CASE NO: 16PR0140 STATUS: PENDING APPROVAL
PROJECT NAME: CASCADE CREEK RETAIL - LAST INTERNET UPDATE: 11/22/17
SUBMITTAL TYPE: COMMERCIAL
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ASSESSOR----: 00 09/02/15 09/23/15 ******** ********
ENVIR.ENGR.-: 03 07/24/17 08/14/17 ******** 12/09/15 CBH 776-7836
FIRE DEPT.--: 03 07/24/17 08/14/17 COMPLETE 07/31/17 AWB 717-6167
HOUSE NUMBER: 02 02/10/17 03/03/17 ******** 11/03/15 NCP 751-4319
MAPPING/GIS-: 03 07/24/17 08/14/17 COMPLETE 07/27/17 AMJ 768-7549
PLANNING----: 03 07/24/17 08/14/17 COMPLETE 08/21/17 JHL 751-4158
TRANSPORT.--: 03 07/24/17 08/14/17 COMPLETE 07/26/17 SJA 751-4461
UTIL.PLAN.--: 03 07/24/17 08/14/17 ******** ********
UTILITIES---: 03 07/24/17 08/14/17 ******** 05/12/17 M L 748-1338
UTIL.R.O.W.-: 03 07/24/17 08/14/17 ******** ********
VDOT--------: 03 07/24/17 08/14/17 ******** ********
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : RYAN EVANS, P.E./748-1338
NAME OF PLAN : CASCADE CREEK RETAIL
ADDRESS : 8700 COGBILL ROAD
SUBMISSION DATE : 09-03-15
PLAN DATED : 08-19-15
REVIEW DATE : 09-15-15
SITE PLAN NO. : 16PR0140
COMMENTS : 1ST REVIEW-NOT APPROVED
TABLE REVIEW :
PLAT PROCESS :
1. SHOW THE COUNTY UTILITIES PROJECT NUMBER 15-0271 ON TH
LOWER RIGHT HAND CORNER OF EACH SHEET.
2. LABEL WHAT IS PROPOSED TO BE PUBLIC AND WHAT IS PROPOS
AS PRIVATE ON BOTH PLAN AND PROFILE VIEWS. ALSO, SEPARATE
THE UTILITY QUANTITIES SIMILARLY.
3. OBTAIN THE PERTINENT EXISTING WATER AND SEWER AS-
BUILT INFORMATION FROM THE UTILITIES DEPARTMENT. ENSURE TH
THE FIELD SURVEY AND AS-BUILT INFORMATION ACCURATELY REFLE
THE ON-SITE CONDITIONS AND PRESENT SAID INFORMATION
ACCORDINGLY ON THE PLANS. CLEARLY LABEL THE EXISTING SIZE,
MATERIAL TYPE, AND COUNTY PROJECT # ON ALL WATER AND SEWER
LINE WITHIN THE PLAN VIEWPORT. INFORMATION MAY BE OBTAINED
BY EMAILING SWAVAILABILITY@CHESTERFIELD.GOV OR AT THE
UTILITIES DEPARTMENT BUILDING.
4. PROVIDE CALCULATIONS TO VERIFY THAT THE FIRE FLOW AND
DOMESTIC FLOWS CAN BE SUSTAINED WITH A RESIDUAL PRESSURE O
20 PSI. SHOW ON THE PLANS DETAILS DES-5 AND DES-6.
5. SUBMIT AN ENGINEER'S CHECKLIST FROM PART 1 OF THE SPECS
6. WILL THERE BE IRRIGATION ON THE SITE? IF AN IRRIGATION
METER IS USED, SUBMIT AN IRRIGATION METER SIZING FORM.
OTHERWISE, INCLUDE HOSE BIBS OR ON THE DOMESTIC METER SIZI
FORM OR INDICATE WHAT OTHER APPROVED METHOD IS PROPOSED.
7. DD A NOTE THAT BEYOND THE WATER METER IT IS THE PLUMBER
RESPONSIBILITY TO INSTALL THE WATER SERVICE AND THE WATER
SERVICE WILL BE INSPECTED BY THE BUILDING INSPECTION OFFIC
MARK THE WATER SERVICE BEHIND THE METER "PRIVATE".
8. REVISE THE PROPOSED SANITARY SEWER TO ELIMINATE THE FOR
MAIN AND EXTEND PUBLIC SEWER IN ACCORDANCE WITH THE
UTILITIES SPECIFICATIONS.
9. SHOW UTILITIES QUANTITIES AND A SANITARY MANHOLE
COORDINATE TABLE ON THE COVER SHEET. IF THERE IS NO ROOM,
SHOW IT ON THE UTILITIES SHEET.
10. VERTICALLY LOCATE THE EXISTING 30" AND 16" WATERLINES
AT EAST RESPECTIVE ENTRANCE AND EXISTING GAS LINE PRIOR TO
PLAN APPROVAL.
11. MAINTAIN A MINIMUM OF 10' HORIZONTAL SEPARATION BETWE
ANY PROPOSED STORM OR SANITARY LINES AND THE EXISTING
WATERLINES SURROUNDING THIS PROPERTY.
12. FOR EACH BUILDING SHOW AN RPZ, EITHER OUTSIDE OR INSID
THE BUILDING, AND A MONITORING MANHOLE DOWNSTREAM OF ALL T
CLEANOUTS.
13. REVISE THE WATER TAP CONFIGURATIONS TO ELIMINATE THE
NEW TAPPING SLEEVE AND VALVE AND NEW 2" CONNECTION AND
INSTEAD EXTEND ONE OF THE EXISTING 6" STUBS LEFT FOR THIS
PROPERTY ALONG THE 16".
14. REVISE THE NOMENCLATURE OF ANY FDC BFP FROM "DETECTOR
CHECK" TO "DOUBLE CHECK".
15. REVISE THE PLAN TO ENSURE THAT ANY PROPOSED FIRE
HYDRANTS ADHERE TO THE FIR-4 STANDARD DETAIL.
16. SHOW WATER AND SEWER PROFILES ON 24"X36" SHEET ALONG
WITH REVISED SCALE HORIZONTAL 1"=50'/VERTICAL 1"=5'OR
1"=10'.
17. PROVIDE BENCH MARK ON PLANS.
18. REVISE WATER LINE TO HAVE A MINIMUM OF 3.5' OF COVER.
19. THE OWNER SHALL BE REQUIRED TO ENTER INTO A COUNTY
UTILITIES CONTRACT PRIOR TO THE START OF CONSTRUCTION.
PRIOR TO THE PREPARATION OF THE UTILITIES CONTRACT,
UTILITIES MUST BE IN RECEIPT OF THE "ACCEPTED" BID PROPOSA
BETWEEN THE DEVELOPER AND THE COUNTY APPROVED UTILITIES
CONTRACTOR AS WELL AS THE PROJECT'S INFORMATIONAL SHEET
FOUND ON THE "DEVELOPER'S CHECKLIST". PLEASE SEND THOSE TW
ITEMS TO THE ATTENTION OF JACQUE HYDEN
(HYDENJ@CHESTERFIELD.GOV OR 804-318-8437). THE BID PROPOSA
MUST BE BASED ON THE APPROVED SITE PLAN. BE ADVISED THAT I
THE SITE PLAN IS REVISED AND REAPPROVED SUBSEQUENT TO THE
PREPARATION OR RECORDATION OF THE UTILITIES CONTRACT, THE
BID PROPOSAL SHALL BE REVISED ACCORDINGLY AND A REVISED
UTILITIES CONTRACT MAY BE NECESSARY.
20. AFTER FINAL SITE PLAN APPROVAL, SUBMIT THREE SETS OF T
APPROVED PLANS DIRECTLY TO THE UTILITIES DEPARTMENT FOR OU
USE DURING CONSTRUCTION INSPECTION.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : JAMIE BLAND / 751-4439
NAME OF PLAN : CASCADE CREEK RETAIL
ADDRESS : 8700 COGBILL ROAD
SUBMISSION DATE : 10-19-15
PLAN DATED : 10-14-15
REVIEW DATE : 11-2-15
SITE PLAN NO. : 16PR0140
COMMENTS : 2ND REVIEW-NOT APPROVED
TABLE REVIEW :
PLAT PROCESS :
1. LOCATE OFF SITE SANITARY SEWER OUTSIDE RIGHT OF WAY.
REVISE PROPOSED SANITARY SEWER FROM MH 6 AND FOLLOW THE LO
TO THE EXISTING MH 7 (AND LABEL) IN THE FIVE FORKS VILLAGE
COMM ASSOC. THIS IS THE INTENDED ROUTE FOR THE SANITARY
SEWER.
2. REVISE COUNTY PROJECT NUMBER FOR 20" AND 30" WATER LIN
ALONG BELMONT RD TO 86-6013.
3. THE PRIVATE SANITARY SEWER LINE IS LOCATED INSIDE THE
PUBLIC WATER LINE EASEMENT. RELOCATE SANITARY SEWER OUTSID
OF 16' WATER LINE EASEMENT.
4. ON SHEET 7 & 12 CHANGE TEXT FROM UTILITY TO WATER
EASEMENT.
