3. Please verify that Environmental Engineering, Fire, CDOT, VDOT, and Planning have reviewed the submittal before resubmitting. A resubmittal tendered, prior to receiving all the required departments’ review, will be counted as an additional submittal. Go to Case Selection Form or Go to Project List


 
CASE NO: 16TS0144 STATUS: PENDING APPROVAL
PROJECT NAME: UPPER MAGNOLIA GREEN - LAST INTERNET UPDATE: 11/22/17
SUBMITTAL TYPE: TENTATIVE SUBDIVISION
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
AIRPORT-----: 03 03/29/17 04/19/17 ******** ********
ENVIR.ENGR.-: 03 03/29/17 04/19/17 AMENDED* 04/20/17 RPW 748-1028
FIRE DEPT.--: 03 03/29/17 04/19/17 COMPLETE 04/06/17 AWB 717-6167
HOUSE NUMBER: 03 03/29/17 04/19/17 ******** ********
MAPPING/GIS-: 03 03/29/17 04/19/17 ******** ********
PLANNING----: 03 03/29/17 04/19/17 ******** 12/13/16 JHL 751-4158
PARKS & REC.: 03 03/29/17 04/19/17 ******** ********
SCHOOL BOARD: 03 03/29/17 04/19/17 ******** ********
SOILS-------: 03 03/29/17 04/19/17 ******** ********
TRANSPORT.--: 03 03/29/17 04/19/17 COMPLETE 04/14/17 SES 751-4912
UTIL.PLAN.--: 03 03/29/17 04/19/17 ******** 01/23/17 TVM 751-4435
UTILITIES---: 03 03/29/17 04/19/17 COMPLETE 04/03/17 TVM 751-4435
UTIL.R.O.W.-: 03 03/29/17 04/19/17 ******** ********
VDOT--------: 03 03/29/17 04/19/17 ******** ********
REVIEW DEPARTMENT: UTILITIES
REVIEWER / PHONE # : TERRY MAPLES 751-4435
PLAN NAME : UPPER MAGNOLIA GREEN, PH. 1
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE: 8/14/16
REVIEW DATE: 4/03/17
LATEST SUBMISSION DATE: 2/15/17
SUBMITTAL NUMBER: 4
STATUS: APPROVED
TABLE REVIEW:
.
.
.
1. THIS OFFICE MAY REQUIRE REDESIGN OR MODIFICATIONS TO
THE PROPOSED SEWER LAYOUT, AS SHOWN ON THE LATEST
PRELIMINARY PLAN, ONCE THE FIELD WORK, GRADING PLAN
AND SEWER DESIGN HAS BEEN COMPLETED BY THE
ENGINEER AND SHOWN ON INITIAL CONSTRUCTION PLAN
SUBMITTAL FOR REVIEW AND APPROVAL. (U)
.
2. IT WILL BE THE RESPONSIBILITY OF THE SUB DIVIDER TO
MAKE CERTAIN, BY WHATEVER MEANS NECESSARY,
(I.E., ON-SITE WATER LINE LOOPING OR OFF-SITE
WATER LINE EXTENSIONS, ETC.) THAT THE DEMANDS
GENERATED BY THE PROPOSED PROJECT DO NOT
ADVERSELY AFFECT ANY PORTION OF THE PRESSURE
ZONE THE PROJECT IS LOCATED WITHIN AND THAT
THE ADDITION OF THIS PROJECT WILL NOT CAUSE ANY
AREA WITHIN THE PRESSURE ZONE TO FAIL TO COMPLY
WITH THE CHESTERFIELD COUNTY FIRE DEPARTMENT'S
REQUIRED FIRE FLOW OF 1000 GPM AT 20 PSI
RESIDUAL. (U)
REVIEW DEPARTMENT: UTILITIES
REVIEWER / PHONE # : TERRY MAPLES 751-4435
PLAN NAME : UPPER MAGNOLIA GREEN - PH. 1
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE: 8/14/15
REVIEW DATE: 1/23/17
LATEST SUBMISSION DATE: 12/20/16
SUBMITTAL NUMBER: 3
STATUS: APPROVED
TABLE REVIEW:
1. THIS OFFICE MAY REQUIRE REDESIGN OR MODIFICATIONS TO
THE PROPOSED SEWER LAYOUT, AS SHOWN ON THE LATEST
PRELIMINARY PLAN, ONCE THE FIELD WORK, GRADING PLAN
AND SEWER DESIGN HAS BEEN COMPLETED BY THE
ENGINEER AND SHOWN ON INITIAL CONSTRUCTION PLAN
SUBMITTAL FOR REVIEW AND APPROVAL. (U)
2. IT WILL BE THE RESPONSIBILITY OF THE SUB DIVIDER TO
MAKE CERTAIN, BY WHATEVER MEANS NECESSARY,
(I.E., ON-SITE WATER LINE LOOPING OR OFF-SITE
WATER LINE EXTENSIONS, ETC.) THAT THE DEMANDS
GENERATED BY THE PROPOSED PROJECT DO NOT
ADVERSELY AFFECT ANY PORTION OF THE PRESSURE
ZONE THE PROJECT IS LOCATED WITHIN AND THAT
THE ADDITION OF THIS PROJECT WILL NOT CAUSE ANY
AREA WITHIN THE PRESSURE ZONE TO FAIL TO COMPLY
WITH THE CHESTERFIELD COUNTY FIRE DEPARTMENT'S
REQUIRED FIRE FLOW OF 1000 GPM AT 20 PSI
RESIDUAL. (U)
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: UPPER MAGNOLIA GREEN, PHASE I OVERALL
CONCEPTUAL PLAN
CASE NUMBER: 16TS0144
LATEST PLAN DATE: 10/18/2016
DEPT. REC'D. DATE: 11/01/2016
SUBMITTAL NUMBER: TWO
REVIEW DATE: 11/18/2016
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
NOTE: IN ACCORDANCE WITH THE COUNTY'S TURN LANE POLICY,
TURN LANES WILL BE REQUIRED AT INTERSECTIONS ALONG DUVAL
ROAD, BOSTON POND ROAD, AND WESTERLEIGH PARKWAY.
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: UPPER MAGNOLIA GREEN, PHASE I OVERALL
CONCEPTUAL PLAN
CASE NUMBER: 16TS0144
LATEST PLAN DATE: 12/20/2016
DEPT. REC'D. DATE: 12/28/2016
SUBMITTAL NUMBER: THREE
REVIEW DATE: 01/18/2017
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
.
NOTE: IN ACCORDANCE WITH THE COUNTY'S TURN LANE POLICY,
TURN LANES WILL BE REQUIRED AT INTERSECTIONS ALONG DUVAL
ROAD, BOSTON POND ROAD, AND WESTERLEIGH PARKWAY.
.
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: UPPER MAGNOLIA GREEN, PHASE I OVERALL
CONCEPTUAL PLAN
CASE NUMBER: 16TS0144
LATEST PLAN DATE: 02/15/2017
DEPT. REC'D. DATE: 04/03/2017
SUBMITTAL NUMBER: FOUR
REVIEW DATE: 04/14/2017
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
.
NOTE: IN ACCORDANCE WITH THE COUNTY'S TURN LANE POLICY,
TURN LANES WILL BE REQUIRED AT INTERSECTIONS ALONG DUVAL
ROAD, BOSTON POND ROAD, AND WESTERLEIGH PARKWAY.
.
REVIEW DEPARTMENT : PLANNING
REVIEWER / PHONE # : JEFF LAMSON/ 751-4158
PLAN NAME :
PLAN NUMBER :
ORIGINAL PLAN DATE :
REVIEW DATE :
LATEST SUBMISSION DATE :
SUBMITTAL NUMBER :
STATUS :
UPON RESUBMITTAL, PLEASE SUBMIT A RESPONSE LETTER ADDRESSING
EACH OF THE REVISIONS, CONDITIONS AND/OR NOTES BELOW.
REVIEW DEPARTMENT : FIRE DEPARTMENT
REVIEWER / PHONE # : ANTHONY BATTEN / 717-6167
PLAN NAME : UPPER MAGNOLIA GREEN, PHASE 1
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE : 8/14/15
LATEST PLAN DATE : 8/14/15
REVIEW DATE : 9/14/15
DEPARTMENT RECEIVED DATE: 1/16/15
SUBMITTAL NUMBER : 1ST REVIEW
STATUS : APPROVED
TABLE REVIEW: YES
COMMENTS:
1. THE TENATIVE IS APPROVED AS SUBMITTED.
2. HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE
TENTATIVE PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S)
REQUIRED AND THEIR LOCATION WILL BE EVALUATED AT
THE TIME OF CONSTRUCTION PLAN REVIEW.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT : FIRE DEPARTMENT
REVIEWER / PHONE # : ANTHONY BATTEN / 717-6167
PLAN NAME : UPPER MAGNOLIA GREEN, PHASE 1
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE : 8/14/15
LATEST PLAN DATE : 10/18/16
REVIEW DATE : 11/15/16
DEPARTMENT RECEIVED DATE: 11/2/16
SUBMITTAL NUMBER : 2ND REVIEW
STATUS : APPROVED
TABLE REVIEW: YES
COMMENTS:
1. THE TENATIVE IS APPROVED AS SUBMITTED.
2. HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE
TENTATIVE PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S)
REQUIRED AND THEIR LOCATION WILL BE EVALUATED AT
THE TIME OF CONSTRUCTION PLAN REVIEW.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT : FIRE DEPARTMENT
REVIEWER / PHONE # : ANTHONY BATTEN / 717-6167
PLAN NAME : UPPER MAGNOLIA GREEN, PHASE 1
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE : 8/14/15
LATEST PLAN DATE : 12/20/16
REVIEW DATE : 1/9/17
DEPARTMENT RECEIVED DATE: 12/30/16
SUBMITTAL NUMBER : 3RD REVIEW
STATUS : APPROVED
TABLE REVIEW: YES
COMMENTS:
1. THE TENATIVE IS APPROVED AS SUBMITTED.
2. HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE
TENTATIVE PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S)
REQUIRED AND THEIR LOCATION WILL BE EVALUATED AT
THE TIME OF CONSTRUCTION PLAN REVIEW.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT : FIRE DEPARTMENT
REVIEWER / PHONE # : ANTHONY BATTEN / 717-6167
PLAN NAME : UPPER MAGNOLIA GREEN, PHASE 1
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE : 8/14/15
LATEST PLAN DATE : 2/15/17
REVIEW DATE : 4/6/17
DEPARTMENT RECEIVED DATE: 4/4/17
SUBMITTAL NUMBER : 4TH REVIEW
STATUS : APPROVED
TABLE REVIEW: YES
COMMENTS:
1. THE TENATIVE IS APPROVED AS SUBMITTED.
2. HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE
TENTATIVE PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S)
REQUIRED AND THEIR LOCATION WILL BE EVALUATED AT
THE TIME OF CONSTRUCTION PLAN REVIEW.
