAL STATEMENT 3.C.4.D. CDOT
CAN SUPPORT PHASING OF LEFT TURN LANE PROVIDED A NOTE IS
ADDED TO PLAN AS FOLLOWS: "ADDITIONAL SOUTHBOUND LANE (LEF
TURN LANE) SHALL BE CONSTRUCTED PRIOR TO ISSUANCE OF ANY
CERTIFICATE OF OCCUPANCY FOR CC PARCEL 4 OR 5." ALSO, THIS
WILL NEED TO BE IDENTIFIED ON THE PHASING PLAN.
4. SHEET C4.1, DEVELOPMENT OF PARCELS 4 AND 5 WILL REQUIRE
CONSTRUCTION OF SEPARATE RIGHT TURN LANES AT STATION 15+50
ACCESS LOCATIONS. THIS WILL REQUIRE REPLACEMENT OF
SIDEWALK AND ADDITIONAL RIGHT-OF-WAY DEDICATION.
5. ADVISORY COMMENTS:
A. WITH DEVELOPMENT OF THE PARCELS ADJACENT TO SITE ROAD D
TRAFFIC SIGNALIZATION MAY BE REQUIRED BY THE DEVELOPER
ALONG WITH THE EVALUATION OF DUAL LEFT TURN LANES FROM
EASTBOUND 360 TO SITE ROAD D.
B. CONSTRUCTION OF THIRD THRU LANE ALONG WB 360 WILL
REQUIRE THE REPLACEMENT OF THE WB 360 RIGHT TURN LANE INTO
SITE ROAD D.
==========================================================
==========================================================
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #-----JEFF LAMSON
NAME OF PLAN-----------MAGNOLIA GREEN COMMERCIAL RD D PH 2
SITE PLAN NUMBER-------16PR0145
ADDRESS----------------
LATEST PLAN DATE-------9-11-15
DEPT. REC'D. DATE------9-14-15
PLAN ACCEPTED DATE-----9-16-15
SUBMITTAL NUMBER-------1
REVIEW DATE------------9-22-15
RECOMMENDATION---------REVISIONS REQUIRED
TABLE REVIEW-----------NO
PLAT PROCESSING--------YES- R/W DEDICATION
LANDSCAPE PLAN STATUS--NOT YET SUBMITTED
ARCHITECTURAL ELEVATIONS--N/A
LIGHTING PLAN/CUTSHEETS---NOT YET SUBMITTED
IRRIGATION/HOSEBIB PLAN---NOT YET SUBMITTED
1. PUT A REVISION DATE ON THE RESUBMITTED PLANS. RESUBMIT
10 FULL SETS AND ONE COPY OF THE SITE PLAN SHEET TO THE
PLANNING DEPARTMENT FOR YOUR NEXT REVIEW. PROVIDE A COMPLE
RESPONSE TO COMMENTS FOR ALL DEPARTMENTS TO THE PLANNING
DEPARTMENT.
BELOW EACH COMMENT TO DESCRIBE HOW YOU HAVE ADDRESSED EACH
REVIEW COMMENT. BE SURE TO INDICATE WHICH SHEETS SHOW THE
REQUIRED CHANGES. PROVIDE A TRANSMITTAL LETTER TO DESCRIBE
ANY CHANGES TO THE PLANS NOT CAUSED BY THE STAFF REVIEW
COMMENTS.
2. ROAD NAMING REQUIRED - SEE IST / HOUSE NUMBERING
COMMENTS.
3. PARKING, DRIVE, AND BUILDING SETBACKS ALONG THIS ROAD M
BE 25 FEET.
4. EXTEND SIDEWALKS ALONG THE FRONTAGE OF ROUTE 360.
REFERENCE APPROVED PEDESTRIAN PLAN ON THE OVERALL MASTER
PLAN.
5. COORDINATE PEDESTRIAN ACCESS WITH PARKS AND RECREATION
DEPARTMENT. CONTACT BRIAN GOUGE.
6. IDENTIFY THE DEVELOPMENT AREA OF THE COUNTY WHERE THE
SITE IS LOCATED: EMERGING GROWTH AREA. ALSO IDENTIFY IF TH
SITE IS IN A SPECIFIC DISTRICT THAT OVERLAYS EITHER THE
EMERGING GROWTH OR POST DEVELOPMENT AREAS. THESE DISTRICT
ARE: ROUTE 360 CORRIDOR WEST.
7. PROVIDE LANDSCAPE PLAN AND IRRIGATION PLAN FOR MEDIAN
PLANTINGS FOR REVIEW AND APPROVAL IN CONJUNCTION WITH SITE
PLAN REVIEW.
A. THE LANDSCAPE PLAN SHALL IDENTIFY THE STATE REGISTERED
LANDSCAPE ARCHITECT, NURSERYMAN, OR LANDSCAPE DESIGNER
PREPARING THE PLAN. PLAND SHALL INCLUDE:
-ALL EASEMENTS AND RIGHTS OF WAY, FIRE HYDRANT
LOCATIONS, AND SITE LIGHTING LOCATIONS. SHOW
VDOT SIGHT LINES FROM ENTRANCES.
- PROVIDE STANDARD COUNTY LANDSCAPE NOTES ON
DETAILED LANDSCAPE PLAN.
8. PER SEC. 19-508.3, SHOW ON THE LANDSCAPE PLAN OR
ADDITIONALLY ON A SEPARATE LIGHTING PLAN THE LOCATION OF A
EXTERIOR SITE LIGHTING MOUNTED ON POLES, THE BUILDING, OR
THE GROUND AND HAVE THEM KEYED TO CUT SHEETS FOR EACH LIGH
FIXTURE SHOWN ON THE PLAN.
9. PROVIDE CATALOGUE CUTSHEETS FOR EACH EXTERIOR LIGHT
FIXTURE PROPOSED.
10. PER SEC. 19-508.3, UNLESS A PROJECT IS APPROVED FOR
ORNAMENTAL PEDESTRIAN-STYLE LIGHTING, ALL LIGHT FIXTURES
SHALL BE OF A DIRECTIONAL TYPE THAT SHIELDS THE LIGHT SOUR
FROM DIRECT VIEW FROM ANY ADJOINING, A, R, R-TH, MH, TND,
R-MF DISTRICT OR PUBLIC RIGHT-OF -WAY.
11. SPECIFIC LIGHTING REQUIREMENTS OCCUR WITH THE
FOLLOWING OVERLAY DISTRICTS:
- ROUTE 360 CORRIDOR WEST - SEC. 19-586(A)(5)
12. PUT THE CHESTERFIELD COUNTY SITE PLAN NUMBER IN THE
LOWER RIGHT CORNER OF EACH SHEET (16PR0145).
13. PUT NOTE ON PLANS, "ALL PROPOSED UTILITIES ARE TO BE
INSTALLED UNDERGROUND INCLUDING ELECTRIC, TELEPHONE AND
CATV."
14. PUT NOTE ON PLANS, "ANY SIGN IN EXCESS OF EIGHT (8)
SQUARE FEET REQUIRES A PERMIT. PERMIT MUST BE OBTAINED
THROUGH BUILDING INSPECTIONS DEPARTMENT." IF A SIGN IS
SHOWN ON THE SITE PLAN, NOTE ON PLAN "SIGNAGE CONTINGENT
UPON APPROVAL THROUGH SIGN PERMIT REVIEW PROCESS."
