Thanksgiving Holiday Closings... MORE

Hover here for Site Tools
Subdivision Review Comments
All Subdivision Review Comments for Case # 16CP0014




For VDOT’s comments please contact Virginia Department of Transportation at (804) 674-2814 or send e-mail to Boris.Solomonov@VDOT.Virginia.gov

For Tentative Subdivision resubmittals:

1. Please note that submittal fees include the original submittal and two (2) additional reviews.

2. A letter of transmittal is required to accompany each submittal.

3. Please verify that Environmental Engineering, Fire, CDOT, VDOT, and Planning have reviewed the submittal before resubmitting. A resubmittal tendered, prior to receiving all the required departments’ review, will be counted as an additional submittal. Go to Case Selection Form or Go to Project List


 
CASE NO: 16CP0014 STATUS: PENDING APPROVAL
PROJECT NAME: WEATHERBURY SEC 2 - LAST INTERNET UPDATE: 11/22/17
SUBMITTAL TYPE: CONSTRUCTION PLAN
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ENVIR.ENGR.-: 02 11/14/17 12/15/17 ******** 04/04/16 MCJ 751-2335
FIRE DEPT.--: 02 11/14/17 12/15/17 ******** 03/15/16 JKL 748-1489
PLANNING----: 02 11/14/17 12/15/17 ******** 04/05/16 CH 717-6042
TRANSPORT.--: 02 11/14/17 12/15/17 ******** 03/17/16 SES 751-4912
UTIL.PLAN.--: 02 11/14/17 12/15/17 ******** ********
UTILITIES---: 02 11/14/17 12/15/17 ******** 03/16/16 WBV 748-1343
UTIL.R.O.W.-: 02 11/14/17 12/15/17 ******** ********
VDOT--------: 02 11/14/17 12/15/17 ******** ********
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME: WEATHERBY, SECTION 2
PLAN NUMBER: 16CP0014
ORIGINAL PLAN DATE: 7/15/15
REVIEW DATE: 8/25/15
LATEST SUBMISSION DATE: 8/12/15
SUBMITTAL NUMBER: 1
STATUS: REVISIONS REQUIRED
TABLE REVIEW: NO
IN REGARD TO YOUR SUBMITTAL OF UTILITIES PLANS FOR THE
ABOVE REFERENCED PROJECT DATED JULY 15, 2015,
WE MAKE THE FOLLOWING COMMENTS AND RECOMMENDATIONS:
1. A COPY OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S
APPROVAL LETTER REGARDING PAVEMENT REPLACEMENT, METHOD
OF CROSSING, AND ALIGNMENT OF UTILITY WITH STATE RIGHT
OF WAY, AND A COPY OF ENVIRONMENTAL ENGINEERING'S
INITIAL REVIEW LETTER MUST BE SUBMITTED BEFORE REVISED
PLANS ARE SUBMITTED FOR RE-REVIEW.
2. PRIOR TO RELEASING TO THE CONSTRUCTION SECTION, A
COPY OF THE ENVIRONMENTAL ENGINEERING APPROVAL LETTER
AND/OR ALL OTHER APPLICABLE LOCAL STATE AND FEDERAL
AGENCIES' APPROVAL LETTERS MUST BE RECEIVED BY THIS
DEPARTMENT. IN ADDITION, ALL EASEMENTS NOT INCLUDED
WITH THE SUBDIVISION PLAT MUST BE DEDICATED WITH A
SEPARATE PLAT AND AGREEMENT TO THE COUNTY PRIOR TO
RELEASING THE PROJECT TO THE CONSTRUCTION SECTION.
3. SHOW THE COUNTY PROJECT NUMBER 91-0096 ON THE LOWER
RIGHT HAND CORNER OF EACH SHEET.
4. PROVIDE DEED BOOK AND PAGE NUMBERS FOR EACH
EXISTING EASEMENT.
5. FIELD VERIFY THE TOP AND ALL INVERT ELEVATIONS OF
THE PROPOSED TIE-IN MANHOLE REFLECTING THE FIELD DATA ON
THE PLANS.
6. PROVIDE A NOTE, IN EACH OF THE PLAN AND PROFILE
VIEWS, STATING THAT EXISTING MANHOLE NUMBER 27 IS TO BE
CORE DRILLED AND A KOR-N-SEAL GASKET IS TO BE INSTALLED.
7. SPECIFY EACH WATER SERVICE > 60 LF AS 1" IN
DIAMETER. NOTE THIS CONDITION ON EACH APPLICABLE LOT IN
THE PLAN VIEWS.
8. THERE APPEARS TO BE < 1.5 VF CLEARANCE AT EACH OF
THE FOLLOWING LOCATIONS:
A. THE SEWER CONNECTION FOR LOT NUMBER 8 AND THE
STORM SEWER.
B. THE SEWER CONNECTION FOR LOT NUMBER 7 AND THE
WATER LINE.
REVISE AS NECESSARY TO PROVIDE 1.5 VF CLEARANCE AT
EACH LOCATION.
9. PROCEED AS FOLLOWS REGARDING THE PROPOSED WATER
LINE IN THE AREA OF STATION 10 + 20 ±, GILLINGHAM DRIVE:
A. SHOW AND "CALL OUT" EACH WATER LINE BEND IN
THE PROFILE VIEW.
B. THIS ALIGNMENT WILL REQUIRE AN ENGINEERED,
DESIGNED, JOINT RESTRAINT SYSTEM. PROVIDE A COPY OF ALL
CALCULATIONS PERFORMED TO THE LENGTHS OF PIPE REQUIRING
JOINT RESTRAINT, AND CLEARLY SHOW THESE DISTANCES IN THE
PROFILE VIEWS.
10. PROCEED AS FOLLOWS AT THE PROPOSED TIE-IN MANHOLE:
A. PROVIDE THE COUNTY PROJECT NUMBER AND AS-BUILT
MANHOLE NUMBER.
B. SHOW IT USING A "DARK, DASHED" LINE TYPE.
C. SHOW THE EXISTING 42" SEWER LINE AND MATCH EXISTING AND
ROWN ELEVATIONS.
11. SPECIFY DUCTILE IRON (CLASS 52 MINIMUM) WITH
CONCRETE ENCASEMENT FROM MANHOLE NUMBER 1 TO 2 TO 3.
SHOW THE APPLICABLE DETAIL ON THE PLANS, REFERENCING ITS
LOCATION.
12. CHECK ALL SANITARY SEWER SLOPE CALCULATIONS FOR
ACCURACY, REVISING AS NECESSARY.
13. LABEL THE "FUTURE LOT" AND PROVIDE THE FOLLOWING
NOTE ON THAT PLAN VIEWSHEET:
FOR WATER SERVICES ON FUTURE LOTS
1. THE FRONT PROPERTY CORNER OF EACH "FUTURE LOT"
IS TO BE STAKED IN THE FIELD.
2. LOCATE THE WATER SERVICES FOR TWO ADJOINING
LOTS AT A COMMON FRONT PROPERTY CORNER AT ALL PRACTICAL
LOCATIONS WHILE PROVIDING 10 LF MINIMUM HORIZONTAL
SEPARATION BETWEEN ALL WATER SERVICES/METER BOXES AND
ALL SANITARY SEWER CONNECTIONS AT ALL LOCATIONS.
3. ALL ADJUSTMENTS/RELOCATIONS OF THESE SERVICES
FOUND TO BE NECESSARY IN THE FUTURE WILL BE TOTALLY THE
RESPONSIBILITY OF T HE DEVELOPER.
14. THOROUGHLY EXAMINE ALL SHEETS TO CORRECT ALL
EXTRANEOUS MARKINGS, OVERLAPPING TEST, ILLEGIBLE TEXT
AND DRAWING FEATURES, ETC. IN ORDER TO FACILITATE A
CLEAN DRAWING WITH ALL TEXT AND DRAWING FEATURES
COMPLETELY LEGIBLE AND ABUNDANTLY VISIBLE.
15. REVISE THE "MATERIALS LIST" AS NECESSARY.
PLEASE MAKE ALL OF THE SUGGESTED CHANGES PREVIOUSLY
MENTIONED, AND SUBMIT ONE (1) SET OF REVISED PLANS.
THE OWNER MUST ENTER INTO A COUNTY CONTRACT PRIOR TO THE
START OF CONSTRUCTION. PLEASE SEND ME A COPY OF THE
"ACCEPTED" BID PROPOSAL BETWEEN THE DEVELOPER AND THE
CONTRACTOR SO WE MAY PREPARE THE COUNTY CONTRACT. THE
BID PROPOSAL MUST BE BASED ON THE LATEST REVISED
UTILITIES PLANS REFLECTING THE REVIEWER'S STAMP, AND ALL
WORK MUST BE PERFORMED BY AN ACCEPTABLE UTILITIES
CONTRACTOR. IF PLANS ARE REVISED AFTER CONTRACT
PREPARATION DUE TO A CHANGE BECAUSE OF VIRGINIA
DEPARTMENT OF TRANSPORTATION'S AND/OR ENVIRONMENTAL
ENGINEERING DEPARTMENT'S APPROVAL OF THE ROAD, DRAINAGE,
AND EROSION CONTROL DESIGN OR BECAUSE OF STATE AGENCIES'
REVIEW AND APPROVAL OF THE UTILITIES DESIGN, A REVISED
BID PROPOSAL MAY BE NECESSARY TO ACCURATELY REFLECT THE
LATEST UTILITIES DESIGN AND A NEW CONTRACT PREPARATION
MAY BE NECESSARY AND EXECUTED PRIOR TO THE START OF
CONSTRUCTION.
IF YOU HAVE ANY QUESTIONS, DO NOT HESITATE TO CONTACT ME
AT 748-1343.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME: WEATHERBURY 11
PLAN NUMBER: 16CP0014
ORIGINAL PLAN DATE: 7/15/15
REVIEW DATE: 3/16/16
LATEST SUBMISSION DATE: 3/4/16
SUBMITTAL NUMBER: 2
STATUS: REVISIONS REQUIRED
TABLE REVIEW: NO
IN REGARD TO YOUR SUBMITTAL OF UTILITIES PLANS FOR THE
ABOVE REFERENCED PROJECT DATED JULY 15, 2015, WITH
THE LATEST REVISION DATED FEBRUARY 29, 2016, WE MAKE THE
FOLLOWING COMMENTS AND RECOMMENDATIONS:
1. A COPY OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S
APPROVAL LETTER REGARDING PAVEMENT REPLACEMENT, METHOD
OF CROSSING, AND ALIGNMENT OF UTILITY WITH STATE RIGHT
OF WAY, AND A COPY OF ENVIRONMENTAL ENGINEERING'S
INITIAL REVIEW LETTER MUST BE SUBMITTED BEFORE REVISED
PLANS ARE SUBMITTED FOR RE-REVIEW.
2. PRIOR TO RELEASING TO THE CONSTRUCTION SECTION, A
COPY OF THE ENVIRONMENTAL ENGINEERING APPROVAL LETTER
AND/OR ALL OTHER APPLICABLE LOCAL STATE AND FEDERAL
AGENCIES' APPROVAL LETTERS MUST BE RECEIVED BY THIS
DEPARTMENT. IN ADDITION, ALL EASEMENTS NOT INCLUDED
WITH THE SUBDIVISION PLAT MUST BE DEDICATED WITH A
SEPARATE PLAT AND AGREEMENT TO THE COUNTY PRIOR TO
RELEASING THE PROJECT TO THE CONSTRUCTION SECTION.
3. SHOW THE COUNTY PROJECT NUMBER 15-0267 ON THE LOWER
RIGHT HAND CORNER OF EACH SHEET. (NOTE: THIS IS A
CHANGE FROM THE PREVIOUS COMMENTS.)
4. PROVIDE THE COUNTY PROJECT NUMBER (03-0281) IN THE
PLAN VIEW OF THE TIE-IN MANHOLE.
5. PROVIDE RIP-RAP AT THE SEWER/CREEK CROSSING NOTING
AS SUCH IN EACH OF THE PLAN AND PROFILE VIEWS. IN
ADDITION, PROVIDE CONCRETE ENCASEMENT OF THE SEWER LINE
AT THIS LOCATION.
6. REVISE THE LABELS IN THE PLAN AND PROFILE VIEWS OF
MANHOLE NUMBERS 1, 2 AND 3 TO "DUCTILE IRON CLASS 52
SANITARY SEWER WITH CONCRETE ENCASEMENT, SEE DETAIL
DRAWING NUMBER CAS-5 SHEET C6.1".
7. THOSE PORTIONS OF THE WATERLINE LOCATED BEYOND THE
LAST FIRE HYDRANT IN GILINGHAM DRIVE AND GILLINGHAM
COURT CAN BE REDUCED TO 6" IN DIAMETER. PROVIDE AN 8" X
6" REDUCER AT EACH LOCATION AND REVISE ALL FITTINGS,
BENDS, ETC. IN EACH OF THE PLAN AND PROFILE VIEWS.
8. RELOCATE THE SEWER CONNECTION FOR LOT NUMBER 6 SUCH
THAT IT IS NOT LOCATED UNDER THE WATERLINE BEND.
9. LOCATE ALL WATER METERS ADJACENT TO A FRONT
PROPERTY CORNER TO THE GREATEST EXTENT POSSIBLE.
