Site Plan Review Comments
All Site Plan Review Comments for Case # 14PR0121
Modify comments view for Case # 14PR0121

Go to Case Selection Form or Go to Project List

 
CASE NO: 14PR0121 STATUS: APPROVED - ADMIN
PROJECT NAME: MAGNOLIA GREEN WELCO - LAST INTERNET UPDATE: 10/24/14
SUBMITTAL TYPE: COMMERCIAL
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ENVIR.ENGR.-: 02 03/19/14 03/19/14 AMENDED* 03/20/14 CBH 776-7836
FIRE DEPT.--: 02 03/19/14 03/19/14 ******** 11/12/13 GDS 706-2012
HOUSE NUMBER: 02 03/19/14 03/19/14 ******** 11/19/13 NCP 751-4319
MAPPING/GIS-: 02 03/19/14 03/19/14 ******** 11/19/13 NCP 751-4319
POLICE DEPT.: 02 03/19/14 03/19/14 ******** ********
PLANNING----: 02 03/19/14 03/19/14 ******** 01/02/14 JHL 751-4158
TRANSPORT.--: 02 03/19/14 03/19/14 ******** 11/15/13 SJA 751-4461
UTIL.PLAN.--: 02 03/19/14 03/19/14 ******** ********
UTILITIES---: 02 03/19/14 03/19/14 ******** 11/06/13 RME 748-1338
UTIL.R.O.W.-: 02 03/19/14 03/19/14 ******** ********
VDOT--------: 02 03/19/14 03/19/14 ******** ********
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : RYAN EVANS, P.E./748-1338
NAME OF PLAN : MAGNOLIA GREEN WELCOME CENTER
ADDRESS :
SUBMISSION DATE : 11/05/13
PLAN DATED : 10/29/13
REVIEW DATE : 11/06/13
SITE PLAN NO. : 14PR0121
COMMENTS : 2ND REVIEW- APPROVED
TABLE REVIEW :
PLAT PROCESS :
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: MAGNOLIA GREEN WELCOME CENTER
SITE PLAN NUMBER: 14PR0121
LATEST PLAN DATE: 08/28/13
DEPT. REC'D. DATE: 09/05/13
SUBMITTAL NUMBER: ONE
REVIEW DATE: 09/27/13
RECOMMENDATION: APPROVED
==========================================================
==========================================================
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMEN
REVIEWER/PHONE#: STEVEN J. ADAMS, P.E. (804)751-4461
EMAIL: ADAMSST@CHESTERFIELD.GOV
NAME OF PLAN: MAGNOLIA GREEN WELCOME CENTER
SITE PLAN NUMBER: 14PR0121
LATEST PLAN DATE: 10/29/13
DEPT. REC'D. DATE: 11/01/13
SUBMITTAL NUMBER: TWO
REVIEW DATE: 11/15/13
RECOMMENDATION: APPROVED
==========================================================
==========================================================
**********************************************************
REVIEW DEPARTMENT------PLANNING
REVIEWER / PHONE #-----JEFF LAMSON/ 804-751-4158
NAME OF PLAN-----------MAGNOLIA GREEN WELCOME CENTER
SITE PLAN NUMBER-------14PR0121
ADDRESS----------------
LATEST PLAN DATE-------8-28-13
DEPT. REC'D. DATE------8-28-13
SUBMITTAL NUMBER-------1
REVIEW DATE------------10-1-13
RECOMMENDATION---------NOT APPROVED
TABLE REVIEW-----------NO
PLAT PROCESSING--------
LANDSCAPE PLAN STATUS-----NOT YET SUBMITTED
ARCHITECTURAL ELEVATIONS--NOT YET SUBMITTED
LIGHTING PLAN/CUTSHEETS---NOT YET SUBMITTED
IRRIGATION/HOSEBIB PLAN---NOT YET SUBMITTED
1. PUT A REVISION DATE ON THE RESUBMITTED PLANS. RESUBMIT
10 FULL SETS AND ONE COPY OF THE SITE PLAN SHEET TO THE
PLANNING DEPARTMENT FOR YOUR NEXT REVIEW. PROVIDE A COMPLE
RESPONSE TO COMMENTS FOR ALL DEPARTMENTS TO THE PLANNING
DEPARTMENT.
BELOW EACH COMMENT TO DESCRIBE HOW YOU HAVE ADDRESSED EACH
REVIEW COMMENT. BE SURE TO INDICATE WHICH SHEETS SHOW THE
REQUIRED CHANGES. PROVIDE A TRANSMITTAL LETTER TO DESCRIBE
ANY CHANGES TO THE PLANS NOT CAUSED BY THE STAFF REVIEW
COMMENTS.
(CL X.X REPRESENTS CHECKLIST ITEM NUMBER)
**********************************************************
REVIEWER / PHONE #-----JEFF LAMSON/ 804-751-4158
NAME OF PLAN-----------MAGNOLIA GREEN WELCOME CENTER
SITE PLAN NUMBER-------14PR0121
ADDRESS----------------
LATEST PLAN DATE-------10-29-13
DEPT. REC'D. DATE------10-31-13
SUBMITTAL NUMBER-------2
REVIEW DATE------------1-2-14
RECOMMENDATION---------SUBSTANTIAL APPROVAL
TABLE REVIEW-----------YES
LANDSCAPE PLAN STATUS-----NOT YET SUBMITTED
ARCHITECTURAL ELEVATIONS--NOT YET SUBMITTED
LIGHTING PLAN/CUTSHEETS---NOT YET SUBMITTED
IRRIGATION/HOSEBIB PLAN---NOT YET SUBMITTED
1. PUT A REVISION DATE ON THE RESUBMITTED PLANS. RESUBMIT
10 FULL SETS AND ONE COPY OF THE SITE PLAN SHEET TO THE
PLANNING DEPARTMENT FOR YOUR NEXT REVIEW. PROVIDE A COMPLE
RESPONSE TO COMMENTS FOR ALL DEPARTMENTS TO THE PLANNING
DEPARTMENT.