5. MAINTAIN A MINIMUM OF 10' HORIZONTAL SEPARATION BETWEE
ANY PROPOSED SANITARY LINES AND THE PROPOSED WATERLINES
SURROUNDING THIS PROPERTY.
6. REVISE THE WATER TAP CONFIGURATIONS TO ELIMINATE THE
NEW TAPPING SLEEVE AND VALVE AND NEW 2" CONNECTION AND
INSTEAD EXTEND ONE OF THE EXISTING 6" STUBS LEFT FOR THIS
PROPERTY ALONG THE 16". (PREVIOUS COMMENT)
7. SHOW DETAILS DES-5 AND DES-6 ON SHEET 22.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : MIKE LARSON / 748-1338
NAME OF PLAN : CASCADE CREEK RETAIL
ADDRESS : 8700 COGBILL ROAD
SUBMISSION DATE : 2/10/17
PLAN DATED : 1/27/17
REVIEW DATE : 2/21/17
SITE PLAN NO. : 16PR0140
COMMENTS : 3RD REVIEW-NOT APPROVED
TABLE REVIEW : YES
PLAT PROCESS :
.
1. INCLUDE SEWER ITEMS IN THE MATERIALS QUANTITY LIST.
2. THE VALVE AT THE CUT-IN TEE IS OBSCURED TY THE STATION
3. THE POST INDICATOR VALVE CANNOT BE PUBLIC AND IF NEEDE
MUST BE LOCATED ON THE CUSTOMERS SIDE OF DDCA.
.
4. SHOW MH 5 ON THE PROFILE ON SHEET 27 AND ELIMINATE THE
DROP CONNECTION.
5. INCLUDE THE PROFILE FOR THE FIRE WATER LINE ON SHEET 2
6. THE OFFSITE SANITARY SEWER PLAN IS MISSING THE ROUTE N
ROW WIDTH FOR COGBILL RD,, THE RIGHT OF WAY AND PROP
7. ADJUST THE INVERT IN ON MH 10 SO THAT IT IS A 0.1 FT DR
. PIN OF THE ADJACENT SITES ARE NOT SHOWN.
.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : MIKE LARSON / 748-1338
NAME OF PLAN : CASCADE CREEK RETAIL
ADDRESS : 8700 COGBILL ROAD
SUBMISSION DATE : 5/8/17
PLAN DATED : 4/11/17
REVIEW DATE : 5/11/17
SITE PLAN NO. : 16PR0140
COMMENTS : 4TH REVIEW- APPROVED
TABLE REVIEW : YES
PLAT PROCESS :
SUBMIT 3 COPIES OF THE PLANS TO THE UTILITY DEPARTMENT ONC
ALL APPROVALS HAVE BEEN OBTAINED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
FULL ACCESS SPACING FOR MINOR ARTERIALS FOR BOTH ACCESSES.
EVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
LATEST PLAN DATE: 08/19/15
DEPT. REC'D. DATE: 09/04/15
SUBMITTAL NUMBER: ONE
REVIEW DATE: 09/25/15
RECOMMENDATION: NOT APPROVED
PLAT PROCESSING: R/W DEDICATION, SHARED ACCESS ESMT
1. NOTE THE EXISTING RIGHT-OF-WAY FROM THE CENTERLINE OF
COGBILL ROAD AND BELMONT ROAD. IF LESS THAN 45', PRIOR TO
SITE PLAN APPROVAL, DEDICATE ADDITIONAL RIGHT-OF-WAY
ACCORDINGLY, FREE AND UNRESTRICTED, TO AND FOR THE BENEFIT
OF CHESTERFIELD COUNTY.
2. PRIOR TO SITE PLAN APPROVAL, RECORD PRIVATE ACCESS
EASEMENTS FROM BOTH ACCESSES TO THE ADJACENT PROPERTY TO
THE WEST TO ENSURE SHARED ACCESS IN THE FUTURE. THE
PRIVATE ACCESS EASEMENT SHALL BE NON-EXCLUSIVE.
3. ENSURE ACCESS MEET VDOT ACCESS MANAGEMENT STANDARDS FOR
FULL ACCESS SPACING FOR MINOR ARTERIALS FOR BOTH ACCESSES.
4. PROVIDE LEFT & RIGHT TURN LANES AT EACH APPROVED ACCESS
TURN LANES ARE REQUIRED BY COUNTY TRANSPORTATION AND ARE
NOT BASED ON VDOT WARRANTS - BOTH ROAD ARE CLASSIFIED AS
MAJOR ARTERIALS PER COUNTY THOROUGHFARE PLAN.
5. PROVIDE A 5' SIDEWALK ALONG THE DEVELOPMENT'S FRONTAGE
TO COGBILL ROAD AND BELMONT ROAD. SIDEWALK SHALL BE
LOCATED WITHIN THE R/W.
6. NOTE ON PLAN SHEETS THAT BELMONT ROAD AND COGBILL ROAD
ARE CLASSIFED AS MAJOR ATERIALS PER THE COUNTY'S
THOROUGHFARE PLAN.
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
LATEST PLAN DATE: 10/14/15
DEPT. REC'D. DATE: 10/20/15
SUBMITTAL NUMBER: TWO
REVIEW DATE: 11/09/15
RECOMMENDATION: NOT APPROVED
PLAT PROCESSING: NO
1. PLEASE ENSURE ADEQUATE DRAINAGE SYSYEM IS PROVIDED ALON
COGBILL RD AT THE RIGHT TURN LANE AND SIDEWALK AREAS SO
WATER DOES NOT GET TRAPPED AND STANDING WATER IS ON THE
ROAD.
2. BELMONT LEFT TURN LANE: REDUCE THE STORAGE AND/OR TAPER
LENGTH IN ORDER TO ENSURE 200' STORAGE IS MAINTAINED ON TH
SOUTHBOUND BELMONT LEFT TURN LANE AT BELMONT ROAD.
3. NOTE THE ROAD CLASSIFICATIONS (MAJOR ARTERIAL) FOR
BELMONT RD AND COGBILL RD ON THE PLAN SHEETS UNDER THE
STREET NAME.
==========================================================
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
LATEST PLAN DATE: 02/02/17
DEPT. REC'D. DATE: 02/13/17
SUBMITTAL NUMBER: THREE
REVIEW DATE: 02/15/17
RECOMMENDATION: SUBSTANTIAL APPROVAL
PLAT PROCESSING: R/W DEDICATION - COGBILL RD
.
FINAL SITE PLAN APPROVAL IS PENDING RIGHT-OF-WAY DEDICATIO
ALONG COGBILL ROAD. IT APPEARS SHEET 5 IS SHOWING A SMALL
AREA OF RIGHT-OF-WAY DEDICATION.
==========================================================
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
LATEST PLAN DATE: 05/02/17
DEPT. REC'D. DATE: 05/10/17
SUBMITTAL NUMBER: FOUR
REVIEW DATE: 05/19/17
RECOMMENDATION: APPROVED
==========================================================
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
LATEST PLAN DATE: 06/29/17
DEPT. REC'D. DATE: 07/26/17
SUBMITTAL NUMBER: FIVE (LAMSON)
REVIEW DATE: 07/26/17
RECOMMENDATION: APPROVED
==========================================================
==========================================================
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : NANCY PARKER 751-4319
NAME OF PLAN : CASCADE CREEK RETAIL
PLAN NO. : 16PR0140
ADDRESS :
LATEST PLAN DATE : 8/13/15
RECEIVED DATE : 9/3/15
SUBMITTAL NUMBER : 1
REVIEW DATE : 9/17/15
RECOMMENDATION : NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNING
THE COMMENTS BELOW.
1. MORE THAN ONE DIRECTION OF TRAVERSE IS SHOWN.
PLEASE REVISE THE SURVEY TO SHOW ONLY ONE PATH OF
TRAVERSE.
2. COORDINATE POINTS BASED ON THE VIRGINIA STATE PLANE
COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM
1983 ARE NOT PRESENT. TWO POINTS MUST BE SHOWN ON THE
SITE BOUNDARY.
3. BEARINGS SHOWN ARE NOT INDICATED TO BE NAD83 BEARINGS.
ADD THIS INDICATION TO THE NORTH ARROW.
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : NANCY PARKER 751-4319
NAME OF PLAN : CASCADE CREEK RETAIL
PLAN NO. : 16PR0140
ADDRESS :
LATEST PLAN DATE : 10/14/15
RECEIVED DATE : 10/20/15
SUBMITTAL NUMBER : 2
REVIEW DATE : 11/3/15
RECOMMENDATION : APPROVED
==========================================================
REVIEW DEPARTMENT: GIS + HOUSE NUMBERING
REVIEWER : AMY JOHANSON 768-7549
PROJECT NAME : CASCADE CREEK RETAIL
CASE NUMBER : 16PR0140
LATEST PLAN DATE : 2/2/17
RECEIVED DATE : 2/13/17
SUBMITTAL NUMBER : 3
REVIEW DATE : 3/2/17
ADDRESS : PENDING
STATUS : NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNING
THE COMMENTS BELOW.
1. COORDINATE POINTS BASED ON THE VIRGINIA STATE PLANE
COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM 1983
ARE INCORRECT. THE LOCATION OF THE POINTS IS ACCEPTABLE,
HOWEVER, THE VALUES SHOWN ARE INCORRECT.