15. REVISE THE PLANS TO SAVE TREES AND / OR ADJUST THE TRE
CANOPY CONSERVATION AREA PLANS.
**********************************************************
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #-----JEFF LAMSON
NAME OF PLAN-----------MAGNOLIA GREEN COMMERCIAL RD D PH 2
SITE PLAN NUMBER-------16PR0135
ADDRESS----------------
LATEST PLAN DATE-------2-5-2016
DEPT. REC'D. DATE------2-19-16
SUBMITTAL NUMBER-------2
REVIEW DATE------------3-29-16
RECOMMENDATION---------REVISIONS REQUIRED
TABLE REVIEW-----------NO
PLAT PROCESSING--------YES- R/W DEDICATION
ARCHITECTURAL ELEVATIONS--N/A
LIGHTING PLAN/CUTSHEETS---PROVIDE LIGHT FIXTURE SPEC SHEET
IRRIGATION/HOSEBIB PLAN---NOT YET SUBMITTED
1. PUT A REVISION DATE ON THE RESUBMITTED PLANS. RESUBMIT
10 FULL SETS AND ONE COPY OF THE SITE PLAN SHEET TO THE
PLANNING DEPARTMENT FOR YOUR NEXT REVIEW. PROVIDE A COMPLE
RESPONSE TO COMMENTS FOR ALL DEPARTMENTS TO THE PLANNING
DEPARTMENT.
BELOW EACH COMMENT TO DESCRIBE HOW YOU HAVE ADDRESSED EACH
REVIEW COMMENT. BE SURE TO INDICATE WHICH SHEETS SHOW THE
REQUIRED CHANGES. PROVIDE A TRANSMITTAL LETTER TO DESCRIBE
ANY CHANGES TO THE PLANS NOT CAUSED BY THE STAFF REVIEW
COMMENTS.
2. PARKING, DRIVE, AND BUILDING SETBACKS ALONG MAGNOLIA MK
AVENUE MAY BE 25 FEET (35 FOOT BUFFER NOT REQUIRED FOR
COMMERCIAL/ MULTIFAMILY ROAD).
3. EXTEND SIDEWALKS ALONG THE FRONTAGE OF ROUTE 360. REFER
TO APPROVED PEDESTRIAN PLAN ON THE OVERALL MASTER PLAN.
4. IDENTIFY THE DEVELOPMENT AREA OF THE COUNTY WHERE THE
SITE IS LOCATED: EMERGING GROWTH AREA AND ROUTE 360 CORRID
WEST.
5. PROVIDE LANDSCAPE PLAN AND IRRIGATION PLAN FOR MEDIAN
PLANTINGS FOR REVIEW AND APPROVAL IN CONJUNCTION WITH SITE
PLAN REVIEW.
A. THE LANDSCAPE PLAN SHALL IDENTIFY THE STATE REGISTERED
LANDSCAPE ARCHITECT, NURSERYMAN, OR LANDSCAPE DESIGNER
PREPARING THE PLAN. PLAND SHALL INCLUDE:
- ALL EASEMENTS AND RIGHTS OF WAY, FIRE HYDRANT
LOCATIONS, AND SITE LIGHTING LOCATIONS. SHOW
VDOT SIGHT LINES FROM ENTRANCES.
- PROVIDE STANDARD COUNTY LANDSCAPE NOTES ON
DETAILED LANDSCAPE PLAN.
6. PER SEC. 19-508.3, SHOW ON THE LANDSCAPE PLAN OR
ADDITIONALLY ON A SEPARATE LIGHTING PLAN THE LOCATION OF A
EXTERIOR SITE LIGHTING MOUNTED ON POLES, THE BUILDING, OR
THE GROUND AND HAVE THEM KEYED TO CUT SHEETS FOR EACH LIGH
FIXTURE SHOWN ON THE PLAN.
7. PROVIDE CATALOGUE CUTSHEETS FOR EACH EXTERIOR LIGHT
FIXTURE PROPOSED.
8. PER SEC. 19-508.3, UNLESS A PROJECT IS APPROVED FOR
ORNAMENTAL PEDESTRIAN-STYLE LIGHTING, ALL LIGHT FIXTURES
SHALL BE OF A DIRECTIONAL TYPE THAT SHIELDS THE LIGHT SOUR
FROM DIRECT VIEW FROM ANY ADJOINING, A, R, R-TH, MH, TND,
R-MF DISTRICT OR PUBLIC RIGHT-OF -WAY.
9. PUT NOTE ON PLANS, "ALL PROPOSED UTILITIES ARE TO BE
INSTALLED UNDERGROUND INCLUDING ELECTRIC, TELEPHONE AND
CATV."
10. PUT NOTE ON PLANS, "ANY SIGN IN EXCESS OF EIGHT (8)
SQUARE FEET REQUIRES A PERMIT. PERMIT MUST BE OBTAINED
THROUGH BUILDING INSPECTIONS DEPARTMENT." IF A SIGN IS
SHOWN ON THE SITE PLAN, NOTE ON PLAN "SIGNAGE
CONTINGENT UPON APPROVAL THROUGH SIGN PERMIT REVIEW
PROCESS."
11. REVISE THE PLANS TO SAVE TREES AND / OR ADJUST THE TRE
CANOPY CONSERVATION AREA: RESUBMIT TREE CANOPY PLAN WITH
ADJUSTED TREE CANOPY AREAS.
**********************************************************
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #-----JEFF LAMSON
NAME OF PLAN-----------MAGNOLIA GREEN COMMERCIAL RD D PH 2
SITE PLAN NUMBER-------16PR0135
ADDRESS----------------
LATEST PLAN DATE-------5-27-16
DEPT. REC'D. DATE------5-31-16
SUBMITTAL NUMBER-------3
REVIEW DATE------------6-20-16
RECOMMENDATION---------SUBSTANTIAL APROVAL
TABLE REVIEW-----------YES
R-MF DISTRICT OR PUBLIC RIGHT-OF -WAY.TION
LANDSCAPE PLAN STATUS- N/A
ARCHITECTURAL ELEVATIONS--N/A
LIGHTING PLAN/CUTSHEETS---PROVIDE LIGHT FIXTURE SPECS
IRRIGATION/HOSEBIB PLAN---N/A
1. PUT A REVISION DATE ON THE RESUBMITTED PLANS. RESUBMIT
10 FULL SETS AND ONE COPY OF THE SITE PLAN SHEET TO THE
PLANNING DEPARTMENT FOR YOUR NEXT REVIEW. PROVIDE A COMPLE
RESPONSE TO COMMENTS FOR ALL DEPARTMENTS TO THE PLANNING
DEPARTMENT.
BELOW EACH COMMENT TO DESCRIBE HOW YOU HAVE ADDRESSED EACH
REVIEW COMMENT. BE SURE TO INDICATE WHICH SHEETS SHOW THE
REQUIRED CHANGES. PROVIDE A TRANSMITTAL LETTER TO DESCRIBE
ANY CHANGES TO THE PLANS NOT CAUSED BY THE STAFF REVIEW
COMMENTS.
2. PROVIDE CATALOGUE CUTSHEETS FOR EACH EXTERIOR LIGHT
FIXTURE PROPOSED.