10. WHY IS A 2" CORPORATION STOP CALLED OUT FOR THE
WATER SERVICE FOR LOT NUMBER 1? PLEASE EXPLAIN
THOROUGHLY, REVISING THE PLANS AS NECESSARY.
11. DELETE ITEM NUMBER 3 UNDER "NOTES". AS DISCUSSED,
THIS REQUIREMENT APPLIES ONLY TO THOSE SERVICES GREATER
THAN OR EQUAL TO 60 LF AND IS NOTED ON EACH APPLICABLE
LOT IN THE PLAN VIEWS.
12. RELOCATE ITEM NUMBER 2 UNDER "NOTES" SUCH THAT IT
IS OFF BY ITSELF WITH A "THICK BOX" AROUND IT.
13. ALL SANITARY SEWER CONNECTIONS ARE TO BE SPECIFIED
AS 6" IN DIAMETER.
14. REVISE THE SEWER CONNECTION FOR LOT NUMBER 8 AS PER
OUR TELEPHONE CONVERSATION.
15. EXAMINE THE FEASIBILITY OF SPECIFYING A DUCTILE
IRON WATERLINE WHERE IT CROSSES THE STORM PIPE AT
STATION 10 + 20 ± GILLINGHAM DRIVE, ELIMINATING THE NEED
FOR VERTICAL BENDS. PLEASE CALL THIS OFFICE TO DISCUSS
YOUR FINDINGS.
16. THOROUGHLY EXAMINE ALL SHEETS TO CORRECT ALL
EXTRANEOUS MARKINGS, OVERLAPPING TEXT, ILLEGIBLE TEXT
AND DRAWING FEATURES, ETC. IN ORDER TO FACILITATE A
CLEAN DRAWING WITH ALL TEXT AND DRAWING FEATURES
COMPLETELY LEGIBLE AND ABUNDANTLY VISIBLE.
17. REVISE THE "MATERIALS LIST" AS NECESSARY.
PLEASE MAKE ALL OF THE SUGGESTED CHANGES AND SUBMIT
ONE (1) SET OF REVISED PLANS.
THE OWNER MUST ENTER INTO A COUNTY CONTRACT PRIOR TO THE
START OF CONSTRUCTION. PLEASE SEND ME A COPY OF THE
"ACCEPTED" BID PROPOSAL BETWEEN THE DEVELOPER AND THE
CONTRACTOR SO WE MAY PREPARE THE COUNTY CONTRACT. THE
BID PROPOSAL MUST BE BASED ON THE LATEST REVISED
UTILITIES PLANS REFLECTING THE REVIEWER'S STAMP, AND ALL
WORK MUST BE PERFORMED BY AN ACCEPTABLE UTILITIES
CONTRACTOR. IF PLANS ARE REVISED AFTER CONTRACT
PREPARATION DUE TO A CHANGE BECAUSE OF VIRGINIA
DEPARTMENT OF TRANSPORTATION'S AND/OR ENVIRONMENTAL
ENGINEERING DEPARTMENT'S APPROVAL OF THE ROAD, DRAINAGE,
AND EROSION CONTROL DESIGN OR BECAUSE OF STATE AGENCIES'
REVIEW AND APPROVAL OF THE UTILITIES DESIGN, A REVISED
BID PROPOSAL MAY BE NECESSARY TO ACCURATELY REFLECT THE
LATEST UTILITIES DESIGN AND A NEW CONTRACT PREPARATION
MAY BE NECESSARY AND EXECUTED PRIOR TO THE START OF
CONSTRUCTION.
IF YOU HAVE ANY QUESTIONS, DO NOT HESITATE TO CONTACT ME
AT 748-1343.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: WEATHERBURY, SECTION 2
CASE NUMBER: 16CP0014
LATEST PLAN DATE: 07/15/15
DEPT. REC'D. DATE: 08/13/15
SUBMITTAL NUMBER: ONE
REVIEW DATE: 09/03/15
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: WEATHERBURY, SECTION 2
CASE NUMBER: 16CP0014
LATEST PLAN DATE: 02/29/2016
DEPT. REC'D. DATE: 03/04/2016
SUBMITTAL NUMBER: TWO
REVIEW DATE: 03/17/2016
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT---------PLANNING
REVIEWER / PHONE #--------CHRIS HALE / (804) 717-6042
NAME OF PLAN--------------WEATHERBURY II
SITE PLAN NUMBER----------16CP0014
LATEST PLAN DATE----------07/15/15
DEPT. REC'D. DATE---------07/23/15
SUBMITTAL NUMBER----------ONE
REVIEW DATE---------------09/11/15
RECOMMENDATION------------REVISION REQUIRED
TABLE REVIEW--------------NO
01. PUT A REVISION DATE ON THE RESUBMITTED PLANS. RESUBMIT
10 FULL SETS AND ONE COPY OF THE SITE PLAN SHEET TO THE
PLANNING DEPARTMENT FOR YOUR NEXT REVIEW. PROVIDE A
COMPLETE RESPONSE TO COMMENTS FOR ALL DEPARTMENTS TO THE
PLANNING DEPARTMENT. BELOW EACH COMMENT DESCRIBE HOW YOU
HAVE ADDRESSED EACH REVIEW COMMENT. BE SURE TO INDICATE
WHICH SHEETS SHOW THE REQUIRED CHANGES. PROVIDE A
TRANSMITTAL LETTER TO DESCRIBE ANY CHANGES TO THE PLANS NOT
CAUSED BY THE STAFF REVIEW COMMENTS.
02. THE FIRST SUBMITTAL SHALL INCLUDE A PLAN DATE (MONTH,
DAY & YEAR), AND EACH REVISED SET OF PLANS SHALL SHOW A
REVISION DATE.
03. PUT THE CHESTERFIELD COUNTY CONSTRUCTION PLAN NUMBER IN
THE LOWER RIGHT CORNER OF EACH SHEET (PROVIDED BY THE
COUNTY UPON COMPLETION OF THE FIRST REVIEW).
04. FOR THE PORTION OF THE SUDIVISION ZONED AGRICULTURAL,
COMPLY WITH THE ZONING ORDINANCE IN ONE OF THE FOLLOWING
WWAYS:
A. PROVIDE A LOT THAT MEETS THE ROAD FRONTAGE AND LOT AREA
REQUIREMENTS FOR AN AGRICULTURAL LOT.
B. DESIGNATE THE AREA AS OPEN SPACE UTIMATELY TO BE
CONTROLLED AND MAINTAINED BY THE HOMEOWNERS ASSOCIATION.
05. HOMEOWNERS ASSOCIATION WITH MANDATORY MEMBERSHIP WILL
BE REQUIRED. OWNERSHIP AND MAINTENANCE RESPONSIBILITIES OF
THE ASSOCIATION SHALL BE STATED ON ALL FINAL CHECK AND
RECORD PLATS. THE SUBDIVIDER SHALL SUBMIT DRAFT BYLAWS AND
COVENANTS OF THE ASSOCIATION TO THE PLANNING DEPARTMENT
AND COUNTY ATTORNEY'S OFFICE IN CONJUNCTION WITH THE FINAL
CHECK PLAT. THE SUBDIVIDER SHALL ALSO INCORPORATE THE
ASSOCIATION WITH THE STATE CORPORATION COMMISSION. THE
APPROVED BYLAWS AND COVENANTS SHALL BE RECORDED PRIOR TO
OR IN CONJUNCTION WITH THE RECORD PLAT. THE RECORDATION
INFORMATION SHALL BE SHOWN ON THE FINAL CHECK AND RECORD
PLAT. THE SUBDIVIDER SHALL FUND THE FIRST YEAR OPERATIONAL
EXPENSES OF THE ASSOCIATION AS REQUIRED IN SECTION 19.1-
303.P
06. PROVIDE LOT LINE DIMENSIONS ON ALL LOTS.
07. PROVIDE ALL SETBACK DIMENSIONS FOR ALL LOTS.
08. A PORTION OF THE FRONTAGE OF LOT 6 IS NOT ALONG THE
CUL-DE-SAC. THIS PORTION SHOULD MEET THE 60 FOOT MINIMUM
FRONT YARD SETBACK REQUIREMENTS OF 19.1-66.C.1.A
09. PROVIDE LENGTH AND BEARING OF THE EXTERIOR BOUNDARIES
OF THE SUBDIVISION EXPRESSED IN FEET TO THE NEAREST ONE
HUNDREDTH.
10. VERIFY THAT LOTS 11, 12, 13, AND 14 MEET THE 150 FOOT
LOT WIDTH REQUIREMENT OF 19.1-66.A.1.B. PROVIDE THE
DIMENSION ON THE PLANS.
11. INCLUDE THE TREE CANOPY PLAN WITHIN THE CONSTRUCTION
PLAN DRAWING SET PER THE ZONING ORDINANCE SEC. 19.1-246.C
12. TREE CANOPY AREAS TO REMAIN UNDISTURBED. REMOVAL
OF TREE CANOPY PRESERVATION AREAS THAT ARE INCLUDED
IN OPEN SPACE MAINTAINED BY THE HOMEOWNERS'
ASSOCIATION, ARE SUBJECT TO A PERPETUAL CONSERVATION
EASEMENT, OR ARE INCLUDED ON INDIVIDUAL LOTS WHICH
HAVE NOT RECEIVED A CERTIFICATE OF OCCUPANCY SHALL BE
SUBJECT TO COUNTY APPROVAL. REMOVAL OF TREE CANOPY
PRESERVATION AREAS INCLUDED ON INDIVIDUAL LOTS THAT
HAVE OBTAINED A CERTIFICATE OF OCCUPANCY SHALL BE
SUBJECT TO APPROVAL BY THE HOME OWNERS' ASSOCIATION.
13. STUB ROADS ARE TYPICALLY REQUIRED FOR CONNECTIVITY TO
ADJACENT DEVELOPABLE PARCELS. SINCE THE SUBDIVISION IS
SURROUNDED BY A PRESERVATION AREA THIS REQUIREMENT CAN BE
WAIVED. PROVIDE ON THE PLANS THE RECORDED PLAT INFORMATION
WITH DEED BOOK/PAGE FOR THE ADJACENT PRESERVATION AREA.
14. THE SUBDIVISION ORDINANCE SECTION 17-83.E.E STATES:
UNDER NO CIRCUMSTANCES SHALL LOTS BE ARRANGED SO THAT ONE
IS BEHIND ANOTHER. THE BUILDING ENVELOPE FOR LOT 16 IS
BEHIND THE BUILDING ENVELOPE OF LOT 15. ADJUST THE LOT
CONFIGURATIONS TO MEET THIS REQIREMENT.
************************************************************
REVIEW DEPARTMENT---------PLANNING
REVIEWER / PHONE #--------CHRIS HALE / (804) 717-6042
NAME OF PLAN--------------WEATHERBURY II
SITE PLAN NUMBER----------16CP0014
LATEST PLAN DATE----------02/29/16
DEPT. REC'D. DATE---------03/02/16
SUBMITTAL NUMBER----------TWO
REVIEW DATE---------------04/05/16
RECOMMENDATION------------REVISION REQUIRED
TABLE REVIEW--------------YES
01. PUT A REVISION DATE ON THE RESUBMITTED PLANS. RESUBMIT
10 FULL SETS AND ONE COPY OF THE SITE PLAN SHEET TO THE
PLANNING DEPARTMENT FOR YOUR NEXT REVIEW. PROVIDE A
COMPLETE RESPONSE TO COMMENTS FOR ALL DEPARTMENTS TO THE
PLANNING DEPARTMENT. BELOW EACH COMMENT DESCRIBE HOW YOU
HAVE ADDRESSED EACH REVIEW COMMENT. BE SURE TO INDICATE
WHICH SHEETS SHOW THE REQUIRED CHANGES. PROVIDE A
TRANSMITTAL LETTER TO DESCRIBE ANY CHANGES TO THE PLANS NOT
CAUSED BY THE STAFF REVIEW COMMENTS.
02. INCLUDE THE AGRICULTURAL LOT AS A NUMBERED LOT WITHIN
THE SUBDIVISION. NO LOTS CAN BE DESIGNATED AS FUTURE PER
17-62.26. A NOTE CAN BE ADDED THAT FUTURE LOTS THAT MEET
R-40 STANDARDS MAY BE CREATED WITH REZONING. THE FUTURE LOT
LINE CAN BE SHOWN AND LABELED AS SUCH.