2. WILL THE 2.78 ACRES BE SPLIT OUT OF GPIN
762-678-4600-00000 AS SHOWN ON SHEET 30? WE NEED THIS
INFORMATION TO ADDRESS THE PARCELS. FYI: PARCEL 2 WILL
GET TEN ADDRESSES FOR THE BUILDING; ONE FOR EACH SUITE.
==========================================================
REVIEW DEPARTMENT: GIS + HOUSE NUMBERING
REVIEWER : AMY JOHANSON 768-7549
PROJECT NAME : CASCADE CREEK RETAIL
CASE NUMBER : 16PR0140
LATEST PLAN DATE : 4/11/17
RECEIVED DATE : 5/12/17
SUBMITTAL NUMBER : 4
REVIEW DATE : 5/26/17
ADDRESS : PENDING
STATUS : APPROVED
==========================================================
==========================================================
REVIEW DEPARTMENT: GIS + HOUSE NUMBERING
REVIEWER : AMY JOHANSON 768-7549
PROJECT NAME : CASCADE CREEK RETAIL
CASE NUMBER : 16PR0140
LATEST PLAN DATE : 7/24/17
RECEIVED DATE : 7/27/17
SUBMITTAL NUMBER : 5
REVIEW DATE : 7/27/17
ADDRESS : PENDING
==========================================================
==========================================================
==========================================================
DEPARTMENT REVIEW: IST / HOUSE NUMBERING SECTION
REVIEWER: NANCY PARKER
PHONE NUMBER: 751-4319
CASE NUMBER: 16PR0140
NAME OF PLAN:CASCADE CREEK RETAIL
ADDRESS: NOT YET ASSIGNED
DATE OF REVIEW:9/17/15 REVIEW # 1
STATUS: HOUSE NUMBERING NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS
CONCERNING THE COMMENTS BELOW.
1) SHOW THE LOCATION OF THE MAIL BOX KIOSKS OR CLUSTER
BOXES ON THE PLAN SHEET OR INDICATE IN WHICH BUILDING THEY
ARE LOCATED.
2) LOCATION OF STREET ADDRESS SIGN IS NOT SHOWN.
(THE ADDRESS CAN BE PART OF YOUR MONUMENT SIGN.
THIS DOES NOT COUNT AS PART OF THE SQUARE FOOTAGE OF THE
SIGN. IF YOU ARE USING THE MONUMENT
SIGN FOR THE ADDRESS, A DETAIL OF THE MONUMENT SIGN
NEEDS TO BE ON THE SITE PLAN.)
3) SPECIFY THE MATERIAL THAT THE ADDRESS SIGN IS TO BE
MADE OF. (MATERIAL TO BE MORE DURABLE THAN WOOD).
4) SHOW THE MAXIMUM NUMBER OF TENANT SPACES WITHIN
EACH BUILDING SO THAT CORRECT ADDRESSING CAN BE
ASSIGNED.
==========================================================
==========================================================
DEPARTMENT REVIEW: IST / HOUSE NUMBERING SECTION
REVIEWER: NANCY PARKER
PHONE NUMBER: 751-4319
CASE NUMBER: 16PR0140
NAME OF PLAN:CASCADE CREEK RETAIL
ADDRESS: NOT YET ASSIGNED
DATE OF REVIEW:11/3/15 REVIEW # 2
STATUS: HOUSE NUMBERING NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS
CONCERNING THE COMMENTS BELOW.
1) CHECK WITH THE POST OFFICE SERVING THIS AREA TO ENSURE
THAT MAILBOXES CAN BE INSIDE BUILDINGS. I BELIEVE THE POS
OFFICE PREFERS A COLLECTION BOX UNIT IN COMMERCIAL OR
RETAIL AREAS. IF THAT IS THE CASE, SHOW THE LOCATION OF T
COLLECTION BOX UNIT ON THE PLANS.
2) LOCATION OF STREET ADDRESS SIGN IS NOT SHOWN.
(THE ADDRESS CAN BE PART OF YOUR MONUMENT SIGN.
THIS DOES NOT COUNT AS PART OF THE SQUARE FOOTAGE OF THE
SIGN. IF YOU ARE USING THE MONUMENT
SIGN FOR THE ADDRESS, A DETAIL OF THE MONUMENT SIGN
NEEDS TO BE ON THE SITE PLAN.)
3) SPECIFY THE MATERIAL THAT THE ADDRESS SIGN IS TO BE
MADE OF. (MATERIAL TO BE MORE DURABLE THAN WOOD).
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
ADDRESS: 8700 COGBILL ROAD
LATEST PLAN DATE: 8/19/2015
DEPT. REC'D. DATE: 9/4/15
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 9/4/15
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: NO
PLAT PROCESSING: NO
COMMENTS:
1. PROVIDE COMPUTER GENERATED WATER FLOW TEST DATA,
PROVIDED BY THE CHESTERFIELD COUNTY UTILITIES
DEPARTMENT, VERIFYING THE REQUIRED WATER FLOW FOR FIRE
PROTECTION IS AVAILABLE AT THE SITE. THE WATERFLOW TEST
RESULTS AND GRAPH SHALL BE SHOWN ON THE SUBMITTED PLAN.
THE MINIMUM REQUIRED FIRE FLOW FOR ALL BUILDINGS, WITH
THE EXCEPTION OF ONE AND TWO-FAMILY DWELLINGS, IS 1500
GPM (SPRINKLER PROTECTED OR NON-SPRINKLER PROTECTED) IN
ACCORDANCE WITH THE INTERNATIONAL FIRE CODE (2012) -
SECTION B105.2 AND TABLE B105.1.
2. SHOW THE NODE MAP AND RESULTS TABLE FOR THE PROPOSED
OR EXISTING HYDRANTS ON SITE SHOWING THE MAXIMUM FIRE
FLOW CAN BE ACHIEVED. WHEN MULTIPLE FIRE HYDRANTS ARE
USED THE COMBINED FLOW MUST BE SIMULTANEOUS.
3. REVIEW DOES NOT INDICATE PROPER NUMBER AND OR LOCATION
OF FIRE HYDRANTS. THE NUMBER OF FIRE HYDRANTS REQUIRED
SHALL BE BASED ON THE INTERNATIONAL FIRE CODE - SECTION
C105 AND TABLE C105.1 FOR AVERAGE SPACING BETWEEN FIRE
HYDRANTS AND MAXIMUM DISTANCE FROM ANY POINT ON A STREET
OR ROAD FRONTAGE TO A FIRE HYDRANT. A MINIMUM DISTANCE OF
40 FEET SHALL BE PROVIDED BETWEEN FIRE HYDRANTS AND
BUILDING EXTERIOR WALL AND FIRE HYDRANTS SHALL BE
LOCATED AT A MAXIMUM DISTANCE OF 50 FEET BETWEEN HYDRANT
AND FIRE DEPARTMENT CONNECTION FOR ANY PROPOSED FIRE
SPRINKLER SYSTEM OR STANDPIPE SYSTEM.
4. THE HYDRANT SHOWN ON THE PLAN IS DEDICATED FOR THE FIRE
SPRINKLER SYSTEM. A SECOND HYDRANT SHALL BE REQUIRED FOR
GENERAL FIREFIGHTING NEEDS.
5. ADD AN ARROW TO THE FIRE HYDRANT INDICATING WHICH
DIRECTION IT SHALL FACE.
6. ADD A NOTE TO THE UTILITY PLAN STATING:
"THE 4.5 INCH DISCHARGE OF THE FIRE HYDRANT SHALL FACE
IN THE DIRECTION INDICATED BY THE ARROW ON THE PLAN."
7. PROVIDE THE CHESTERFIELD COUNTY STANDARD FIRE LANE
DETAIL ON THE PLAN.
8. PARKING STALLS OR OTHER OBSTRUCTIONS, AS INDICATED IN
THE INTERNATIONAL FIRE CODE (2012) - SECTION 508.5.4,
SHALL NOT BE PLACED IN FRONT OF THE ACCESS TO FIRE
HYDRANTS, FIRE PUMP TEST HEADERS, FIRE DEPARTMENT
SPRINKLER SYSTEM CONNECTIONS, FIRE DEPARTMENT STANDPIPE
CONNECTIONS OR FIRE PROTECTION SYSTEM CONTROL VALVES
9. THE APPROXIMATE LOCATION OF ALL REQUIRED FIRE LANE
SIGNS AND CURB / STREET MARKING SHALL BE INDICATED ON
THE PLAN. FIRE LANES THAT ARE BETWEEN TWENTY AND
TWENTY-SIX FEET IN WIDTH SHALL BE POSTED AND MARKED ON
BOTH SIDES OF THE ROADWAY. FIRE LANES IN EXCESS OF
TWENTY-SIX FEET IN WIDTH UP TO THIRTY-TWO FEET IN WIDTH
SHALL BE POSTED AND MARKED ON ONE SIDE OF THE
ROADWAY. THE LOCATION OF AND METHOD OF MARKING FIRE
LANES SHALL BE CLEARLY INDICATED ON THE SUBMITTED SITE
PLAN. ALL FIRE LANE SIGNS SHALL BE DOUBLE FACED AND
INSTALLED PERPENDICULAR TO THE CURB.