BELOW EACH COMMENT TO DESCRIBE HOW YOU HAVE ADDRESSED EACH
REVIEW COMMENT. BE SURE TO INDICATE WHICH SHEETS SHOW THE
REQUIRED CHANGES. PROVIDE A TRANSMITTAL LETTER TO DESCRIBE
ANY CHANGES TO THE PLANS NOT CAUSED BY THE STAFF REVIEW
COMMENTS.
2 PER SEC. 19-519(A & B), AT LEAST 50% OF THE TREES SHA
LARGE MATURING TREES THAT ARE IN ISLANDS WITH A MINIMUM
WIDTH OF 15 FEET AND 250 S.F. IN SIZE. SMALL MATURING
TREES SHALL BE IN ISLANDS WITH A MINIMUM WIDTH OF 9 FEET
AND BE 150 S.F. IN SIZE.
3 PER SEC. 19-264(A), THE LANDSCAPE PLAN SHALL IDENTIFY
STATE REGISTERED LANDSCAPE ARCHITECT, NURSERYMAN, OR
LANDSCAPE DESIGNER PREPARING THE PLAN.
4 PER SEC. 19-518(E), ALL LANDSCAPED AREAS SHALL BE
WITH A READILY AVAILABLE WATER SUPPLY. THE COUNTY ACCEPTS
EITHER YARD HYDRANTS AND/OR HOSE BIBS WITHIN 100 FEET OF
ALL NEW PLANTINGS OR AN IRRIGATION SYSTEM FOR ALL AREAS OF
NEW PLANTINGS.
5 PER SEC. 19-508.3, SHOW ON THE LANDSCAPE PLAN OR
ADDITIONALLY ON A SEPARATE LIGHTING PLAN THE LOCATION OF
ALL EXTERIOR SITE LIGHTING MOUNTED ON POLES, THE BUILDING,
OR ON THE GROUND AND HAVE THEM KEYED TO CUT SHEETS FOR
EACH LIGHT FIXTURE SHOWN ON THE PLAN.
6 PER SEC. 19-264(D)(18), PROVIDE 2 COPIES OF
RENDERINGS/ELEVATIONS OF THE BUILDINGS WITH ALL BUILDING
MATERIALS AND COLORS IDENTIFIED, LOCATIONS OF JUNCTION AND
ACCESS BOXES SHOWN, AND HOW ALL MECHANICAL EQUIPMENT IS
SCREENED WHETHER IT IS MOUNTED ON THE ROOF OR ON THE
GROUND.
A. PER SEC. 19-570(B), SHOW THAT JUNCTION AND
ACCESS BOXES ARE EITHER SCREENED OR PAINTED TO
MATCH THE BUILDING EXCEPT AS ALLOWED IN I-2 AND
I-3 DISTRICTS.
B. PER SEC. 19-507(C), MECHANICAL EQUIPMENT,
WHETHER ROOF-TOP OR GROUND LEVEL, SHALL BE
SHIELDED AND SCREENED FROM PUBLIC VIEW AND
DESIGNED TO BE PERCEIVED AS AN INTEGRAL PART OF
THE BUILDING.
**********************************************************
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : NANCY PARKER 751-4319
NAME OF PLAN : MAGNOLIA GREEN WELCOME CENTER
PLAN NO. : 14PR0121
ADDRESS :
LATEST PLAN DATE : 8/26/13
RECEIVED DATE : 8/28/13
SUBMITTAL NUMBER : 1
REVIEW DATE : 9/20/13
RECOMMENDATION : APPROVED
==========================================================
==========================================================
REVIEW DEPARTMENT: IST / GIS
REVIEWER : NANCY PARKER 751-4319
NAME OF PLAN : MAGNOLIA GREEN WELCOME CENTER
PLAN NO. : 14PR0121
ADDRESS :
LATEST PLAN DATE : 10/29/13
RECEIVED DATE : 10/31/13
SUBMITTAL NUMBER : 2
REVIEW DATE : 11/19/13
RECOMMENDATION : APPROVED
==========================================================
==========================================================
DEPARTMENT REVIEW: IST / HOUSE NUMBERING SECTION
REVIEWER: NANCY PARKER
PHONE NUMBER: 751-4319
CASE NUMBER: 14PR0121
NAME OF PLAN:MAGNOLIA GREEN WELCOME CENTER
ADDRESS: 17301 MEMORIAL TOURNAMENT DR
DATE OF REVIEW: 9/20/13 REVIEW # 1
STATUS: HOUSE NUMBERING NOT APPROVED
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS
CONCERNING THE COMMENTS BELOW.
1 LOCATION OF STREET ADDRESS SIGN IS NOT SHOWN.
(THE ADDRESS CAN BE PART OF YOUR MONUMENT SIGN.
THIS DOES NOT COUNT AS PART OF THE SQUARE FOOTAGE OF THE
SIGN. IF YOU ARE USING THE MONUMENT
SIGN FOR THE ADDRESS, A DETAIL OF THE MONUMENT SIGN
NEEDS TO BE ON THE SITE PLAN.)
2) SPECIFY THE MATERIAL THAT THE ADDRESS SIGN IS TO BE
MADE OF. (MATERIAL TO BE MORE DURABLE THAN WOOD).
3) BECAUSE THE EXISTING BUILDING IS BEING DEMOLISHED
THE ADDRESS 17301 WILL BE REUSED ON THE NEW WELCOME
CENTER BUILDING.