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: ROBERT W. BOSWELL / 748-1977
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE: 8/14/15
LATEST SUBMISSION DATE: 9/8/15
REVIEW DATE: 10/6/15
SUBMITTAL NUMBER: 1
STATUS: REVISION REQUESTED
TABLE REVIEW: NO
PERTAINING TO THE ABOVE REFERENCED TENTATIVE PLAT DATED
8/14/15, RECEIVED BY THE PLANNING DEPARTMENT ON 8/17/15
AND BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT ON
9/11/15.
….
PLEASE SPECIFY THE TENTATIVE CASE NUMBER 16TS0144 IN THE
GENERAL NOTES ON SHEET 1.
….
PLEASE LABEL HORSEPEN CREEK ON APPLICABLE SHEETS IN THE
OVERALL PLAN.
….
PLEASE LABEL THE APPROXIMATE FEMA FLOODPLAIN LIMITS AS
ZONE AE ON ALL APPLICABLE SHEETS.
….
PLEASE CORRECT THE CALLOUT LEGEND ON APPLICABLE SHEETS TO
REFLECT THE TERMINOLOGY "100' RPA BUFFER AREA" IN LIEU OF
"100' CONSERVATION BUFFER AREA". ALSO, THE LEGEND SHOWS
TWO NOTATIONS AS WE WHEN ONE SHOULD BE WET FOR
WETLANDS. PLEASE ADDRESS.
….
PLEASE REVISE THE WATER QUALITY NOTE ON SHEET 1 TO STATE,
"TO
SATISFY THE REQUIREMENTS OF THE CBPA AND ZONING
CONDITIONS IMPOSED BY CASES 89SN0343 AND 91SN0343 THE
DEVELOPER SHALL" .
….
PLEASE PROVIDE A COPY OF THE USCOE WETLANDS CONFIRMATION
DOCUMENTATION WITH THE WETLANDS MAP.
….
PLEASE CLARIFY IF ANY GAS LINE EASEMENTS/FACILITIES
EXIST/CROSS
THIS PROPERTY WITHIN THE LIMITS OF THE TENTATIVE.
….
PLEASE REVISE THE LIMITS OF PHASE 1 IN THE VICINITY OF DUVAL
ROAD REALIGNMENT BEHIND LOTS 63/64 IN THE VICINITY MAP ON
SHEET 1.
….
PLEASE LABEL THE WETLAND LIMITS AS RPA IN THE VICINITY OF
LOTS
162/172 TO COINCIDE WITH THE RPAD ON ALL APPLICABLE
SHEETS.
….
STREET NAMES:
2. THE BASE NAME ASTER WAS NOT APPROVED BY RRPD.
PLEASE SELECT ANOTHER APPROVED BASE NAME AND
CONTINUE IT THE FULL LENGTH USING THE STREET TYPE
DESIGNATION CROSSING/LANE/TRAIL/ETC HANDLED SIMILAR
TO BATCH ELDER LANE.
3. PLEASE SELECT A DIFFERENT BASE NAME THAN KHAOSON
WHICH HAS AWKWARD SPELLING. THE DESIGNATION RUN
SHOULD EXTEND TO THE CULDESAC REPLACING COURT.
4. STREETS CONTINUING THROUGH AN INTERSECTION WILL KEEP
THE SAME NAME. USE EITHER TERRACE OR COURT AT
DALAL AND VACI, BUT NOT BOTH.
.
CBPA/USCW:
.
1. PLEASE SUBMIT PART IIC WORKSHEET A CALCULATIONS THAT
SHOW THE REQUIRED POLLUTANT REMOVAL TO SATISFY THE
DEFAULT LOADING OF 0.30 LB/YR. A COMPARISON OF THE
RR TO THE VRRM RR IS NECESSARY TO SHOW
COMPLIANCE WITH THE ZONING CONDITION.
2. PLEASE USE THE DEQ STANDARD VRRM WORKSHEET
FORMAT WHEN SUBMITTING CALCULATIONS TO ESTABLISH
WATER QUALITY COMPLIANCE. FOR EXAMPLE, POD #5
SHEETS FOR DRAINAGE AREA A ARE MISSING HYDROLOGIC
SOILS GROUPING TABLE. THE DRAINAGE AREA A & B
SHEETS HAVE ADDITIONAL LOT AREA/IMPERV/TURF QUANTITIES
NOT A PART OF THE DEQ WORKSHEET. IT APPEARS SOME
OF THE BMP PRACTICE HEADINGS ARE MISSING.
MODIFICATIONS APPEAR TO HAVE BEEN MADE TO THE
STANDARD WORKSHEETS. THIS IS NOT ACCEPTABLE.
3. THE POD #5 DRAINAGE AREA B HAS A DISCREPANCY
BETWEEN THE ACREAGES SHOWN FOR DRAINAGE AREA LAND
COVER IN THE TABLE. A SIMILAR ERROR IN ACREAGES CAN
BE FOUND IN THE SITE DATA SUMMARY TABLES. PLEASE
ADDRESS.
4. IN POD #5 THE DRAINAGE AREA C WORKSHEET HAS BEEN
OMITTED.
5. THE SHADED AREAS FOR ROW IMPERVIOUSNESS APPEAR
IN THE PRELIMINARY CBPA PLAN, HOWEVER, THE LOT AREA
SOILS GROUPING NOTATION IN THE LEGEND DOES NOT.
PLEASE ADDRESS.
6. PLEASE INCLUDE THE NOTE IN BOLD PRINT ON BOTH SHEETS
" CBPA/USCW COMPLIANCE AS PER VRRM CRITERIA
WILL BE REVIEWED AND APPROVED WITH THE INDIVIDUAL
SUBMITTAL OF EACH SUBDIVISION CONSTRUCTION PLAN".
7. THERE APPEARS TO BE A DISCREPANCY IN THE DIMENSIONS
USED TO CALCULATE THE TOTAL IMPERVIOUS AREAS FOR THE
R-15 LOTS UPPER LEFT SHEET 1 - CHECK WALK AND
FOOTPRINT BREAKDOWN.
8. WHEN SUMMATING THE TOTAL PROJECT AREA FROM POD'S
1 AND 3-5, THE ACREAGE IS 476.84 VS 478.12. PLEASE
ADDRESS.
9. IN POD #1 THE DRAINAGE AREA A LAND COVER TABLE IS
MISSING HYDROLOGIC SOIL GROUPINGS/ACREAGES.
10. THE PRELIMINARY VRRM WORKSHEETS SHOW A TOTAL
RR OF 100.18 LB/YR AND ACHIEVED RR OF 105.49
LB/YR.
11. THE TOTAL FOS AREA OF 220.75 ACRES APPEARS
INCLUSIVE OF WETLANDS, RPA, AND SWM/BMP'S. THE
PROPOSED WETPOND BMP'S WOULD NOT QUALIFY AS A
FOS AREA.
12. IN POD #4 THERE ARE TWO 4A WETPONDS BUT ONLY ONE
DRAINAGE AREA A. PLEASE CLARIFY.
13. THE PRELIMINARY PLAN APPEARS TO HAVE DELINATED THE
LIMITS OF THE OPEN SPACE/RECREATION OUTSIDE POD #4,
YET BMP 4D IS SHOWN. PLEASE ADDRESS.
14. IF IT'S THE INTENT NOT TO ADDRESS THE OPEN
SPACE/RECREATION AREA WITH THIS PRELIMINARY PLAN, IT
SHOULD BE SO STATED ON THE TENTATIVE AND PRELIMINARY
CBPA PLAN.
15. THE DRAINAGE AREA SUMMARY IN POD #4 DOES NOT
SHOW MATCHING ACREAGES. THE DRAINAGE AREA A
LAND COVER TABLE IS MISSING THE HYDROLOGIC SOIL
GROUPINGS/ACREAGES.
16. PLEASE REVIEW THE DRAINAGE AREA LAND COVER TABLES
AND DRAINAGE AREA SUMMARY TABLES IN ALL POD'S FOR
DISCREPANCIES CORRECTING AS APPLICABLE.
17. THE DRAINAGE AREA BMP PRACTICE SHEETS FOR C/D/E
WERE OMITTED IN POD #3. PLEASE ADDRESS.
18. IT APPEARS THAT TWO WETPONDS LABELED AS 3D IN
DIFFERENT DRAINAGE AREAS ARE PROPOSED IN POD #3.
PLEASE CLARIFY.
19. A SIMILAR SITUATION EXISTS LABELED AS 3E IN POD #3.
PLEASE CLARIFY.
20. PLEASE LABEL THE BMP CONCEPT PLAN AS THE
"PRELIMINARY CBPA COMPLIANCE PLAN".