************************************************************
REVIEW DEPARTMENT: FIRE AND LIFE SAFETY
REVIEWER / PHONE#: KIM LESTER / 748-1489
PLAN NAME: WEATHERBURY SEC. 2
PLAN NUMBER: 16CP0014
LATEST REVISION DATE: 7/15/15
REVIEW DATE: 9/16/15
LATEST SUBMISSION DATE: 8/11/15
SUBMITTAL NUMBER: 1ST REVIEW
STATUS: NOT APPROVED
TABLE REVIEW: YES
IT LOOKS LIKE THE SPACING IS OVER 500'. AN HYDRANT NEEDS TO
BE ADDED ON GILLINGHAM COURT. VFSP 2012, C105.1
IT LOOKS LIKE THE SPACING IS OVER 500'. AN HYDRANT NEEDS TO
BE ADDED ON GILLINGHAM COURT. VFSP 2012, C105.1
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE AND LIFE SAFETY
REVIEWER / PHONE#: KIM LESTER / 748-1489
PLAN NAME: WEATHERBURY SEC. 2
PLAN NUMBER: 16CP0014
LATEST REVISION DATE: 1/29/106
REVIEW DATE: 10/15/16
LATEST SUBMISSION DATE: 3/4/16
SUBMITTAL NUMBER: 2ND REVIEW
STATUS: NOT APPROVED
TABLE REVIEW: YES
RELOCATE THE HYDRANT AT STATION 18+00 ON GILLINGHAM DRIVE
TO THE PROPERTY LINE OF LOT 16 AND 17.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS/751-2335
NAME OF PLAN : WEATHERBURY SECTION2
ADDRESS : AT THE INTERSECTION WEATHERBURY PLACE
AND GILLINGHAM DRIVE
SITE PLAN NO. : 16CP0014
LATEST PLAN DATE : 07/15/15
DEPT. REC'D DATE : 08/12/15
SUBMITTAL NUMBER : 1
REVIEW DATE : 09/16/15
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : NO
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND/OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR STATE
PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES INCLUDING
BUT NOT LIMITED TO WETLANDS, SURFACE WATERS (E.G. VSMP
PERMIT FOR CONSTRUCTION SITES, GROUND WATER AND AIR
QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT RELIEVE YOU
OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE LAND
DISTURBANCE PERMIT.
2 THIS OFFICE IS RECOGNIZING THAT THE 10-YEAR PRE/10-YEAR
POST REQUIREMENTS FOR FLOOD PROTECTION MAY BE ADDRESSED BY
DISCHARGING INTO THE 100-YEAR FLOODPLAIN.
=== EROSION CONTROL ===
1. AN ITEMIZED EROSION CONTROL COST ESTIMATE MUST BE
SUBMITED FOR REVIEW AND/OR APPROVAL.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A COPY OF THE AUTOCAD FILE MUST BE SUBMITTED TO
CAROLE CLIBORNE OF THE ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD
VERSION 2009 OR EARLIER AND REFERENCED DIRECTLY TO THE
VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN
THE NAD83 DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A
CD, DVD, OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH
THE SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN
NUMBER, ENGINEERING FIRM AND CAD FILE PREPARER'S NAME
AND PHONE NUMBER. THE FILE MUST CONTAIN THE FOLLOWING,
EACH CLEARLY LABELED IN SEPARATE LAYERS:
I.EDGES OF ROADS TO INCLUDE CURB AND GUTTER; AND
II. EDGES OF SIDEWALKS;
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
B) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
C) SAFETY FENCE AND/OR SUPER SILT FENCE WITH OPTIC
ORANGE FABRIC MUST BE IN PLACED ALONG THE RPA LIMITS.
D) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
E) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
F) IF APPLICABLE, A COPY OF VDOT LAND USE PERMIT MUST
BE RECEIVED.
G) AN EROSION CONTROL BOND MUST BE POSTED.
H) THE RISER AND BARREL PIPE (PERMANENT RISER/BARREL)
ASSOCIATED WITH THE SEDIMENT BASIN(S) MUST BE ON-SITE.
I) AN EROSION CONTROL BOND MUST BE POSTED.
3. WE OFFER, BUT NOT LIMITED TO, THE FOLLOWING COMMENTS:
A) PLEASE INCLUDE THE FOLLOWING NOTE ON THE EC PLANS
STATING, "THE ENVIRONMENTAL ENGINEERING DEPARTMENT MAY
IMPOSE A MORE RIGOROUS EROSION AND SEDIMENT CONTROL
PROGRAM THAN THAT WHICH IS PROVIDED BY MINIMUM STANDARDS
FOUND IN THE VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK."
B) PLEASE BE SURE TO USE THE APPROPRIATE LEGEND/STANDARD
SYMBOL FOR SILT FENCE (-X-X-), SUPER SILT FENCE (-XX-XX-
). REFLECT THE CHANGES ON THE EROSION AND SEDIMENT
CONTROL PHASE I AND PHASE II.
C) A NOTE SHOULD BE PROVIDED ON SHEET C-2.3 STATING,
"THE AREAS OF THE RPA AFFECTED BY THE INSTALLATION OF
THE OFFSITE SANITARY SEWER AND THE OUTFALL PIPE STR. 15
SHOULD BE STABILIZED WITH AN APPROVED RPA RESTORATION
PLANTING."
IN ADDITION, INCLUDE THE ENCLOSED RPA RESTORATION
PLANTING TABLE ON THE EC PLANS.
D) PLEASE PROVIDE A NOTE IN THE PHASE I SEQUENCE OF
CONSTRUCTION (SHEET C2.0) STATING, "SAFETY FENCE AND/OR
SUPER SILT FENCE WITH OPTIC ORANGE FABRIC MUST BE
VISIBLE ALONG THE RPA LIMITS PRIOR TO THE ISSUANCE OF A
LAND DISTURBANCE PERMIT. FOR THE AREAS OF THE RPA'S THAT
ARE NEAR 25' OR LESS OF THE CONSTRUCTION ACTIVITY OR BY
THE INSTALLATION OF THE OFFSITE SANITARY SEWER."
E) PLEASE REVISE THE NUMBER OF LOTS TO BE 19 AS OPPOSED
TO 21 IN ITEM 1 UNDER EROSION CONTROL NARRATIVE (SHEET
C2.5).
F) PLEASE PROVIDE SUPER SILT FENCE IN A HORSESHOE
CONFIGURATION TO SURROUND STR. 15 PRIOR THE INSTALLATION
OF THE STORM SEWER STRUCTURES 14/15. REFLECT THE CHANGES
ON THE EC PLANS PHASE II.
G) PLEASE ADD NOTE TO THE SUPER SILT FENCE LOCATED
ADJACENT TO THE RPA LIMITS STATING "WITH OPTIC ORANGE
FENCE".
H) PLEASE PROVIDE SUPER SILT FENCE WITH OPTIC ORANGE IN
LIEU OF SILT FENCE TO THE SILT FENCE SPECIFIED FOR THE
INSTALLATION OF THE OFFSITE SANITARY SEWER.
IN ADDITION, SPECIFY SAFETY FENCE ALONG THE WESTERN SIDE
AND WITHIN THE LIMITS OF THE 30' SANITARY SEWER EASEMENT
FOR THE INSTALLATION OF THE OFFSITE SANITARY SEWER.
I) PLEASE RELOCATE THE TEMPORARY STOCKPILE TO BE OUTSIDE
THE LIMITS OF THE 100-YEAR FEMA FLOODPLAIN.
IN ADDITION, SPECIFY SILT FENCE AROUND THE PERIMETER OF
THE STOCKPILE. REFLECT THE CHANGES ON THE EC PLANS PHASE
I AND PHASE II.
J) PLEASE PROVIDE A DETAIL OF THE SUPER SILT FENCE AND
OUTLET PROTECTION ON THE EC PLANS.
K) PLEASE PROVIDE UTILITY STREAM CROSSING
DETAIL/RESTORATION FOR THE INSTALLATION OF THE OFFSITE
SANITARY SEWER SPECIFIED TO CROSS THE SWIFT CREEK. IN
ADDITION, SHOW/LABEL THE LOCATION OF THE TEMPORARY
STREAM CROSSING ON THE EC PLANS.
L) PLEASE EXTEND THE EXISTING CONTOURS WITH SUFFICIENT
DISTANCE BEYOND THE LIMITS OF CLEARING PERTINENT TO THE
INSTALLATION OF THE OFFSITE SANITARY SEWER TO VERIFY IF
ADDITIONAL EROSION CONTROL MEASURES MAY BE NEEDED.
IN ADDITION, BE SURE TO LABEL ALL THE EXISTING CONTOURS
WITH ELEVATIONS.
M) SIMILARLY, PLEASE SHOW THE EXISTING CONTOURED
TOPOGRAPHY ALL THE WAY TO THE SWIFT CREEK IN THE
PROXIMITY OF LOT 16 AND OPEN SPACE. IT APPEARS PORTION
OF THE EXISTING CONTOURS STOP WITHIN THE PROPOSED LOTS
(I.E. ON LOT 16, OPEN SPACE, ETC.) AND BE SURE TO LABEL
THE EXISTING CONTOURS WITH ELEVATIONS AND/OR THEY SHOULD
BE LABELED MORE FREQUENTLY ALONG THE CONTOUR-LINE.
REFLECT THE CHANGES ON THE EC PHASE I AND PHASE II.
N) PLEASE REVISE THE EC PHASE II TO SHOW THE PROPOSED
CONTOURS TYING BACK TO THE EXISTING CONTOURS AS SHOWN ON
SHEETS C5.0 AND C5.1 IN THE VICINITY OF LOTS 1, 2, 5
THRU 8, 18, 19, ETC.). AS APPLICABLE EXTEND THE SILT
FENCE AND/OR SUPER SILT FENCE TO SURROUND THE FILL
GRADING AND BE SURE FOR THE AREAS OF FILL GRADING THAT
ARE CLOSE TO 25' OR LESS TO THE RPA LIMITS SUPER SILT
FENCE SHOULD BE PROVIDED.
IN ADDITION, PROVIDE MINIMUM 10' BREAK IN THE LOW AREA
OF THE SILT FENCE OR SUPER SILT FENCE ON LOT 6. THE
BREAK MUST BE BACKFILLED WITH STONE TO WITHIN THE TOP OF
THE SILT FENCE TO SERVE AS AN OVERFLOW.
ADDITIONALLY, PROVIDE SMALL EXCAVATED PIT ON THE
UPSTREAM SIDE OF THE 10' BREAK. SEE ATTACHMENT FOR
CLARIFICATION AND PROVIDE THE ENCLOSED DETAIL OF THE
TEMPORARY GRAVEL OUTLET/EXCAVATED PIT ON THE EC PLANS.
O) PLEASE PROVIDE SAFETY FENCE ALONG THE RPA LIMITS IN
THE VICINITY OF LOT 6, ETC.
P) PLEASE PROVIDE A SEDIMENT TRAP ON THE DOWNSTREAM SIDE
OF THE PROPOSED GRADING SPECIFIED ON LOT 2 TO BE LOCATED
NEAR THE PROPOSED CULVERT STR. C2 IN CONJUNCTION WITH
SILT FENCE TO SURROUND THE DOWNSTREAM SIDE OF THE
SEDIMENT TRAP. INCLUDE DRAINAGE AREAS INTERCEPTED BY
THIS TRAP AND DIMENSIONS OF THIS DEVICE ON THE PLANS.
REFLECT THE CHANGES ON THE EC PHASE I AND PHASE II
PLANS.
Q) SIMILARLY, PLEASE PROVIDE A SEDIMENT TRAP TO BE
LOCATED ON THE DOWNSTREAM SIDE OF THE PROPOSED GRADING
ON LOT 10 NEAR THE CULVERT STR. C3 AND OUTSIDE OF THE
PROPOSED STORM SEWER STR. P11. INCLUDE DRAINAGE AREAS
INTERCEPTED BY THIS TRAP AND DIMENSIONS OF THIS DEVICE.
SEE ATTACHMENT FOR CLARIFICATION AND REFLECT THE CHANGES
ON THE EC PHASE I AND PHASE II PLANS.
IN ADDITION, PLEASE ADJUST THE SILT FENCE SPECIFIED ON
LOT 10 TO INCLUDE THIS TRAP.
R) PLEASE PROVIDE NOTE IN THE PHASE II SEQUENCE OF
CONSTRUCTION (SHEET C2.2) WHEN THE REMOVAL OF THE
EXISTING DIRT PATH LOCATED ACROSS LOTS 1, 3, 8, 11, 13,
ETC. SHOULD OCCUR.
IN ADDITION, IT APPEARS SILT FENCE MAY BE NEEDED FOR THE
REMOVAL OF THE LAST PORTION OF THE DIRT PATH ON LOT 13.
PLEASE ADDRESS.
S) PLEASE SHOW/LABEL CENTERLINE STATIONING AT EVERY 100'
ALONG THE PROPOSED ROADS. REFLECT THE CHANGES ON THE EC
PHASE I PLANS.
T) PLEASE REVISE THE EC PLANS PHASE I TO REMOVE ANY
INFORMATION THAT PERTAINS TO THE FINAL DRAINAGE DESIGN
(I.E. TYPICAL GRASS SWALE/SWALE FLOW LINE WITH SPOT
ELEVATIONS SHOWN AT LOTS 15, 17, 19, 20, ETC., PROPOSED
BERM/INVERTS/ETC. ON LOTS 1, 9, 10, 14, 21, ETC.) AND
INSTEAD, SHOW THIS INFORMATION ON THE EC PHASE II PLANS.
REVISE ACCORDINGLY.
U) PLEASE REVISE A PORTION OF THE SILT FENCE LOCATED TO
SURROUND THE CUL-DE-SAC ON GILLIGHAM DRIVE TO BE
RELOCATED TO SURROUND THE PROPOSED FILL GRADING
SPECIFIED DOWNSTREAM OF THIS CUL-DE-SAC AND CONTINUE
THIS SILT FENCE UNTIL IT REACHES THE SEDIMENT BASIN. SEE
ATTACHMENT FOR CLARIFICATION.