10. PLACE THE HYDRANT ON THE PUBLIC WATER SIDE OF THE DOUB
CHECK ASSEMBLY AND VAULT.
11. ONE (1) FDC CAN SERVICE BOTH BUILDINGS WITH THE USE OF
INDICATING VALVES (PIV'S). SHOW LOCATION OF PIV'S ON UTILI
PLAN.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
ADDRESS: 8700 COGBILL ROAD
LATEST PLAN DATE: 10/14/15
DEPT. REC'D. DATE: 10/19/15
SUBMITTAL NUMBER: 2ND REVIEW
REVIEW DATE: 10/19/15
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: NO
PLAT PROCESSING: NO
COMMENTS:
1. SHOW THE NODE MAP AND RESULTS TABLE FOR THE PROPOSED
OR EXISTING HYDRANTS ON SITE SHOWING THE MAXIMUM FIRE
FLOW CAN BE ACHIEVED. WHEN MULTIPLE FIRE HYDRANTS ARE
USED THE COMBINED FLOW MUST BE SIMULTANEOUS.
2. THE APPROXIMATE LOCATION OF ALL REQUIRED FIRE LANE
SIGNS AND CURB / STREET MARKING SHALL BE INDICATED ON
THE PLAN. FIRE LANES THAT ARE BETWEEN TWENTY AND
TWENTY-SIX FEET IN WIDTH SHALL BE POSTED AND MARKED ON
BOTH SIDES OF THE ROADWAY. FIRE LANES IN EXCESS OF
TWENTY-SIX FEET IN WIDTH UP TO THIRTY-TWO FEET IN WIDTH
SHALL BE POSTED AND MARKED ON ONE SIDE OF THE
ROADWAY. THE LOCATION OF AND METHOD OF MARKING FIRE
LANES SHALL BE CLEARLY INDICATED ON THE SUBMITTED SITE
PLAN. ALL FIRE LANE SIGNS SHALL BE DOUBLE FACED AND
INSTALLED PERPENDICULAR TO THE CURB.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
ADDRESS: 8700 COGBILL ROAD
LATEST PLAN DATE: 2/2/17
DEPT. REC'D. DATE: 2/14/17
SUBMITTAL NUMBER: 2ND REVIEW
REVIEW DATE: 2/17/17
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: NO
PLAT PROCESSING: NO
COMMENTS:
1. REMOVE THE POST INDICATOR VALVE FROM THE UTILITY PLAN
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
ADDRESS: 8700 COGBILL ROAD
LATEST PLAN DATE: 5/2/17
DEPT. REC'D. DATE: 5/1117
SUBMITTAL NUMBER: 3RD REVIEW
REVIEW DATE: 5/12/17
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE REVISED SITE PLAN IS APPROVED AS SUBMITTED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: CASCADE CREEK RETAIL
SITE PLAN NUMBER: 16PR0140
ADDRESS: 8700 COGBILL ROAD
LATEST PLAN DATE: 6/29/17
DEPT. REC'D. DATE: 7/27/17
SUBMITTAL NUMBER: 4TH REVIEW
REVIEW DATE: 7/31/17
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE REVISED SITE PLAN IS APPROVED AS SUBMITTED.
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : CATHY HILL, P.E. / 768-7836
NAME OF PLAN : CASCADE CREEK RETAIL
ADDRESS : 8700 COGBILL ROAD
SITE PLAN NO. : 16PR0140
LATEST PLAN DATE : 08/19/2015
DEPT. REC'D DATE : 09/03/2015
SUBMITTAL NUMBER : 1
REVIEW DATE : 09/30/2015
RECOMMENDATION : NOT APPROVED
TABLE REVISION : NO
PLAT PROCESSING : NO
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL
FEATURES INCLUDING BUT NOT LIMITED TO WETLANDS,
SURFACE WATERS (E.G. VSMP PERMIT FOR CONSTRUCTION
SITES, GROUND WATER AND AIR QUALITY) FINAL APPROVAL
OF THESE PLANS WILL NOT RELIEVE YOU OF YOUR
RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE
LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. EFFECTIVE JULY 1, 2014, ENFORCEMENT OF THE VIRGINIA
STORMWATER REGULATIONS BECAME THE RESPONSIBILITY OF
THE COUNTY FOR DEVELOPMENT PROJECTS WITHIN
CHESTERFIELD COUNTY. ADDITIONALLY, NEW STATE
STORMWATER REGULATIONS ALSO BECAME EFFECTIVE ON
JULY 1, 2014. LAND DISTURBING ACTIVITIES THAT
OBTAINED A VSMP PERMIT PRIOR TO JULY 1, 2014 MAY
USE THE STORMWATER MANAGEMENT CRITERIA SPECIFIED
IN PART II C (9VAC25-870-93 ET SEQ) FOR TWO PERMIT
CYCLES. PROJECTS GRANDFATHERED UNDER THE PROVISIONS
OF 9VAC25-870-48 MAY FOLLOW THE REQUIREMENTS LISTED
UNDER PART IIC FOR ONE PERMIT CYCLE. ALL OTHER NEW
DEVELOPMENT WILL BE SUBJECT TO THE REQUIREMENTS OF
PART IIB (9VAC25-870-62 TO 9VAC25-870-92).
03. PROVIDE THE FOLLOWING INFORMATION ON THE COVER SHEET:
A. LATITUDE AND LONGITUDE FOR THE PROJECT SITE (IN
DEGREES, MINUTES, SECONDS, TO THE NEAREST 15 SECONDS)
B. NAME OF RECEIVING CHANNEL/WATERS
C. VAHU6 FOUR DIGIT WATERSHED CODE
04. PROVIDE A DRAINAGE AREA MAP OFF-SITE DRAINAGE AREAS.
(MAXIMUM SCALE OF 1"=200') (CL-G&D 3)
05. THE PROPOSED RIP-RAP OUTFALL MUST SPECIFY A
MINIMUM OF 24" OF VDOT CL.I RIP-RAP PLACED OVER A
LAYER OF FILTER CLOTH. (CL-G&D 4)
06. SHOW THE OFFSITE DRAINAGE AREA TO THE EXISTING CULVERT
UNDER BELMONT ROAD.
07. CALCULATIONS MUST BE SUBMITTED TO SUPPORT THE DESIGN O
ALL PROPOSED CULVERTS, OPEN DITCHES, DROP INLETS, AND
STORM SEWERS ON VDOT STANDARD CALCULATION SHEETS.
(CL-G&D 11) THIS APPLIES TO STORM SYSTEM "A".
08. HYDRAULIC GRADE LINE CALCULATIONS ARE REQUIRED TO
SUPPORT THE DESIGN OF ALL PROPOSED STORM SEWERS.
(CL-G&D 12) THIS APPLIES TO THE EXISTING CULVERT UNDER
BELMONT ROAD AND STORM SYSTEM "A".
09. CLARIFY WHERE THE STORMTECH ST1 FACILITY OUTFALL IS
LOCATED.
10. THE DESIGN OF THE SYSTEM OUTFALL MAY CREATE PONDING
AND RESULT AT THE REAR OF THE PROPOSED COMMERCIAL
BUILDING. THE LACK OF FINAL GRADES IN THAT AREA
DO NOT ALLOW A PROPER REVIEW OF THE DESIGN.
11. PROFILES MUST BE SHOWN FOR ALL PROPOSED STORM SEWERS
AND OUTFALL CHANNELS. (CL-G&D 13) THIS APPLIES TO ALL
PROPOSED STORM SEWER, WITH THE EXCEPTION OF THE 8" ROO
DRAIN PIPES.
12. STEPS STD. ST-1 MUST BE SPECIFIED IN THE TABULAR
DRAINAGE DESCRIPTION OF ANY STRUCTURE OVER 4 FEET IN
HEIGHT. (CL-G&D 20)
13. BOOT CONNECTORS MUST BE SPECIFIED IN THE TABULAR
DRAINAGE DESCRIPTION FOR ALL PLASTIC PIPES THAT TIE
INTO A CONCRETE STRUCTURE. (CL-G&D 21)
14. ALL EXISTING AND PROPOSED DRAINAGE EASEMENTS MUST BE
SHOWN. (CL-G&D 27)
15. DRAINAGE EASEMENTS MUST BE SHOWN ALONG ANY STORMWATER
CONVEYANCE SYSTEM WHICH RECEIVES RUNOFF FROM OFFSITE,
FROM A PUBLIC RIGHT OF WAY OR REQUIRES IMPROVEMENTS ON
A DOWNSTREAM PROPERTY OWNER. (CL-G&D 29)
16. A SEPARATE PLAN SHEET MUST BE ADDED WHICH ONLY SHOWS
ALL PROPOSED EASEMENTS AND RIGHT OF WAY TO BE
DEDICATED. METES AND BOUNDS MUST BE PROVIDED.
(CL-G&D 30)
17. ALL AREAS OF PROPOSED PAVEMENT MUST BE STIPPLED.
(CL-G&D 33)
18. TREES CANNOT BE PLANTED WITHIN 8 FEET OF STORM SEWER
PIPES. REVISE THE LANDSCAPE PLAN ACCORDINGLY.