21. PLEASE BE REMINDED THAT THE LIMITS OF THE PROPOSED
SWM/BMP'S MUST REMAIN OUTSIDE THE RPA'S
EXCLUDING THE OUTFALL IMPROVEMENT.
….
TENTATIVE CONDITIONS COULD INCLUDE, BUT NOT BE LIMITED TO,
THE FOLLOWING:
….
1. THE BMP'S INITIAL, PREDOMINANT WATER-QUALITY FUNCTION
SHALL BE SEDIMENT CONTROL; THE IMPLEMENTATION OF WHICH
SHALL BE COORDINATED WITH THE FIRST PORTION OF THE PROJECT
THAT DRAINS IN ITS DIRECTION.
….
2 . THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS SHOWN ON
THE
TENTATIVE SHALL BE INCLUDED IN THE ROAD AND DRAINAGE PLANS
THAT MUST BE APPROVED BY BOTH VDOT AND THE
ENVIRONMENTAL ENGINEERING DEPARTMENT. ROAD RIGHT-OF-
WAY SHALL BE WIDE ENOUGH TO ENCOMPASS THE PEDESTRIAN-
ACCESS FACILITIES IF THE SIDEWALKS MEET STATE CRITERIA.
….
3. A DAM-FAILURE ANALYSIS SHALL, AT A MINIMUM, BE
PERFORMED BASED ON AN OVER-TOPPING BREACH OF THE DAM
EMBANKMENT DURING A 100 YEAR STORM EVENT. CRITERIA PER
THE VIRGINIA DAM SAFETY ACT WILL TAKE PRECEDENCE. EXISTING
OR PROPOSED HOMES SHALL BE OUTSIDE OF THE DAM FAILURE
INUNDATION LIMITS.
….
5. THE DESIGN AND CONSTRUCTION OF THE SWM/BMPS THAT
WILL BE COUNTY MAINTAINED FACILITIES SHALL BE SUBJECT
TO DOCUMENTED GEOTECHNICAL APPROVAL. THE SERVICES
THAT MUST BE PROVIDED BY THE GEOTECHNICAL ENGINEER
SHALL INCLUDE FULL-TIME GEOTECHNICAL INSPECTION PAID
FOR BY THE DEVELOPER. THAT FULL-TIME INSPECTION SHALL
INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:
….
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS NECESSARY
TO FACILITATE THE APPROVAL PROCESS OF THE INDEPENDENT
GEOTECHNICAL CONSULTANT. OBSERVATION, TESTING AND
DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED STRUCTURAL
FILL FOR EARTH DAM CONSTRUCTION.
II. THE CUT-OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE, AND CONCRETE CHUTE SPILLWAY SUB-GRADES AS
APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS PRESENT AT
BEARING GRADE TO VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
….
6. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL ON THE DAM WILL
BE FURNISHED PRIOR TO THE ISSUANCE OF THE LAND
DISTURBANCE PERMIT.
….
7. AS DIRECTED BY ENVIRONMENTAL ENGINEERING,
ENGINEERED FILLING, GRADING, AND DRAINAGE
IMPROVEMENTS SHALL BE INCLUDED IN THE CONSTRUCTION
PLANS FOR THOSE LOTS IMPACTED BY THE CONCENTRATION OF
STORMWATER RUNOFF. THE AFFECTED LOTS SHALL BE
ANNOTATED WITH AN NBP.
….
7. THE SUB-DIVIDER SHALL POST SIGNS DEMARKING THE LIMITS
OF
THE RPA AREA SO BUILDERS AND HOMEOWNERS MAY BE
INFORMED AS TO THE LIMITATIONS IMPOSED ON THESE AREAS.
SPECIFIC PLANS FOR THE EXACT NUMBER AND PLACEMENT OF THE
SIGNS SHALL BE APPROVED BY THE ENVIRONMENTAL ENGINEERING
DEPARTMENT
….
8. LANGUAGE SHALL BE INCORPORATED INTO THE HOMEOWNERS'
ASSOCIATION COVENANTS ADVISING HOMEOWNERS WITH AN
RPA ON OR ADJACENT TO THEIR PROPERTY STATING THAT
RPAS ARE TO REMAIN IN THEIR NATURALLY VEGETATED STATE
AND THAT THE COUNTY'S CHESAPEAKE BAY PRESERVATION
ORDINANCE REQUIREMENTS RELATING TO RPAS READS AS
FOLLOWS: "A VEGETATED CONSERVATION AREA THAT RETARDS
RUNOFF, PREVENTS EROSION, AND FILTERS NON-POINT
SOURCE POLLUTION FROM RUNOFF SHALL BE RETAINED IF
PRESENT AND SHALL BE ESTABLISHED WHERE IT DOES NOT
EXIST." SECTION 19-232 OF CHESTERFIELD COUNTY CODE
STATES, "IF A HOMEOWNER WISHES TO MODIFY THE RPA,
A PLAN MUST BE SUBMITTED TO THE ENVIRONMENTAL
ENGINEERING DEPARTMENT FOR THEIR APPROVAL PRIOR TO
THE COMMENCEMENT OF ANY LAND CLEARING ACTIVITY."
….
9. PRIOR TO RECORDATION, A COPY OF THE COVENANTS AND
ARTICLES
OF INCORPORATION OF THE HOMEOWNERS' ASSOCIATION SHALL BE
PROVIDED TO THE ENVIRONMENTAL ENGINEERING DEPARTMENT FOR
APPROVAL. IN ADDITION TO LANGUAGE PERTAINING TO THE RPA,
THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL DETERMINE
WHETHER THE SUBDIVISION HAS BEEN PROVIDED WITH THE
INFORMATION TO DEVELOP AND IMPLEMENT A FERTILIZATION/LAWN
CARE PROGRAM TO MINIMIZE PHOSPHOROUS RUNOFF FROM
MAGNOLIA GREEN. PER ZONING CONDITION E.11 OF CASE
89SN0343. THE REQUIREMENTS OF THE PROGRAM SHALL BECOME
A PART OF THE COVENANTS FOR THE PROJECT AFFECTING ALL
PROPERTIES WITHIN THE DEVELOPMENT.
….
10. SPECIAL UPPER SWIFT CREEK WATERSHED END TREATMENT AS
DIRECTED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL
BE PLACED IN THE VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS. THE DI-7 END TREATMENTS SHALL BE
EXCLUDED FROM WITHIN THE LIMITS OF LOTS.
….
11. THE POINTS OF PERENNIAL FLOW ALONG WITH THEIR GPS
COORDINATE VALUES WILL BE SHOWN ON THE CONSTRUCTION PLAN
AND RECORD PLAT.
….
12. UNLESS OTHERWISE APPROVED, THE SPILLWAY STRUCTURE FOR
WET PONDS SHALL BE A CONCRETE WEIR.
….
13. PRIOR TO CONSTRUCTION PLAN APPROVAL, DOCUMENTATION
MUST BE PROVIDED TO ENVIRONMENTAL ENGINEERING THAT CERTAIN
PROPERTY OWNERS HAVE BEEN NOTIFIED OF THE PROPOSED
CONSTRUCTION ACTIVITY.
….
14. ENVIRONMENTAL ENGINEERING MAY IMPOSE MORE RIGOROUS
EROSION AND SEDIMENT CONTROL MEASURES THAN THAT WHICH IS
PROVIDED BY THE MINIMUM STANDARDS FOUND IN THE E&SC
HANDBOOK.
….
NOTE:
….
AS PER ZONING CONDITION E10 OF CASE 89SN0343, "THE
DEVELOPER SHALL INSTALL AT THE TIME OF INSTALLATION OF THE
EROSION AND SEDIMENT CONTROL FACILITIES, THE LARGEST VOLUME
REQUIRED AS DICTATED BY EITHER EROSION CONTROL, WATER
QUALITY,
OR WATER QUANTITY DESIGN STANDARDS".
….
AS PER SECTION 19-57 ITEM (D), A FEMA LETTER OF MAP
REVISION IS REQUIRED WHEN DEVELOPMENT OCCURRING IN ZONE
AE WITHOUT A DESIGNATED FLOODWAY WILL CAUSE A RISE OF MORE
THAN ONE FOOT IN THE BASE FLOOD ELEVATION. THIS WOULD APPLY
TO THE BOSTON POND ROAD CROSSING OF HORSEPEN CREEK.
PLEASE PROVIDE A WRITTEN RESPONSE IN THE MARGIN OF A COPY
OF
THESE COMMENTS WITH YOUR TENTATIVE PLAT REVISIONS.
(PLEASE PLACE ON DEVELOPER LETTERHEAD)
(DATE)
KIRKLAND A. TURNER, DIRECTOR
CHESTERFIELD COUNTY PLANNING DEPARTMENT
P. O. BOX 40
CHESTERFIELD, VIRGINIA 23832
RE: ENTRANCE EMBELLISHMENTS (____________ TENTATIVE)
DEAR MR. TURNER:
AS DEVELOPER OF THE PROPOSED __________________
SUBDIVISION, I AM AWARE THAT THE FOLLOWING NOTE IS NOW
REQUIRED NOT ONLY ON TENTATIVES BUT ALSO ON RECORD PLATS.
"NO STRUCTURE EMBELLISHMENTS WILL BE ALLOWED ON VDOT
RIGHT-OF-WAY WITHOUT THE COMMITMENT OF, OR THE ISSUANCE OF,
A VDOT LAND USE PERMIT. WITHIN THE 10' CLEAR ZONE
(MEASURED FROM THE EDGE OF THE ROADWAY'S PAVEMENT OUT
10'), NO STRUCTURE EMBELLISHMENT WILL BE PERMITTED THAT IS
CLOSER THAN 3' FROM THE EDGE OF PAVEMENT OF THE PUBLIC
STREET OR HIGHER THAN 6" ABOVE THE SURFACE OF THE DRIVE."