V) THESE ARE IN REGARDS TO THE SEDIMENT BASIN:
V.1) PLEASE REVISE ITEM 8 UNDER PHASE I SEQUENCE
CONSTRUCTION (SHEET C2.0) TO MENTION SEDIMENT BASIN.
V.2) ITEM 9 UNDER PHASE I SEQUENCE CONSTRUCTION (SHEET
C2.0) SHOULD BE REMOVED FROM THE PHASE I AND BE SHOWN IN
THE PHASE II SEQUENCE OF CONSTRUCTION. IN ADDITION,
REPLACE THE WORDING "SEDIMENT TRAP" WITH "SEDIMENT
BASIN".
V.3) PLEASE REVISE THE SYMBOL TO REFER THE TEMPORARY
SEDIMENT BASIN AS "SB" AS OPPOSED TO "ST". REFLECT THE
CHANGES ON THE EC PHASE I AND PHASE II.
V.4) PLEASE REMOVE THE ANNOTATION THAT REFERS TO
PERMANENT BMP/SWM BASIN SPECIFIED ON THE EC PHASE I AND
INSTEAD PROVIDE A NOTE TO REFERENCE THE SHEET FOR
DETAILS/DIMENSION FOR TEMPORARY SEDIMENT BASIN.
V.5) PLEASE REVISE THE EC PHASE I TO SHOW/LABEL THE
LIMITS OF DRAINAGE AREAS WITH THE AMOUNT OF ACREAGE
INTERCEPTED BY THE TEMPORARY SEDIMENT BASIN.
V.6) PLEASE SUBMIT THE TEMPORARY SEDIMENT CALCULATIONS
FOR FURTHER REVIEW AND/OR APPROVAL. INCLUDE THE STAGE-
STORAGE TABLE TO VERIFY WET/DRY VOLUME REQUIREMENTS.
V.7) PLEASE REVISE THE EC PHASE I PLANS TO SHOW 1'
CONTOURED GRADING PLAN FOR THE CONSTRUCTION OF THE
SEDIMENT BASIN. IN ADDITION, SHOW/LABEL THE
RISER/BARREL/STR. 15/ETC. AND EMERGENCY SPILLWAY ON THIS
SHEET.
V.8) PLEASE PROVIDE AN X-SECTIONAL VIEW OF THE EMERGENCY
SPILLWAY. INCLUDE DIMENSIONS, LINING, DESIGN DEPTH, ETC.
ON THE EC PLANS.
V.9) PLEASE PROVIDE TRASH RACK DETAIL ON THE EC PLANS.
V.10) PLEASE PROVIDE TEMPORARY DEWATERING DEVICE DETAIL
WITH PERTINENT INFORMATION ON THE EC PLANS.
V.11) IF APPLICABLE, SPECIFY CONCRETE CRADLE AS OPPOSED
TO ANTI-SEEP COLLARS ALONG THE BARREL PIPE. INCLUDE
LOCATION ALONG THE BARREL AND PROVIDE A DETAIL OF THE
CONCRETE CRADLE ON THE EC PLANS.
V.12) PLEASE REVISE THE NOTE OF "BMP/SWM BASIN SEE SHEET
C2.7 FOR DETAIL" SPECIFIED AT THE SEDIMENT BASIN (SHEET
C2.3) TO STATE, "FOR THE CONVERSION OF THE TEMPORARY
SEDIMENT BASIN REFER TO SHEET C2.7."
V.13) PLEASE REVISE THE LABELING OF ANTI-VORTEX DEVICE
TO BE TRASH RACK IN THE PRINCIPAL SPILLWAY DESIGN DETAIL
(SHEET C2.5), SINCE THE PERMANENT RISER/BARREL WOULD BE
PROVIDED.
W) PLEASE PROVIDE A NOTE ON SHEET C2.2 THAT THE SILT
FENCE MUST BE IN PLACE AS SHOWN ON THE PLANS PRIOR TO
START THE EC PHASE II FOR THE INSTALLATION OF THE STORM
SEWERS AND CULVERTS.
4. IF TIMBERING IS REQUIRED ON THE PROJECT, IT SHOULD BE
INCORPORATED INTO THE EROSION CONTROL PLAN / NARRATIVE AND
SHOULD NOT BEGIN UNTIL AFTER THE ISSUANCE OF A LAND
DISTURBANCE PERMIT AND THE INSTALLATION OF THE APPROVED
EROSION CONTROL DEVICES.
======= CBPA =======
1. PLEASE REVISE THE CBPA NOTE (SHEET C1.0) TO STATE, "CBPA
COMPLIANCE: VIRGINIA RUNOFF REDUCTION METHOD (VRRM) VSMP
PART IIB AND USCW DEFAULT 0.22 LB/AC/YR."
2. PLEASE DIMENSION/LABEL THE "100' RPA BUFFER AREA" FROM
THE WETLANDS TO THE RPA LIMITS. REFLECT THE CHANGES ON ALL
APPLICABLE SHEETS.
3. PLEASE SHOW/LABEL THE TYPICAL RPA SIGN AT EVERY OTHER
LOT ALONG THE LIMITS OF THE RPA.
==== SWM ======
1. IT APPEARS SIGNIFICANT INFORMATION NEEDED IN THE DESIGN
AND CONSTRUCTION OF THE SWM DETENTION BASIN IS CURRENTLY
MISSING FROM THE CONSTRUCTION PLANS. REFER TO THE
SUBDIVISION CHECKLIST AND/OR THE ENVIRONMENTAL ENGINEER
MANUAL FOR ADDITIONAL REQUIREMENTS NEEDED TO BE ON THE
PLANS. IN ADDITION, PLEASE SEE , BUT NOT LIMITED, TO THE
FOLLOWING:
2. PLEASE ADD THE FOLLOWING NOTE IN THE SPECIFICATION FOR
POND CONSTRUCTION (SHEET C2.7) STATING, "THE FACILITY
CERTIFICATION PROCESS SHALL BE PERFORMED BY AN
ENGINEERING/SURVEYING PROFESSIONAL APPROVED BY THE COUNTY
AT THE OWNER'S EXPENSE."
3. PLEASE PROVIDE SCHEDULE WITH PERTINENT INFORMATION FOR
STRUCTURES 14, 14P, 15 ON THE DETENTION BASIN PLAN SHEET
(SHEET C2.7).
4. PLEASE PROVIDE ENLARGED DETAIL OF THE RISER/BARREL DRAWN
TO SCALE. A PLAN VIEW AND SIDE VIEW SHOULD BE PROVIDED WITH
PERTINENT DIMENSIONS AND MATERIALS.
5. SECONDARY SPILLWAY MUST BE PAVED WITHIN FILL, OTHERWISE,
LOCATE WITHIN EXISTING GROUND. IT CAN BE LINED TO >/= 10-
YEAR WSE 187.33.
IN ADDITION, PROVIDE AN ENLARGED DETAIL OF THIS SECONDARY
SPILLWAY WITH PERTINENT INFORMATION AND IT SHOULD BE DRAWN
TO SCALE.
6. PLEASE SUBMIT A LETTER TO THE DIRECTOR OF ENVIRONMENTAL
ENGINEERING REQUESTING A VARIANCE FOR PROPOSING A SWM/BMP
POND IN THE 100-YEAR FEMA FLOODPLAIN, SINCE DISTURBANCE IS
PROHIBITED WITHIN USCW 100-YEAR FLOODPLAINS WHEN DRAINAGE
AREAS EXCEED 100 ACRES.
8. IF PERMITTED BY THE DIRECTOR WITHIN THE FEMA ZONE AE
FLOODPLAIN, A NO-RISE CERTIFICATE SIGNED/SEALED BY A
LICENSED PROFESSIONAL ENGINEER MUST BE PROVIDED WITH
SUPPORTING TECHNICAL DATA THAT PROPOSED DETENTION BASIN
FILL GRADING ACTIVITY WILL NOT IMPACT THE FEMA FLOODPLAIN.
7. THESE ARE IN REGARDS TO THE SWM DETENTION BASIN GRADING
PLAN (SHEET C2.7):
A) PLEASE SHOW/LABEL THE 1/10/100-YEAR WSE.
B) PLEASE REVISE THE SCALE TO BE 1"=20' AS OPPOSED TO
1"=30'.
C) PROVIDE POSITIVE DRAINAGE AT 1% SLOPE FROM THE INFLOW
BOTTOM WITH LOW FLOW CHANNEL TO THE RISER.
D) LABEL THE 3:1 SLOPE WITH DIRECTIONAL FLOW ARROWS TO
THE INNER/OUTER SIDE OF THE EMBANKMENT.
E) PROVIDE 12' MAINTENANCE CORRIDOR TO THE
INFLOW/OUTFLOW LOCATIONS.
F) PLEASE SHOW/LABEL THE 12' BMP ROAD TO ACCESS THE
DETENTION BASIN AND INCLUDE THE 12' BMP ACCESS ROAD
DETAIL ON SHEET C2.7.
G) SHOW/LABEL THE SWM/BMP EASEMENT AND 20' ACCESS
EASEMENT ON ALL APPLICABLE PLAN VIEWS.
H) PLEASE SHOW/LABEL THE 50' VEGETATIVE PERIMETER YARD
SETBACK AROUND THE DETENTION BASIN.
8. THESE ARE IN REGARDS TO THE BASIN OUTFALL PIPE PROFILE
(SHEET C2.7):
A) PLEASE INDICATE THE 8" ORIFICE AT ELEV. 184.00.
B) PLEASE SHOW/LABEL THE 1/10/100-YEAR WSE.
C) PLEASE PROVIDE THE TOP RISER ELEVATION AT STR. 14.
D) PLEASE ADD THE FOLLOWING INFORMATION TO STR. P14,"18"
O-RING".
E) PLEASE REVISE THE INFORMATION FOR STR. 15 TO
ELIMINATE "36" DIA. RISER" AND INSTEAD NOTED AS USCW
SPECIAL END TREATMENT DI-7.
F) PLEASE EXTEND THE EXISTING GROUND BEYOND STR. 15 TO
ENSURE HAS ADEQUATE DAYLIGHT.
G) PLEASE SHOW THE 18" FOOTING TO THE RISER.
H) PLEASE SHOW/LABEL THE LIMITS OF THE 100-YEAR FEMA
FLOODPLAIN.
9. THESE ARE IN REGARDS TO THE ROUTING CALCULATIONS:
A) PER PREVIOUS COMMENTS FOR THE VRRM REGARDING THE
DISCREPANCIES FOUND IN THE AREAS THAT DRAIN TO THE
DETENTION POND, PLEASE SUBMIT REVISED COMPLETE
1/10/100-YEAR ROUTING CALCULATIONS FOR FURTHER REVIEW
AND/OR APPROVAL. BE SURE THE STAGE-DISCHARGES FOR EACH
STRUCTURE ARE PROVIDED IN THE ROUTING FOR REVIEW.
B) IT APPEARS THE PIPE BARREL IS MISSING FROM THE
ANALYSIS. PLEASE CLARIFY.
C) THERE APPEARS TO BE A DISCREPANCY IN THE WIDTH OF THE
RECTANGULAR WEIR WHEN COMPARING THE 100-YEAR STORM
ROUTING WITH 2/10-YEAR STORM ROUTING. IN THE 100-YEAR
STORM ROUTING A 20' LONG BROAD CREST RECTANGULAR WEIR
WAS USED AND ON THE 2/10-YEAR ROUTING A 10' LONG BROAD
CREST RECTANGULAR WEIR WAS USED. PLEASE REVISE
ACCORDINGLY AND SUBMIT REVISED 1/10/100-YEAR STORM
ROUTING FOR FURTHER REVIEW AND/OR APPROVAL.
D) PLEASE DEPICT PRE/POST DEVELOPED AREAS DRAINING
TOWARDS THE DETENTION BASIN ON THE PLANS. AN ADDITIONAL
SHEET MAY BE NEEDED.
10. PLEASE LABEL THE OPEN SPACE ENCUMBERED BY PROPOSED SWM
DETENTION POND. REFLECT THE CHANGES ON ALL APPLICABLE
SHEETS.
======= VRRM =======
1. THESE ARE IN REGARDS TO VRRM STORMWATER COMPLIANCE
CALCULATIONS (SHEET C5.6):
A) PLEASE PROVIDE THE DELINEATION OF HYDROLOGIC SOILS
GROUPING B, C AND D ON A SCALE 1"=100' MAP.
B) PLEASE ENLARGE THE SOIL DELINEATION MAPS AND DRAINAGE
MAP TO 1"=100' SCALE WITH HOME AND DRIVEWAY FOOTPRINTS.
C) THE DRAINAGE AREA A & B MAPS SHOULD BE REVISED TO
ADDRESS THE PROPOSED GRADING AS IT AFFECTS THE DRAINAGE
AREAS LIMITS.
D) IT APPEARS ADDITIONAL AREA BELOW THE CUL-DE-SAC AT
STR. P1 DRAINS TO THE DETENTION BASIN UNACCOUNTED IN THE
DRAINAGE MAP. PLEASE ADDRESS.