==========================================================
==========================================================
DEPARTMENT REVIEW: IST / HOUSE NUMBERING SECTION
REVIEWER: NANCY PARKER
PHONE NUMBER: 751-4319
CASE NUMBER: 14PR0121
NAME OF PLAN:MAGNOLIA GREEN WELCOME CENTER
ADDRESS: 17301 MEMORIAL TOURNAMENT DR
DATE OF REVIEW: 11/19/13 REVIEW # 2
STATUS: HOUSE NUMBERING APPROVED
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: GREG SMITH / 706-2012
EMAIL: SMITHGD@CHESTERFIELD.GOV
NAME OF PLAN: MAGNOLIA GREEN WELCOME CENTER
SITE PLAN NUMBER: 14PR0121
ADDRESS: 17301 MEMORIAL TOURNAMENT DR
LATEST PLAN DATE: 8/28/13
DEPT. REC'D. DATE: 9/5/13
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 9/17/13
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. ADJUST FIRE LAME MARKINGS IN ACCORDANCE WITH THE MARK-U
SENT ON 9/17/13.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: GREG SMITH / 706-2012
EMAIL: SMITHGD@CHESTERFIELD.GOV
NAME OF PLAN: MAGNOLIA GREEN WELCOME CENTER
SITE PLAN NUMBER: 14PR0121
ADDRESS: 17301 MEMORIAL TOURNAMENT DR
LATEST PLAN DATE: 10/29/13
DEPT. REC'D. DATE: 11/5/13
SUBMITTAL NUMBER: 2ND REVIEW
REVIEW DATE: 11/12/13
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLAT PROCESSING: YES
COMMENTS:
1. THE REVISED PLAN IS APPROVED AS SUBMITTED.
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : CATHY HILL, P.E. / 768-7836
NAME OF PLAN : MAGNOLIA GREEN - WELCOME CENTER
ADDRESS : 17301 AND 17320 HULL STREET ROAD
SITE PLAN NO. : 14PR0121
LATEST PLAN DATE : 08/28/2013 (ENGINEER'S STAMP)
DEPT. REC'D DATE : 09/05/2013
SUBMITTAL NUMBER : 1
REVIEW DATE : 10/01/2013
RECOMMENDATION : NOT APPROVED
TABLE REVISION : NO
PLAT PROCESSING : NO
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURE
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NO
RELIEVE YOU OF YOUR RESPONSIBILITY. WETLANDS
DOCUMENTATION MUST BE RECEIVED BY THIS DEPARTMENT PRIO
TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. IT HAS RECENTLY COME TO OUR ATTENTION THAT THE STATE
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
REQUIREMENTS CONCERNING THE 10-YEAR STORM PEAK
ATTENUATION AND WATER QUALITY COMPLIANCE, WHICH VARIES
FROM BAY ACT COMPLIANCE, MAY BECOME AN ISSUE DURING TH
STATE SITE INSPECTION PROCESS. COUNTY CONSTRUCTION PL
APPROVAL DOES NOT RELIEVE THE OWNER/DEVELOPER OF
RESPONSIBILITY FOR COMPLIANCE WITH STATE REGULATIONS -
E.G. 4VAC50-60-66 WATER QUANTITY, 4VAC50-60-63 WATER
QUALITY, 4VAC50-60-65 WATER QUALITY COMPLIANCE, ETC.
TECHNICAL ASSISTANCE FROM DEQ IS AVAILABLE AND
RECOMMENDED.
03. THE DEPARTMENT HAS NOT PERFORMED A REVIEW OF THOSE
ONSITE DRAINAGE CONVEYANCE SYSTEMS WHOSE CONTRIBUTING
DRAINAGE AREAS LIE WITHIN THE LIMITS OF THE PROPERTY A
ARE NOT REQUIRED TO BE ENCLOSED IN A COUNTY DRAINAGE
EASEMENT.
04. ALL ROOF WATER AND DOWNDRAINS MUST BE COLLECTED AND
DISCHARGED IN A NON-ERODIBLE MANNER. (CL-G&D 6)
05. SHOW THE DRAINAGE AREAS HANDLED BY THE GRAVEL ENERGY
DISSIPATION TRENCHES.
06. INCLUDE PIPE EX4 IN THE STORM SEWER PROFILE AND ON THE
STORM SEWER AND HGL CALCULATIONS.
07. ALL EXISTING AND PROPOSED STORM SEWERS, CULVERTS, DROP
INLETS AND APPURTENANCES MUST BE ASSIGNED A STRUCTURE
NUMBER AND LISTED IN TABULAR FORM ON THE PLAN SHEET ON
WHICH THEY ARE LOCATED. (CL-G&D 14)
08. THE THROAT LENGTH FOR ALL CURB DROP INLETS MUST BE
SHOWN. (CL-G&D 16)
09. STEPS STD. ST-1 MUST BE SPECIFIED IN THE TABULAR
DRAINAGE DESCRIPTION OF ANY STRUCTURE OVER 4 FEET IN
HEIGHT. (CL-G&D 20)
10. BOOT CONNECTORS MUST BE SPECIFIED IN THE TABULAR
DRAINAGE DESCRIPTION FOR ALL PLASTIC PIPES THAT TIE IN
A CONCRETE STRUCTURE. (CL-G&D 21)
11. THE FINISHED FLOOR ELEVATION OF ALL STRUCTURES MUST BE
SHOWN. (CL-G&D 26)
12. A MINIMUM 10' BREAK MUST BE PROVIDED IN THE LOW AREA O
THE SILT FENCE . THE BREAK MUST BE BACKFILLED WITH
STONE TO WITHIN 1' OF THE TOP OF THE SILT FENCE TO
SERVE AS AN OVERFLOW. A DETAIL MUST BE SHOWN. (CL-EC 1
13. THE MOST RECENT VERSION OF EROSION CONTROL MINIMUM
STANDARD # 1, (SEE THE VIRGINIA EROSION AND SEDIMENT
CONTROL LAW AND REGULATIONS FOR FY 2013) MUST BE ADDED
TO THE PLANS AND ALL OTHER NOTES WHICH ARE IN CONFLICT
MUST BE ADJUSTED OR REMOVED. (CL-EC 25)
14. AN MS-19 ANALYSIS MUST BE PERFORMED AT EACH POINT OF
CONCENTRATED DISCHARGE AND AT THE DOWNSTREAM PROPERTY
LINE. THE LOCATION OF EACH ANALYSIS MUST BE SHOWN AND
LABELED ON THE EROSION CONTROL PLAN SHEETS. (CL-EC 28)
THE GRADING & DRAINAGE PLAN SHOWS THAT STORMWATER RUNO
FROM THE PROPOSED WELCOME CENTER IS HANDLED BY THE
EXISTING POND ON THE PARCEL. THE POND MUST BE ANALYZE
IN ACCORDANCE WITH MS-19 REGULATIONS. IF THE OUTFALL
OF THE POND IS FOUND TO BE INADEQUATE, IT MUST BE
UPGRADED TO HANDLE THE ADDITIONAL RUNOFF.