19. APPROVAL OF THE SITE PLAN BY THE PRIVATE UTILITY
COMPANY IN RELATION TO ITS EASEMENT AND FACILITIES
THEREIN MUST BE PROVIDED PRIOR TO SITE PLAN APPROVAL.
20. THE EROSION CONTROL PLAN AND SEQUENCE/NARRATIVE MUST B
DIVIDED INTO A MINIMUM OF TWO PHASES.
PHASE I SHALL SHOW THE MINIMAL AMOUNT OF CLEARING TO
INCLUDE DIMENSIONS FOR CONSTRUCTION OF ALL PERIMETER-
CONTROL DEVICES, AND STRATEGICALLY PLACED SEDIMENT
TRAPS AND BASINS, ASSOCIATED DIVERSIONS AND DIVERSION
DIKES, AND SPOIL AND BORROW AREAS FOR THE INSTALLATION
OF EROSION CONTROL MEASURES.
PHASE II WILL INCLUDE ALL REMAINING CLEARING, FINAL
GRADING, AND INSTALLATION OF REMAINING EROSION CONTROL
DEVICES, INSTALLATION OF TEMPORARY AND PERMANENT
IMPROVEMENTS, AND TEMPORARY AND PERMANENT SEEDING AND
STABILIZATION (CL-EC 1)
21. IF TIMBERING IS REQUIRED ON THE PROJECT, IT SHOULD BE
INCORPORATED INTO THE EROSION CONTROL PLAN / NARRATIVE
AND SHOULD NOT BEGIN UNTIL AFTER THE ISSUANCE OF A
LAND DISTURBANCE PERMIT AND THE INSTALLATION OF THE
APPROVED EROSION CONTROL DEVICES. (CL-EC 2)
22. A NOTE MUST BE ADDED TO THE SEQUENCE OF CONSTRUCTION
STATING THAT THE VSMP CONSTRUCTION ACTIVITY OPERATOR
AND THE ENVIRONMENTAL INSPECTOR (OR AUTHORIZED
REPRESENTATIVE) MUST ATTEND THE PRE-CONSTRUCTION
MEETING.
23. REVISE NOTE 25 UNDER THE SEQUENCE OF CONSTRUCTION ON
SHEETS 3 AND 4 TO STATE: "UPON APPROVAL FROM THE
ENVIRONMENTAL ENGINEERING INSPECTOR, REMOVE ALL E&S
MEASURES AFTER THE SITE IS PROPERLY STABILIZED."
24. EROSION CONTROL MEASURES MUST BE PROVIDED FOR THE
PROJECT FOR THE INITIAL CLEARING, GRUBBING AND GRADING
OPERATIONS. THE DRAINAGE AREAS MUST BE OUTLINED FOR
EACH PHASE AND THE SEDIMENT TRAPPING FACILITIES
DESIGNED ON THE WORST CASE SCENARIO. (CL-EC 10)
25. DUE TO THE LARGE AREA OF DISTURBANCE, CONSIDER USING A
SEDIMENT TRAP(S) ONSITE. THE FOLLOWING COMMENTS
SHALL APPLY TO SEDIMENT TRAP(S):
A. THE DRAINAGE AREA, SPILLWAY LENGTH, AND DIMENSIONS
NECESSARY TO ACHIEVE THE REQUIRED STORAGE VOLUMES IN
ACCORDANCE WITH STD. & SPEC. 3.13 MUST BE SHOWN. THE
ELEVATIONS OF THE TRAP BOTTOM, TOP OF WET VOLUME, TOP
OF DRY VOLUME, AND TOP OF EMBANKMENT MUST BE SHOWN
ON THE SEDIMENT TRAP DETAIL. (CL-EC 12)
B. PLEASE SPECIFY IF THE LENGTH AND WIDTH DIMENSIONS FOR
THE SEDIMENT TRAP(S) REFER TO THE BOTTOM OR TOP OF
THE EXCAVATED AREA. (CL-EC 13)
C. ALL THE INFORMATION NECESSARY FOR CONSTRUCTION OF THE
SEDIMENT TRAP(S) MUST BE SHOWN ON THE SEDIMENT TRAP
DETAIL. (CL-EC 14)
D. SAFETY FENCE (STD. & SPEC 3.01) IS REQUIRED AROUND ALL
SEDIMENT TRAPS AND SEDIMENT BASINS. (CL-EC 15)
26. A MINIMUM 10' BREAK MUST BE PROVIDED IN THE LOW AREA O
THE SILT FENCE. THE BREAK MUST BE BACKFILLED WITH
STONE TO WITHIN 1' OF THE TOP OF THE SILT FENCE TO
SERVE AS AN OVERFLOW. A DETAIL MUST BE SHOWN.
(CL-EC 16) THIS SHOULD BE PLACED AT THE SEDIMENT TRAP
OUTFALL(S).
27. VERIFY IF A SECOND CONSTRUCTION ENTRANCE WILL BE NEEDE
(AT THE SITE ENTRANCE OFF COGBILL ROAD).
28. CHESTERFIELD COUNTY USES THE TERM "SUPER SILT FENCE" T
DESCRIBE A CHAIN-LINK BACKED SILT FENCE (IN LIEU OF TH
WIRE-BACKED SILT FENCE THAT IS DETAILED IN THE VIRGINI
EROSION AND SEDIMENT CONTROL HANDBOOK). THE USE OF
THIS TERM ON THE CONSTRUCTION PLANS WILL CREATE SOME
CONFUSION, AND SHOULD BE CHANGED TO THE TYPICAL VESCH
SILT FENCE SYMBOL/DETAIL.
29. ALL EROSION AND SEDIMENT CONTROL MEASURES, STD. & SPEC
NUMBERS, DETAILS, AND NOTES MUST BE CROSS REFERENCED
AND MUST CORRELATE WITH THE 1992 EDITION OF THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND
MINIMUM STANDARDS. (CL-EC 19)
30. STANDARD SYMBOLS MUST BE USED TO REPRESENT EROSION
CONTROL MEASURES ON THE PLAN. PLEASE REFER TO THE FIRS
PAGE OF THE PRACTICE FOUND IN CHAPTER III OF THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
(CL-EC 20)
31. CORRECT NOTE ES-1 ON SHEET 9 TO REFERENCE VIRGINIA
REGULATION 9 VAC 25-840-40. (CL-EC 18)
32. REVISE NOTE ES-6 ON SHEET 9 FROM "PLAN APPROVING
AUTHORITY" TO "ENVIRONMENTAL ENGINEERING DEPARTMENT".
(CL-EC 24)
33. REMOVE TABLE 3.32E ON SHEET 10 AND PROVIDE TABLE
3.32-D, FOUND IN THE CURRENT EDITION OF THE VIRGINIA
EROSION AND SEDIMENT CONTROL HANDBOOK, INSTEAD.
(CL-EC 26)
34. THE DETAIL SHOWN FOR GRATE INLET PROTECTION MUST BE
CHANGED TO THE ONE SHOWN ON PLATE 3.07-3 OF STANDARD
AND SPECIFICATION # 3.07. (CL-EC 35)
35. A DETAIL MUST BE SHOWN WHICH PROVIDES FOR PLACEMENT OF
EXCAVATED TRENCH MATERIAL ON THE UPHILL SIDE OF THE
TRENCH WHILE SILT FENCE AND STOCKPILED MATERIALS ARE
PLACED ON THE DOWNSTREAM SIDE. (CL-EC 37)
36. THE OFF-SITE UTILITY LINE(S) MUST BE SHOWN ON THE
EROSION CONTROL PLAN SHEETS WITH SILT FENCE ON THE
DOWNSTREAM SIDE. (CL-EC 38)
37. THE FOLLOWING NOTE(S) MUST BE ADDED TO OR ADJACENT TO
THE SEQUENCE OF CONSTRUCTION: (CL-EC 42)
A. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER/BMP
DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO ISSUANCE
OF A BUILDING PERMIT FOR THIS PROJECT. (CL-EC 42B)
B. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A
SURETY FOR THE CONSTRUCTION OF THE PERMANENT BMPS MUST
BE POSTED WITH ENVIRONMENTAL ENGINEERING. (COUNTY CODE
PART II, CHAPTER 8, SEC. 8-16)
C. THE BMPS MUST BE CERTIFIED PRIOR TO RELEASE OF THE BMP
PERFORMANCE BOND.
D. A VDOT LAND USE PERMIT IS REQUIRED FOR THIS PROJECT
PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT.
(CL-EC 42D)
E. AT THE TIME OF THE PRE-CONSTRUCTION MEETING, TWO
STANDARD SIGNS MUST BE INSTALLED ON EACH SIDE OF THE
CONSTRUCTION ACCESS. THESE SIGNS SHOULD STATE EITHER
"CONSTRUCTION ENTRANCE AHEAD" OR "TRUCKS ENTERING
HIGHWAY". (CL-EC 42E)
F. THE LIMITS OF THE RPA MUST BE FLAGGED IN THE FIELD
(SURVEY LOCATED) WITH OPTIC ORANGE SAFETY FENCE PRIOR
TO ISSUANCE OF A LAND DISTURBANCE PERMIT. (CL-EC 42G)
38. A RESOURCE PROTECTION AREA DETERMINATION MUST BE
SUBMITTED TO THE WATER QUALITY SECTION FOR REVIEW AND
APPROVAL PRIOR TO THE NEXT SITE PLAN SUBMITTAL.