E) IT APPEARS APPROXIMATELY 1.2 ACRES ONSITE DRAINS TO
STR. C2 BY PASSES THE SWM DETENTION BASIN. PLEASE
ADDRESS.
F) PLEASE REVISE STORMWATER COMPLIANCE TABLE TO ADD
"ROOFTOP DISCONNECT" IN BMP TYPE FOR BMP#1 AND BMP#2.
2. THESE ARE IN REGARDS TO THE VRRM SPREADSHEET:
A) THE RRM WORKSHEETS FOR SITE AND DRAINAGE AREAS A/B
SHOULD BE REVISED TO ADDRESS YARDS/MANAGED TURF AREAS
CLOSER TO 110' X 180' IN LIEU OF 100' X 130'. A FURTHER
DISCUSSION IS RECOMMENDED.
B) THE AREA OF "C" SOILS OMITTED THE 30' ACCESS EASEMENT
WITH GRAVEL DRIVEWAY IN THE IMPERVIOUS CALCULATIONS.
PLEASE ADDRESS.
C) IT APPEARS ADDITIONAL AREA WITHIN LOT 10 ALONG THE
NORTHERN SIDE BYPASS WITHIN DRAINAGE AREA B. PLEASE
CLARIFY AND/OR REVISE ACCORDINGLY.
D) THE SPREADSHEET SHOWS A SURPLUS OF 0.84 LB/YR BASED
ON THE DEFAULT OF 0.41 LB/YR WITHOUT ROOFTOP DISCONNECT
TREATMENT. SINCE THIS IS WITHIN THE USCW, WORKSHEET A
CALCULATIONS ARE NEEDED BASED ON 0.22 LB/YR DEFAULT.
PLEASE ADDRESS.
IN ADDITION, AS LONG AS THE RRM WORKSHEET SHOWS A TOTAL
PHOSPHOROUS REMOVAL WHICH MEETS THAT REQUIRED FOR 0.22
LB/YR WORKSHEET A, COMPLIANCE WILL HAVE BEEN MET.
3. THE DESIGNATION OF LAND AS FOREST/OPEN SPACE REQUIRES
SOME FORM OF A PROTECTIVE COVENANT. IT IS UNCLEAR HOW THIS
HAS BEEN ADDRESSED IN THE SUBDIVISION CONSTRUCTION PLANS.
PLEASE EXPLAIN.
4. THE SIMPLE ROOFTOP DISCONNECT SPEAKS TO DOWNSPOUTS OR
RESIDENTIAL IMPERVIOUS SURFACES DIRECTED TO PERVIOUS FILTER
AREAS COMPLYING WITH THE DESIGN CRITERIA SPEC. 1. HOW DOES
THE IMPERVIOUS ROAD PAVEMENT PLAY A ROLE IN THE TREATMENT
UNDER SIMPLE DISCONNECT? PLEASE EXPLAIN.
5. IN SECTION 4 OF THE ROOFTOP DISCONNECT SPEC. 1
DOCUMENTATION TO THE HOMEOWNERS AND DEED RESTRICTION OR
OTHER MECHANISM ENFORCEABLE BY THE LOCAL PROGRAM MUST BE IN
PLACE. HOW HAS THE PLAN ADDRESSED THIS REQUIREMENT?
PLEASE PROVIDE AN ENLARGED SCALED SOIL DELINEATION AND
DRAINAGE AREA PLAN THAT DEPICTS THE MINIMUM 40'
DISCONNECTION LENGTH AT <2% SLOPE ON EACH HOMESITE.
6. THE ENERGY BALANCE APPEARS TO HAVE BEEN APPLIED TO ONLY
ONE PROPOSED OUTFALL BELOW DETENTION BASIN. THERE ARE TWO
NATURAL CONVEYANCE SYSTEMS DISCHARGING CONCENTRATED
STORMWATER BELOW STR. C3 AND THE EXISTING 12" CPP/LOT 7.
THIS HAS NOT BEEN ADDRESSED. IT DOES NOT APPEAR THE 18.03
ACRES DA B IS CORRECT. PLEASE ADDRESS.
7. A FEW LOTS SUCH AS 5/6 AND UNZONED TWO FUTURE LOTS MAY
QUALIFY FOR SHEET FLOW UNDER REGULATION 870-66 ITEM D. A
FURTHER DISCUSSION WOULD BE HELPFUL.
8. THE USE OF FOREST/OPEN SPACE AS A WATER QUALITY MEASURE
REQUIRES THAT THE APPROXIMATE LIMITS BE SHOWN ON THE
CONSTRUCTION PLANS AND RECORD PLAT THAT ARE FURTHER DEFINED
IN THE COVENANT/DEED RESTRICTION OR OTHER ACCEPTABLE
ENCUMBRANCE. A FURTHER DISCUSSION IS RECOMMENDED.
9. IT APPEARS FROM THE ENERGY BALANCE COMPUTATIONS THAT THE
1-YEAR DISCHARGES WERE USED IN LIEU OF THE RUNOFF VOLUME
(INCHES OR ACRE-FT). PLEASE CLARIFY AND/OR REVISE
ACCORDINGLY.
10. FROM AN EARLIER DISCUSSION WITH DEQ (ROBERT COOPER) THE
INTENT OF THE VSMP REGULATION IS TO ANALYZE EACH
CONCENTRATED STORMWATER OUTFALL FOR CHANNEL AND FLOOD
PROTECTION. THE WETLANDS DITCH CROSSING LOTS 7/8 MAY QUALIFY
UNDER THE 1% LIMITS OF THE ANALYSIS AREA OR 1-YEAR PEAKS.
SEVERAL LOTS MAY SATISFY THE SHEET FLOW CRITERIA WHERE NO
FURTHER QUANTITY ANALYSIS IS REQUIRED.
THE CONCENTRATED STORMWATER OUTFALL TO THE REAR OF LOT 14
MUST MEET THE ENERGY BALANCE CRITERIA. PLEASE CONSIDER
RELOCATING THE PROPOSED DETENTION BASIN TO THE NATURAL
CONVEYANCE OUTFALL BETWEEN LOTS 13/14 SUCH THE PROJECT ONLY
HAS TWO OUTFALL LOCATIONS TO BE ADDRESSED UNDER VSMP
REGULATIONS.
======= ROAD AND DRAINAGE =======
1. UPON COMPLETION OF A FIELD INSPECTION. ADDITIONAL
COMMENTS MAY ARISE IF INDICATED BY THE EXISTING CONDITIONS.
2. PLEASE PROVIDE THE BOARD APPROVAL DATE IN THE SITE DATA
(SHEET C1.0).
3. PLEASE PROVIDE A CROSS-HATCHED PATTERN TO THE WETLANDS
THAT ARE GOING TO BE IMPACTED BY THE PROPOSED 30' SHARED
ACCESS EASEMENT LOCATED ON LOT 16. REFLECT THE CHANGES ON
ALL APPLICABLE SHEETS.
IN ADDITION, PROVIDE A LEGEND FOR THE CROSS-HATCHED PATTERN
FOR THE WETLANDS TO BE IMPACTED.
4. PLEASE BE SURE TO PROVIDE NORTH ARROW ON EACH SHEET
(I.E. SHEET C5.2, C5.3, C5.4, ETC.). REVISE ACCORDINGLY.
5. IT APPEARS THE PROPOSED OVERALL DESIGN OF THE
ROAD/ROADSIDE DITCHES OF ELEVATING THE ROAD AT THE NATURAL
DRAINAGEWAY WOULD CREATE CONFUSION FOR MAINTENANCE, SINCE
IT DOESN'T FOLLOW THE TYPICAL VDOT PRACTICE OF CARRYING THE
ROADSIDE DITCHES TO THE NATURAL LOW/DRAINAGEWAYS. THIS
OFFICE MUST RECEIVE A WRITTEN CONFIRMATION FROM VDOT THAT
THE PROPOSED DESIGN IS ACCEPTABLE TO THEM PRIOR TO
CONSTRUCTION PLAN APPROVAL.
6. PLEASE INDICATE WITH ARROWS THE DIRECTION OF FLOW ALONG
THE FLOW LINES OF THE ROADSIDE DITCHES AND HIGH POINTS.
REFLECT THE CHANGES ON SHEETS C3.0 AND C3.1.
7. THE EXISTING 16' DRAINAGE EASEMENT LOCATED ON THE REAR
OF LOT 2 COULD BE VACATED IF DETERMINED THE NATURAL CHANNEL
IS WOUS OR PROPOSED TO BE ENCUMBERED BY THE 100-YEAR
FLOODPLAIN.
8. PLEASE PROVIDE THE GRATE DETAIL TO THE USCW SPECIAL END
TREATMENT ON SHEET C6.1).
9. PLEASE REVISE THE DIMENSION BUILDING ENVELOPES TO BE
DELINEATED ALONG THE LIMITS OF THE SETBACK AS OPPOSED TO BE
SHOWN TO CONTINUE THRU THE SETBACKS, FLOODPLAINS, WETLANDS,
RPA AREAS, ETC.
IN ADDITION, BE SURE THAT THE BUILDING SETBACKS ARE
DELINEATED WHICHEVER IS MOST RESTRICTIVE OFF THE LIMITS OF
THE 100-YEAR FLOODPLAIN, 100-YEAR FEMA FLOODPLAIN,
WETLANDS, ETC. AND/OR THE SETBACKS ARE ACCURATELY MEASURED
25' OR 35'. FOR INSTANCE, ON THE NORTH-EAST CORNER ON LOT 7
DOES NOT MEASURE 25' OFF THE FLOODPLAIN LIMITS. ANOTHER
EXAMPLE, ON LOT 2 THE 25' BUILDING SETBACK OFF THE 100-YEAR
FLOODPLAIN LIMITS IS NOT CURRENTLY SHOWING ON THE PLANS.
PLEASE REVISE ACCORDINGLY.
10. PLEASE LABEL THE SWIFT CREEK ALONG THE CENTERLINE OF THE
CREEK. REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
11. PLEASE ANNOTATE THE LOTS WITH "NBP" FOR THE REMOVAL OF
THE EXISTING DIRT ROAD AT LOTS 1, 3, 8, 11, 13, ETC. WITH A
NOTE STATING, "EXISTING DIRT ROAD TO BE REMOVED AND GRADED
TO SURROUNDING GROUND ELEVATION." REFLECT THIS NOTE ON
SHEETS C3.0 AND C3.1.
12. PLEASE SPECIFY MFF'S AT LOTS 1 THRU 3, 5 THRU 19, ETC.
TO BE 1' ABOVE WHICHEVER IS GREATER THE 100-YEAR FLOODPLAIN
ELEVATION, 100-YEAR BACKWATER ELEVATION, ROAD SAG, ETC.
REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
IN ADDITION, PROVIDE AN ASTERISK (*) TO THE LOTS ENCUMBERED
WITH THE FEMA FLOODPLAIN WITH A NOTE STATING, ELEVATION
CERTIFICATE(S) SEALED BY A LICENSED PROFESSIONAL ARE
REQUIRED ON LOTS 5 THRU 8, 11, 13 THRU 14, PRIOR TO THE
CERTIFICATE OF OCCUPANCY (CO). REFLECT THIS NOTE ON ALL
APPLICABLE SHEETS.
13. PLEASE REVISE THE LABELING OF "APPROX. LOCATION 100-YEAR
FLOODPLAIN" PERTINENT TO THE LIMITS OF THE 100-YEAR FEMA
FLOODPLAIN LOCATED IN THE PROXIMITY OF LOTS 5 THRU 9, 11
THRU 14, ETC. TO BE LABELED AS "APPROXIMATE LOCATION 100-
YEAR FEMA FLOODPLAIN". REFLECT THE CHANGES ON ALL APPLICABLE
SHEETS.
14. PLEASE PROVIDE TWO 100-YEAR FEMA FLOODPLAIN SECTIONS-
LOCATIONS WITH ELEVATIONS ALONG THE SWIFT CREEK ON THE PLAN
VIEW ONE IN THE PROXIMITY OF LOT 7 AND THE OTHER IN THE
PROXIMITY OF LOT 15. REFLECT THE CHANGES ON ALL APPLICABLE
SHEETS.
15. IT APPEARS THE PROPOSED FILLING IN THE 100-YEAR FEMA
FLOODPLAIN TO ACHIEVE BUILDING ENVELOPE ON LOT 12 IS
PROHIBITED BY ORDINANCE. REFER TO SECTION 19-58 ITEM 18.
THEREFORE, LOT 12 IS NOT BUILDABLE AND IT SHOULD BE REMOVED
FROM THE PROPOSED LOTS. A FURTHER DISCUSSION IS RECOMMENDED.
IN ADDITION, REMOVE THE LABELING OF "EXISTING FLOODPLAIN TO
BE RELOCATED" FROM ALL APPLICABLE PLAN VIEWS.
16. PLEASE PROVIDE EC-1 RIPRAP AT THE BEGINNING/ENDING OF
THE PROPOSED CULVERT. INCLUDE DIMENSIONS OF THE EC-1 RIPRAP
ON THE PLANS AND REFLECT THE CHANGES ON THE PLANS AND
PROFILES.
17. PLEASE PROVIDE OUTLET PROTECTION ON THE DOWNSTREAM SIDE
OF STR. 1 WITH PERTINENT INFORMATION. REFLECT THE CHANGES ON
THE PLANS AND PROFILES.