15. THE CULVERTS DOWNSTREAM OF THE DETENTION BASIN MUST
BE ANALYZED FOR ADEQUACY BASED ON THE 10-YEAR STORM.
EXISTING INADEQUATE CULVERTS IN COUNTY EASEMENTS AND
UNDER STATE ROADS INTO WHICH A PROJECT DRAINS MUST BE
ENLARGED OR ON SITE DETENTION BASED ON THE ULTIMATE
DEVELOPMENT OF THE CONTRIBUTING WATERSHED PROVIDED TO
ACHIEVE MINIMUM 10 YEAR PERFORMANCE OF THE PIPE(S).
A DRAINAGE AREA MAP MUST BE PROVIDED FOR BOTH ONSITE
AND OFFSITE DRAINAGE AREAS. (CL-EC 29)
16. CORRECT THE TOTAL DRAINAGE AREA TO MS-19(2) ON THE
MS-19 ADEQUACY SITUATION TABLE.
17. UPDATE THE MS-19 ADEQUACY SITUATION TABLE AS APPLICABL
WITH REGARD TO THE PREVIOUS COMMENTS. PROVIDE
CALCULATIONS SUPPORTING THE INFORMATION ON THE TABLE.
18. INCLUDE THE DISTURBANCE ASSOCIATED WITH THE CONNECTION
TO EXSITING " WATER LINE IN THE LIMITS OF DISTURBANCE
19. ANY SOIL STOCKPILE AREA MUST BE LOCATED ON THE PLANS.
SILT FENCE MUST BE PROVIDED AROUND THE PERIMETER.
(CL-EC 39)
20. THE FOLLOWING NOTE(S) MUST BE ADDED TO OR ADJACENT TO
THE SEQUENCE OF CONSTRUCTION: (CL-EC 42)
A. ALL OFFSITE DRAINAGE EASEMENTS MUST BE RECORDED PRIOR
TO ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS
PROJECT. (CL-EC 42A)
B. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER/BMP
DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO ISSUANCE
OF A BUILDING PERMIT FOR THIS PROJECT.
(CL-EC 42B)
C. THE STORMWATER/BMP FACILITY MUST BE CERTIFIED BY
A PROFESSIONAL ENGINEER PRIOR TO ISSUANCE OF ANY
OCCUPANCY CERTIFICATES. (CL-EC 42C)
D. A VDOT LAND USE PERMIT IS REQUIRED FOR THIS PROJECT
PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT.
(CL-EC 42D)
21. NUTRIENT CREDITS FROM A BASIN MAY ONLY BE USED BY SITE
WITHIN THE BASIN DRAINAGE AREA. THE USE OF NUTRIENT
OFFSET CREDITS FROM AN OFF-SITE APPROVED NUTRIENT BANK
IS NOT APPLICABLE TO SITES WITHIN THE UPPER SWIFT CREE
WATERSHED.
22. A CBPA COMPLIANCE SHEET(S) IS REQUIRED. (CL-CBPA 3) T
FOLLOWING INFORMATION IS REQUIRED TO BE SHOWN ON THE
SHEET(S):
A. THE CBPA/MS-4 COMPLIANCE TABLE. (SEE APPENDIX I OF TH
CHESAPEAKE BAY CHAPTER IN THE ENVIRONMENTAL ENGINEERIN
REFERENCE MANUAL) (CL-CBPA 3A)
B. THE BMP SIZE, LOCATION, AND GRADING PLAN (1" = 20').
(CL-CBPA 3B)
C. BMP AND OUTLET STRUCTURE PROFILE AND DETAILS. THE
PROFILE MUST SPECIFY THE WATER QUALITY, 2 YEAR, 10 YEA
AND 100 YEAR WATER SURFACE ELEVATIONS WITH THEIR
RESPECTIVE VOLUMES. (CL-CBPA 3C)
D. DETAILS AND SPECIFICATIONS FOR MANUFACTURED BMP'S.
(CL-CBPA 3D)
E. PERCENT IMPERVIOUS CALCULATIONS/ASSUMPTIONS (CL-CBPA 3
F. INCREMENTAL DRAINAGE AREAS TO EACH BMP, THE IMPERVIOUS
AREA WITHIN EACH DRAINAGE AREA, AND THE PERCENT
IMPERVIOUS AREA OF EACH BMP DRAINAGE AREA. (CL-CBPA 3H
G. PROPOSED EASEMENT LOCATIONS. (CL-CBPA 3I)
23. IF THE EXISTING AMENITY POND IS TO BE USED AS AN
SWM/BMP, THE FOLLOWING REQUIREMENTS MUST BE MET:
A. VEHICULAR SAFETY MEASURES ARE REQUIRED ALONG PARKING
SPACES AND DRIVE AISLES ADJACENT TO RETENTION AND
DETENTION FACILITIES. (CL-CBPA 10)
B. ALL POINTS OF CONCENTRATED INFLOW TO THE SWM/BMP
FACILITY MUST TIE INTO THE BASIN AT THE NORMAL WATER
SURFACE OR BELOW. IF THE OUTFALL IS SUBMERGED, A MINIM
OF 3 FEET IS REQUIRED BETWEEN THE INVERT OF THE INFLOW
STRUCTURE AND THE BOTTOM OF THE BASIN. (CL-CBPA 12)
C. A STANDARD ES-1 ENDSECTION OR ENDWALL IS REQUIRED FOR
ALL PIPES 30 INCHES OR GREATER IN DIAMETER ENTERING AN
EXITING THE SWM/BMP FACILITY. (CL-CBPA 13)
D. THE ENTIRE BASIN MUST BE ENCLOSED WITHIN AN SWM/BMP
EASEMENT WHICH EXTENDS 8 FT. BEYOND THE 100-YEAR WSE.