(CL-CBPA 2)
39. A STORMWATER COMPLIANCE SHEET(S) IS REQUIRED FOR
PROJECTS UTILIZING PART IIB OF THE CURRENT VIRGINIA
STORMWATER REGULATIONS. THE FOLLOWING INFORMATION IS
REQUIRED TO BE SHOWN ON THE SHEET(S):
A. ENERGY BALANCE AND OUTFALL ANALYSIS FOR EACH OUTFALL
FOR THE PROJECT
B. DELINEATION OF THE SOIL TYPES (INCLUDE HYDROLOGIC SOIL
GROUP) AND THE THREE LAND COVER CONDITIONS
(FORESTED/OPEN SPACE, MANAGED TURF, IMPERVIOUS)
C. BMP AND OUTLET STRUCTURE PROFILE AND DETAILS. THE
PROFILE MUST SPECIFY THE WATER QUALITY, 2 YEAR,
10 YEAR, AND 100 YEAR WATER SURFACE ELEVATIONS WITH
THEIR RESPECTIVE VOLUMES. (CL-CBPA 4F)
D. DRAINAGE AREA MAP SHOWING:
1) DRAINAGE AREA(S) TO WHERE THE SITE OUTFALL(S) MEET
ENERGY BALANCE FOR THE CHANNEL PROTECTION ANALYSIS
AND WHERE THE SITE MEETS 10-YEAR POST TO 10-YEAR
PRE FOR FLOOD PROTECTION
2) WHERE THE FLOW FROM THE SITE AND ITS DOWNSTREAM ARE
REACHES A NATURAL STORMWATER CONVEYANCE SYSTEM FOR
THE 2-YEAR STORM, AND WHERE THE FLOW FROM THE SITE
AND ITS DOWNSTREAM AREA REACHES A DOCUMENTED
FLOODPLAIN (COUNTY OR FEMA) FOR THE 10-YEAR STORM
E. PROVIDE CHANNEL AND FLOOD PROTECTION CALCULATIONS, TO
INCLUDE CROSS-SECTIONS FOR FLOOD PROTECTION ANALYSIS
F. PROPOSED EASEMENT LOCATIONS
G. ALL SWM/BMP AREAS THAT ARE TO UTILIZE RUNOFF REDUCTION
IN THE DESIGN SHALL BE PROTECTED FROM CONSTRUCTION
TRAFFIC FOR THE DURATION OF THE PROJECT. IF
CONSTRUCTION TRAFFIC IS TO IMPACT THE SWM/BMP AREA,
THEN COMPOST AMENDMENTS OR UNDERDRAINS SHALL BE USED.
THESE AREAS SHALL BE MARKED ON THE PLANS AND IN THE
FIELD TO PREVENT CONSTRUCTION TRAFFIC IMPACTS.
40. PROVIDE THE INPUT INFORMATION FOR THE HYDRAFLOW
CALCULATIONS (SHOWING THE DESIGN DATA FOR THE STORMTEC
FACILITIES).
41. THE CN VALUE USED IN THE HYDRAFLOW CALCULATIONS FOR
THE PRE-DEVELOPED CONDITION IS TOO HIGH FOR "GOOD
CONDITION" WOODS. A CN BETWEEN 65 AND 70 IS MORE
APPROPRIATE.
42. CORRECT THE STORMWATER OUTFALL TABLE ON THE COVER SHEE
TO SHOW Q DEVELOPED FOR THE 10-YEAR STORM AS 11.34 CFS
43. ENSURE THE STORMWATER COMPLIANCE TABLE IS FILLED OUT
CORRECTLY FOR EACH BMP FACILITY (DRAINAGE AREAS,
DESIGN REMOVAL EFFICIENCIES, ETC.).
44. THE FOLLOWING COMMENTS PERTAIN TO THE VRRM SPREADSHEET
A. THE VRRM SPREADSHEET AND THE STORMWATER COMPLIANCE
TABLE (ON THE COVER SHEET OF THE CONSTRUCTION PLANS)
INDICATE THAT A GRASS SWALE IS BEING SPECIFIED AS A
BMP DOWNSTREAM OF THE STORMTECH SYSTEMS. HOWEVER, THE
PLANS DO NOT SHOW ANY GRASS SWALES.
B. CHANGE THE ANNUAL RAINFALL ON THE SITE DATA TAB TO 43
INCHES.
C. FOR A FASTER REVIEW, IT MAY BE HELPFUL TO USE A
SEPARATE DRAINAGE TAB FOR EACH STORMTECH FACILITY.
D. CLARIFY THE TREATMENT TRAIN USED TO MODEL THE STORMTEC
SYSTEMS. VERIFICATION OF DEQ SUPPORT MUST BE PROVIDED
FOR APPROVAL OF THE TREATMENT TRAIN.
45. RESOURCE PROTECTION AREA (RPA) LIMITS MUST BE
ESTABLISHED FROM ALL PERENNIAL WATER BODIES AND THE
ASSOCIATED CONNECTED AND CONTIGUOUS WETLANDS.
(CL-CBPA 5)
46. THE REQUIRED LINE TYPE FOR RPA DESIGNATION MUST INCLUD
THE LETTERS "---RPA---RPA---". (CL-CBPA 7)
47. THE LIMITS OF THE RPA MUST BE SHOWN ON THE GRADING PLA
SHEETS, THE EROSION CONTROL PLAN SHEETS, AND THE
CHESAPEAKE BAY COMPLIANCE SHEET(S)/STORMWATER
COMPLIANCE SHEET(S). (CL-CBPA 8)
48. SIGNAGE MUST BE PROVIDED FOR ALL RPA AND NATURAL
VEGETATED AREAS TO REMAIN OR TO BE ESTABLISHED.
49. THE EROSION CONTROL AND CBPA COMPLIANCE SHEET(S) MUST
SPECIFY THE PLACEMENT OF PLASTIC OPTIC ORANGE SAFETY
FENCE (STD. & SPEC. 3.01 OF THE VESCH) ALONG THE RPA
LIMITS. THE LIMITS OF THE RPA AND PLACEMENT OF THE
SAFETY FENCE SHALL BE SURVEY LOCATED. (CL-CBPA 9)
50. ALL PERMITTED UTILITY LINE CROSSINGS WITHIN THE RPA
MUST MINIMIZE THE AMOUNT OF DISTURBANCE. PERMANENT
EASEMENTS MUST BE SEEDED WITH THE APPROVED RPA NATIVE
SEEDING MIXTURES AND TEMPORARY CLEARING OUTSIDE THE
PERMANENT EASEMENT (BUT WITHIN THE RPA LIMITS) MUST BE
REPLANTED WITH WOODY VEGETATION. PROVIDE THE
APPROPRIATE SEEDING TABLE(S). (CL-CBPA 11)
51. EACH BMP MUST BE ENCLOSED WITHIN AN SWM/BMP EASEMENT.
(CL-CBPA 14)
52. A MINIMUM 20' WIDE ACCESS EASEMENT MUST BE PROVIDED
FROM THE SWM/BMP EASEMENT TO A PUBLIC RIGHT-0F-WAY FOR
FUTURE MAINTENANCE. (CL-CBPA 15)
53. METES AND BOUNDS MUST BE PROVIDED ON THE PLAN SHEET FO
SWM/BMP EASEMENTS AND ACCESS EASEMENTS. (CL-CBPA 16)
54. A PROFILE VIEW MUST BE PROVIDED FOR THE SWM/BMP
FACILITY WHICH SHOWS ALL THE DETAIL CONSTRUCTION
INFORMATION WHICH WILL BE NECESSARY FOR ITS FUTURE
CERTIFICATION. (CL-CBPA 21)
55. THE REQUIRED STORAGE VOLUMES FOR WATER QUALITY AND
AND WATER QUANTITY MUST BE SHOWN ON THE PROFILE VIEW O
THE BASIN. (CL-CBPA 22)
56. THE 2, 10, AND 100 YEAR WATER SURFACE ELEVATIONS MUST
BE SHOWN FOR ALL SWM/BMP FACILITIES ON THE PLAN AND
PROFILE VIEWS. (CL-CBPA 24)
57. SEVERAL SOIL BORINGS MUST BE MADE WITHIN THE LIMITS OF
THE INFILTRATION SYSTEM TO A DEPTH OF AT LEAST FIVE
FEET BELOW THE BOTTOM. A PERCOLATION TEST MUST BE
PERFORMED TO DETERMINE IF THE INFILTRATION RATE OF THI
SOIL IS ACCEPTABLE. (CL-CBPA 40)
58. PROVISIONS MUST BE MADE IN THE EROSION CONTROL
NARRATIVE FOR THE SWM/BMP FACILITY TO BE OBSERVED
BY A PROFESSIONAL ENGINEER DURING CONSTRUCTION. "AS
BUILT" INFORMATION WILL BE REQUIRED FOR FUTURE
CERTIFICATION OF THE FACILITY. CERTIFICATION IS
REQUIRED PRIOR TO RELEASE OF THE SWM/BMP PERFORMANCE
BOND AND ANY CERTIFICATE OF OCCUPANCY. (CL-CBPA 42)
59. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL
ENGINEERING DEPARTMENT AND OBTAIN AN "APPROVED FOR
CONSTRUCTION" STAMP ON TWO ADDITIONAL SETS FOR THE
OWNER TO KEEP ON-SITE.
60. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER /
BMP DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO
ISSUANCE OF A BUILDING PERMIT FOR THIS PROJECT.
61. THE POLLUTION PREVENTION PLAN MUST BE PROVIDED TO THE
ENVIRONMENTAL ENGINEERING INSPECTOR PRIOR TO ISSUANCE
OF A LAND DISTURBANCE PERMIT. THE CHESTERFIELD COUNTY
POLLUTION PREVENTION PLAN SHEET MAY BE PROVIDED IN THE
CONSTRUCTION PLANS (THIS IS AVAILABLE ON THE
ENVIRONMENTAL ENGINEERING DOCUMENTS AND FORMS WEBPAGE)
62. AS-BUILT BMP INFORMATION WILL BE REQUIRED FOR EACH
BMP FACILITY AS PART OF ITS FUTURE CERTIFICATION.
63. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A
SURETY FOR THE CONSTRUCTION OF THE PERMANENT BMP MUST
BE POSTED WITH ENVIRONMENTAL ENGINEERING. (COUNTY CODE
PART II, CHAPTER 8, SEC. 8-16)
64. THE BMP MUST BE CERTIFIED PRIOR TO RELEASE OF THE BMP
PERFORMANCE BOND.
65. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD FILE MUST BE SUBMITTED TO CAROLE
CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE AUTOCAD
FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD VERSIO
2009 OR EARLIER AND REFERENCED DIRECTLY TO THE VIRGINI
STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN THE NAD83
DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD
OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH THE SITE
PLAN NAME, SITE PLAN NUMBER, ENGINEERING FIRM AND CAD
FILE PREPARER'S NAME AND PHONE NUMBER. THE FILE MUST
CONTAIN THE FOLLOWING, EACH CLEARLY LABELED IN SEPARAT
LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. PARKING LOTS AND DRIVEWAYS;
C. ROADS;
D. SIDEWALKS;
E. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE; AND
F. FLOODPLAINS.
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
66. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
67. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A VDOT LAND USE PERMIT
C. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
D. THE VIRGINIA STORMWATER MANAGEMENT PERMIT (VSMP)
REGISTRATION STATEMENT AND FEE OF $2700
E. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BOOK
F. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)
==========================================================
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : CATHY HILL, P.E. / 768-7836
NAME OF PLAN : CASCADE CREEK RETAIL
ADDRESS : 8700 COGBILL ROAD
SITE PLAN NO. : 16PR0140
LATEST PLAN DATE : 10/14/2015
DEPT. REC'D DATE : 10/19/2015
SUBMITTAL NUMBER : 2
REVIEW DATE : 12/8/2015
RECOMMENDATION : NOT APPROVED
TABLE REVISION : NO
PLAT PROCESSING : NO
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL
FEATURES INCLUDING BUT NOT LIMITED TO WETLANDS,
SURFACE WATERS (E.G. VSMP PERMIT FOR CONSTRUCTION
SITES, GROUND WATER AND AIR QUALITY) FINAL APPROVAL
OF THESE PLANS WILL NOT RELIEVE YOU OF YOUR
RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE
LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. EFFECTIVE JULY 1, 2014, ENFORCEMENT OF THE VIRGINIA
STORMWATER REGULATIONS BECAME THE RESPONSIBILITY OF
THE COUNTY FOR DEVELOPMENT PROJECTS WITHIN
CHESTERFIELD COUNTY. ADDITIONALLY, NEW STATE
STORMWATER REGULATIONS ALSO BECAME EFFECTIVE ON
JULY 1, 2014. LAND DISTURBING ACTIVITIES THAT
OBTAINED A VSMP PERMIT PRIOR TO JULY 1, 2014 MAY
USE THE STORMWATER MANAGEMENT CRITERIA SPECIFIED
IN PART II C (9VAC25-870-93 ET SEQ) FOR TWO PERMIT
CYCLES. PROJECTS GRANDFATHERED UNDER THE PROVISIONS
OF 9VAC25-870-48 MAY FOLLOW THE REQUIREMENTS LISTED
UNDER PART IIC FOR ONE PERMIT CYCLE. ALL OTHER NEW
DEVELOPMENT WILL BE SUBJECT TO THE REQUIREMENTS OF
PART IIB (9VAC25-870-62 TO 9VAC25-870-92).
03. PROVIDE THE LATITUDE AND LONGITUDE FOR THE PROJECT SIT
IN DECIMAL DEGREES ON THE COVER SHEET (THIS IS A CHANG
FROM THE PREVIOUS COMMENTS).
04. SHOW THE DRAINAGE AREA FROM BELMONT ROAD THAT IS
BEING CONVEYED BY THE PROPOSED 36" DIAMETER STORM
SYSTEM (A-SERIES).
05. PROVIDE DITCH CALCULATIONS ON THE BELMONT ROAD
ROADSIDE DITCH.
06. PROVIDE A CROSS-SECTION DETAIL OF THE RETAINING WALL
IN THE VICINITY OF STORM STRUCTURE B-4.
07. SPECIFY GUARDRAIL ALONG THE RETAINING WALL. PROVIDE
A CROSS-SECTION DETAIL SHOWING THE GUARDRAIL AND
WALL.
08. SPECIFY AN ENDWALL (EW-1) ON THE END OF STRUCTURES
A-1 AND A-6.
09. TO AVOID SAFETY AND MAINTENANCE CONCERNS, CONSIDER
CONNECTING THE EXISTING BELMONT ROAD CULVERT TO STORM
SYSTEM A AND ELIMINATING THE OPEN CULVERTS.
10. EXTEND THE PROFILE FOR STORM SYSTEM A (SHEET 26) TO
SHOW THE END OF THE EXISTING CULVERT UNDER BELMONT
AND TO SHOW THE RECEIVING CHANNEL AT THE OUTLET OF
STORM PIPE A-6.
11. CLEARING AND GRADING IS SHOWN IN THE TREE-SAVE AREA
AROUND THE ENTIRE SITE.
12. APPROVAL OF THE SITE PLAN BY THE PRIVATE UTILITY
COMPANY IN RELATION TO ITS EASEMENT AND FACILITIES
THEREIN MUST BE PROVIDED PRIOR TO SITE PLAN APPROVAL.
13. REVISE THE LABEL FOR THE EASEMENT ENCOMPASSING THE
UNDERGROUND DETENTION FACILITY TO "SWM/BMP EASEMENT".
14. MOVE NOTE 28 ON SHEETS 3 AND 4 AND MAKE IT NOTE 3.
15. PROVIDE A NOTE IN THE EROSION CONTROL SEQUENCE OF
CONSTRUCTION (SHEETS 3 AND 4) STATING:
"THE SWM/BMP FACILITY MUST BE OBSERVED BY A
PROFESSIONAL ENGINEER DURING CONSTRUCTION. 'AS BUILT'
INFORMATION WILL BE REQUIRED FOR FUTURE CERTIFICATION
OF THE FACILITY. CERTIFICATION IS REQUIRED PRIOR TO
RELEASE OF THE SWM/BMP PERFORMANCE BOND AND ANY
CERTIFICATE OF OCCUPANCY." (CL-CBPA 42)
16. SPECIFY CULVERT INLET PROTECTION AT THE FOLLOWING
LOCATIONS:
A. THE INLET END OF THE EXISTING 36" CULVERT UNDER BELMON
ROAD
B. THE INLET END OF PROPOSED PIPE A-1 TO A-2.
17. SHOW PROPOSED GRADING AND STORM SEWER ON THE PHASE
2 EROSION AND SEDIMENT CONTROL PLAN.
18. REFERENCE THE OFF-SITE SANITARY SEWER PLAN ON BOTH
EROSION AND SEDIMENT CONTROL PLAN SHEETS (3 AND 4).