18. PLEASE RELOCATE THE SWALE SPECIFIED ON LOT 16 TO BE
LOCATED ON LOT 15 AND 5' OFF THE PROPERTY LINE PERTINENT TO
LOTS 15/16. IN ADDITION, ANNOTATE LOT 15 WITH "NBP". REFLECT
THE CHANGES ON APPLICABLE SHEETS.
FURTHERMORE, REMOVE THE NBP ANNOTATION ON LOT 16, SINCE IT
IS NO LONGER NEEDED.
19. SIMILARLY, RELOCATE THE SWALE SPECIFIED ON LOT 18 TO BE
LOCATED ON LOT 17 AND 5' OFF THE PROPERTY LINE PERTINENT TO
LOTS 17/18. ANNOTATE LOT 17 WITH "NBP" AND REMOVE THE
ANNOTATION OF "NBP" ON LOT 18. REFLECT THE CHANGES ON ALL
APPLICABLE SHEETS.
20. THESE ARE IN REGARDS TO THE ROADSIDE DITCH DRAINAGE
AREAS PLAN (SHEET C5.2):
A) THE ONSITE DRAINAGE MAP SHOULD BE SHOWN ON A SCALE
1"=50" OR 1"=60' AS OPPOSED TO 1"=100'. PLEASE REVISE
ACCORDINGLY.
B) SHOW/LABEL THE CENTERLINE STATIONING AT EVERY 100'
ALONG THE PROPOSED ROADS.
C) SHOW IN GHOSTED LINES THE PROPOSED SUBDIVISION AND
LOT NUMBERING.
D) PLEASE SHOW THE DRIVEWAY ENTRANCE CULVERTS AND
DRAINAGES AREAS INTERCEPTED BY THESE STRUCTURES ON THE
PLANS. IN ADDITION, PROVIDE 10-YEAR ENTRANCE CULVERT
CALCULATIONS FOR FURTHER REVIEW AND/OR APPROVAL. BE SURE
THE 10-YEAR HW/D<1.
FURTHERMORE, INCLUDE ENTRANCE CULVERT SCHEDULE WITH
PERTINENT INFORMATION (I.E. DIAMETER, MIN. 20' LENGTH,
RCP CLASS III ETC.) ON THE PLANS.
E) PLEASE BE SURE TO SHOW THE OUTFALL STR. 1 DRAIN TO
THE DETENTION POND AS OPPOSED TO SHOWING IT DRAINING
TOWARDS THE DRAINAGEWAY.
F) THE SHAPE OF THE BASIN APPEARS TO BE DIFFERENT WHEN
COMPARED WITH OTHER SHEETS ON THE CONSTRUCTION PLANS.
REVISE AS APPLICABLE.
21. THESE ARE IN REGARDS TO THE CULVERTS PLAN SHEET (SHEET
5.3):
A) PLEASE INCREASE THE SIZE OF THE LABELING OF C1/C2/C3
TO BE MORE LEGIBLE.
B) PLEASE INCREASE THE LETTER SIZE OF THE ELEVATIONS FOR
THE PROPOSED CONTOURS TO BE MORE LEGIBLE. REFLECT THE
CHANGES ON ALL APPLICABLE SHEETS (I.E. SHEETS C5.2 THRU
C5.4, ETC.).
C) PLEASE REVISE THE LIMITS OF DRAINAGE AREAS FOR D.I.
2/3 TO CONSIDER THE PROPOSED FILL GRADING AS OPPOSED TO
THE EXISTING CONTOURS. REVISE THE PLAN VIEWS,
COMPUTATION SHEETS AND PROFILES TO REFLECT THE CHANGES.
D) PLEASE REVISE THE LIMITS OF DRAINAGE AREAS
INTERCEPTED BY THE CULVERT C2 TO BE DELINEATED AT THE
CURVE OF THE PROPOSED CONTOURS ON LOT 2 AND ON THE WEST
SIDE DELINEATE THEM TO INCLUDE A PORTION OF THE EXISTING
DIRT ROAD. SEE ATTACHMENT FOR CLARIFICATION. REVISE THE
PLANS, PROFILES AND COMPUTATION SHEETS TO REFLECT THE
CHANGES.
E) PLEASE INDICATE WITH ARROWS THE DIRECTION OF FLOW
ALONG THE WETLANDS, SWIFT CREEK, STORM SEWER, CULVERTS,
ETC. REFLECT THE CHANGES ON ALL APPLICABLE SHEETS (I.E.
SHEETS C1.1 THRU C2.4, C2.7 THRU C3.2, C5.0 THRU 5.4,
ETC).
F) PLEASE SHOW IN GHOSTED LINES THE PROPOSED SUBDIVISION
AND LOTS NUMBERING.
G) A CHECK OF THE CULVERT CALCULATIONS STRUCTURES C2/C3
INDICATES THAT THE 18" VERTICAL CLEARANCE BETWEEN EDGE
OF SHOULDER AND 10-YEAR HEADWATER HAS NOT BEEN PROVIDED.
PLEASE ADDRESS.
H) BE SURE TO LABEL THE PROPOSED ROADS ON THE PLAN VIEW.
I) THE INCREMENTAL DRAINAGE AREAS PERTINENT TO 0.99
ACRES ON LOT 2 APPEAR ONLY A SMALL AREA TO DRAIN TO THE
ROAD AND THE REMAINING AREA TO DRAIN TO CULVERT C2.
PLEASE ADJUST THE LIMITS/ACREAGE ACCORDINGLY AND REFLECT
THE CHANGES ON ALL APPLICABLE SHEETS (I.E. PLANS,
PROFILES, COMPUTATION SHEETS, VRRM SHEETS, ETC.).
J) PLEASE BE SURE TO SHOW/LABEL THE LIMITS OF 100-YEAR
FLOODPLAIN ALONG THE WETLAND AREAS ON THIS SHEET.
K) PAVED DITCH IS REQUIRED FOR SLOPES LESS THAN 0.75%
(I.E. FROM STATIONS 15+00 TO 16+00 LEFT/RIGHT ON
GILLINGHAM DRIVE, FROM STATIONS 14+00 TO 14+50
LEFT/RIGHT ON GILLINGHAM COURT). REFLECT THE CHANGES ON
ALL APPLICABLE SHEETS.
L) PLEASE PROVIDE A SECONDARY RCP CLASS III ENTRANCE
CULVERT TO CROSS THE WETLANDS DRAINAGEWAY FOR ACCESSING
LOT 16. SUBMIT 100-YEAR CULVERT CALCULATIONS FOR
FURTHER REVIEW AND/OR APPROVAL AND BE SURE THE DESIGN OF
THESE CULVERTS PASS THE 100-YEAR STORM.
IN ADDITION, SHOW/LABEL THE DRIVEWAY PATH ON THE PLANS.
FURTHERMORE, SHOW/LABEL THE LIMITS OF INCREMENTAL
DRAINAGE AREAS WITH THE NUMBER OF ACREAGE THAT DRAINS TO
THIS SECONDARY ENTRANCE CULVERT AND THE HYDROLOGIC
INFORMATION TO CALCULATE THE 100-YEAR DISCHARGES
(I.E. THE RUNOFF COEFFICIENT, FLOW PATH, ETC.).
ADDITIONALLY, SHOW THE EXISTING HOMES/DRIVEWAYS OF THE
EXISTING DEVELOPMENT, ETC. LOCATED UPSTREAM OF LOT 16.
ADDITIONALLY, CROSS-HATCHED THE WETLAND AREA TO BE
IMPACTED BY THE INSTALLATION OF THIS CULVERT.
22. THESE ARE IN REGARDS THE 100-YEAR FLOODPLAIN DRAINAGE
AREAS AND CROSS-SECTIONS PLANS (SHEETS C5.4 AND C5.5):
A) PLEASE SHOW/LABEL THE LIMITS OF THE INCREMENTAL
DRAINAGE AREAS WITH THE NUMBER OF ACREAGE AT EACH
SECTIONS-LOCATIONS. INCLUDE RUNOFF COEFFICIENT, FLOW
PATH (I.E. SHEET FLOW, SHALLOW CONCENTRATED FLOW AND
CHANNEL FLOW), ETC. ON THE PLANS.
B) THE LIMITS OF THE OFFSITE DRAINAGE AREAS WITH THE
NUMBER OF ACREAGE THAT DRAIN TO X-SECTIONS A1 THRU A6/B1
THRU B9/C1 THRU C4/ETC. SHOULD BE SHOWN ON THIS SHEET
WITH PERTINENT HYDROLOGIC INFORMATION (I.E. RUNOFF
COEFFICIENT, FLOW PATH, ETC.).
C) BE SURE TO SHOW THE EXISTING CONTOURS WITH ELEVATIONS
FOR THE OFFSITE DRAINAGE AREAS.
D) PLEASE PROVIDE THE FOLLOWING INFORMATION TO THE
SCALED X-SECTIONS (A1 THRU A6/B1 THRU B9/C1 THRU
C4/ETC.), THE MANNING ROUGHNESS COEFFICIENT, 100-YEAR
DISCHARGE/DEPTH/VELOCITY, % SLOPE, ETC. ON THE PLANS.
E) PLEASE SUBMIT COMPLETE HYDROLOGIC CALCULATIONS TO
CALCULATE THE 100-YEAR DISCHARGE (I.E. DRAINAGE AREAS,
RUNOFF COEFFICIENT, ETC, ETC.) FOR X-SECTIONS A1 THRU
A6/B1 THRU B9/C1 THRU C4/ETC. FOR FURTHER REVIEW AND/OR
APPROVAL.
F) PLEASE PROVIDE COMPLETE HYDRAULIC CALCULATIONS FOR X-
SECTIONS A1 THRU A6/B1 THRU B9/C1 THRU C4/ETC. TO
INCLUDE THE MANNING ROUGHNESS COEFFICIENT, CHANNEL X-
SECTION DATA, WETTED PERIMETER, CHANNEL AREA, VELOCITY,
SLOPE, ETC. FOR FURTHER REVIEW AND/OR APPROVAL.
G) IT APPEARS TO BE A DISCREPANCY WHEN COMPARING THE
100-YEAR DISCHARGE USED IN X-SECTION B3 WITH THE CULVERT
C2 CALCULATIONS OF 32.54 CFS/30.69 CFS RESPECTIVELY.
PLEASE CLARIFY OR REVISE ACCORDINGLY.
H) SIMILARLY, IT APPEARS TO BE A DISCREPANCY WHEN
COMPARING THE 100-YEAR YEAR DISCHARGE USED IN X-SECTION
B7 WITH THE CULVERT C3 CALCULATIONS OF 33.80CFS/31.50
CFS. IT APPEARS THE DISCHARGE AT THE CULVERTS C2/C3
SHOULD BE THE SAME OR MORE. PLEASE CLARIFY OR REVISE
ACCORDINGLY.
I) PLEASE SHOW THE FEMA TEXT ALONG THE LIMITS OF THE
100-YEAR FEMA FLOODPLAIN. REFLECT THE CHANGES ON ALL
APPLICABLE SHEETS (I.E. SHEETS C.20 THRU C2.3, C3.0,
C3.1,C5.0 THRU C5.5, ETC.).
J) PLEASE SHOW/LABEL TWO SECTION-LOCATIONS OF THE 100-
YEAR FEMA FLOODPLAIN WITH ELEVATIONS ALONG THE SWIFT
CREEK IN THE PROXIMITY OF LOT 8 AND LOT 15.
23. THESE ARE IN REGARDS TO THE GRADING PLAN (SHEET C5.0):
A) BASED ON THE X-SECTION B-3 THE EXISTING CONTOURS
APPEAR THAT THE FLOODPLAIN ELEVATION 202.72 ARE MUCH
WIDER THAN SHOWN. PLEASE REVISE ACCORDINGLY.
B) IT APPEARS THE PROPOSED ROADSIDE DITCH FLOWLINE ON
EITHER SIDE/FILL BERM IN THE PROXIMITY OF THE PROPOSED
CULVERT STR. 3 IS MUCH LOWER THAN THE 100-YEAR
BACKWATER/100-YEAR FLOODPLAIN OF 195.20. AS A RESULT,
PART OF THE UPSTREAM AREAS WOULD BE DRAINING TOWARDS
THE PROPOSED DETENTION POND. PLEASE ADJUST THE DESIGN
TO ADDRESS THIS CONCERN.
C) IT IS UNCLEAR WHICH WAY THE WETLANDS DRAIN CROSSING
LOTS 7/8. PLEASE PROVIDE CONTOURS WITH ELEVATIONS
SUFFICIENT DISTANCE BEYOND SECTION BOUNDARY.
D) PLEASE PROVIDE THE SECTION LINE BELOW X-SECTIONS B-1
THRU B-9 AND C-1 THRU C-4. REFLECT THE CHANGES ON ALL
APPLICABLE SHEETS.
E) PROVIDE LOT NUMBERING ON SHEETS C5.0 AND C5.1.
F) PLEASE CLARIFY IF THE 12" CPP WOULD BE REMOVED.
PROVIDE THE NECESSARY NOTES ON THE PLANS.