OR DOWNSTREAM TOE OF DAM, WHICHEVER APPLIES.(CL-CBPA 1
E. A MINIMUM 20' WIDE ACCESS EASEMENT MUST BE PROVIDED FR
THE SWM/BMP EASEMENT TO A PUBLIC RIGHT-0F-WAY FOR FUTU
MAINTENANCE. (CL-CBPA 15)
F. METES AND BOUNDS MUST BE PROVIDED ON THE PLAN SHEET FO
SWM/BMP EASEMENTS AND ACCESS EASEMENTS. (CL-CBPA 16)
G. A MINIMUM 12 FOOT WIDE RAMP MUST BE PROVIDED FROM THE
ACCESS GATE TO THE BOTTOM OF THE SWM/BMP FACILITY. TH
SLOPE CANNOT EXCEED 6:1. (CL-CBPA 17)
H. OUTLET PROTECTION MUST BE PROVIDED IN ACCORDANCE
WITH STD. & SPEC. 3.18 OF THE VESCH FOR ALL PIPES
DISCHARGING INTO THE SWM/BMP FACILITY. A DETAIL MUST
BE SHOWN FOR KEYING CLASS I RIP-RAP INTO THE GROUND AT
LEAST 2 FEET AND PLACING IT OVER FILTER CLOTH.
DIMENSIONS MUST BE SHOWN ON THE PLAN VIEW. (CL-CBPA 35
24. A BMP MAINTENANCE FEE IN THE AMOUNT OF $1,500 PER
IMPERVIOUS ACRE IS REQUIRED FOR COMMERCIAL DEVELOPMENT
PAYMENT MUST BE RECEIVED PRIOR TO ISSUANCE OF A LAND
DISTURBANCE PERMIT. (CL-USC 1) THIS APPLIES TO NEW
IMPERVIOUS FOR THIS PROJECT.
25. ADDITIONAL EROSION CONTROL MEASURES OTHER THAN THE
MINIMUM STANDARDS CONTAINED IN THE VIRGINIA EROSION AN
SEDIMENT CONTROL HANDBOOK WILL BE REQUIRED IF IT IS
DETERMINED THAT SUCH MEASURES ARE NECESSARY FOR
PROTECTION OF SENSITIVE ENVIRONMENTAL FEATURES AND/OR
WATER RESOURCES. (CL-USC 3)
26. ENHANCED PERIMETER PROTECTION MEASURES ARE REQUIRED.
(SUPER SILT FENCE, SEDIMENT BASINS AND TRAPS SIZED 25
PERCENT LARGER THAN MINIMUM STANDARDS, ETC.) (CL-USC 4
SPECIFY SUPER SILT FENCE IN LIEU OF SILT FENCE AND
PROVIDE A DETAIL IN THE PLANS.
27. AN ALTERNATIVE MEANS OF DEFINING PAVEMENT EDGES AS
DETERMINED BY THE DIRECTOR OF ENVIRONMENTAL ENGINEERIN
MAY BE SUBSTITUTED FOR CURB AND GUTTER WHEN LOW IMPACT
DEVELOPMENT PRACTICES ARE USED. (CL-USC 8)
28. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL ENGINEERI
DEPARTMENT AND OBTAIN AN "APPROVED FOR CONSTRUCTION"
STAMP ON TWO ADDITIONAL SETS FOR THE OWNER TO KEEP
ON-SITE.
29. PERMISSION MUST BE OBTAINED FROM THE ADJACENT PROPERTY
OWNER(S) ALLOWING FOR GRADING ON THE PROPERTY AS
PROPOSED PRIOR TO ISSUANCE OF A LAND DISTURBANCE
PERMIT.
30. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, THE
NAME, "WALK-IN" ADDRESS, AND TELEPHONE NUMBER OF
A LOCAL REGISTERED AGENT REPRESENTING THE OWNER FOR
SERVICE OF PROCESS MUST BE PROVIDED ON THE "APPOINTMEN
OF AGENT FOR SERVICE OF PROCESS" FORM FOUND ON THE
CHESTERFIELD COUNTY ENVIRONMENTAL ENGINEERING WEBPAGE.
(CL-GENERAL 12)
31. ALL OFFSITE DRAINAGE EASEMENTS MUST BE RECORDED PRIOR
TO ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS
PROJECT.
32. ALL ONSITE DRAINAGE EASEMENTS INCLUDING STORMWATER /
BMP DRAINAGE EASEMENTS MUST BE RECORDED PRIOR TO
ISSUANCE OF A BUILDING PERMIT FOR THIS PROJECT.
33. THE STORMWATER/BMP FACILITY MUST BE CERTIFIED BY
A PROFESSIONAL ENGINEER PRIOR TO ISSUANCE OF ANY
OCCUPANCY CERTIFICATES.
34. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COST
ESTIMATE FOR THE CONSTRUCTION OF THE PERMANENT BMP(S)
MUST BE SUBMITTED TO AND APPROVED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. A SURETY FOR THE CONSTRUCTION
OF THE PERMANENT BMP MUST BE POSTED WITH ENVIRONMENTAL
ENGINEERING PRIOR TO ISSUANCE OF A TEMPORARY CERTIFICA
OF OCCUPANCY (TCO) IF THE BMP IS NOT CERTIFIED AT THE
TIME OF TCO REQUEST.
35. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD .DWG OR .DXF MUST BE SUBMITTED TO
CAROLE CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD, OR VIA
EMAIL. THE FILE MUST CONTAIN THE FOLLOWING, EACH
CLEARLY IN SEPARATE LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. ALL IMPERVIOUS AREAS (PARKING LOTS, DRIVEWAYS, ROADS,
ETC);
C. THE STORM SEWER SYSTEM AND ALL CULVERTS;
D. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE;
E. STREAMS AND OTHER WATER BODIES;
F. LOCATIONS OF FIELD VERIFIED RESOURCE PROTECTION AREA
DESIGNATIONS TO INCLUDE WATER BODIES WITH PERENNIAL
FLOW, TIDAL SHORES, TIDAL WETLANDS, NON-TIDAL WETLANDS
WHICH ARE CONNECTED AND CONTIGUOUS TO TIDAL WETLANDS O
PERENNIAL FLOW;
G. LOCATIONS OF PERENNIAL FLOW ORIGINS AND THEIR ASSOCIAT
GPS COORDINATES (NAD83 STATE PLANE VA SOUTH FEET);
H. LOCATION(S) OF BREAK POINT(S) IN SURFACE FLOW AND/OR
NON-CONTIGUOUS WETLANDS AND THEIR ASSOCIATED GPS
COORDINATES; AND
I. FLOOD PLAINS.
ALL AUTOCAD FILES MUST BE SAVED AS A .DWG OR .DXF IN
AUTOCAD VERSION 2009 OR EARLIER AND REFERENCED DIRECTL
TO THE VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH
ZONE IN THE NAD83 DATUM. THE CD, DVD, OR EMAIL MUST B
LABELED WITH THE SITE PLAN NAME, SITE PLAN NUMBER,
ENGINEERING FIRM AND CONTACT NAME AND PHONE NUMBER.
36. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
37. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A VDOT LAND USE PERMIT
C. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
D. COPIES OF THE VIRGINIA STORMWATER MANAGEMENT PERMIT
(VSMP) REGISTRATION STATEMENT AND PERMIT FEE FORM (AS
DEVELOPED BY THE DEPARTMENT OF ENVIRONMENTAL QUALITY)
MUST BE SUBMITTED
E. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)
==========================================================
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : CATHY HILL, P.E. / 768-7836
NAME OF PLAN : MAGNOLIA GREEN - WELCOME CENTER
ADDRESS : 17301 AND 17320 HULL STREET ROAD
SITE PLAN NO. : 14PR0121
LATEST PLAN DATE : 10/29/2013 (ENGINEER'S STAMP)
DEPT. REC'D DATE : 11/01/2013
SUBMITTAL NUMBER : 2
REVIEW DATE : 12/03/2013
RECOMMENDATION : NOT APPROVED
TABLE REVISION : NO
PLAT PROCESSING : N/A
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURE
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NO
RELIEVE YOU OF YOUR RESPONSIBILITY. WETLANDS
DOCUMENTATION MUST BE RECEIVED BY THIS DEPARTMENT PRIO
TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. IT HAS RECENTLY COME TO OUR ATTENTION THAT THE STATE
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
REQUIREMENTS CONCERNING THE 10-YEAR STORM PEAK
ATTENUATION AND WATER QUALITY COMPLIANCE, WHICH VARIES
FROM BAY ACT COMPLIANCE, MAY BECOME AN ISSUE DURING TH
STATE SITE INSPECTION PROCESS. COUNTY CONSTRUCTION PL
APPROVAL DOES NOT RELIEVE THE OWNER/DEVELOPER OF
RESPONSIBILITY FOR COMPLIANCE WITH STATE REGULATIONS -
E.G. 4VAC50-60-66 WATER QUANTITY, 4VAC50-60-63 WATER
QUALITY, 4VAC50-60-65 WATER QUALITY COMPLIANCE, ETC.
TECHNICAL ASSISTANCE FROM DEQ IS AVAILABLE AND
RECOMMENDED.
03. THE DEPARTMENT HAS NOT PERFORMED A REVIEW OF THOSE
ONSITE DRAINAGE CONVEYANCE SYSTEMS WHOSE CONTRIBUTING
DRAINAGE AREAS LIE WITHIN THE LIMITS OF THE PROPERTY A
ARE NOT REQUIRED TO BE ENCLOSED IN A COUNTY DRAINAGE
EASEMENT.
04. MS-19 ANALYSES MUST INCLUDE THE ENTIRE SYSTEM BETWEEN
THE PROJECT OUTFALL AND THE RECEIVING CHANNEL. IN
THIS CASE, THE ANALYSIS FOR THE DISCHARGE FROM
PROPOSED STRUCTURE 2 WOULD INCLUDE THE EXISTING STORM
SYSTEM FROM EX1 TO EX4 AS WELL AS A SEPARATE CROSS-
SECTIONAL ANALYSIS AT THE OUTFALL. THE DISCHARGE FROM
THE GRAVEL ENERGY DISSIPATION TRENCHES MUST INCLUDE TH
EXISTING CULVERT C1 AND THE CROSS-SECTIONAL ANALYSIS
AT THE CULVERT OUTFALL. EACH OF THESE MUST BE LISTED
LISTED ON THE MS-19 ADEQUACY SITUATIONS TABLE WITH
THE FOLLOWING ADEQUACY SITUATIONS:
- EXISTING STORM SEWER EX1 - EX4, SITUATION D
- MS-19 EX1, SITUATION C
- EXISTING CULVERT C1, SITUATION D
- EXISTING CROSS-SECTION C2 (FROM WYNSTONE PARK SECTION
PLANS), SITUATION B
A CROSS-SECTION DETAIL AND ANALYSIS MUST BE PROVIDED
FOR CROSS-SECTION C2.
06. THE MS-19 RUNOFF CALCULATIONS ON SHEET C7.0 FOR
MS-19 EX1 SHOULD USE A DRAINAGE AREA OF 1.54 ACRES,
BASED ON THE DRAINAGE AREA SHOWN ON SHEET C5.0.
07. THE MS-19 RUNOFF CALCULATIONS FOR C1 ON SHEET C7.0
SHOULD USE A DRAINAGE AREA OF 10.57 ACRES AND A
C-FACTOR OF 0.55, BASED ON THE INFORMATION SHOWN
ON SHEET C5.0. THE CAPACITY OF EXISTING CULVERT
C1 IS LISTED IN THE WYNSTONE SECTION 1 PLANS AS
31.4 CFS, WHICH SHOULD ALSO BE LISTED IN THE MS-19
ADEQUACY SITUATIONS TABLE FOR THIS PROJECT.