3. PER SEC. 19-508.3, UNLESS A PROJECT IS APPROVED FOR
ORNAMENTAL PEDESTRIAN-STYLE LIGHTING, ALL LIGHT FIXTURES
SHALL BE OF A DIRECTIONAL TYPE THAT SHIELDS THE LIGHT SOUR
FROM DIRECT VIEW FROM ANY ADJOINING, A, R, R-TH, MH, TND,
R-MF DISTRICT OR PUBLIC RIGHT-OF -WAY.
**********************************************************
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : NANCY PARKER 751-4319
NAME OF PLAN : MAG GREEN COMMERCIAL ROAD D PH 1
PLAN NO. : 16PR0145
ADDRESS :
LATEST PLAN DATE : 9/11/15
RECEIVED DATE : 9/17/15
SUBMITTAL NUMBER : 1
REVIEW DATE : 9/25/15
RECOMMENDATION : REVIEW NOT NECESARY
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : NANCY PARKER 751-4319
NAME OF PLAN : MAG GREEN COMMERCIAL ROAD D PH 1
PLAN NO. : 16PR0145
ADDRESS :
LATEST PLAN DATE : 2/5/16
RECEIVED DATE : 2/20/16
SUBMITTAL NUMBER : 3
REVIEW DATE : 3/9/16
RECOMMENDATION : REVIEW NOT NECESARY
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : AMY JOHANSON
NAME OF PLAN : MAGNOLIA GREEN - MAGNOLIA MARKET AVE
PLAN NO. : 16PR0145
ADDRESS :
LATEST PLAN DATE : 5/27/16
RECEIVED DATE : 6/3/16
SUBMITTAL NUMBER : 4
REVIEW DATE : 6/24/16
RECOMMENDATION : REVIEW NOT NECESARY
==========================================================
==========================================================
DEPARTMENT REVIEW: IST / HOUSE NUMBERING SECTION
REVIEWER: NANCY PARKER
PHONE NUMBER: 751-4319
CASE NUMBER: 16PR0145
NAME OF PLAN:MAG GREEN COMMERCIAL RD D PH 2
ADDRESS:
DATE OF REVIEW:9/25/15 REVIEW # 1
STATUS: HOUSE NUMBERING NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS
CONCERNING THE COMMENTS BELOW.
1) A STREET SIGN FEE OF $150.00 PER INTERSECTION (1) NEEDS
BE PAID TO ENVIRONMENTAL ENGINEERING PRIOR TO
SUBSTANTIAL APPROVAL SO THAT STREET SIGNS CAN BE
MANUFACTURED. PAYMENT SHOULD BE SUBMITTED TO
ENVIRONMENTAL ENGINEERING AND REFERENCED
TO SITE PLAN NUMBER 16PR0145.
2) STREET NAMES MUST BE APPROVED THROUGH RICHMOND
REGIONAL PLANNING DISTRICT COMMISSION STREET NAME
CLEARINGHOUSE AND/OR CRATER PLANNING DISTRICT
COMMISSION STREET NAME CLEARING HOUSE WITH
VERIFICATION SUBMITTED TO NANCY PARKER PRIOR TO
SUBSTANTIAL APPROVAL.
==========================================================
==========================================================
DEPARTMENT REVIEW: IST / HOUSE NUMBERING SECTION
REVIEWER: NANCY PARKER
PHONE NUMBER: 751-4319
CASE NUMBER: 16PR0145
NAME OF PLAN:MAG GREEN COMMERCIAL RD D PH 2
ADDRESS:
DATE OF REVIEW:3/9/16 REVIEW # 3
STATUS: HOUSE NUMBERING NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS
CONCERNING THE COMMENTS BELOW.
1) A STREET SIGN FEE OF $150.00 PER INTERSECTION (1) NEEDS
BE PAID TO ENVIRONMENTAL ENGINEERING PRIOR TO
SUBSTANTIAL APPROVAL SO THAT STREET SIGNS CAN BE
MANUFACTURED. PAYMENT SHOULD BE SUBMITTED TO
ENVIRONMENTAL ENGINEERING AND REFERENCED
TO SITE PLAN NUMBER 16PR0145.
==========================================================
==========================================================
DEPARTMENT REVIEW: IST / HOUSE NUMBERING SECTION
REVIEWER: AMY JOHANSON
PHONE NUMBER: 768-7549
CASE NUMBER: 16PR0145
NAME OF PLAN:MAGNOLIA GREEN - MAGNOLIA MARKET AVE
ADDRESS:
DATE OF REVIEW:6/24/16 REVIEW # 4
STATUS: HOUSE NUMBERING NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS
CONCERNING THE COMMENTS BELOW.
1) A STREET SIGN FEE OF $150.00 PER INTERSECTION (1) NEEDS
TO BE PAID TO ENVIRONMENTAL ENGINEERING PRIOR TO
SUBSTANTIAL APPROVAL SO THAT STREET SIGNS CAN BE
MANUFACTURED. PAYMENT SHOULD BE SUBMITTED TO
ENVIRONMENTAL ENGINEERING AND REFERENCED TO SITE
PLAN NUMBER 16PR0145.
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: MAG GREEN COMMERCIAL RD. D, PH. 2
SITE PLAN NUMBER: 16PR0145
ADDRESS: 117800 HULL STREET ROAD
LATEST PLAN DATE: 9/11/15
DEPT. REC'D. DATE: 9/22/15
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 9/22/15
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE SITE PLAN IS APPROVED AS SUBMITTED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: MAG GREEN COMMERCIAL RD. D, PH. 2
SITE PLAN NUMBER: 16PR0145
ADDRESS: 117800 HULL STREET ROAD
LATEST PLAN DATE: 2/5/16
DEPT. REC'D. DATE: 2/25/16
SUBMITTAL NUMBER: 2ND REVIEW
REVIEW DATE: 2/25/16
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE SITE PLAN IS APPROVED AS SUBMITTED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: MAG GREEN COMMERCIAL RD. D, PH. 2
SITE PLAN NUMBER: 16PR0145
ADDRESS: 117800 HULL STREET ROAD
LATEST PLAN DATE: 5/27/16
DEPT. REC'D. DATE: 6/2/16
SUBMITTAL NUMBER: 3RD REVIEW
REVIEW DATE: 6/2/16
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE SITE PLAN IS APPROVED AS SUBMITTED.
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : DUSTIN DUNNAGAN / 706-2061
NAME OF PLAN : MAGNOLIA GREEN - COMMERCIAL ROAD D -
PHASE 2
ADDRESS : APPROXIMATELY 3800' WEST OF MAGNOLIA
GREEN PARKWAY AND HULL STREET ROAD
SITE PLAN NO. : 16PR0145
LATEST PLAN DATE : SEPTEMBER 11, 2015
DEPT. REC'D DATE : SEPTEMBER 17, 2015
SUBMITTAL NUMBER : 1
REVIEW DATE : OCTOBER 5, 2015
RECOMMENDATION : NOT APPROVED
TABLE REVISION : NO
PLAT PROCESSING : NO
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURE
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NO
RELIEVE YOU OF YOUR RESPONSIBILITY. WETLANDS
DOCUMENTATION MUST BE RECEIVED BY THIS DEPARTMENT PRIO
TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. EFFECTIVE JULY 1, 2014, ENFORCEMENT OF THE VIRGINIA
STORMWATER REGULATIONS BECAME THE RESPONSIBILITY OF TH
COUNTY FOR DEVELOPMENT PROJECTS WITHIN CHESTERFIELD
COUNTY. ADDITIONALLY, NEW STATE STORMWATER REGULATION
ALSO BECAME EFFECTIVE ON JULY 1, 2014. LAND DISTURBING
ACTIVITIES THAT OBTAINED A VSMP PERMIT PRIOR TO JULY 1
2014 MAY USE THE STORMWATER MANAGEMENT CRITERIA
SPECIFIED IN PART II C (9VAC25-870-93 ET SEQ) FOR TWO
PERMIT CYCLES. PROJECTS GRANDFATHERED UNDER THE
PROVISIONS OF 9VAC25-870-48 MAY FOLLOW THE REQUIREMENT
LISTED UNDER PART IIC FOR ONE PERMIT CYCLE. ALL OTHER
NEW DEVELOPMENT WILL BE SUBJECT TO THE REQUIREMENTS OF
PART IIB (9VAC25-870-62 TO 9VAC25-870-92).
