All Subdivision Review Comments for Case # 18CP0036




For VDOT’s comments please contact Virginia Department of Transportation at (804) 674-2814 or send e-mail to Boris.Solomonov@VDOT.Virginia.gov

For Tentative Subdivision resubmittals:

1. Please note that submittal fees include the original submittal and two (2) additional reviews.

2. A letter of transmittal is required to accompany each submittal.

3. Please verify that Environmental Engineering, Fire, CDOT, VDOT, and Planning have reviewed the submittal before resubmitting. A resubmittal tendered, prior to receiving all the required departments’ review, will be counted as an additional submittal. Go to Case Selection Form or Go to Project List


 
CASE NO: 18CP0036 STATUS: PENDING APPROVAL
PROJECT NAME: SUMMER LAKE SEC 8 - LAST INTERNET UPDATE: 06/22/18
SUBMITTAL TYPE: CONSTRUCTION PLAN
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ENVIR.ENGR.-: 01 12/07/17 12/08/17 ******** ********
FIRE DEPT.--: 01 12/07/17 12/08/17 ******** 11/08/17 JKL 748-1489
PLANNING----: 01 12/07/17 12/08/17 ******** ********
TRANSPORT.--: 01 12/07/17 12/08/17 ******** 12/07/17 SES 751-4912
UTIL.PLAN.--: 01 12/07/17 12/08/17 ******** 11/22/17 A U
UTILITIES---: 01 12/07/17 12/08/17 ******** ********
UTIL.R.O.W.-: 01 12/07/17 12/08/17 ******** ********
VDOT--------: 01 12/07/17 12/08/17 ******** ********
REVIEW DEPARTMENT: UTILITIES DEPARTMENT
REVIEWER/PHONE # : ANNE URENDA, P.E./(804)748-1343
NAME OF PLAN : SUMMER LAKE SECTION 8
ADDRESS :
SUBMISSION DATE : 10/30/17
PLAN DATED : 11/7/2017
REVIEW DATE : 11/21/17
PLANNING CASE NO.: 18CP0036
COMMENTS : APPROVED
THE PLAN IS APPROVED BY UTILITIES
THE OWNER SHALL BE REQUIRED TO ENTER INTO A COUNTY
UTILITIES CONTRACT PRIOR TO THE START OF CONSTRUCTION.
PRIOR TO THE PREPARATION OF THE UTILITIES CONTRACT,
UTILITIES MUST BE IN RECEIPT OF THE "ACCEPTED" BID PROPOSAL
BETWEEN THE DEVELOPER AND THE COUNTY-APPROVED UTILITIES
CONTRACTOR AS WELL AS THE PROJECT'S INFORMATIONAL SHEET
FOUND ON THE "DEVELOPER'S CHECKLIST". PLEASE SEND THESE
DOCUMENTS TO THE ATTENTION OF ANNE URENDA
(URENDAA@CHESTERFIELD.GOV). THE BID PROPOSAL MUST BE BASED
ON THE APPROVED SITE PLAN. BE ADVISED THAT IF THE SITE PLAN
IS REVISED AND REAPPROVED SUBSEQUENT TO THE PREPARATION OR
RECORDATION OF THE UTILITIES CONTRACT, THE BID PROPOSAL
SHALL BE REVISED ACCORDINGLY AND A REVISED UTILITIES
CONTRACT MAY BE NECESSARY.
A TOTAL OF FOUR SETS OF THE APPROVED PLANS MUST BE
SUBMITTED TO THE UTILITIES DEPARTMENT FOR OUR USE DURING
CONSTRUCTION INSPECTION. ONE ADDITIONAL ROLLED SET WILL BE
REQUESTED AFTER THE PROJECT IS RELEASED TO CONSTRUCTION TO
BE USED FOR AS-BUILTS.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: SUMMER LAKE, SECTION 8
CASE NUMBER: 18CP0036
LATEST PLAN DATE: 10/20/2017
DEPT. REC'D. DATE: 11/01/2017
SUBMITTAL NUMBER: ONE
REVIEW DATE: 11/16/2017
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
.
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: SUMMER LAKE, SECTION 8
CASE NUMBER: 18CP0036
LATEST PLAN DATE: 11/07/2017
DEPT. REC'D. DATE: 12/07/2017
SUBMITTAL NUMBER: TWO
REVIEW DATE: 12/07/2017
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
.
REVIEW DEPARTMENT: PLANNING
REVIEWER / PHONE #: WHIT KIRTLEY / 706-7691
PLAN NAME: SUMMER LAKE SEC 8
PLAN NUMBER: 18CP0036
ORIGINAL PLAN DATE: 10/20/17
REVIEW DATE: 11/28/17
LATEST SUBMISSION DATE: 10/10/17
SUBMITTAL NUMBER: 2
STATUS: CORRECTION REQUIRED
TABLE REVIEW: Y
.
1. INCLUDE A NOTE IN THE E & S PLAN STATING
DISTURBANCE OF THE BUFFERS WILL RESULT IN
A LANDSCAPE PLAN AND BOND
.
NOTES:
.
THE CLEARED PORTION OF THE BUFFER ALONG LOT 1 WILL
REQUIRE REPLANTING.
.
ANY CHANGE IN THE CURRENT PLAN, WHETHER IT STEMS FROM
DEPARTMENT COMMENTS OR AN ENGINEERING CHANGE REQUESTED
BY THE APPLICANT, MAY GENERATE ADDITIONAL COMMENTS FROM
THE REVIEWING DEPARTMENTS, RESULTING IN REQUIRED REVISIONS.
.
.
ANY BULK REQUIREMENTS (LOT AREA, LOT WIDTH, SETBACKS,
BUILDING ENVELOPES, ETC.) SHOWN ON THE APPROVED
CONSTRUCTION PLANS WILL BE SUBJECT TO REVIEW FOR COMPLIANCE
AT TIME OF FINAL CHECK.
..
.
END OF COMMENTS.
REVIEW DEPARTMENT: FIRE AND LIFE SAFETY
REVIEWER / PHONE#: KIM LESTER / 748-1489
PLAN NAME: SUMMER LAKE SECT. 8
PLAN NUMBER: 18CP0036
LATEST REVISION DATE: 10/20/17
REVIEW DATE: 11/8/17
LATEST SUBMISSION DATE: 11/2/17
SUBMITTAL NUMBER: 1ST SUBMITTAL
STATUS: APPROVED
TABLE REVIEW: YES
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE AND LIFE SAFETY
REVIEWER / PHONE#: KIM LESTER / 748-1489
PLAN NAME: SUMMER LAKE SECT. 8
PLAN NUMBER: 18CP0036
LATEST REVISION DATE: 11/28/17
REVIEW DATE: 12/11/17
LATEST SUBMISSION DATE: 12/7/17
SUBMITTAL NUMBER: 2ND SUBMITTAL
STATUS: APPROVED
TABLE REVIEW: YES
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

Go to Case Selection Form or Go to Project List