I WILL DO ALL POSSIBLE TO PROVIDE THE CORRECT INFORMATION
FOR
BUILDERS OR CITIZENS CONSTRUCTING ENTRANCE EMBELLISHMENTS.
I AM ALSO AWARE THAT, PRIOR TO STATE ACCEPTANCE OF THE
ROADS, I AM RESPONSIBLE FOR REMOVING EMBELLISHMENTS THAT
DO NOT MEET STATE STANDARDS.
SINCERELY,
DEVELOPER NAME (PRINTED)
DEVELOPER SIGNATURE
(DATE)
*******************************************
PLAN NAME: UPPER MAGNOLIA GREEN PHASE 1
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: REBECCAH WARD / 748-1028
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE: 8/14/15
LATEST SUBMISSION DATE: 10/18/16
REVIEW DATE: 10/21/16
SUBMITTAL NUMBER: 2
STATUS: REVISION REQUESTED
TABLE REVIEW: NO
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS
THE FOLLOWING PRELIMINARY COMMENTS AND OBSERVATIONS
PERTAINING TO THE ABOVE REFERENCED PRELIMINARY PLAT DATED
8/14/15, RECEIVED BY THE PLANNING DEPARTMENT ON 10/26/16 AND
BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT ON 11/01/16.
PLEASE LABEL HORSEPEN CREEK ON SHEET 2.
PLEASE PROVIDE A COPY OF THE USCOE WETLANDS CONFIRMATION
DOCUMENTATION WITH THE WETLANDS MAP.
PLEASE REVISE THE LIMITS OF PHASE 1 IN THE VICINITY OF DUVAL
ROAD REALIGNMENT BEHIND LOTS 63/64 IN THE VICINITY MAP ON
SHEET 1.
PLEASE SHOW AND LABEL THE LOCATIONS OF THE FEMA BASE FLOOD
ELEVATIONS OR ANY APPLICABLE CROSS-SECTIONS (BK-BK OR BJ-BJ)
ALL APPLICABLE SHEETS.
PLEASE LABEL THE POINT OF RPA ORIGIN IN THE OPEN SPACE ON
SHEET 8.
PLEASE SHOW ALL PROPOSED SWM/BMP EASEMENTS ON THE
PRELIMINARY PLAT.
PLEASE SHOW AND LABEL THE 50-FOOT VEGETATIVE PERIMETER YARD
AROUND ALL WET PONDS.
PLEASE IDENTIFY AND LABEL ALL PROPOSED IMPACTED WETLANDS.
PRIOR TO APPROVAL OF THE UPPER MAGNOLIA GREEN PHASE 1
PRELIMINARY PLAT, THE DEVELOPER WILL SUBMIT A LETTER OF
ACKNOWLEDGEMENT OF THE CONDITION REGARDING MASONRY
EMBELLISHMENTS WITHIN THE VDOT CLEAR ZONE. THIS
ACKNOWLEDGEMENT IS THE RESPONSIBILITY OF THE DEVELOPER AND
NOT HIS REPRESENTATIVE AS HE IS ULTIMATELY RESPONSIBLE FOR
REMOVAL OF HEADWALLS IN ALL NEW SUBDIVISIONS SHOULD IT
BECOME NECESSARY. A DRAFT OF THAT LETTER IS ENCLOSED.
STREET NAMES:
1. THE BASE NAMES SKIPPERS CANNON AND CARRETERA WERE NOT
APPROVED BY THE RICHMOND REGIONAL PLANNING DISTRICT
COMMISSION (RRPDC). PLEASE SELECT OTHER APPROVED BASE NAMES
OR PROVIDE A COMPLETE STREET NAME CLEARINGHOUSE REQUEST
WHICH HAS BEEN REVIEWED AND APPROVED BY THE RRPDC FOR THESE
BASE NAMES.
2. THERE ARE TWO STREETS LABELED AS TWO RINGS DRIVE ON SHEET
7. IT IS RECOMMENDED TO RENAME THE CUL-DE-SAC SERVING LOTS
317-325 TO TWO RINGS COURT OR SIMILAR. PLEASE REVISE.
CBPA/USCW:
1. ON THE WORKSHEET A FOR THE PART IIC POST-DEVELOPMENT
LOCATING CALCULATIONS FOR EACH POD, THE AVERAGE LOT SIZE
SHOULD BE CALCULATED USING THE AREA IN THE LOTS AND OPEN
SPACE DIVIDED BY THE TOTAL NUMBER OF LOTS. THIS NUMBER
SHOULD BE USED TO DETERMINE THE FPOST FOR THE ENTIRE SITE
MINUS THE NON-FRONTAGE RIGHT OF WAYS. THE AREA OF THE
NON-FRONTAGE RIGHT OF WAY SHOULD BE CALCULATED SEPARATE AND
ADDED TO THE TOTAL LPOST FOR THE REMAINDER OF THE SITE.
2. THERE APPEARS TO BE A DISCREPANCY IN THE DIMENSIONS USED
TO CALCULATE THE TOTAL IMPERVIOUS AREAS FOR THE FOOTPRINT
BREAKDOWN USED FOR THE R-15 LOTS IN THE UPPER LEFT OF SHEET
1.
3. THE HATCHING FOR THE LOT AREA IN 'C' SOILS IS NOT
CONSISTENT WITH THE LEGEND. PLEASE REVISE THE LEGEND
ACCORDINGLY.
4. PLEASE IDENTIFY WHAT THE HATCHING NEAR BMP-3F REPRESENTS.
5. WHEN SUMMING THE TOTAL PROJECT AREA FROM PODS 1 AND 3-5,
THE ACREAGE IS 476.84 VERSUS 488.58 AS SHOWN ON THE SHEET 1
OF THE PRELIMINARY PLAT. PLEASE ADDRESS.
6. THE SUMMATION OF THE ACREAGES FOR ROW, LOTS, AND OPEN
SPACE USED IN THE PART IIC WORKSHEETS FOR PODS 1 AND 3-5, AS
WELL AS THE PART IIB SITE INFORMATION SHEETS, DOES NOT MATCH
THE TOTAL ACREAGE LISTED ON THE SHEET 1 OF THE PRELIMINARY
PLAT. PLEASE ADDRESS.
7. IN POD#3, THE SUMMATION OF THE ACREAGE OF MANAGED TURF
LISTED IN THE DRAINAGE AREA TABS IS 61.12 ACRES; HOWEVER,
52.02 ACRES IS LISTED ON SITE INFORMATION SHEET. PLEASE
REVISE.
8. IN POD #3, BMPS 3A, 3C, 3D, 3E, AND 3F, AREAS OF
FOREST/OPEN SPACE ARE USED IN THE CALCULATIONS. IT IS
UNCLEAR WHICH AREAS OF OPEN SPACE ARE BEING USED FOR WATER
QUALITY COMPLIANCE. PLEASE SHOW AND HATCH THE AREAS OF
FOREST/OPEN SPACED USED ON THE PRELIMINARY CBPA COMPLIANCE
PLAN. PLEASE NOTE THE PROPOSED WET PONDS DO NOT QUALIFY AS A
FOREST/OPEN SPACE AREA.
9. BMPS 3M, 3N, AND 3O ARE SHOWN AS LEVEL 2 BIORETENTION
FACILITIES; HOWEVER, WETLANDS ARE SHOWN IN THESE LOCATIONS.
DELINEATED WETLANDS DO NOT MEET THE SPECIFICATIONS FOR A
BIORETENTION. IF IMPACTS TO THESE WETLANDS ARE PROPOSED TO
CONSTRUCT THE BIORETENTIONS, PLEASE SHOW THEM AS IMPACTED ON
BOTH THE PRELIMINARY CBPA COMPLIANCE PLAN AND THE
PRELIMINARY PLAT.
10. IN POD #3, THERE ARE BIORETENTIONS LISTED IN THE
CALCULATIONS FOR DRAINAGE AREAS A, D, F, AND J; HOWEVER,
THEY ARE NOT SHOWN AND/OR LABELED ON THE PLANS. PLEASE
CLEARLY SHOW AND LABEL ALL PROPOSED STORMWATER MANAGEMENT
FACILITIES ON BOTH THE PRELIMINARY CBPA COMPLIANCE PLAN AND
THE PRELIMINARY PLAT.
11. PLEASE VERIFY ALL LOTS IDENTIFIED FOR ROOFTOP DISCONNECT
CAN BE GRADED AS INTEND AND WILL DRAIN TO THE PROPOSED
DOWNSTREAM BMP.
12. ALL OF THE ACREAGE LISTED IN BMP-3P FOR SHEET FLOW TO
CONSERVATION AREA IS SHOWN IN THE C/D SOILS BMP; HOWEVER,
MANY OF THE LOTS ARE WITHIN B SOILS. PLEASE REVISE.
13. PLEASE VERIFY ALL OF THE LOTS IDENTIFIED FOR SHEET FLOW
TO CONSERVATION AREA WILL BE ABLE TO BE GRADED TO MEET ALL
OF THE REQUIRED SPECIFICATIONS OF VA DEQ STORMWATER DESIGN
SPECIFICATION 2 FOR SHEET FLOW TO OPEN SPACE.
14. IN POD #4, BMPS 4B, 4C, 4D, AND 4E, AREAS OF FOREST/OPEN
SPACE ARE USED IN THE CALCULATIONS. IT IS UNCLEAR WHICH
AREAS OF OPEN SPACE ARE BEING USED FOR WATER QUALITY
COMPLIANCE. PLEASE SHOW AND HATCH THE AREAS OF FOREST/OPEN
SPACED USED ON THE PRELIMINARY CBPA COMPLIANCE PLAN. PLEASE
NOTE THE PROPOSED WET PONDS DO NOT QUALIFY AS A FOREST/OPEN
SPACE AREA.
15. IN POD #5, BMPS 5A AND 5C, AREAS OF FOREST/OPEN SPACE
ARE USED IN THE CALCULATIONS. IT IS UNCLEAR WHICH AREAS OF
OPEN SPACE ARE BEING USED FOR WATER QUALITY COMPLIANCE.