03. ITEMS LABELED AS FUTURE WERE NOT REVIEWED AND ARE NOT
APPROVED WITH THIS PLAN.
04. SINCE PHASE 2 CONSTRUCTION RELIES UPON INFRASTRUCTURE
BUILT WITHIN PHASE 1 CONSTRUCTION, THE LDP FOR PHASE 2
WILL ALSO RELY UPON ISSUANCE OF THE PHASE 1 PERMIT.
05. INFORMATION IN THIS PLAN IS RELIANT UPON DESIGN DATA
FROM THE PHASE 1 CONSTRUCTION OF THE COMMERCIAL ROAD.
ANY DESIGN CHANGES FROM PHASE 1 CONSTRUCTION THAT
IMPACTS PHASE 2 DESIGN AND/OR CONSTRUCTION WILL NEED T
BE SHOWN UPON THESE PLANS.
06. INLET SHAPING IS RESTRICTED TO PIPE DIAMETERS OF 30"
OR LESS AND TO SITUATIONS WHERE ONE PIPE ENTERS THE
CHAMBER AND ONE PIPE EXITS THE CHAMBER. STORM SEWERS
WITH PIPE DIAMETERS OF 30" AND ABOVE SHALL QUALIFY FOR
THE 50 PERCENT REDUCTION IN JUNCTION LOSSES ONLY WHEN
PRE-CAST TEES AND ELBOWS ARE USED. (CL-G&D 18)
07. A DETAIL MUST BE SHOWN ON THE PLANS FOR INLET SHAPING
STD. IS-1. IF INLET SHAPING CANNOT BE ACCOMPLISHED
WITHIN THE STANDARD STRUCTURE, THEN DETAILS MUST BE
PROVIDED FOR THE MODIFICATIONS NECESSARY TO THE
STRUCTURE TO ACCOMPLISH INLET SHAPING. (CL-G&D 19)
08. A SEPARATE PLAN SHEET MUST BE ADDED WHICH ONLY SHOWS
ALL PROPOSED EASEMENTS AND RIGHT OF WAY TO BE
DEDICATED. METES AND BOUNDS MUST BE PROVIDED.
(CL-G&D 30)
09. ENSURE ALL STREET NAMES HAVE BEEN APPROVED BY THE RRPD
STREET NAME CLEARINGHOUSE.
10. THE RADIUS OF ALL RADIAL CURBING MUST BE SHOWN.
(CL-G&D 35)
11. A STREET SIGN FEE OF $75 PER ROAD INTERSECTION MUST BE
PROVIDED PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
12. SHEET C5.0:
A) IT IS RECOMMENDED THAT CONCRETE FLUME/PAD BE CREATE
BETWEEN THE TWO CULVERTS NEAR STATION 61+50 AND
76+50 TO HELP REDUCE POTENTIAL SCOUT FROM THE
EXPANSION AND CONTRACTION BETWEEN THE TWO CULVERTS.
B) CULVERT 13 IS SHOWN AS A 30" RCP THAT DISCHARGES TO
A 24" CMP. DOWNSIZING OF PIPES IS TYPICALLY NOT
ALLOWED. CLARIFY THE NEED FOR THIS, OTHERWISE
REPLACE THE EXISTING 24" CMP WITH A 30" RCP.
C) PROVIDE CALCULATIONS FOR THE TOE-LIKE DITCH NEAR
CULVERT 13 ALONG THE NORTH SIDE OF THE ROAD SHOWING
THE CHANNELIZATION OF FLOW ALONG THE TOE OF FILL
WILL NOT LEAD TO EROSION PROBLEMS.
13. SHEET C5.1:
A) REMOVE THE DA LINES FROM SHEET C5.2, AS PRESENTED
THE TWO DA LINES MAKE IT DIFFICULT TO DISCERN THE
INFORMATION SHOWN ON THE PLANS.
B) THE DRAINAGE AREA FOR 1-51 APPEARS TO ENCOMPASS ARE
THAT IS DOWNSTREAM ON THE FILL SLOPE.
C) THE DRAINAGE AREA FOR 1-47 AND 1-45 APPEARS TO GO
PAST THE HIGH POINT IN HULL STREET ROAD. VERIFY
DRAINAGE AREAS.
D) CLARIFY IF THE WATERLINE IS TO CHANGE SIDES AS
DISCUSSED FOR THE PHASE 1 PROJECT.
E) CLARIFY HOW THE DRAINAGE AREA FOR 1-53 IS TO BE
CONVEYED TO THE INLET, AS SHOWN THE WATER WILL
LIKELY FLOW DOWN THE FILL EMBANKMENT. IT IS
SUGGESTED TO PROVIDE DIVERSIONARY PRACTICES TO
PREVENT THIS FROM HAPPENING.
14. SHEET C5.2:
A) CLARIFY THE TWO DIFFERENT FLOW PATHS SHOWN FOR DA
E-E.
B) THE DA FOR CULVERT 12 AND SECTION E-E APPEAR TO BE
THE SAME. VERIFY DA.
C) LABEL THE DA FOR 1-53.
D) ENSURE THE DA SHOWN ARE UTILIZING THE FUTURE
CONDITIONS BASED UPON ZONING.
E) THE STRUCTURE HEIGHT FOR 1-53 DOES NOT MEET VDOT
STANDARDS. PROVIDE THE MINIMUM HEIGHT FOR THE
STRUCTURE OR PROVIDE DETAILS FOR ITS MODIFICATION.
15. SHEET C7.2:
A) PROVIDE INLET CALCULATIONS FOR 1-20 AND 1-53 SHOWIN
THEY MEET ACCEPTABLE PONDING DEPTHS.
B) THE INLET SPREAD CALCULATIONS FOR INLETS 1-37, 1-49
1-55, AND 1-9 UTILIZE A 2' GUTTER SECTION; HOWEVER,
THESE AREAS APPEAR TO BE CG-2 THAT DOES NOT HAVE A
GUTTER. VERIFY INLET CALCULATIONS.
C) SHOW THE CALCULATION FOR CULVERT 2 AS 36" IN THE
PIPE SIZE COLUMN.
16. ON SHEET C7.3, SHOW THE N-VALUE USED. SOME OF THE
PIPES FLOW INTO EXISTING CMP PIPES THAT MAY ALTER THE
HGL CALCULATIONS.