08. THE RUNOFF REDUCTION METHOD CALCULATIONS FOR
PHOSPHOROUS REMOVAL ON SHEET C7.1 SHOW THAT AN
ADDITIONAL 1.28 LBS/YR MUST BE REMOVED.
09. A BMP MAINTENANCE FEE IN THE AMOUNT OF $1,500 PER
IMPERVIOUS ACRE IS REQUIRED FOR COMMERCIAL DEVELOPMENT
PAYMENT MUST BE RECEIVED PRIOR TO ISSUANCE OF A LAND
DISTURBANCE PERMIT. (CL-USC 1) THIS APPLIES TO NEW
IMPERVIOUS FOR THIS PROJECT.
10. ADDITIONAL EROSION CONTROL MEASURES OTHER THAN THE
MINIMUM STANDARDS CONTAINED IN THE VIRGINIA EROSION AN
SEDIMENT CONTROL HANDBOOK WILL BE REQUIRED IF IT IS
DETERMINED THAT SUCH MEASURES ARE NECESSARY FOR
PROTECTION OF SENSITIVE ENVIRONMENTAL FEATURES AND/OR
WATER RESOURCES. (CL-USC 3)
11. ENHANCED PERIMETER PROTECTION MEASURES ARE REQUIRED.
(SUPER SILT FENCE, SEDIMENT BASINS AND TRAPS SIZED 25
PERCENT LARGER THAN MINIMUM STANDARDS, ETC.) (CL-USC 4
SPECIFY SUPER SILT FENCE IN LIEU OF SILT FENCE AND
PROVIDE A DETAIL IN THE PLANS.
12. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL ENGINEERI
DEPARTMENT AND OBTAIN AN "APPROVED FOR CONSTRUCTION"
STAMP ON TWO ADDITIONAL SETS FOR THE OWNER TO KEEP
ON-SITE.
13. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, THE
NAME, "WALK-IN" ADDRESS, AND TELEPHONE NUMBER OF
A LOCAL REGISTERED AGENT REPRESENTING THE OWNER FOR
SERVICE OF PROCESS MUST BE PROVIDED ON THE "APPOINTMEN
OF AGENT FOR SERVICE OF PROCESS" FORM FOUND ON THE
CHESTERFIELD COUNTY ENVIRONMENTAL ENGINEERING WEBPAGE.
(CL-GENERAL 12)
14. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD .DWG OR .DXF MUST BE SUBMITTED TO
CAROLE CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD, OR VIA
EMAIL. THE FILE MUST CONTAIN THE FOLLOWING, EACH
CLEARLY IN SEPARATE LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. ALL IMPERVIOUS AREAS (PARKING LOTS, DRIVEWAYS, ROADS,
ETC);
C. THE STORM SEWER SYSTEM AND ALL CULVERTS;
D. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE;
E. STREAMS AND OTHER WATER BODIES;
F. LOCATIONS OF FIELD VERIFIED RESOURCE PROTECTION AREA
DESIGNATIONS TO INCLUDE WATER BODIES WITH PERENNIAL
FLOW, TIDAL SHORES, TIDAL WETLANDS, NON-TIDAL WETLANDS
WHICH ARE CONNECTED AND CONTIGUOUS TO TIDAL WETLANDS O
PERENNIAL FLOW;
G. LOCATIONS OF PERENNIAL FLOW ORIGINS AND THEIR ASSOCIAT
GPS COORDINATES (NAD83 STATE PLANE VA SOUTH FEET);
H. LOCATION(S) OF BREAK POINT(S) IN SURFACE FLOW AND/OR
NON-CONTIGUOUS WETLANDS AND THEIR ASSOCIATED GPS
COORDINATES; AND
I. FLOOD PLAINS.
ALL AUTOCAD FILES MUST BE SAVED AS A .DWG OR .DXF IN
AUTOCAD VERSION 2009 OR EARLIER AND REFERENCED DIRECTL
TO THE VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH
ZONE IN THE NAD83 DATUM. THE CD, DVD, OR EMAIL MUST B
LABELED WITH THE SITE PLAN NAME, SITE PLAN NUMBER,
ENGINEERING FIRM AND CONTACT NAME AND PHONE NUMBER.
15. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
16. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A VDOT LAND USE PERMIT
C. A LETTER MUST BE RECEIVED FROM A QUALIFIED WETLANDS
EXPERT STATING:
1.THERE ARE NO WETLANDS IMPACTED ON THIS PROJECT, OR
2.ALL APPLICABLE FEDERAL AND STATE WETLAND PERMITS HAVE
BEEN ACQUIRED (COPIES OF THE PERMITS MUST BE SUBMITTED
D. COPIES OF THE VIRGINIA STORMWATER MANAGEMENT PERMIT
(VSMP) REGISTRATION STATEMENT AND PERMIT FEE FORM (AS
DEVELOPED BY THE DEPARTMENT OF ENVIRONMENTAL QUALITY)
MUST BE SUBMITTED
E. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(AMOUNT TO BE APPROVED BY EE)
==========================================================
==========================================================
==========================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : CATHY HILL, P.E. / 768-7836
NAME OF PLAN : MAGNOLIA GREEN - WELCOME CENTER
ADDRESS : 17301 AND 17320 HULL STREET ROAD
SITE PLAN NO. : 14PR0121
LATEST PLAN DATE : 02/12/2014 (ENGINEER'S STAMP)
DEPT. REC'D DATE : 03/19/2014
SUBMITTAL NUMBER : 3
REVIEW DATE : 03/19/2014
RECOMMENDATION : APPROVED
TABLE REVISION : N/A
PLAT PROCESSING : N/A
01. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURE
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NO
RELIEVE YOU OF YOUR RESPONSIBILITY.
