Thanksgiving Holiday Closings... MORE

Hover here for Site Tools
Subdivision Review Comments
All Subdivision Review Comments for Case # 18FC0033




For VDOT’s comments please contact Virginia Department of Transportation at (804) 674-2814 or send e-mail to Boris.Solomonov@VDOT.Virginia.gov

For Tentative Subdivision resubmittals:

1. Please note that submittal fees include the original submittal and two (2) additional reviews.

2. A letter of transmittal is required to accompany each submittal.

3. Please verify that Environmental Engineering, Fire, CDOT, VDOT, and Planning have reviewed the submittal before resubmitting. A resubmittal tendered, prior to receiving all the required departments’ review, will be counted as an additional submittal. Go to Case Selection Form or Go to Project List


 
CASE NO: 18FC0033 STATUS: PENDING APPROVAL
PROJECT NAME: HALLSLEY SEC 24 - LAST INTERNET UPDATE: 11/22/17
SUBMITTAL TYPE: FINAL CHECK
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ASSESSOR----: 00 10/23/17 11/06/17 COMPLETE 11/13/17 SSD 748-1348
ENVIR.ENGR.-: 00 10/23/17 11/06/17 ******** ********
FIRE DEPT.--: 00 10/23/17 11/06/17 COMPLETE 11/02/17 JKL 748-1489
MAPPING/GIS-: 00 10/23/17 11/06/17 COMPLETE 11/06/17 JMB 748-1280
PLANNING----: 00 10/23/17 11/06/17 COMPLETE 11/06/17 SCP 751-4321
TRANSPORT.--: 00 10/23/17 11/06/17 COMPLETE 11/01/17 SES 751-4912
UTIL.PLAN.--: 00 10/23/17 11/06/17 ******** ********
UTILITIES---: 00 10/23/17 11/06/17 COMPLETE 10/27/17 TVM 751-4435
UTIL.R.O.W.-: 00 10/23/17 11/06/17 COMPLETE 11/03/17 KIP 748-1376
REVIEW DEPARTMENT : UTILITIES RIGHT OF WAY
REVIEWER : KIMBERLY PULLEY / 748-1376
NAME OF PLAN & NO. : HALLSLEY SEC 24/18FC0033
ADDRESS :
RECEIVED DATE : 10/25/17
PLAN/REVISION DATED: N/A
REVIEW DATE : 11/3/17
STATUS : NOT APPROVED
1. SIGN SURVEYORS SEAL ON EACH SHEET
2. FILL IN COMPLETE SUBDIVISION ID #
3. FILL IN DB & PG FOR OFFSITE EASEMENTS
4. ADD TEMPORARY TURNAROUND NOTE
5. SHEET 2: IN OPEN SPACE A OF HALLSLEY SECTION 9, THE
VARIABLE WIDTH DRAINAGE EASEMENT SHOULD BE LABELED AS 16'
DRAINAGE EASEMENT PB 241 PG 91-92
6. SHEET 2: LABEL THE TEMPORARY TURNAROUND EASEMENT ON LOT 4
& 5
7. SHEET 2: SHOW AND LABEL THE 10' TEMPORARY CONSTRUCTION
EASEMENT ON LOT 4
8. SHEET 2: LABEL THE TEMPORARY DRAINAGE EASEMENT ON LOT 5
9. SHEET 2: LABEL THE 10' TEMPORARY CONSTRUCTION EASEMENT
DB ___ PG___ AROUND THE OFFSITE 20' SEWER EASEMENT
10. SHEET 2: SHOW AND LABEL THE VARIABLE WIDTH SLOPE &
DRAINAGE EASEMENT FOR VDOT MAINTENANCE ON LOT 10
11. SHEET 2: THE ADJACENT PARCEL 709-701-7328-00000 SHOULD
BE RIVERSTONE PROPERTIES, LLC
12. SHEET 2: FILL IN THE DB & PG FOR ADJACENT RP NORTH
HALLSLEY PARCEL WITH NEW GPIN #
13. SHEET 2: EXISTING SAVILLE CHASE ROAD SHOULD BE LABELED
WITH PB 232 PG 6-8