PLEASE SHOW AND HATCH THE AREAS OF FOREST/OPEN SPACED USED
ON THE PRELIMINARY CBPA COMPLIANCE PLAN. PLEASE NOTE THE
PROPOSED WET PONDS DO NOT QUALIFY AS A FOREST/OPEN SPACE
AREA.
16. IN POD #5, THE ACREAGES OF MANAGED TURF AND IMPERVIOUS
COVER LISTED IN THE SHEET FLOW TO OPEN SPACE BMP ROWS FOR
BMP-5D DO NOT MATCH THE DRAINAGE AREA LAND COVER
INFORMATION. PLEASE REVISE.
17. PLEASE REVIEW THE DRAINAGE AREA LAND COVER TABLES AND
DRAINAGE AREA SUMMARY TABLES IN ALL PODS FOR DISCREPANCIES
CORRECTING AS APPLICABLE.
18. PLEASE BE REMINDED THAT THE LIMITS OF THE PROPOSED
SWM/BMPS MUST REMAIN OUTSIDE THE RPAS EXCLUDING THE OUTFALL
IMPROVEMENT.
TENTATIVE CONDITIONS COULD INCLUDE, BUT NOT BE LIMITED TO,
THE FOLLOWING:
1. THE BMP'S INITIAL, PREDOMINANT WATER-QUALITY FUNCTION
SHALL BE SEDIMENT CONTROL; THE IMPLEMENTATION OF WHICH SHALL
BE COORDINATED WITH THE FIRST PORTION OF THE PROJECT THAT
DRAINS IN ITS DIRECTION.
2. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS SHOWN ON THE
TENTATIVE SHALL BE INCLUDED IN THE ROAD AND DRAINAGE PLANS
THAT MUST BE APPROVED BY BOTH VDOT AND THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROAD RIGHT-OF-WAY SHALL BE WIDE
ENOUGH TO ENCOMPASS THE PEDESTRIAN-ACCESS FACILITIES IF THE
SIDEWALKS MEET STATE CRITERIA.
3. A DAM-FAILURE ANALYSIS SHALL, AT A MINIMUM, BE PERFORMED
BASED ON AN OVER-TOPPING BREACH OF THE DAM EMBANKMENT DURING
A 100 YEAR STORM EVENT. CRITERIA PER THE VIRGINIA DAM
SAFETY ACT WILL TAKE PRECEDENCE. EXISTING OR PROPOSED HOMES
SHALL BE OUTSIDE OF THE DAM FAILURE INUNDATION LIMITS.
4. THE DESIGN AND CONSTRUCTION OF THE SWM/BMPS THAT WILL BE
COUNTY MAINTAINED FACILITIES SHALL BE SUBJECT TO DOCUMENTED
GEOTECHNICAL APPROVAL. THE SERVICES THAT MUST BE PROVIDED
BY THE GEOTECHNICAL ENGINEER SHALL INCLUDE FULL-TIME
GEOTECHNICAL INSPECTION PAID FOR BY THE DEVELOPER. THAT
FULL-TIME INSPECTION SHALL INCLUDE BUT NOT BE LIMITED TO THE
FOLLOWING:
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS NECESSARY
TO FACILITATE THE APPROVAL PROCESS OF THE INDEPENDENT
GEOTECHNICAL CONSULTANT. OBSERVATION, TESTING AND
DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED STRUCTURAL FILL
FOR EARTH DAM CONSTRUCTION.
II. THE CUT-OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE, AND CONCRETE CHUTE SPILLWAY SUB-GRADES AS
APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS PRESENT AT
BEARING GRADE TO VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
5. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL ON THE DAM WILL BE
FURNISHED PRIOR TO THE ISSUANCE OF THE LAND DISTURBANCE
PERMIT.
6. AS DIRECTED BY ENVIRONMENTAL ENGINEERING, ENGINEERED
FILLING, GRADING, AND DRAINAGE IMPROVEMENTS SHALL BE
INCLUDED IN THE CONSTRUCTION PLANS FOR THOSE LOTS IMPACTED
BY THE CONCENTRATION OF STORMWATER RUNOFF. THE AFFECTED LOTS
SHALL BE ANNOTATED WITH AN NBP.
7. THE SUB-DIVIDER SHALL POST SIGNS DEMARKING THE LIMITS OF
THE RPA AREA SO BUILDERS AND HOMEOWNERS MAY BE INFORMED AS
TO THE LIMITATIONS IMPOSED ON THESE AREAS. SPECIFIC PLANS
FOR THE EXACT NUMBER AND PLACEMENT OF THE SIGNS SHALL BE
APPROVED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT.
8. LANGUAGE SHALL BE INCORPORATED INTO THE HOMEOWNERS'
ASSOCIATION COVENANTS ADVISING HOMEOWNERS WITH AN RPA ON OR
ADJACENT TO THEIR PROPERTY STATING THAT RPAS ARE TO REMAIN
IN THEIR NATURALLY VEGETATED STATE AND THAT THE COUNTY'S
CHESAPEAKE BAY PRESERVATION ORDINANCE REQUIREMENTS RELATING
TO RPAS READS AS FOLLOWS: "A VEGETATED CONSERVATION AREA
THAT RETARDS RUNOFF, PREVENTS EROSION, AND FILTERS NON-POINT
SOURCE POLLUTION FROM RUNOFF SHALL BE RETAINED IF PRESENT
AND SHALL BE ESTABLISHED WHERE IT DOES NOT EXIST." SECTION
19-232 OF CHESTERFIELD COUNTY CODE STATES, "IF A HOMEOWNER
WISHES TO MODIFY THE RPA, A PLAN MUST BE SUBMITTED TO THE
ENVIRONMENTAL ENGINEERING DEPARTMENT FOR THEIR APPROVAL
PRIOR TO THE COMMENCEMENT OF ANY LAND CLEARING ACTIVITY."
9. PRIOR TO RECORDATION, A COPY OF THE COVENANTS AND
ARTICLES OF INCORPORATION OF THE HOMEOWNERS' ASSOCIATION
SHALL BE PROVIDED TO THE ENVIRONMENTAL ENGINEERING
DEPARTMENT FOR APPROVAL. IN ADDITION TO LANGUAGE PERTAINING
TO THE RPA, THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL
DETERMINE WHETHER THE SUBDIVISION HAS BEEN PROVIDED WITH THE
INFORMATION TO DEVELOP AND IMPLEMENT A FERTILIZATION/LAWN
CARE PROGRAM TO MINIMIZE PHOSPHOROUS RUNOFF FROM MAGNOLIA
GREEN. PER ZONING CONDITION E.11 OF CASE 89SN0343. THE
REQUIREMENTS OF THE PROGRAM SHALL BECOME A PART OF THE
COVENANTS FOR THE PROJECT AFFECTING ALL PROPERTIES WITHIN
THE DEVELOPMENT.
10. SPECIAL UPPER SWIFT CREEK WATERSHED END TREATMENT AS
DIRECTED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL BE
PLACED IN THE VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS. THE DI-7 END TREATMENTS SHALL BE EXCLUDED
FROM WITHIN THE LIMITS OF LOTS.
11. THE POINTS OF PERENNIAL FLOW ALONG WITH THEIR GPS
COORDINATE VALUES WILL BE SHOWN ON THE CONSTRUCTION PLAN AND
RECORD PLAT.
12. UNLESS OTHERWISE APPROVED, THE SPILLWAY STRUCTURE FOR
WET PONDS SHALL BE A CONCRETE WEIR.
13. PRIOR TO CONSTRUCTION PLAN APPROVAL, DOCUMENTATION MUST
BE PROVIDED TO ENVIRONMENTAL ENGINEERING THAT CERTAIN
PROPERTY OWNERS HAVE BEEN NOTIFIED OF THE PROPOSED
CONSTRUCTION ACTIVITY.
14. ENVIRONMENTAL ENGINEERING MAY IMPOSE MORE RIGOROUS
EROSION AND SEDIMENT CONTROL MEASURES THAN THAT WHICH IS
PROVIDED BY THE MINIMUM STANDARDS FOUND IN THE E&SC
HANDBOOK.
NOTES:
AS PER ZONING CONDITION E10 OF CASE 89SN0343, "THE DEVELOPER
SHALL INSTALL AT THE TIME OF INSTALLATION OF THE EROSION AND
SEDIMENT CONTROL FACILITIES, THE LARGEST VOLUME REQUIRED AS
DICTATED BY EITHER EROSION CONTROL, WATER QUALITY, OR WATER
QUANTITY DESIGN STANDARDS".
AS PER SECTION 19-57 ITEM (D), A FEMA LETTER OF MAP REVISION
IS REQUIRED WHEN DEVELOPMENT OCCURRING IN ZONE AE WITHOUT A
DESIGNATED FLOODWAY WILL CAUSE A RISE OF MORE THAN ONE FOOT
IN THE BASE FLOOD ELEVATION. THIS WOULD APPLY TO THE BOSTON
POND ROAD CROSSING OF HORSEPEN CREEK.
THE LIMITS OF ALL PROPOSED STORMWATER MANAGEMENT FACILITIES
MUST REMAIN OUTSIDE THE RESOURCE PROTECTION AREA, EXCLUDING
THE OUTFALL IMPROVEMENT.
THE 2013 VIRGINIA RUNOFF REDUCTION METHOD SPREADSHEETS
(VRRM) WERE USED TO PROVIDE THE PRELIMINARY CBPA COMPLIANCE
CALCULATIONS. THESE SPREADSHEETS ARE STILL DRAFT AND ARE
NOT ACCEPTED BY THE DEPARTMENT OF ENVIRONMENTAL ENGINEERING.