(CL-XX #) REPRESENTS A SUBMITTAL CHECKLIST COMMENT -
SECTION AND COMMENT NUMBER
02. IT HAS RECENTLY COME TO OUR ATTENTION THAT THE STATE
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
REQUIREMENTS CONCERNING THE 10-YEAR STORM PEAK
ATTENUATION AND WATER QUALITY COMPLIANCE, WHICH VARIES
FROM BAY ACT COMPLIANCE, MAY BECOME AN ISSUE DURING TH
STATE SITE INSPECTION PROCESS. COUNTY CONSTRUCTION PL
APPROVAL DOES NOT RELIEVE THE OWNER/DEVELOPER OF
RESPONSIBILITY FOR COMPLIANCE WITH STATE REGULATIONS -
E.G. 4VAC50-60-66 WATER QUANTITY, 4VAC50-60-63 WATER
QUALITY, 4VAC50-60-65 WATER QUALITY COMPLIANCE, ETC.
TECHNICAL ASSISTANCE FROM DEQ IS AVAILABLE AND
RECOMMENDED.
03. THE DEPARTMENT HAS NOT PERFORMED A REVIEW OF THOSE
ONSITE DRAINAGE CONVEYANCE SYSTEMS WHOSE CONTRIBUTING
DRAINAGE AREAS LIE WITHIN THE LIMITS OF THE PROPERTY A
ARE NOT REQUIRED TO BE ENCLOSED IN A COUNTY DRAINAGE
EASEMENT.
04. A BMP MAINTENANCE FEE IN THE AMOUNT OF $1,500 PER
IMPERVIOUS ACRE IS REQUIRED FOR COMMERCIAL DEVELOPMENT
PAYMENT MUST BE RECEIVED PRIOR TO ISSUANCE OF A LAND
DISTURBANCE PERMIT. (CL-USC 1) THIS APPLIES TO NEW
IMPERVIOUS FOR THIS PROJECT.
05. ADDITIONAL EROSION CONTROL MEASURES OTHER THAN THE
MINIMUM STANDARDS CONTAINED IN THE VIRGINIA EROSION AN
SEDIMENT CONTROL HANDBOOK WILL BE REQUIRED IF IT IS
DETERMINED THAT SUCH MEASURES ARE NECESSARY FOR
PROTECTION OF SENSITIVE ENVIRONMENTAL FEATURES AND/OR
WATER RESOURCES. (CL-USC 3)
06. IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE ONE
ADDITIONAL SET OF PLANS TO THE ENVIRONMENTAL ENGINEERI
DEPARTMENT AND OBTAIN AN "APPROVED FOR CONSTRUCTION"
STAMP ON TWO ADDITIONAL SETS FOR THE OWNER TO KEEP
ON-SITE.
07. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, THE
NAME, "WALK-IN" ADDRESS, AND TELEPHONE NUMBER OF
A LOCAL REGISTERED AGENT REPRESENTING THE OWNER FOR
SERVICE OF PROCESS MUST BE PROVIDED ON THE "APPOINTMEN
OF AGENT FOR SERVICE OF PROCESS" FORM FOUND ON THE
CHESTERFIELD COUNTY ENVIRONMENTAL ENGINEERING WEBPAGE.
(CL-GENERAL 12)
08. PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT, A COPY
OF THE AUTOCAD .DWG OR .DXF MUST BE SUBMITTED TO
CAROLE CLIBORNE OF ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MAY BE SUBMITTED ON A CD, DVD, OR VIA
EMAIL. THE FILE MUST CONTAIN THE FOLLOWING, EACH
CLEARLY IN SEPARATE LAYERS:
A. PROPOSED BUILDING FOOTPRINT;
B. ALL IMPERVIOUS AREAS (PARKING LOTS, DRIVEWAYS, ROADS,
ETC);
C. THE STORM SEWER SYSTEM AND ALL CULVERTS;
D. ALL JURISDICTIONAL WETLAND AREAS AND/OR WATERS OF THE
U.S./STATE;
E. STREAMS AND OTHER WATER BODIES;
F. LOCATIONS OF FIELD VERIFIED RESOURCE PROTECTION AREA
DESIGNATIONS TO INCLUDE WATER BODIES WITH PERENNIAL
FLOW, TIDAL SHORES, TIDAL WETLANDS, NON-TIDAL WETLANDS
WHICH ARE CONNECTED AND CONTIGUOUS TO TIDAL WETLANDS O
PERENNIAL FLOW;
G. LOCATIONS OF PERENNIAL FLOW ORIGINS AND THEIR ASSOCIAT
GPS COORDINATES (NAD83 STATE PLANE VA SOUTH FEET);
H. LOCATION(S) OF BREAK POINT(S) IN SURFACE FLOW AND/OR
NON-CONTIGUOUS WETLANDS AND THEIR ASSOCIATED GPS
COORDINATES; AND
I. FLOOD PLAINS.
ALL AUTOCAD FILES MUST BE SAVED AS A .DWG OR .DXF IN
AUTOCAD VERSION 2009 OR EARLIER AND REFERENCED DIRECTL
TO THE VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH
ZONE IN THE NAD83 DATUM. THE CD, DVD, OR EMAIL MUST B
LABELED WITH THE SITE PLAN NAME, SITE PLAN NUMBER,
ENGINEERING FIRM AND CONTACT NAME AND PHONE NUMBER.
09. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND SUBSTANTIAL OR FULL SITE PLAN APPROVAL IS REQUIRED
PRIOR TO ITS ISSUANCE. A LAND DISTURBANCE PERMIT IS
A PREREQUISITE TO A BUILDING PERMIT.
10. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT
AND THE FOLLOWING ARE REQUIRED PRIOR TO ITS ISSUANCE:
A. SUBSTANTIAL OR FULL SITE PLAN APPROVAL
B. A VDOT LAND USE PERMIT
C. COPIES OF THE VIRGINIA STORMWATER MANAGEMENT PERMIT
(VSMP) REGISTRATION STATEMENT AND PERMIT FEE FORM (AS
DEVELOPED BY THE DEPARTMENT OF ENVIRONMENTAL QUALITY)
MUST BE SUBMITTED
D. POSTING OF AN EROSION AND SEDIMENT CONTROL SURETY
(THE AMOUNT OF $18,567.50 IS APPROVED)
==========================================================

Modify comments view for case # 14PR0121



Go to Case Selection Form or Go to Project List