17. A NOTE MUST BE ADDED TO THE SEQUENCE OF CONSTRUCTION
STATING THAT THE VSMP CONSTRUCTION ACTIVITY OPERATOR
AND THE ENVIRONMENTAL INSPECTOR (OR AUTHORIZED
REPRESENTATIVE) MUST ATTEND THE PRE-CONSTRUCTION
MEETING.
18. A TEMPORARY SLOPE DRAIN (STD. & SPEC. #3.15) MUST BE
PROVIDED TO CONVEY RUNOFF FROM THE TOP OF THE FINISHED
SLOPE TO THE BOTTOM AND THEN INTO A SEDIMENT TRAPPING
FACILITY WHERE FILL SECTIONS ARE GREATER THAN 4 FEET.
(CL-EC 32)
19. THE DETAIL SHOWN FOR GRATE INLET PROTECTION MUST BE
CHANGED TO THE ONE SHOWN ON PLATE 3.07-3 OF STANDARD
AND SPECIFICATION # 3.07. (CL-EC 35)
20. THE FOLLOWING NOTE(S) MUST BE ADDED TO OR ADJACENT TO
THE SEQUENCE OF CONSTRUCTION: (CL-EC 42)
1. A CONSTRUCTION PERFORMANCE BOND MUST BE PROVIDED FOR
THE IMPROVEMENTS WITHIN THE PROPOSED RIGHT OF WAY PRIO
TO ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS
PROJECT.
2. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER/BMP
DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO ISSUANCE
OF A BUILDING PERMIT FOR THIS PROJECT. (CL-EC 42B)
21. IF THE SEDIMENT BASIN FROM PHASE 1 IS TO BE USED FOR
THE DURATION OF PHASE 2 CONSTRUCTION, THEN THE BONDS
CANNOT BE RELEASED UNTIL AFTER BOTH PHASES ARE
STABILIZED UNLESS THE BASIN IS BONDED UNDER EACH PHASE
22. ON SHEET C3.0, UPDATE TABLE 3.32-D TO BE FOR THE
PIEDMONT REGION.
23. ON SHEET C3.1, UPDATE THE OUTLET PROTECTION DETAIL TO
REQUIRE A MINIMUM OF 24" OF CLASS 1 RIP-RAP.
24. SHEET C3.5:
A) PROVIDE SUPER SILT FENCE IN LIEU OF SILT FENCE ON
THE NORTH SIDE OF HULL STREET ROAD.
B) SHOW THE SILT FENCE BREAKS.
C) PROVIDE CIP FOR THE CULVERT IN THE PROPOSED CROSSIN
NEAR STATION 67+00.
D) PROVIDE SILT FENCE AROUND THE PROPOSED CROSSING NEA
STATION 67+00.
E) CLARIFY HOW THE DRAINAGE IS TO BE DISCHARGED THROUG
THE SITE WHILE THE EXISTING CULVERTS ARE BEING
DEMOLISHED AND THE NEW CULVERT INSTALLED. PROVIDE
ANY NECESSARY DIVERSIONS OR PUMPING PRACTICES.
F) PROVIDE NOTE THAT WETLAND BOUNDARIES ARE TO BE
FLAGGED AND DELINEATED PRIOR TO IMPLEMENTING PHASE
PRACTICES.
25. SHEET C3.6:
A) LABEL HULL STREET ROAD.
B) CLARIFY IF THERE IS TO BE A CONSTRUCTION ENTRANCE
ALONG HULL STREET OR IF ALL TRAFFIC IS TO APPROACH
THROUGH THE PHASE 1 ROAD. IF THE PHASES ARE BEING
BUILT AT THE SAME TIME A SECOND CONSTRUCTION
ENTRANCE MAY BE DESIRED.
C) PROVIDE SUPER SILT FENCE IN LIEU OF SILT FENCE.
D) PROVIDE OUTFALL GRADING OF SEDIMENT TRAPS.
E) PROVIDE TEMPORARY SEEDING FOR THE STOCKPILE.
F) PROVIDE TEMPORARY SEEDING FOR DIVERSIONARY
PRACTICES.
G) PROVIDE CIP FOR TEMPORARY SLOPE DRAINS.
H) THE TSD FOR ST2 APPEARS TO INTERCEPT THE DRAINAGE
AREA BOUNDARY.
I) THE DRAINAGE AREA FOR CULVERT 2 APPEARS TO EXCEED
THE AMOUNT ALLOWED WITHIN THE VESCH. ALTERNATIVE
SEDIMENTARY CONTROL DEVICES MAY BE REQUIRED.
J) PROVIDE NOTE THAT WORK WITHIN THE WOUS IS TO BE
STABILIZED IMMEDIATELY.
K) THE LOD FOR PHASE 1 SHALL ENCOMPASS ONLY THE MINIMA
CLEARING REQUIRED TO IMPLEMENT PHASE 1 BOUNDARY
CONTROL DEVICES.
L) A VSC MAY BE WARRANTED FOR THE CROSSING NEAR STATIO
22+50.
26. SHEET C3.7:
A) PROVIDE BLANKET AND MATTING ON ALL EXPOSED SLOPES
3:1 OR GREATER.
B) PROVIDE SUPER SILT FENCE IN LIEU OF SILT FENCE.
C) SHOW OP FOR THE CULVERT DOWNSTREAM OF PROPOSED
CULVERT 13.
27. SHEET C3.8:
A) IT APPEARS THE DA FOR 1-7 AND 1-58 EXCEED THE AMOUN
ALLOWED BY THE VESCH. DIVERT EXCESSIVE DA AS NEEDE
OR PROVIDE ALTERNATIVE SEDIMENT TRAPPING DEVICES.
B) REMOVE ESC PRACTICES FROM THE PREVIOUS CONSTRUCTION
PROJECT NOT REQUIRED FOR THIS PROJECT.
C) PROVIDE BLANKET AND MATTING ON THE SOUTH SIDE CUT
SLOPES.
D) PROVIDE FILL DIVERSIONS AND TEMPORARY SLOPE DRAINS
AS REQUIRED TO PREVENT THE RUNOFF FROM ERODING FILL
SLOPES DURING CONSTRUCTION.
28. MS-19:
A) PROVIDE A MS-19 LOCATION APPROXIMATELY 50-100
DOWNSTREAM OF E-E WITHIN THE EXISTING CHANNEL.
B) PROVIDE A MS-19 LOCATION FOR CULVERT 2 DOWNSTREAM O
ITS CONFLUENCE WITH THE MAIN CHANNEL.
C) PROVIDE A MS-19 LOCATION FOR THE CULVERT CARRYING
THE BMP DISCHARGE DOWNSTREAM OF ITS CONFLUENCE WITH
THE MAIN CHANNEL.
D) THE POND ALSO REDUCES THE FLOW FROM THE STORM EVENT
TO HELP MAKE THE DOWNSTREAM CHANNELS AND CROSSINGS
ADEQUATE. THIS IS SITUATION G AND REQUIRES A
VARIANCE REQUEST.
E) PROVIDE CALCULATIONS FOR THE HYDROLOGY USED IN
DETERMINING THE FLOWS FOR THE MS-19 CROSS-SECTIONS.
F) VERIFY THE SECTION GEOMETRY INCLUDING CHANNEL
ROUGHNESS THAT IS USED IN THE CROSS-SECTION
CALCULATIONS.