PLEASE USE THE STANDARD 2011VRRM SPREADSHEETS OR OTHER
VERSIONS ACCEPTED BY THE DEPARTMENT OF ENVIRONMENTAL
ENGINEERING FOR CONSTRUCTION PLAN APPROVAL.
PLEASE PROVIDE A WRITTEN RESPONSE IN THE MARGIN OF A COPY OF
THESE COMMENTS WITH YOUR PRELIMINARY PLAT REVISIONS.
(PLEASE PLACE ON DEVELOPER LETTERHEAD)
(DATE)
KIRKLAND A. TURNER, DIRECTOR
CHESTERFIELD COUNTY PLANNING DEPARTMENT
P. O. BOX 40
CHESTERFIELD, VIRGINIA 23832
RE: ENTRANCE EMBELLISHMENTS (____________ TENTATIVE)
DEAR MR. TURNER:
AS DEVELOPER OF THE PROPOSED __________________ SUBDIVISION,
I AM AWARE THAT THE FOLLOWING NOTE IS NOW REQUIRED NOT ONLY
ON TENTATIVES BUT ALSO ON RECORD PLATS.
"NO STRUCTURE EMBELLISHMENTS WILL BE ALLOWED ON VDOT
RIGHT-OF-WAY WITHOUT THE COMMITMENT OF, OR THE ISSUANCE OF,
A VDOT LAND USE PERMIT. WITHIN THE 10' CLEAR ZONE (MEASURED
FROM THE EDGE OF THE ROADWAY'S PAVEMENT OUT
10'), NO STRUCTURE EMBELLISHMENT WILL BE PERMITTED THAT IS
CLOSER THAN 3' FROM THE EDGE OF PAVEMENT OF THE PUBLIC
STREET OR HIGHER THAN 6" ABOVE THE SURFACE OF THE DRIVE."
I WILL DO ALL POSSIBLE TO PROVIDE THE CORRECT INFORMATION
FOR BUILDERS OR CITIZENS CONSTRUCTING ENTRANCE
EMBELLISHMENTS. I AM ALSO AWARE THAT, PRIOR TO STATE
ACCEPTANCE OF THE ROADS, I AM RESPONSIBLE FOR REMOVING
EMBELLISHMENTS THAT DO NOT MEET STATE STANDARDS.
SINCERELY,
DEVELOPER NAME (PRINTED)
DEVELOPER SIGNATURE
(DATE)
*******************************************
PLAN NAME: UPPER MAGNOLIA GREEN PHASE 1
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: REBECCAH WARD / 748-1028
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE: 8/14/15
LATEST SUBMISSION DATE: 12/20/16
REVIEW DATE: 01/26/17
SUBMITTAL NUMBER: 3
STATUS: REVISION REQUESTED
TABLE REVIEW: NO
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS
THE FOLLOWING PRELIMINARY COMMENTS AND OBSERVATIONS
PERTAINING TO THE ABOVE REFERENCED PRELIMINARY PLAT DATED
8/14/15, RECEIVED BY THE PLANNING DEPARTMENT ON 10/28/16 AND
BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT ON 12/29/16.
PER CONFIRMATION WITH THE DEPARTMENT OF ENVIRONMENTAL
ENGINEERING-WATER QUALITY SECTION, THE POINT OF RPA ORIGIN
IN THE OPEN SPACE BEHIND LOT 485 ON SHEET 9 REPRESENTS A
WETLAND BREAK POINT RATHER THAN A POINT OF RPA ORIGIN.
PLEASE REVISE THE CALLOUT FROM "POINT OF RPA ORIGIN" TO
"WETLAND BREAK POINT".
THE 50-FOOT VEGETATED PERIMETER YARD AND BMP EASEMENT MUST
BE WITHIN THE LIMITS OF THE DEVELOPMENT. PLEASE REVISE
BMP-3E SUCH THAT THE 50-FOOT VEGETATED PERIMETER YARD AND
BMP EASEMENT DO NOT EXTEND OFF THE PROPERTY AND ARE
CONTAINED WITHIN THE LIMITS OF THE DEVELOPMENT.
PLEASE IDENTIFY WHAT THE DASHED LINE BETWEEN THE BMP
EASEMENT AND THE VEGETATED PERIMETER YARD AROUND BMP-1A
REPRESENTS.
THE BMP EASEMENTS SHOWN AROUND BMPS-3F, 4A, 4D, AND 5A
ENCROACH INTO EITHER THE RPA AND/OR WETLANDS. PLEASE REVISE
THESE FACILITIES SO THAT NO ENVIRONMENTAL FEATURES WILL BE
IMPACTED WITH THE BMP AND EASEMENT.
THE BIORETENTIONS PROPOSED WITH AREAS 3A AND 5B MUST BE
INCLUDED WITHIN THE BMP EASEMENT. PLEASE REVISE
ACCORDINGLY.
PRIOR TO APPROVAL OF THE UPPER MAGNOLIA GREEN PHASE 1
PRELIMINARY PLAT, THE DEVELOPER WILL SUBMIT A LETTER OF
ACKNOWLEDGEMENT OF THE CONDITION REGARDING MASONRY
EMBELLISHMENTS WITHIN THE VDOT CLEAR ZONE. THIS
ACKNOWLEDGEMENT IS THE RESPONSIBILITY OF THE DEVELOPER AND
NOT HIS REPRESENTATIVE AS HE IS ULTIMATELY RESPONSIBLE FOR
REMOVAL OF HEADWALLS IN ALL NEW SUBDIVISIONS SHOULD IT
BECOME NECESSARY. A DRAFT OF THAT LETTER IS ENCLOSED.
CBPA/USCW:
1. ON THE WORKSHEET A FOR THE PART IIC POST-DEVELOPMENT
LOCATING CALCULATIONS FOR EACH POD, PLEASE PROVIDE BASIC
SUPPORTING INFORMATION ON HOW THE NON-FRONTAGE RIGHT-OF-WAY
IMPERVIOUS PERCENTAGES WERE CALCULATED. THE PERCENTAGES
PROVIDED IN THE CALCULATIONS SEEM TO BE LOW.
2. PLEASE LABEL AREA A IN POD #3 ON SHEET 1 OF THE
PRELIMINARY CBPA COMPLIANCE PLAN.
3. IT APPEARS AS IF SEVERAL OF THE LOTS WILL SHEET FLOW TO
THE ROADWAY PRIOR TO ENTERING THE WET POND AND/OR
BIORETENTION, WHICH IS NOT CONSISTENT WITH THE STORMWATER
DESIGN SPECIFICATION FOR ROOFTOP DISCONNECTION. PLEASE
CLARIFY.
4. THE DRAINAGE AREAS TO THE BIORETENTIONS IN AREAS D AND F
IN POD #3 EXCEED THE MAXIMUM CONTRIBUTING DRAINAGE AREA
LISTED IN THE STORMWATER DESIGN SPECIFICATION FOR
BIORETENTIONS. PLEASE REVISE.
5. THE DRAINAGE AREAS TO THE BIORETENTIONS IN AREAS B AND C
IN POD #5 EXCEED THE MAXIMUM CONTRIBUTING DRAINAGE AREA
LISTED IN THE STORMWATER DESIGN SPECIFICATION FOR
BIORETENTIONS. PLEASE REVISE.
6. PLEASE BE REMINDED THAT THE LIMITS OF THE PROPOSED
SWM/BMPS AND ASSOCIATED EASEMENTS MUST REMAIN OUTSIDE THE
RPAS EXCLUDING THE OUTFALL IMPROVEMENT.
TENTATIVE CONDITIONS COULD INCLUDE, BUT NOT BE LIMITED TO,
THE FOLLOWING:
1. THE BMP'S INITIAL, PREDOMINANT WATER-QUALITY FUNCTION
SHALL BE SEDIMENT CONTROL; THE IMPLEMENTATION OF WHICH SHALL
BE COORDINATED WITH THE FIRST PORTION OF THE PROJECT THAT
DRAINS IN ITS DIRECTION.
2. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS SHOWN ON THE
TENTATIVE SHALL BE INCLUDED IN THE ROAD AND DRAINAGE PLANS
THAT MUST BE APPROVED BY BOTH VDOT AND THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROAD RIGHT-OF-WAY SHALL BE WIDE
ENOUGH TO ENCOMPASS THE PEDESTRIAN-ACCESS FACILITIES IF THE
SIDEWALKS MEET STATE CRITERIA.
3. A DAM-FAILURE ANALYSIS SHALL, AT A MINIMUM, BE PERFORMED
BASED ON AN OVER-TOPPING BREACH OF THE DAM EMBANKMENT DURING
A 100-YEAR STORM EVENT. CRITERIA PER THE VIRGINIA DAM
SAFETY ACT WILL TAKE PRECEDENCE. EXISTING OR PROPOSED HOMES
SHALL BE OUTSIDE OF THE DAM FAILURE INUNDATION LIMITS.
4. THE DESIGN AND CONSTRUCTION OF THE SWM/BMPS THAT WILL BE
COUNTY MAINTAINED FACILITIES SHALL BE SUBJECT TO DOCUMENTED
GEOTECHNICAL APPROVAL. THE SERVICES THAT MUST BE PROVIDED
BY THE GEOTECHNICAL ENGINEER SHALL INCLUDE FULL-TIME
GEOTECHNICAL INSPECTION PAID FOR BY THE DEVELOPER. THAT
FULL-TIME INSPECTION SHALL INCLUDE BUT NOT BE LIMITED TO THE
FOLLOWING:
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS NECESSARY
TO FACILITATE THE APPROVAL PROCESS OF THE INDEPENDENT
GEOTECHNICAL CONSULTANT. OBSERVATION, TESTING AND
DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED STRUCTURAL FILL
FOR EARTH DAM CONSTRUCTION.