19. THE AREA OF DISTURBANCE IS STILL SHOWN AS NEARLY
3 ACRES. AS PREVIOUSLY REQUESTED, DUE TO THIS LARGE
AREA OF DISTURBANCE, CONSIDER USING A SEDIMENT TRAP(S)
ONSITE. THE FOLLOWING COMMENTS SHALL APPLY TO SEDIMEN
TRAP(S):
A. THE DRAINAGE AREA, SPILLWAY LENGTH, AND DIMENSIONS
NECESSARY TO ACHIEVE THE REQUIRED STORAGE VOLUMES IN
ACCORDANCE WITH STD. & SPEC. 3.13 MUST BE SHOWN. THE
ELEVATIONS OF THE TRAP BOTTOM, TOP OF WET VOLUME, TOP
OF DRY VOLUME, AND TOP OF EMBANKMENT MUST BE SHOWN
ON THE SEDIMENT TRAP DETAIL. (CL-EC 12)
B. PLEASE SPECIFY IF THE LENGTH AND WIDTH DIMENSIONS FOR
THE SEDIMENT TRAP(S) REFER TO THE BOTTOM OR TOP OF
THE EXCAVATED AREA. (CL-EC 13)
C. ALL THE INFORMATION NECESSARY FOR CONSTRUCTION OF THE
SEDIMENT TRAP(S) MUST BE SHOWN ON THE SEDIMENT TRAP
DETAIL. (CL-EC 14)
D. SAFETY FENCE (STD. & SPEC 3.01) IS REQUIRED AROUND ALL
SEDIMENT TRAPS AND SEDIMENT BASINS. (CL-EC 15)
20. A MINIMUM 10' BREAK MUST BE PROVIDED IN THE LOW AREA O
THE SILT FENCE. THE BREAK MUST BE BACKFILLED WITH
STONE TO WITHIN 1' OF THE TOP OF THE SILT FENCE TO
SERVE AS AN OVERFLOW. A DETAIL MUST BE SHOWN.
(CL-EC 16) THIS SHOULD BE PLACED AT THE SEDIMENT TRAP
OUTFALL(S).
21. ANY ENVIRONMENTAL ASSESSMENT THAT IS MORE THAN 5 YEARS
OLD IS NOT ACCEPTABLE AND MUST BE REDONE. AS
PREVIOUSLY REQUESTED, A RESOURCE PROTECTION AREA
DETERMINATION MUST BE SUBMITTED TO THE WATER QUALITY
SECTION FOR REVIEW AND APPROVAL PRIOR TO THE NEXT SITE
PLAN SUBMITTAL. (CL-CBPA 2) THE FOLLOWING COMMENTS
ARE APPLICABLE TO RPAS:
A. RESOURCE PROTECTION AREA (RPA) LIMITS MUST BE
ESTABLISHED FROM ALL PERENNIAL WATER BODIES AND THE
ASSOCIATED CONNECTED AND CONTIGUOUS WETLANDS.
(CL-CBPA 5)
B. THE REQUIRED LINE TYPE FOR RPA DESIGNATION MUST INCLUD
THE LETTERS "---RPA---RPA---". (CL-CBPA 7)
C. THE LIMITS OF THE RPA MUST BE SHOWN ON THE GRADING PLA
SHEETS, THE EROSION CONTROL PLAN SHEETS, AND THE
CHESAPEAKE BAY COMPLIANCE SHEET(S)/STORMWATER
COMPLIANCE SHEET(S). (CL-CBPA 8)
D. SIGNAGE MUST BE PROVIDED FOR ALL RPA AND NATURAL
VEGETATED AREAS TO REMAIN OR TO BE ESTABLISHED.
E. THE EROSION CONTROL AND CBPA COMPLIANCE SHEET(S) MUST
SPECIFY THE PLACEMENT OF PLASTIC OPTIC ORANGE SAFETY
FENCE (STD. & SPEC. 3.01 OF THE VESCH) ALONG THE RPA
LIMITS. THE LIMITS OF THE RPA AND PLACEMENT OF THE
SAFETY FENCE SHALL BE SURVEY LOCATED. (CL-CBPA 9)
F. ALL PERMITTED UTILITY LINE CROSSINGS WITHIN THE RPA
MUST MINIMIZE THE AMOUNT OF DISTURBANCE. PERMANENT
EASEMENTS MUST BE SEEDED WITH THE APPROVED RPA NATIVE
SEEDING MIXTURES AND TEMPORARY CLEARING OUTSIDE THE
PERMANENT EASEMENT (BUT WITHIN THE RPA LIMITS) MUST BE
REPLANTED WITH WOODY VEGETATION. PROVIDE THE
APPROPRIATE SEEDING TABLE(S). (CL-CBPA 11)
22. CHANGE THE ANNUAL RAINFALL ON THE SITE DATA TAB OF THE
VRRM SPREADSHEET TO 43 INCHES.
23. THE VRRM SPREADSHEET INDICATES 0.96 ACRES OF
FOREST/OPEN SPACE IS PRESENT ON-SITE. THE GRADING
WITHIN THE TREE-SAVE AREAS CAN ONLY BE CLAIMED AS
FOREST/OPEN SPACE IF THOSE AREAS WILL BE REPLANTED AND
ALLOWED TO NATURALLY REDEVELOP VEGETATION. SIGNAGE
MUST BE PROVIDED TO INDICATE THAT THOSE AREAS ARE TO
REMAIN IN A NATURAL STATE AND WILL NOT BE MOWED MORE
THAN 4 TIMES PER YEAR. LANDSCAPED AREAS MUST BE
CONSIDERED AS MANAGED TURF.
24. THE "DRAINAGE AREA A" TAB OF THE VRRM SPREADSHEET
INDICATES THAT THE DRY SWALE REMOVAL/RUNOFF REDUCTION
IS BEING USED FOR THE PROPOSED STORMTECH FACILITY.
PROVIDE DOCUMENTATION FROM DEQU WHICH APPROVES THIS
REMOVAL RATE, AS STORMTECH IS CURRENTLY NOT ON THE
DEQ'S PROPRIETARY BMP CLEARINGHOUSE LIST.
25. STORMWATER QUALITY COMPLIANCE MUST ACCOUNT FOR THE
ADDITIONAL IMPERVIOUS ASSOCIATED WITH THE TURN LANE
ADDITIONS ON BELMONT ROAD AND COGBILL ROAD.
26. THE STORMTECH ROUTING CALCULATIONS SHOW THAT IT IS
HANDLING 2.61 ACRES OF RUNOFF, WHILE THE PLANS
SHOW THAT 2.44 ACRES IS BEING CONVEYED TO THE SYSTEM.
27. THE ROUTING SHOULD USE A DRAINAGE AREA OF 0.24 ACRES
FOR THE POST-DEVELOPMENT (DIRECT DISCHARGE)
CALCULATION.
28. CORRECT THE STORMWATER OUTFALL TABLE ON THE COVER SHEE
AS NECESSARY.
29. SEVERAL SOIL BORINGS MUST BE MADE WITHIN THE LIMITS OF
THE INFILTRATION SYSTEM TO A DEPTH OF AT LEAST FIVE
FEET BELOW THE BOTTOM. A PERCOLATION TEST MUST BE
PERFORMED TO DETERMINE IF THE INFILTRATION RATE OF THI
SOIL IS ACCEPTABLE. (CL-CBPA 40)
30. THE SWM/BMP FACILITY MUST BE OBSERVED BY A PROFESSIONA
ENGINEER DURING CONSTRUCTION. "AS BUILT" INFORMATION
IS REQUIRED FOR FUTURE CERTIFICATION OF THE FACILITY.
CERTIFICATION IS REQUIRED PRIOR TO RELEASE OF THE
SWM/BMP PERFORMANCE BOND AND ANY CERTIFICATE OF
OCCUPANCY. (CL-CBPA 42)
31. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL
ENGINEERING DEPARTMENT AND OBTAIN AN "APPROVED FOR
CONSTRUCTION" STAMP ON TWO ADDITIONAL SETS FOR THE
OWNER TO KEEP ON-SITE.
32. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER /
BMP DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO
ISSUANCE OF A BUILDING PERMIT FOR THIS PROJECT.
33. THE POLLUTION PREVENTION PLAN MUST BE PROVIDED TO THE
ENVIRONMENTAL ENGINEERING INSPECTOR PRIOR TO ISSUANCE
OF A LAND DISTURBANCE PERMIT. THE CHESTERFIELD COUNTY
POLLUTION PREVENTION PLAN SHEET MAY BE PROVIDED IN THE
CONSTRUCTION PLANS (THIS IS AVAILABLE ON THE
ENVIRONMENTAL ENGINEERING DOCUMENTS AND FORMS WEBPAGE)
34. THE BMP MUST BE CERTIFIED PRIOR TO RELEASE OF THE BMP
PERFORMANCE BOND.
35. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD FILE MUST BE SUBMITTED TO CAROLE
CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE AUTOCAD
FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD VERSIO
2009 OR EARLIER AND REFERENCED DIRECTLY TO THE VIRGINI
STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN THE NAD83
DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD
OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH THE SITE
PLAN NAME, SITE PLAN NUMBER, ENGINEERING FIRM AND CAD
FILE PREPARER'S NAME AND PHONE NUMBER. THE FILE MUST
CONTAIN THE FOLLOWING, EACH CLEARLY LABELED IN SEPARAT
LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. PARKING LOTS AND DRIVEWAYS;
C. ROADS;
D. SIDEWALKS;
E. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE; AND
F. FLOODPLAINS.
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
36. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
37. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A VDOT LAND USE PERMIT
C. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
D. THE VIRGINIA STORMWATER MANAGEMENT PERMIT (VSMP)
REGISTRATION STATEMENT AND FEE OF $2700
E. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BOOK
F. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)
G. A SURETY FOR THE CONSTRUCTION OF THE PERMANENT BMP MUS
BE POSTED (COUNTY CODE, PART II, CHAPTER 8, SEC. 8-16)
==========================================================