G) THE DITCH CALCULATIONS FOR HULL STREET ROAD HAS THE
Q2 BEING HIGHER THAN THE Q10. IN ADDITION THE
ROUGHNESS OF 0.05 IS HIGHER THAN WHAT IS NORMALLY
USED FOR GRASS CHANNELS. VERIFY FLOWS AND ROUGHNES
VALUES.
29. IF THE BASIN IS TO BE USED AS AN ESC BASIN DURING PHAS
2 CERTIFICATION FOR THE POND AND RELEASE OF THE BMP
BOND CANNOT OCCUR UNTIL THE POND IS NO LONGER NEEDED A
AN ESC BASIN AND HAS BEEN CONVERTED.
30. BASIN CALCULATIONS WERE NOT REVIEWED DUE TO CHANGES
GENERATED FROM PHASE 1 OF THE PROJECT.
31. PROVIDE A MAP SHOWING THE IMPERVIOUS AREA FOR THIS
PHASE DRAINING TO THE BMP AND THE OVERALL IMPERVIOUS
AREA DRAINING TO THE BMP.
32. SHEET C7.0:
A) THE INFORMATION SHOWN FOR THE ULTIMATE DESIGN IN TH
WATER QUALITY CALCULATIONS APPEARS TO BE DIFFERENT
THAN THOSE PRESENTED IN THE PHASE 1 PLANS. VERIFY
CALCULATIONS.
B) CLARIFY IF THE BMP IS DESIGNED TO ACCOMMODATE ANY
UPSTREAM DEVELOPMENT WITHIN THE WATERSHED OR IF IT
IS INTENDED FOR USE ONLY WITH THE ROADWAY PROJECTS.
33. A BMP MAINTENANCE FEE IN THE AMOUNT OF $1,500 PER
IMPERVIOUS ACRE IS REQUIRED FOR COMMERCIAL DEVELOPMENT
PAYMENT MUST BE RECEIVED PRIOR TO ISSUANCE OF A LAND
DISTURBANCE PERMIT. (CL-USC 1)
34. ADDITIONAL EROSION CONTROL MEASURES OTHER THAN THE
MINIMUM STANDARDS CONTAINED IN THE VIRGINIA EROSION AN
SEDIMENT CONTROL HANDBOOK WILL BE REQUIRED IF IT IS
DETERMINED THAT SUCH MEASURES ARE NECESSARY FOR
PROTECTION OF SENSITIVE ENVIRONMENTAL FEATURES AND/OR
WATER RESOURCES. (CL-USC 3)
35. ENHANCED PERIMETER PROTECTION MEASURES ARE REQUIRED.
(SUPER SILT FENCE, SEDIMENT BASINS AND TRAPS SIZED 25
PERCENT LARGER THAN MINIMUM STANDARDS, ETC.) (CL-USC 4
36. FOR SITES OVER FIVE ACRES, A MONTHLY EROSION AND
SEDIMENT CONTROL REPORT FROM THE CRLD MUST BE SUBMITTE
TO ENVIRONMENTAL ENGINEERING BY THE FIRST OF EACH
MONTH. (CL-USC 6)
37. THE DESIGN AND CONSTRUCTION OF THE SWM/BMP WHICH WILL
BE A COUNTY MAINTAINED FACILITY WILL BE SUBJECT TO
INDEPENDENTLY DOCUMENTED GEOTECHNICAL APPROVAL. THE
SERVICES WHICH MUST BE PROVIDED BY THE INDEPENDENT
GEOTECHNICAL ENGINEERING FIRM SHALL INCLUDE FULL TIME
GEOTECHNICAL INSPECTION PAID FOR BY THE DEVELOPER.
THAT FULL TIME INSPECTION SHALL INCLUDE BUT NOT BE
LIMITED TO THE FOLLOWING (CL-USC 9):
1. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS
NECESSARY TO FACILITATE THE APPROVAL PROCESS OF THE
INDEPENDENT GEOTECHNICAL CONSULTANT. (CL-USC 9A)
OBSERVATION, TESTING AND DOCUMENTATION OF:
2. SUITABLE SUBGRADES TO RECEIVE COMPACTED STRUCTURAL FIL
FOR EARTH DAM CONSTRUCTION. (CL-USC 9B)
3. THE CUT OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE AND CONCRETE CHUTE SPILLWAY SUBGRADES
AS APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS
PRESENT AT BEARING GRADE TO VERIFY PROPER INSTALLATION
(CL-USC 9C)
4. FILL PLACEMENT AND FIELD DENSITY TESTING TO EVALUATE/
VERIFY PROPER COMPACTION. (CL-USC 9D)
5. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
(CL-USC 9E)
38. THE FACILITY CERTIFICATION PROCESS SHALL BE PERFORMED
BY AN ENGINEERING/SURVEYING PROFESSIONAL CHOSEN BY THE
COUNTY AT THE OWNERS EXPENSE. (CL-USC 10)
39. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL OF THE SWM/BMP WILL
BE FURNISHED ON THE LAND DISTURBANCE PERMIT.(CL-USC 11
40. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL
ENGINEERING DEPARTMENT AND OBTAIN AN "APPROVED FOR
CONSTRUCTION" STAMP ON TWO ADDITIONAL SETS FOR THE
OWNER TO KEEP ON-SITE.
41. A CONSTRUCTION PERFORMANCE BOND MUST BE PROVIDED FOR
THE IMPROVEMENTS WITHIN THE PROPOSED RIGHT OF WAY PRIO
TO ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS
PROJECT.
42. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER /
BMP DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO
ISSUANCE OF A BUILDING PERMIT FOR THIS PROJECT.
43. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD FILE MUST BE SUBMITTED TO CAROLE
CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE AUTOCAD
FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD VERSIO
2009 OR EARLIER AND REFERENCED DIRECTLY TO THE VIRGINI
STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN THE NAD83
DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD
OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH THE SITE
PLAN NAME, SITE PLAN NUMBER, ENGINEERING FIRM AND CAD
FILE PREPARER'S NAME AND PHONE NUMBER. THE FILE MUST
CONTAIN THE FOLLOWING, EACH CLEARLY LABELED IN SEPARAT
LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. PARKING LOTS AND DRIVEWAYS;
C. ROADS;
D. SIDEWALKS;
E. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE; AND
F. FLOODPLAINS.
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
44. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
45. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A VDOT LAND USE PERMIT
C. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
D. COPY OF THE VIRGINIA STORMWATER PERMIT AND REGISTRATIO
STATEMENT.
E. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BOOK
F. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)
G. A STREET SIGN FEE OF $75 PER ROAD INTERSECTION MUST BE
PROVIDED
==========================================================
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : DUSTIN DUNNAGAN / 706-2061
NAME OF PLAN : MAGNOLIA GREEN - COMMERCIAL ROAD D -
PHASE 2
ADDRESS : APPROXIMATELY 3800' WEST OF MAGNOLIA
GREEN PARKWAY AND HULL STREET ROAD
SITE PLAN NO. : 16PR0145
LATEST PLAN DATE : FEBRUARY 5, 2016
DEPT. REC'D DATE : FEBRUARY 25, 2016
SUBMITTAL NUMBER : 2
REVIEW DATE : MARCH 11, 2016
RECOMMENDATION : NOT APPROVED
TABLE REVISION : NO
PLAT PROCESSING : NO
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURE
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NO
RELIEVE YOU OF YOUR RESPONSIBILITY. WETLANDS
DOCUMENTATION MUST BE RECEIVED BY THIS DEPARTMENT PRIO
TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. EFFECTIVE JULY 1, 2014, ENFORCEMENT OF THE VIRGINIA
STORMWATER REGULATIONS BECAME THE RESPONSIBILITY OF TH
COUNTY FOR DEVELOPMENT PROJECTS WITHIN CHESTERFIELD
COUNTY. ADDITIONALLY, NEW STATE STORMWATER REGULATION
ALSO BECAME EFFECTIVE ON JULY 1, 2014. LAND DISTURBING
ACTIVITIES THAT OBTAINED A VSMP PERMIT PRIOR TO JULY 1
2014 MAY USE THE STORMWATER MANAGEMENT CRITERIA
SPECIFIED IN PART II C (9VAC25-870-93 ET SEQ) FOR TWO
PERMIT CYCLES. PROJECTS GRANDFATHERED UNDER THE
PROVISIONS OF 9VAC25-870-48 MAY FOLLOW THE REQUIREMENT
LISTED UNDER PART IIC FOR ONE PERMIT CYCLE. ALL OTHER
NEW DEVELOPMENT WILL BE SUBJECT TO THE REQUIREMENTS OF
PART IIB (9VAC25-870-62 TO 9VAC25-870-92).
03. ITEMS LABELED AS FUTURE WERE NOT REVIEWED AND ARE NOT
APPROVED WITH THIS PLAN.
04. SINCE PHASE 2 CONSTRUCTION RELIES UPON INFRASTRUCTURE
BUILT WITHIN PHASE 1 CONSTRUCTION, THE LDP FOR PHASE 2
WILL ALSO RELY UPON ISSUANCE OF THE PHASE 1 PERMIT.
05. INFORMATION IN THIS PLAN IS RELIANT UPON DESIGN DATA
FROM THE PHASE 1 CONSTRUCTION OF THE COMMERCIAL ROAD.
ANY DESIGN CHANGES FROM PHASE 1 CONSTRUCTION THAT
IMPACTS PHASE 2 DESIGN AND/OR CONSTRUCTION WILL NEED T
BE SHOWN UPON THESE PLANS.
06. A STREET SIGN FEE OF $150 PER ROAD INTERSECTION MUST B
PROVIDED PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
07. ON SHEET 3.0, AMEND NOTE 2 UNDER PHASE 1 SEQUENCE OF
CONSTRUCTION TO THE FOLLOWING: "UPON THE FIRST SITE
PLAN AND/OR SUBDIVISION WITH ACCESS TO MAGNOLIA MARKET
AVENUE, A BOND MUST BE POSTED WITH ENVIRONMENTAL
ENGINEERING FOR THE ROAD CONSTRUCTION PRIOR TO STATE
ACCEPTANCE."
08. ON SHEET C3.2, IN THE MS-19 TABLE INCLUDE ACTUAL
DRAINAGE AREAS FOR PROJECT DRAINAGE AREA.
09. SHEET C3.5:
A) PROVIDE OUTLET PROTECTION FOR EXISTING 18" CMP.
B) CLARIFY IF PROPOSED PIPES ARE OPEN CUT OR BORED. I
BORING IS REQUIRED INDICATE BORE PIT AREAS AND
REQUIRED ESC MEASURES.
10. SHEET C3.6:
A) THE LOD FOR PHASE 1 SHALL ENCOMPASS ONLY THE MINIMA
CLEARING REQUIRED TO IMPLEMENT PHASE 1 BOUNDARY
CONTROL DEVICES. AS SHOWN THE WHOLE RIGHT-OF-WAY IS
BEING CLEARED DURING PHASE 1. THIS SHOULD BE
MINIMIZED.
B) EXTEND THE DIVERSION DIKE TO THE EAST ALONG THE
STAGING AREA TOWARD THE SOUTH TO ENSURE ALL DRAINAG
IS CAPTURED AND DISCHARGED INTO THE TRAP.
C) THE DRAINAGE AREA FOR CULVERT 2 EXCEEDS THE MAXIMUM
ALLOWED FOR CULVERT INLET PROTECTION BY THE VESCH.
PROVIDE ALTERNATIVE SEDIMENT AND EROSION CONTROL.
D) FOR THE TEMPORARY SLOPE DRAINS PROVIDE DIVERSION
PRACTICES TO CONVEY THE RUNOFF INTO THE SLOPE DRAIN
TO THE MAXIMUM AMOUNT POSSIBLE.
11. SHEET C3.7:
A) PROVIDE CHECK DAMS IN THE PROPOSED DITCHES/SWALES.
B) SHOW SILT FENCE OUTLETS FOR THE SUPER SILT FENCE
BETWEEN STATION 70+00 TO 75+00 ALONG HULL STREET
ROAD.
12. SHEET C3.8:
A) ENSURE PROJECT NUMBERS SHOWN ARE CORRECT. THEY
APPEAR TO BE REFERENCING CONSTRUCTION PLANS
(SUBDIVISIONS) INSTEAD OF SITE PLANS (PR).
B) CLARIFY WHY THE CONSTRUCTION IS NEEDED TO EXTEND
ACROSS THE CHANNEL FOR CULVERT 1. CONSTRUCTION
SHOULD BE MINIMIZED TO INCLUDE ONLY WORK NECESSARY
TO INSTALL MAGNOLIA MARKET AVENUE.
13. SHEET 4.1:
A) SEVERAL LABELS ARE OVERLAPPING CALLOUTS AND OTHER
LINEWORK CAUSING THE LABELS TO BE OBSCURED.
B) IT IS SUGGESTED TO EVALUATE THE DESIGN TO DETERMINE
IF STRUCTURES 1-49 AND 1-47 CAN BE ELIMINATED.
C) PROVIDE 10' SEPARATION BETWEEN THE WATERLINE AND
STORM SEWER PER UTILITY STANDARDS.
D)
14. SHEET C5.3:
A) CLARIFY HOW THE C-VALUES FOR SECTION A-A AND BMP1
WERE OBTAINED. THESE APPEAR TO BE THE SAME DRAINAG
AREA WITH DIFFERENT C-VALUES.
B) VERIFY THE DRAINAGE AREAS FOR FF AND EE. THERE
APPEARS TO BE A MISSING PIECE OF THE DRAINAGE AREA
TO THE NORTHWEST OF THE FUTURE COLLECTOR ROAD.
15. SHEET C7.0:
A) THE PHASE 2 IMPERVIOUS AREA APPEARS TO DIFFER FROM
THE PROPOSED CONDITION TO THE ONSITE DRAINAGE AREA
AND IN THE POND SIZING. VERIFY IMPERVIOUS AREA.
16. SHEET C7.3:
A) THE CA VALUE FOR STRUCTURE 1-11 DOES NOT MATCH THE
PLANS.
B) THE PIPE GEOMETRY FOR PIPE 1-58 DOES NOT MATCH THE
PLANS.
C) VERIFY THAT THE STRUCTURES RECEIVING IS-1 TREATMENT
ARE ACCOUNTED FOR CORRECTLY. IT APPEARS IT MAY BE
OFF BY A STRUCTURE IN THE CALCULATIONS.
D) VERIFY ANGLES FOR THE STORM SEWER LINE BETWEEN 1-59
TO 1-29 INCLUDING CROSS PIPES ARE CORRECT IN THE
CALCULATIONS.