II. THE CUT-OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE, AND CONCRETE CHUTE SPILLWAY SUB-GRADES AS
APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS PRESENT AT
BEARING GRADE TO VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
5. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL ON THE DAM WILL BE
FURNISHED PRIOR TO THE ISSUANCE OF THE LAND DISTURBANCE
PERMIT.
6. AS DIRECTED BY ENVIRONMENTAL ENGINEERING, ENGINEERED
FILLING, GRADING, AND DRAINAGE IMPROVEMENTS SHALL BE
INCLUDED IN THE CONSTRUCTION PLANS FOR THOSE LOTS IMPACTED
BY THE CONCENTRATION OF STORMWATER RUNOFF. THE AFFECTED LOTS
SHALL BE ANNOTATED WITH AN NBP.
7. THE SUB-DIVIDER SHALL POST SIGNS DEMARKING THE LIMITS OF
THE RPA AREA SO BUILDERS AND HOMEOWNERS MAY BE INFORMED AS
TO THE LIMITATIONS IMPOSED ON THESE AREAS. SPECIFIC PLANS
FOR THE EXACT NUMBER AND PLACEMENT OF THE SIGNS SHALL BE
APPROVED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT.
8. LANGUAGE SHALL BE INCORPORATED INTO THE HOMEOWNERS'
ASSOCIATION COVENANTS ADVISING HOMEOWNERS WITH AN RPA ON OR
ADJACENT TO THEIR PROPERTY STATING THAT RPAS ARE TO REMAIN
IN THEIR NATURALLY VEGETATED STATE AND THAT THE COUNTY'S
CHESAPEAKE BAY PRESERVATION ORDINANCE REQUIREMENTS RELATING
TO RPAS READS AS FOLLOWS: "A VEGETATED CONSERVATION AREA
THAT RETARDS RUNOFF, PREVENTS EROSION, AND FILTERS NON-POINT
SOURCE POLLUTION FROM RUNOFF SHALL BE RETAINED IF PRESENT
AND SHALL BE ESTABLISHED WHERE IT DOES NOT EXIST." SECTION
19-232 OF CHESTERFIELD COUNTY CODE STATES, "IF A HOMEOWNER
WISHES TO MODIFY THE RPA, A PLAN MUST BE SUBMITTED TO THE
ENVIRONMENTAL ENGINEERING DEPARTMENT FOR THEIR APPROVAL
PRIOR TO THE COMMENCEMENT OF ANY LAND CLEARING ACTIVITY."
9. PRIOR TO RECORDATION, A COPY OF THE COVENANTS AND
ARTICLES OF INCORPORATION OF THE HOMEOWNERS' ASSOCIATION
SHALL BE PROVIDED TO THE ENVIRONMENTAL ENGINEERING
DEPARTMENT FOR APPROVAL. IN ADDITION TO LANGUAGE PERTAINING
TO THE RPA, THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL
DETERMINE WHETHER THE SUBDIVISION HAS BEEN PROVIDED WITH THE
INFORMATION TO DEVELOP AND IMPLEMENT A FERTILIZATION/LAWN
CARE PROGRAM TO MINIMIZE PHOSPHOROUS RUNOFF FROM MAGNOLIA
GREEN. PER ZONING CONDITION E.11 OF CASE 89SN0343. THE
REQUIREMENTS OF THE PROGRAM SHALL BECOME A PART OF THE
COVENANTS FOR THE PROJECT AFFECTING ALL PROPERTIES WITHIN
THE DEVELOPMENT.
10. SPECIAL UPPER SWIFT CREEK WATERSHED END TREATMENT AS
DIRECTED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL BE
PLACED IN THE VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS. THE DI-7 END TREATMENTS SHALL BE EXCLUDED
FROM WITHIN THE LIMITS OF LOTS.
11. THE POINTS OF PERENNIAL FLOW ALONG WITH THEIR GPS
COORDINATE VALUES WILL BE SHOWN ON THE CONSTRUCTION PLAN AND
RECORD PLAT.
12. UNLESS OTHERWISE APPROVED, THE SPILLWAY STRUCTURE FOR
WET PONDS SHALL BE A CONCRETE WEIR.
13. PRIOR TO CONSTRUCTION PLAN APPROVAL, DOCUMENTATION MUST
BE PROVIDED TO ENVIRONMENTAL ENGINEERING THAT CERTAIN
PROPERTY OWNERS HAVE BEEN NOTIFIED OF THE PROPOSED
CONSTRUCTION ACTIVITY.
14. ENVIRONMENTAL ENGINEERING MAY IMPOSE MORE RIGOROUS
EROSION AND SEDIMENT CONTROL MEASURES THAN THAT WHICH IS
PROVIDED BY THE MINIMUM STANDARDS FOUND IN THE E&SC
HANDBOOK.
NOTES:
AS PER ZONING CONDITION E10 OF CASE 89SN0343, "THE DEVELOPER
SHALL INSTALL AT THE TIME OF INSTALLATION OF THE EROSION AND
SEDIMENT CONTROL FACILITIES, THE LARGEST VOLUME REQUIRED AS
DICTATED BY EITHER EROSION CONTROL, WATER QUALITY, OR WATER
QUANTITY DESIGN STANDARDS".
AS PER SECTION 19-57 ITEM (D), A FEMA LETTER OF MAP REVISION
IS REQUIRED WHEN DEVELOPMENT OCCURRING IN ZONE AE WITHOUT A
DESIGNATED FLOODWAY WILL CAUSE A RISE OF MORE THAN ONE FOOT
IN THE BASE FLOOD ELEVATION. THIS WOULD APPLY TO THE BOSTON
POND ROAD CROSSING OF HORSEPEN CREEK.
THE LIMITS OF ALL PROPOSED STORMWATER MANAGEMENT FACILITIES
MUST REMAIN OUTSIDE THE RESOURCE PROTECTION AREA, EXCLUDING
THE OUTFALL IMPROVEMENT.
THE 2013 VIRGINIA RUNOFF REDUCTION METHOD SPREADSHEETS
(VRRM) WERE USED TO PROVIDE THE PRELIMINARY CBPA COMPLIANCE
CALCULATIONS. THESE SPREADSHEETS ARE STILL DRAFT AND ARE
NOT ACCEPTED BY THE DEPARTMENT OF ENVIRONMENTAL ENGINEERING.
PLEASE USE THE STANDARD 2011VRRM SPREADSHEETS OR OTHER
VERSIONS ACCEPTED BY THE DEPARTMENT OF ENVIRONMENTAL
ENGINEERING FOR CONSTRUCTION PLAN APPROVAL.
PRIOR TO APPROVAL OF THE CONSTRUCTION PLANS, THE FINAL
ALIGNMENT OF THE SANITARY SEWER LINES AND EASEMENTS ADJACENT
TO PROPOSED SWM/BMPS MUST BE APPROVED BY BOTH THE DEPARTMENT
OF ENVIRONMENTAL ENGINEERING AND THE DEPARTMENT OF PUBLIC
UTILITIES.
PLEASE PROVIDE A WRITTEN RESPONSE IN THE MARGIN OF A COPY OF
THESE COMMENTS WITH YOUR PRELIMINARY PLAT REVISIONS.
(PLEASE PLACE ON DEVELOPER LETTERHEAD)
(DATE)
KIRKLAND A. TURNER, DIRECTOR
CHESTERFIELD COUNTY PLANNING DEPARTMENT
P. O. BOX 40
CHESTERFIELD, VIRGINIA 23832
RE: ENTRANCE EMBELLISHMENTS (____________ TENTATIVE)
DEAR MR. TURNER:
AS DEVELOPER OF THE PROPOSED __________________ SUBDIVISION,
I AM AWARE THAT THE FOLLOWING NOTE IS NOW REQUIRED NOT ONLY
ON TENTATIVES BUT ALSO ON RECORD PLATS.
"NO STRUCTURE EMBELLISHMENTS WILL BE ALLOWED ON VDOT
RIGHT-OF-WAY WITHOUT THE COMMITMENT OF, OR THE ISSUANCE OF,
A VDOT LAND USE PERMIT. WITHIN THE 10' CLEAR ZONE (MEASURED
FROM THE EDGE OF THE ROADWAY'S PAVEMENT OUT
10'), NO STRUCTURE EMBELLISHMENT WILL BE PERMITTED THAT IS
CLOSER THAN 3' FROM THE EDGE OF PAVEMENT OF THE PUBLIC
STREET OR HIGHER THAN 6" ABOVE THE SURFACE OF THE DRIVE."
I WILL DO ALL POSSIBLE TO PROVIDE THE CORRECT INFORMATION
FOR BUILDERS OR CITIZENS CONSTRUCTING ENTRANCE
EMBELLISHMENTS. I AM ALSO AWARE THAT, PRIOR TO STATE
ACCEPTANCE OF THE ROADS, I AM RESPONSIBLE FOR REMOVING
EMBELLISHMENTS THAT DO NOT MEET STATE STANDARDS.
SINCERELY,
DEVELOPER NAME (PRINTED)
DEVELOPER SIGNATURE
(DATE)
*******************************************
PLAN NAME: UPPER MAGNOLIA GREEN PHASE 1
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: REBECCAH WARD / 748-1028
PLAN NUMBER: 16TS0144
ORIGINAL PLAN DATE: 8/14/15
LATEST SUBMISSION DATE: 02/15/17
REVIEW DATE: 04/20/17
SUBMITTAL NUMBER: 4
STATUS: APPROVED
TENTATIVE CONDITIONS INCLUDE THE FOLLOWING:
1. THE BMP'S INITIAL, PREDOMINANT WATER-QUALITY FUNCTION
SHALL BE SEDIMENT CONTROL; THE IMPLEMENTATION OF WHICH SHALL
BE COORDINATED WITH THE FIRST PORTION OF THE PROJECT THAT
DRAINS IN ITS DIRECTION.
2. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS SHOWN ON THE
TENTATIVE SHALL BE INCLUDED IN THE ROAD AND DRAINAGE PLANS
THAT MUST BE APPROVED BY BOTH VDOT AND THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROAD RIGHT-OF-WAY SHALL BE WIDE
ENOUGH TO ENCOMPASS THE PEDESTRIAN-ACCESS FACILITIES IF THE
SIDEWALKS MEET STATE CRITERIA.
3. A DAM-FAILURE ANALYSIS SHALL, AT A MINIMUM, BE PERFORMED
BASED ON AN OVER-TOPPING BREACH OF THE DAM EMBANKMENT DURING
A 100-YEAR STORM EVENT. CRITERIA PER THE VIRGINIA DAM
SAFETY ACT WILL TAKE PRECEDENCE. EXISTING OR PROPOSED HOMES
SHALL BE OUTSIDE OF THE DAM FAILURE INUNDATION LIMITS.
4. THE DESIGN AND CONSTRUCTION OF THE SWM/BMPS THAT WILL BE
COUNTY MAINTAINED FACILITIES SHALL BE SUBJECT TO DOCUMENTED
GEOTECHNICAL APPROVAL. THE SERVICES THAT MUST BE PROVIDED
BY THE GEOTECHNICAL ENGINEER SHALL INCLUDE FULL-TIME
GEOTECHNICAL INSPECTION PAID FOR BY THE DEVELOPER. THAT
FULL-TIME INSPECTION SHALL INCLUDE BUT NOT BE LIMITED TO THE
FOLLOWING:
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS NECESSARY
TO FACILITATE THE APPROVAL PROCESS OF THE INDEPENDENT
GEOTECHNICAL CONSULTANT. OBSERVATION, TESTING AND
DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED STRUCTURAL FILL
FOR EARTH DAM CONSTRUCTION.
II. THE CUT-OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE, AND CONCRETE CHUTE SPILLWAY SUB-GRADES AS
APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS PRESENT AT
BEARING GRADE TO VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
5. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL ON THE DAM WILL BE
FURNISHED PRIOR TO THE ISSUANCE OF THE LAND DISTURBANCE
PERMIT.
6. AS DIRECTED BY ENVIRONMENTAL ENGINEERING, ENGINEERED
FILLING, GRADING, AND DRAINAGE IMPROVEMENTS SHALL BE
INCLUDED IN THE CONSTRUCTION PLANS FOR THOSE LOTS IMPACTED
BY THE CONCENTRATION OF STORMWATER RUNOFF. THE AFFECTED LOTS
SHALL BE ANNOTATED WITH AN NBP.
7. THE SUB-DIVIDER SHALL POST SIGNS DEMARKING THE LIMITS OF
THE RPA AREA SO BUILDERS AND HOMEOWNERS MAY BE INFORMED AS
TO THE LIMITATIONS IMPOSED ON THESE AREAS. SPECIFIC PLANS
FOR THE EXACT NUMBER AND PLACEMENT OF THE SIGNS SHALL BE
APPROVED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT.
8. LANGUAGE SHALL BE INCORPORATED INTO THE HOMEOWNERS'
ASSOCIATION COVENANTS ADVISING HOMEOWNERS WITH AN RPA ON OR
ADJACENT TO THEIR PROPERTY STATING THAT RPAS ARE TO REMAIN
IN THEIR NATURALLY VEGETATED STATE AND THAT THE COUNTY'S
CHESAPEAKE BAY PRESERVATION ORDINANCE REQUIREMENTS RELATING
TO RPAS READS AS FOLLOWS: "A VEGETATED CONSERVATION AREA
THAT RETARDS RUNOFF, PREVENTS EROSION, AND FILTERS NON-POINT
SOURCE POLLUTION FROM RUNOFF SHALL BE RETAINED IF PRESENT
AND SHALL BE ESTABLISHED WHERE IT DOES NOT EXIST." SECTION
19-232 OF CHESTERFIELD COUNTY CODE STATES, "IF A HOMEOWNER
WISHES TO MODIFY THE RPA, A PLAN MUST BE SUBMITTED TO THE
ENVIRONMENTAL ENGINEERING DEPARTMENT FOR THEIR APPROVAL
PRIOR TO THE COMMENCEMENT OF ANY LAND CLEARING ACTIVITY."
9. PRIOR TO RECORDATION, A COPY OF THE COVENANTS AND
ARTICLES OF INCORPORATION OF THE HOMEOWNERS' ASSOCIATION
SHALL BE PROVIDED TO THE ENVIRONMENTAL ENGINEERING
DEPARTMENT FOR APPROVAL. IN ADDITION TO LANGUAGE PERTAINING
TO THE RPA, THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL
DETERMINE WHETHER THE SUBDIVISION HAS BEEN PROVIDED WITH THE
INFORMATION TO DEVELOP AND IMPLEMENT A FERTILIZATION/LAWN
CARE PROGRAM TO MINIMIZE PHOSPHOROUS RUNOFF FROM MAGNOLIA
GREEN. PER ZONING CONDITION E.11 OF CASE 89SN0343. THE
REQUIREMENTS OF THE PROGRAM SHALL BECOME A PART OF THE
COVENANTS FOR THE PROJECT AFFECTING ALL PROPERTIES WITHIN
THE DEVELOPMENT.
10. SPECIAL UPPER SWIFT CREEK WATERSHED END TREATMENT AS
DIRECTED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL BE
PLACED IN THE VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS. THE DI-7 END TREATMENTS SHALL BE EXCLUDED
FROM WITHIN THE LIMITS OF LOTS.
11. THE POINTS OF PERENNIAL FLOW ALONG WITH THEIR GPS
COORDINATE VALUES WILL BE SHOWN ON THE CONSTRUCTION PLAN AND
RECORD PLAT.
12. UNLESS OTHERWISE APPROVED, THE SPILLWAY STRUCTURE FOR
WET PONDS SHALL BE A CONCRETE WEIR.
13. PRIOR TO CONSTRUCTION PLAN APPROVAL, DOCUMENTATION MUST
BE PROVIDED TO ENVIRONMENTAL ENGINEERING THAT CERTAIN
PROPERTY OWNERS HAVE BEEN NOTIFIED OF THE PROPOSED
CONSTRUCTION ACTIVITY.
14. ENVIRONMENTAL ENGINEERING MAY IMPOSE MORE RIGOROUS
EROSION AND SEDIMENT CONTROL MEASURES THAN THAT WHICH IS
PROVIDED BY THE MINIMUM STANDARDS FOUND IN THE E&SC
HANDBOOK.
15. PRIOR TO APPROVAL OF ANY CONSTRUCTION PLAN WITHIN UPPER
MAGNOLIA GREEN PHASE 1 WHICH INCLUDES BMP-3E OR ANY
CONSTRUCTION PLAN WITHIN COLD CREEK WHICH INCLUDES THE BMP
EASEMENT AND/OR 50-FOOT VEGETATED PERIMETER YARD FOR BMP-3E,
ALL NECESSARY PLATS AND EASEMENT DOCUMENTATION FOR THE BMP
EASEMENT AND/OR 50-FOOT VEGETATED PERIMETER YARD WITHIN THE
LIMITS OF COLD CREEK DEVELOPMENT SHALL BE RECORDED.
NOTES:
AS PER ZONING CONDITION E10 OF CASE 89SN0343, "THE DEVELOPER
SHALL INSTALL AT THE TIME OF INSTALLATION OF THE EROSION AND
SEDIMENT CONTROL FACILITIES, THE LARGEST VOLUME REQUIRED AS
DICTATED BY EITHER EROSION CONTROL, WATER QUALITY, OR WATER
QUANTITY DESIGN STANDARDS".
AS PER SECTION 19-57 ITEM (D), A FEMA LETTER OF MAP REVISION
IS REQUIRED WHEN DEVELOPMENT OCCURRING IN ZONE AE WITHOUT A
DESIGNATED FLOODWAY WILL CAUSE A RISE OF MORE THAN ONE FOOT
IN THE BASE FLOOD ELEVATION. THIS WOULD APPLY TO THE BOSTON
POND ROAD CROSSING OF HORSEPEN CREEK.
THE LIMITS OF ALL PROPOSED STORMWATER MANAGEMENT FACILITIES
MUST REMAIN OUTSIDE THE RESOURCE PROTECTION AREA, EXCLUDING
THE OUTFALL IMPROVEMENT.
THE 2013 VIRGINIA RUNOFF REDUCTION METHOD SPREADSHEETS
(VRRM) WERE USED TO PROVIDE THE PRELIMINARY CBPA COMPLIANCE
CALCULATIONS. THESE SPREADSHEETS ARE STILL DRAFT AND ARE
NOT ACCEPTED BY THE DEPARTMENT OF ENVIRONMENTAL ENGINEERING.
PLEASE USE THE STANDARD 2011VRRM SPREADSHEETS OR OTHER
VERSIONS ACCEPTED BY THE DEPARTMENT OF ENVIRONMENTAL
ENGINEERING FOR CONSTRUCTION PLAN APPROVAL.
PRIOR TO APPROVAL OF THE CONSTRUCTION PLANS, THE FINAL
ALIGNMENT OF THE SANITARY SEWER LINES AND EASEMENTS ADJACENT
TO PROPOSED SWM/BMPS MUST BE APPROVED BY BOTH THE DEPARTMENT
OF ENVIRONMENTAL ENGINEERING AND THE DEPARTMENT OF PUBLIC
UTILITIES.
ANY AREAS OF FOREST/OPEN SPACE USED FOR STORMWATER QUALITY
COMPLIANCE SHOULD BE OUTSIDE THE LIMITS OF THE RESIDENTIAL
LOTS.
THE LIMITS OF THE PROPOSED SWM/BMPS AND ASSOCIATED EASEMENTS
MUST REMAIN OUTSIDE THE RPAS EXCLUDING THE OUTFALL
IMPROVEMENT.
*******************************************

Go to Case Selection Form or Go to Project List