24. THESE ARE IN REGARDS TO THE PROFILES:
A) PLEASE BE SURE TO SHOW/LABEL THE LIMITS OF THE 100-
YEAR FLOODPLAIN, WETLAND, RPA, ROW, ETC. ON ALL
APPLICABLE PROFILES.
B) PLEASE SHOW THE STORM SEWER STRUCTURES 2/P2/3,
12/P13/13 WITH PERTINENT INFORMATION IN THE GILLINGHAM
DRIVE PROFILE (SHEET C4.1).
C) PLEASE REVISE THE STORM SEWER PROFILE STRUCTURES 7 TO
1 (SHEET C4.2) TO SHOW/LABEL THE EXISTING 12" CPP, THE
100-YEAR FEMA FLOODPLAIN LIMITS, THE 10/100-YEAR WSE,
ETC.
D) PLEASE SHOW/LABEL THE LEFT/RIGHT ROADSIDE DITCH(ES)
IN THE ROAD PROFILES WITH PERTINENT INFORMATION (I.E.
%SLOPE, DESIGN DEPTH, LINING, ETC.).
25. AS A PREREQUISITE TO SUBDIVISION PLAT RECORDATION:
A) THE $100/LOT BMP MAINTENANCE FEE MUST BE RECEIVED.
B) APPROVED BONDING AND RECORDED EASEMENTS WITH DEED
BOOK AND PAGE NUMBER FOR THE SWM DETENTION POND MUST BE
PROVIDED.
C) A COPY OF THE COVENANTS AND ARTICLES OF INCORPORATION
OF THE HOMEOWNERS' ASSOCIATION SHALL BE PROVIDED TO THE
ENVIRONMENTAL ENGINEERING DEPARTMENT FOR APPROVAL. THE
ENVIRONMENTAL ENGINEERING DEPARTMENT WILL DETERMINE
WHETHER THE SUBDIVISION HAS BEEN PROVIDED WITH THE
INFORMATION TO DEVELOP AND IMPLEMENT A
FERTILIZATION/LAWN CARE PROGRAM TO MINIMIZE PHOSPHOROUS
RUNOFF. THE REQUIREMENTS OF THE PROGRAM SHALL BECOME A
PART OF THE COVENANTS FOR THE PROJECT AFFECTING ALL
PROPERTIES WITHIN THE DEVELOPMENT.
===================== END OF COMMENTS ====================
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS/751-2335
NAME OF PLAN : WEATHERBURY SECTION2
ADDRESS : AT THE INTERSECTION WEATHERBURY PLACE
AND GILLINGHAM DRIVE
SITE PLAN NO. : 16CP0014
LATEST PLAN DATE : 02/29/16
DEPT. REC'D DATE : 03/07/16
SUBMITTAL NUMBER : 2
REVIEW DATE : 04/04/16
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : NO
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND/OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR STATE
PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES INCLUDING
BUT NOT LIMITED TO WETLANDS, SURFACE WATERS (E.G. VSMP
PERMIT FOR CONSTRUCTION SITES, GROUND WATER AND AIR
QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT RELIEVE YOU
OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE LAND
DISTURBANCE PERMIT.
2 THIS OFFICE IS RECOGNIZING THAT THE 10-YEAR PRE/10-YEAR
POST REQUIREMENTS FOR FLOOD PROTECTION MAY BE ADDRESSED BY
DISCHARGING INTO THE 100-YEAR FLOODPLAIN.
=== EROSION CONTROL ===
1. IT APPEARS THREE CONSTRUCTION ENTRANCES HAVE BEEN
SPECIFIED ON THE EC PLANS (I.E. TWO CONSTRUCTION ENTRANCES
ARE ON THE EC PHASE I AND ONE ADDITIONAL ON THE EC PHASE
II). IN ADDITION, THE DRAINAGE AREAS IN THE SEDIMENT BASIN
SHOULD BE DESIGNED FOR THE ULTIMATE DRAINAGE AREAS, ETC.).
PLEASE SUBMIT REVISED ITEMIZED COST ESTIMATE TO INCLUDE
ADDITIONAL EROSION CONTROL MEASURES REQUESTED IN THIS
REVIEW FOR FURTHER REVIEW AND/OR APPROVAL.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A COPY OF THE AUTOCAD FILE MUST BE SUBMITTED TO
CAROLE CLIBORNE OF THE ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD
VERSION 2009 OR EARLIER AND REFERENCED DIRECTLY TO THE
VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN
THE NAD83 DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A
CD, DVD, OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH
THE SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN
NUMBER, ENGINEERING FIRM AND CAD FILE PREPARER'S NAME
AND PHONE NUMBER. THE FILE MUST CONTAIN THE FOLLOWING,
EACH CLEARLY LABELED IN SEPARATE LAYERS:
I.EDGES OF ROADS TO INCLUDE CURB AND GUTTER; AND
II. EDGES OF SIDEWALKS;
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
B) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
C) SAFETY FENCE AND/OR SUPER SILT FENCE WITH OPTIC
ORANGE FABRIC MUST BE IN PLACED ALONG THE RPA LIMITS.
D) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
E) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
F) IF APPLICABLE, A COPY OF VDOT LAND USE PERMIT MUST
BE RECEIVED.
G) AN EROSION CONTROL BOND MUST BE POSTED.
H) THE RISER AND BARREL PIPE (PERMANENT RISER/BARREL)
ASSOCIATED WITH THE SEDIMENT BASIN(S) MUST BE ON-SITE.
I) AN EROSION CONTROL BOND MUST BE POSTED.
3. WE OFFER, BUT NOT LIMITED TO, THE FOLLOWING COMMENTS:
A) PLEASE BE SURE TO USE THE APPROPRIATE LEGEND/STANDARD
SYMBOL FOR SUPER SILT FENCE (-XX-XX-). REFLECT THE
CHANGES ON THE EROSION AND SEDIMENT CONTROL PHASE I AND
PHASE II.
B) PLEASE PROVIDE SAFETY FENCE FOR THE INSTALLATION OF
THE OUTFALL PIPE STRUCTURES 14/15 TO BE LOCATED WITHIN
THE WIDTH OF THE SWM/BMP EASEMENT ON BOTH SIDES OF THIS
OUTFALL PIPE. REFLECT THE CHANGES ON THE EC PHASE
I/PHASE II.
IN ADDITION, LABEL THE STORM SEWER STRUCTURES 14/15.
REFLECT THE CHANGES ON THE EC PHASE I/PHASE II.
C) PLEASE PROVIDE SUPER SILT FENCE WITH OPTIC ORANGE
FENCE ALONG THE RPA LIMITS ON THE FUTURE LOT WHERE THE
TEMPORARY STOCKPILE IS LOCATED. REFLECT THE CHANGES ON
THE EC PHASE I/PHASE II.
D) PLEASE PROVIDE CULVERT INLET PROTECTION TO THE
EXISTING 12" CPP. REFLECT THE CHANGES ON THE EC PHASE I
AND PHASE II.
E) AS PREVIOUSLY REQUESTED, PLEASE PROVIDE A SEDIMENT
TRAP ON THE DOWNSTREAM SIDE OF THE PROPOSED GRADING
SPECIFIED ON LOT 2 TO BE LOCATED NEAR THE PROPOSED
CULVERT STR. C2 IN CONJUNCTION WITH SILT FENCE TO
SURROUND THE DOWNSTREAM SIDE OF THE SEDIMENT TRAP.
INCLUDE DRAINAGE AREAS INTERCEPTED BY THIS TRAP AND
DIMENSIONS OF THIS DEVICE ON THE PLANS. REFLECT THE
CHANGES ON THE EC PHASE I AND PHASE II PLANS.
ALTERNATIVELY, SMALL EXCAVATED PIT WITH TEMPORARY GRAVEL
OUTLET SHOULD BE PROVIDED.
F) PLEASE REVISE ITEM 9 UNDER PHASE II SEQUENCE OF
CONSTRUCTION (SHEET C2.2) TO STATE, "EXISTING ROAD AND
THE ENTRANCE CULVERT LOCATED ON LOTS 1, 3, 8, 11, 13,
ETC. TO BE REMOVED AND RESTORED TO SURROUNDING
CONDITIONS IF CUT OR FILL EXCEEDS ONE FOOT AND
COMPLETELY STABILIZED WITH PERMANENT SEEDING AND
MULCHING".
PLEASE PROVIDE A NOTE TO THE EXISTING ENTRANCE CULVERT
LOCATED AT THE ENTRANCE TO THE EXISTING ROAD STATING,
"THE EXISTING ENTRANCE CULVERT TO BE REMOVED. RESTORE
THE ROADSIDE DITCH TO MATCH THE EXISTING DESIGN AND BE
SURE TO PROVIDE POSITIVE DRAINAGE."
G) EC COMMENTS WILL NOT BE PROVIDED FOR THE GRADING
PROPOSED WITHIN THE FEMA FLOODPLAIN SPECIFIED ON LOTS
12/13 UNTIL THIS OFFICE RECEIVES A WRITTEN CONFIRMATION
FROM THE DIRECTOR OF THE ENVIRONMENTAL ENGINEERING
DEPARTMENT WHETHER OR NOT FILLING IN THE 100-YEAR FEMA
FLOODPLAIN IS ALLOWED.
H) AS PREVIOUSLY REQUESTED, PLEASE SHOW/LABEL CENTERLINE
STATIONING AT EVERY 100' ALONG THE PROPOSED ROADS.
REFLECT THE CHANGES ON THE EC PHASE I PLANS (I.E. SHEETS
C2.0, ETC.).
I) PLEASE REVISE THE EC PHASE II TO SHOW/LABEL CULVERT
INLET PROTECTION (CIP) TO THE PROPOSED SECONDARY
ENTRANCE CULVERT TO ACCESS LOT 16.
J) PLEASE SHOW/LABEL THE EXISTING CULVERT WITH PERTINENT
INFORMATION LOCATED UNDER WEATHERBURY PLACE IN THE
PROXIMITY OF STATION 35+50, WHICH WAS SHOWN ON THE
PREVIOUS PLANS DATED 7/17/15. REFLECT THE CHANGES ON THE
EC PHASEI/PHASE II.
K) PLEASE BE SURE SHOW/LABEL THE EC MEASURES PROVIDED
ALONG THE EXISTING ROAD (I.E. THE SILT FENCE,
CONSTRUCTION ENTRANCE, LIMITS OF CLEARINGS, ETC.)
SPECIFIED ON THE EC PHASE I TO BE SHOWN ON THE EC PHASE
II AND PROVIDE A NOTE STATING, "ONCE THE SEDIMENT BASIN
IS CONSTRUCTED AND OTHER EROSION & SEDIMENT CONTROL
MEASURES ARE IN PLACE FOR THE INSTALLATION OF THE STORM
SEWER AND THE ROUGH GRADING OF THE ROAD AS SHOWN ON THE
EC PHASE II PLANS, THE SILT FENCE AND CONSTRUCTION
ENTRANCE CAN BE REMOVED AFTER THE REMOVAL OF THE
EXISTING ROAD LOCATED ON LOTS 3, 8, 11, 13, ETC."
L) THESE ARE IN REGARDS TO THE SEDIMENT BASIN:
L.1) THERE APPEARS TO BE A DISCREPANCY WHEN COMPARING
THE SEDIMENT BASIN CALCULATIONS/STAGE STORAGE TABLE WITH
THE CONSTRUCTION PLANS. ON THE CONSTRUCTION PLANS THE
BOTTOM OF THE BASIN IS SHOWN TO BE AT 184.00 AND ON THE
STAGE-STORAGE TABLE STARTS AN ELEVATION OF 181.00. AS
APPLICABLE REVISE THE PLANS, SEDIMENT BASIN
CALCULATIONS/STAGE STORAGE TABLE, ROUTING, ETC. TO
ENSURE THE INFORMATION IS CONSISTENT.
L.2) BASED ON THE ROUTING CALCULATIONS IT APPEARS 10.59
ACRES WOULD ULTIMATELY BE DRAINING TO THIS BASIN WHEN
ALL THE PROPOSED DRAINAGE IMPROVEMENTS ARE IN PLACE.
HOWEVER, IN THE SEDIMENT BASIN CALCULATIONS ONLY 8.84
ACRES WERE USED TO DESIGN THE WET/DRY VOLUME. PLEASE
CLARIFY AND/OR REVISE ALL APPLICABLE SHEETS TO REFLECT
THE CHANGES.
L.3) PLEASE REVISE THE TEXT FOR LABELING THE PROPOSED
CONTOURS PERTINENT TO THE SEDIMENT BASIN TO BE MORE
LEGIBLE. THE TEXT MAY BE SHOWN IN THINNER LINES TO BE
LESS BOLD. REVISE ALL APPLICABLE SHEETS TO REFLECT THE
CHANGES.
M) PLEASE PROVIDE SMALL EXCAVATED PIT WITH TEMPORARY
GRAVEL OUTLET TO BE LOCATED DOWNSTREAM OF THE PROPOSED
GRADING ON LOT 8. ADJUST THE SILT FENCE TO INCLUDE THIS
PIT. REFLECT THE CHANGES ON THE EC PHASE II.