14. SHEET 2: ADD PB 232 PG 6-8 ON THE LABEL VAR. WIDTH SLOPE
& DRAINAGE EASEMENT FOR VDOT MAINTENANCE
REVIEW DEPARTMENT: UTILITIES
REVIEWER / PHONE # : TERRY MAPLES 751-4435
PLAN NAME : HALLSLEY SEC. 24
PLAN NUMBER: 18FC0033
ORIGINAL PLAN DATE: 10/12/17
REVIEW DATE: 10/27/17
LATEST SUBMISSION DATE:
SUBMITTAL NUMBER: NEW
STATUS: APPROVED
TABLE REVIEW:
.
1. NO ADDITIONAL PUBLIC WATER AND WASTEWATER EASEMENTS
ARE REQUIRED FOR THE ABOVE REFERENCED PROJECT. (U)
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: HALLSLEY, SECTION 24
CASE NUMBER: 18FC0033
LATEST PLAN DATE: 10/12/2017
DEPT. REC'D. DATE: 10/27/2017
SUBMITTAL NUMBER: ONE
REVIEW DATE: 11/01/2017
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
.
.
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #: STEVE PRUSIK/ 751-4321
PLAN NAME: HALLSLEY SEC. 24
PLAN NUMBER: 18FC0033
ORIGINAL PLAN DATE: 10/12/17
REVIEW DATE: 11/06/17
LATEST SUBMISSION DATE: 10/12/17
SUBMITTAL NUMBER: 1
STATUS: NOT APPROVED
.
1. ALL DEED BOOK AND PAGE NUMBER REFERNCES
FOR ALL UTILITY EASEMENTS MUST BE LABELED
PRIOR TO PLAT BEING RECORDED.
.
2. PLEASE SIGN AND SEAL ALL CERTIFICATES AND
NOTARY ON THE PLAT.
.
3. PLEASE ENSURE THAT ALL STANDARD CONDITIONS
(SECT. 17-62) OF THE COUNTY SUBDIVISION ORDINANCE
ARE MET PRIOR TO FINAL PLAT SUBMITTAL.
.
4. PLEASE PROVIDE SUBDIVISION IDENTIFICATION
NUMBER: 024-0473-24 TO LOWER RIGHT CORNER OF
EACH SHEET.
.
5. LABEL THE TEMPORARY TURNAROUND EASEMENT
ON LOTS 4 AND 5 ON SHEET 2.
.
6. LABEL THE 10' TEMPORARY CONSTRUCTION EASEMENT
ON LOT 4 ON SHEET 2.
.
7. LABEL THE TEMPORARY DRAINAGE EASEMENT ON
LOT 5 ON SHEET 2.
.
8. THE ADJACENT PARCEL, RIVERSTONE PROPERTIES, LLC
SHOULD BE GPIN: 709-701-7328-00000.
==========================================================
==========================================================
-
REVIEW DEPARTMENT: IST / GIS
REVIEWER : JASON BYERS 717-6356
NAME OF PLAN : HALLSLEY SEC 24
PLAN NO. : 18FC0033
ADDRESS :
LATEST PLAN DATE : 10/12/17
RECEIVED DATE : 10/20/17
SUBMITTAL NUMBER : 1
REVIEW DATE : 11/6/17
RECOMMENDATION : NOT APPROVED
-
PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNING
THE COMMENTS BELOW.
-
1. MISSING SUBDIVISION ID NUMBER
REVIEW DEPARTMENT: FIRE DEPARTMENT
REVIEWER/PHONE#: KIM LESTER / (804) 748-1489
EMAIL: LESTERK@CHESTERFIELD.GOV
NAME OF PLAN: HALLSLEY SEC. 24
PLAN NUMBER: 18FC0033
LATEST PLAN DATE: 10/12/17
DEPT. REC'D. DATE: 10/31/17
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 11/2/17
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT :ASSESSORS
REVIEWER / PHONE # :SHARON DRISKILL/748-1348
PLAN NAME :HALLSLEY SEC 24
PLAN NUMBER :18FC0033
ORIGINAL PLAN DATE :
REVIEW DATE :11/13/17
LATEST SUBMISSION DATE :
SUBMITTAL NUMBER :
STATUS :1) CORRECT OWNER'S NAME ON ADJACENT
PROPERTY - 709-701-7328 & 713-701-7807.