17. SHEET C7.4:
A) SHOW THE DIVIDE BETWEEN PHASE 1 AND 2 AND QUANTIFY
THE IMPERVIOUS AREA BASED UPON THOSE PHASES.
18. SHEET C7.5:
A) INLET 1-61 APPEARS TO BE MISSING.
19. ON SHEET C9.0, USE PR NUMBERS FOR THE PROJECT NUMBER I
ADDITION TO THE UTILITY PROJECT NUMBERS.
20. IF THE SEDIMENT BASIN FROM PHASE 1 IS TO BE USED FOR
THE DURATION OF PHASE 2 CONSTRUCTION, THEN THE ESC BON
CANNOT BE RELEASED UNTIL AFTER BOTH PHASES ARE
STABILIZED UNLESS THE BASIN IS BONDED UNDER EACH PHASE
IN ADDITION, THE CERTIFICATION FOR THE POND AND RELEAS
OF THE BMP PERFORMANCE BOND CANNOT OCCUR UNTIL THE PON
IS NO LONGER NEEDED AS AN ESC BASIN AND HAS BEEN
CONVERTED.
21. MS-19:
A) SEVERAL OF THE MS-19 FLOW VALUES ARE INCONSISTENT
BETWEEN PHASE 1 AND PHASE 2. VERIFY FLOW VALUES AN
CALCULATIONS.
B) THE ROUGHNESS VALUES USED FOR THE CHANNEL AND
OVERBANKS APPEAR TO BE SWAPPED. A 0.08 N-VALUE IS
CLOSER TO A WOODED/BUSHY FLOODPLAIN WITH LOW
UNDERGROWTH.
C) PROVIDE A CROSS-SECTION UPSTREAM OF CULVERT 1 AND
DOWNSTREAM OF CULVERT 2.
D) THE VARIANCE REQUEST FOR SITUATION G HAS BEEN
APPROVED SINCE THE POND IS DETAINING THE DISCHARGE
FROM POST-DEVELOPED CONDITIONS TO PRE-DEVELOPED
CONDITIONS AT A NON-EROSIVE RATE. A COPY OF THE
VARIANCE REQUEST AND ITS APPROVAL MUST BE KEPT ON
SITE WITH THE SWPPP AT ALL TIMES.
22. PROVIDE CALCULATIONS FOR THE DITCH/SWALE NEAR INLET
1-55.
23. A BMP MAINTENANCE FEE IN THE AMOUNT OF $1,500 PER
IMPERVIOUS ACRE IS REQUIRED FOR COMMERCIAL DEVELOPMENT
PAYMENT MUST BE RECEIVED PRIOR TO ISSUANCE OF A LAND
DISTURBANCE PERMIT. (CL-USC 1)
24. ADDITIONAL EROSION CONTROL MEASURES OTHER THAN THE
MINIMUM STANDARDS CONTAINED IN THE VIRGINIA EROSION AN
SEDIMENT CONTROL HANDBOOK WILL BE REQUIRED IF IT IS
DETERMINED THAT SUCH MEASURES ARE NECESSARY FOR
PROTECTION OF SENSITIVE ENVIRONMENTAL FEATURES AND/OR
WATER RESOURCES. (CL-USC 3)
25. ENHANCED PERIMETER PROTECTION MEASURES ARE REQUIRED.
(SUPER SILT FENCE, SEDIMENT BASINS AND TRAPS SIZED 25
PERCENT LARGER THAN MINIMUM STANDARDS, ETC.) (CL-USC 4
26. FOR SITES OVER FIVE ACRES, A MONTHLY EROSION AND
SEDIMENT CONTROL REPORT FROM THE CRLD MUST BE SUBMITTE
TO ENVIRONMENTAL ENGINEERING BY THE FIRST OF EACH
MONTH. (CL-USC 6)
27. THE DESIGN AND CONSTRUCTION OF THE SWM/BMP WHICH WILL
BE A COUNTY MAINTAINED FACILITY WILL BE SUBJECT TO
INDEPENDENTLY DOCUMENTED GEOTECHNICAL APPROVAL. THE
SERVICES WHICH MUST BE PROVIDED BY THE INDEPENDENT
GEOTECHNICAL ENGINEERING FIRM SHALL INCLUDE FULL TIME
GEOTECHNICAL INSPECTION PAID FOR BY THE DEVELOPER.
THAT FULL TIME INSPECTION SHALL INCLUDE BUT NOT BE
LIMITED TO THE FOLLOWING (CL-USC 9):
1. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS
NECESSARY TO FACILITATE THE APPROVAL PROCESS OF THE
INDEPENDENT GEOTECHNICAL CONSULTANT. (CL-USC 9A)
OBSERVATION, TESTING AND DOCUMENTATION OF:
2. SUITABLE SUBGRADES TO RECEIVE COMPACTED STRUCTURAL FIL
FOR EARTH DAM CONSTRUCTION. (CL-USC 9B)
3. THE CUT OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE AND CONCRETE CHUTE SPILLWAY SUBGRADES
AS APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS
PRESENT AT BEARING GRADE TO VERIFY PROPER INSTALLATION
(CL-USC 9C)
4. FILL PLACEMENT AND FIELD DENSITY TESTING TO EVALUATE/
VERIFY PROPER COMPACTION. (CL-USC 9D)
5. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
(CL-USC 9E)
28. THE FACILITY CERTIFICATION PROCESS SHALL BE PERFORMED
BY AN ENGINEERING/SURVEYING PROFESSIONAL CHOSEN BY THE
COUNTY AT THE OWNERS EXPENSE. (CL-USC 10)
29. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL OF THE SWM/BMP WILL
BE FURNISHED ON THE LAND DISTURBANCE PERMIT.(CL-USC 11
30. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL
ENGINEERING DEPARTMENT AND OBTAIN AN "APPROVED FOR
CONSTRUCTION" STAMP ON TWO ADDITIONAL SETS FOR THE
OWNER TO KEEP ON-SITE.
31. A CONSTRUCTION PERFORMANCE BOND MUST BE PROVIDED FOR
THE IMPROVEMENTS WITHIN THE PROPOSED RIGHT OF WAY PRIO
TO SUBMITTAL OF THE FIRST SITE AND/OR SUBDIVISION PLAN
OFF OF THE PROPOSED ROADWAY.
32. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER /
BMP DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO
ISSUANCE OF A BUILDING PERMIT FOR THIS PROJECT.
33. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD FILE MUST BE SUBMITTED TO CAROLE
CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE AUTOCAD
FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD VERSIO
2009 OR EARLIER AND REFERENCED DIRECTLY TO THE VIRGINI
STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN THE NAD83
DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD
OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH THE SITE
PLAN NAME, SITE PLAN NUMBER, ENGINEERING FIRM AND CAD
FILE PREPARER'S NAME AND PHONE NUMBER. THE FILE MUST
CONTAIN THE FOLLOWING, EACH CLEARLY LABELED IN SEPARAT
LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. PARKING LOTS AND DRIVEWAYS;
C. ROADS;
D. SIDEWALKS;
E. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE; AND
F. FLOODPLAINS.
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
34. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
35. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A VDOT LAND USE PERMIT
C. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
D. COPY OF THE VIRGINIA STORMWATER PERMIT AND REGISTRATIO
STATEMENT.
E. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BOOK
F. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)
G. A STREET SIGN FEE OF $150 PER ROAD INTERSECTION MUST B