4. IF TIMBERING IS REQUIRED ON THE PROJECT, IT SHOULD BE
INCORPORATED INTO THE EROSION CONTROL PLAN / NARRATIVE AND
SHOULD NOT BEGIN UNTIL AFTER THE ISSUANCE OF A LAND
DISTURBANCE PERMIT AND THE INSTALLATION OF THE APPROVED
EROSION CONTROL DEVICES.
======= CBPA =======
1. PLEASE REVISE THE WORKSHEET A CALCULATIONS TO USE TABLE
2: MINIMUM ALLOWABLE PERCENT IMPERVIOUS COVER. AN IN-HOUSE
CHECK WAS PERFORMED. IT APPEARS THE AVERAGE IMPERVIOUS
COVER TO BE 13.7% AS OPPOSED TO 7%, YIELDING A REMOVAL
REQUIRED OF 5.15 LB/YR. PLEASE SUBMIT REVISED
WORKSHEET A CALCULATIONS FOR FURTHER REVIEW AND APPROVAL.
SEE THE ENCLOSED COPY OF WORKSHEET A CALCULATIONS.
IN ADDITION, BE SURE THE POLLUTANT REMOVAL IN THE VRRM IS
EQUAL OR HIGHER THAN 5.15 LB/YR.
==== SWM ======
1. AS PREVIOUSLY REQUESTED, IT APPEARS SIGNIFICANT
INFORMATION NEEDED IN THE DESIGN AND CONSTRUCTION OF THE
SWM DETENTION BASIN IS CURRENTLY MISSING FROM THE
CONSTRUCTION PLANS. REFER TO THE SUBDIVISION CHECKLIST
AND/OR THE ENVIRONMENTAL ENGINEER MANUAL FOR ADDITIONAL
REQUIREMENTS NEEDED TO BE ON THE PLANS. IN ADDITION, PLEASE
SEE, BUT NOT LIMITED, TO THE FOLLOWING:
2. PLEASE REVISE THE TITLE IN THE TITLE BOX TO SPECIFY WHAT
TYPE OF BMP TO BE USED. FOR A DRY BASIN, IT SHOULD BE
LABELED AS "BMP EXTENDED DETENTION POND" AND FOR A WETPOND,
IT SHOULD BE LABELED AS "SWM/BMP WETPOND". REVISE
ACCORDINGLY.
3. PLEASE BE SURE THE RISER/BARREL DETAILS ARE SHOWN TO
SCALE. THEY ARE CURRENTLY SHOWING ON THE PLANS NOT TO
SCALE.
IN ADDITION, PLEASE SPECIFY A TRASH RACK WITH CONCRETE PAD
TO PROTECT THE 8" ORIFICE FROM DEBRIS. PROVIDE A DETAIL
WITH PERTINENT INFORMATION. PLEASE PROVIDE A NOTE THAT THE
8" ORIFICE OPENING SHOULD BE PRE-CAST.
4. PLEASE SHOW/LABEL THE TEMPORARY 4" ORIFICE WITH
PERTINENT ELEVATION IN THE RISER DETAIL. IN ADDITION,
PROVIDE A NOTE FOR THE CONVERSION TO PERMANENT BMP STATING,
"REMOVE THE TEMPORARY DEWATERING DEVICE AND PLUG/GROUT THE
TEMPORARY 4" ORIFICE IN THE 36" RISER."
5. PLEASE BE SURE THE EMERGENCY SPILLWAY DETAIL IS SHOWING
TO SCALE. REVISE ACCORDINGLY.
6. AS PREVIOUSLY REQUESTED, PLEASE SUBMIT A LETTER TO THE
DIRECTOR OF ENVIRONMENTAL ENGINEERING REQUESTING A VARIANCE
FOR PROPOSING A SWM/BMP POND IN THE 100-YEAR FEMA
FLOODPLAIN, SINCE DISTURBANCE IS PROHIBITED WITHIN USCW
100-YEAR FLOODPLAINS WHEN DRAINAGE AREAS EXCEED 100 ACRES.
7. IF PERMITTED BY THE DIRECTOR WITHIN THE FEMA ZONE AE
FLOODPLAIN, A NO-RISE CERTIFICATE SIGNED/SEALED BY A
LICENSED PROFESSIONAL ENGINEER MUST BE PROVIDED WITH
SUPPORTING TECHNICAL DATA THAT PROPOSED DETENTION BASIN
FILL GRADING ACTIVITY WILL NOT IMPACT THE FEMA FLOODPLAIN.
8. THIS OFFICE IS UNABLE TO DO A COMPLETE REVIEW REGARDING
THE PROPOSED BASIN, SINCE THE INFORMATION INDICATED ON THE
CONSTRUCTION PLANS AND THE VIRGINIA RUNOFF REDUCTION
SPREADSHEET DO NOT MATCH. ON THE CONSTRUCTION PLANS APPEAR
TO PROPOSE A DRY BASIN AND ON THE VRRM SPREADSHEET A WET
POND LEVEL 1 WAS USED IN THE ANALYSIS. PLEASE REVISE THE
PLANS, COMPUTATIONS SHEETS, 1/10/100-YEAR ROUTING, VRRM
SPREADSHEET, ETC. TO ENSURE THE INFORMATION IS CONSISTENT.
9. THESE ARE IN REGARDS TO THE SWM DETENTION BASIN GRADING
PLAN (SHEET C2.8):
A) AS PREVIOUSLY REQUESTED, PLEASE REVISE THE SCALE TO
BE 1"=20' AS OPPOSED TO 1"=30'.
B) PLEASE CLARIFY THE TWO PLUNGE POOLS PROPOSED WITHIN
THE BASIN BOTTOM ADJACENT TO STR. 14.
IN ADDITION, IF THE POND IS DESIGNED TO MEET THE NEW
CRITERIA THEN IT SHOULD FOLLOW CLOSELY THE INFORMATION
SPECIFIED IN THE BMP'S CLEARING HOUSE. IT SHOULD INCLUDE
BUT NOT LIMITED TO THE FOLLOWING: POND DESIGN CRITERIA
TABLE (LEVEL 1 OR LEVEL 2) TREATMENT VOLUME, POOL
DEPTH/NWSE, FOREBAYS/MICROPOOLS DETAILS, ETC. A FURTHER
DISCUSSION IS RECOMMENDED.
C) PLEASE SHOW/LABEL THE 12' DIMENSION WITHIN THE WIDTH
OF THE MAINTENANCE CORRIDOR/TOP OF THE EMBANKMENT.
D) PLEASE SHOW THE 12' BMP ACCESS ROAD IN DARKER/THICKER
LINES AS OPPOSED TO THINNER LINES TO STANDOUT FROM OTHER
FEATURES. PERHAPS THE PROPOSED CONTOURS SHOULD BE SHOWN
THINNER/DARKER LINES.
IN ADDITION, SHOW THE GRAVEL PATTERN WITHIN THE BMP
ACCESS ROAD ON ALL APPLICABLE SHEETS.
E) AS PREVIOUSLY REQUESTED, SHOW/LABEL THE SWM/BMP
EASEMENT ENCLOSING THE ENTIRE PROPOSED BASIN/OUTFALL
PIPE STRUCTURES 14/15 ON ALL APPLICABLE VIEWS (I.E. BMP
GRADING PLAN, LAYOUT PLAN, GRADING PLAN, ETC.).
FURTHERMORE, FOR ESTABLISHING THE SWM/BMP EASEMENT BE
SURE IT IS DIMENSIONED 25' OFF THE 100-YEAR WSE OR TOE
OF DAM, WHICHEVER IS MOST RESTRICTIVE. SOME PORTIONS OF
THE DELINEATED SWM/BMP EASEMENT MEASURES LESS THAN
25'OFF THE 100-YEAR. REVISE ACCORDINGLY.
IN ADDITION, BE SURE THE PROPOSED SWM/BMP EASEMENT DOES
NOT ENCROACH INTO THE RPA. EXCEPT FOR THE OUTFALL PIPE
STRUCTURES 14/15.
F) PLEASE LABEL THE 30' DIMENSION THAT IS INDICATING THE
EASEMENT TO ACCESS THE POND AS "30' BMP ACCESS
EASEMENT". REFLECT THE CHANGES ON ALL APPLICABLE VIEWS.
G) PLEASE RELOCATE THE ACCESS GATE TO BE NEAR THE
ENTRANCE AND OUTSIDE THE RIGHT-OF-WAY LIMITS. IN
ADDITION, PROVIDE GRAPHICAL DEPICTION OF THE GATES ON
THE PLAN VIEWS.
H) PLEASE SHOW/LABEL THE AUTHORIZED VEHICLE ONLY SIGN
WITHIN THE ENTRANCE OF THE BMP ACCESS ROAD. REFLECT THE
CHANGES ON ALL APPLICABLE SHEETS.
IN ADDITION, INCLUDE THE ENCLOSED AUTHORIZED VEHICLE
ONLY SIGN DETAIL ON SHEET C2.8.
I) AS PREVIOUSLY REQUESTED, PLEASE SHOW/LABEL THE 50'
VEGETATIVE PERIMETER YARD SETBACK AROUND THE DETENTION
BASIN OR RETENTION BASIN.
10. THESE ARE IN REGARDS TO THE BASIN OUTFALL PIPE PROFILE
(SHEET C2.8):
A) AS PREVIOUSLY REQUESTED, PLEASE REVISE THE
INFORMATION FOR STR. 15 TO ELIMINATE "36" DIA. RISER"
AND INSTEAD NOTED AS USCW SPECIAL END TREATMENT DI-7.
B) PLEASE SHOW/LABEL THE LIMITS OF THE RPA.
11. IF THIS PROPOSED POND IS GOING TO BE AN EXTENDED
DETENTION POND ITEM 7 UNDER POND SPECIFICATION FOR POND
CONSTRUCTION (SHEET C2.8) IT MAY NOT BE APPLICABLE. REVISE
ACCORDINGLY.
12. FURTHER CLARIFICATION IS NEEDED FOR THE PROPOSED
PLANTING AND SERIES OF PLUNGE POOLS SPECIFIED WITHIN THE
PROPOSED BASIN (SHEETS C2.7 AND C2.8). IF THIS PROPOSED
BASIN IS A WETPOND THEN THE PLANTING WILL NOT BE NEEDED.
THEREFORE, NO FURTHER REVIEW WAS MADE TO THE STORMWATER
LANDSCAPE BASIN (SHEET C2.7).
THE TREATMENT VOLUME AND VOLUME FOR THE PERMANENT POOL
CALCULATIONS WERE MISSING FROM THE SUBMITTAL PACKAGE AND
FROM THE CONSTRUCTION PLANS. PLEASE ADDRESS.
FURTHERMORE, THE NWSE INFORMATION WAS MISSING FROM THE PLAN
VIEWS AND PROFILES IF THIS WAS INTENDED TO BE A WETPOND. A
FURTHER DISCUSSION IS RECOMMENDED.
13. THESE ARE IN REGARDS TO THE ROUTING CALCULATIONS:
A) AS PREVIOUSLY REQUESTED, PLEASE SUBMIT REVISED
COMPLETE 1/10/100-YEAR ROUTING CALCULATIONS FOR FURTHER
REVIEW AND/OR APPROVAL. BE SURE THE STAGE-DISCHARGES FOR
EACH STRUCTURE ARE PROVIDED IN THE ROUTING FOR REVIEW.
B) THERE APPEARS TO BE A DISCREPANCY WHEN COMPARING THE
EMERGENCY SPILLWAY GEOMETRICAL DESIGN IN THE
CONSTRUCTION PLANS WITH THE ROUTING. THE CONSTRUCTION
PLANS SHOW A TRAPEZOIDAL DITCH AND THE ROUTING USED A
RECTANGULAR DITCH. BE SURE THIS INFORMATION MATCH.
C) AS PREVIOUSLY REQUESTED, IT APPEARS THE PIPE BARREL
IS MISSING FROM THE ANALYSIS. PLEASE CLARIFY.
D) IT APPEARS A VERTICAL ORIFICE OF 36" AT ELEVATION
184.66 WAS USED IN THE ANALYSIS AS OPPOSED TO 8"
VERTICAL ORIFICE AT ELEVATION 183.99 TO MATCH THE
CONSTRUCTION PLANS.
IN ADDITION, THE 36" HORIZONTAL ORIFICE AT ELEVATION
186.40 IS MISSING FROM THE ANALYSIS. PLEASE CLARIFY OR
SUBMIT REVISED 1/10/100-YEAR ROUTING FOR FURTHER REVIEW
AND/OR APPROVAL.
E) AS PREVIOUSLY REQUESTED, PLEASE DEPICT PRE/POST
DEVELOPED AREAS DRAINING TOWARDS THE DETENTION BASIN ON
THE PLANS. AN ADDITIONAL SHEET MAY BE NEEDED.
F) BE SURE THE 1/10/100-YEAR WSE INFORMATION SHOWN ON
THE CONSTRUCTION PLANS MATCH WITH THE ROUTING
CALCULATIONS. REVISE AS APPLICABLE.
14. AS PREVIOUSLY REQUESTED, PLEASE LABEL THE OPEN SPACE
ENCUMBERED BY PROPOSED SWM DETENTION POND. REFLECT THE
CHANGES ON ALL APPLICABLE SHEETS.
======= VRRM =======
1. THESE ARE IN REGARDS TO VRRM STORMWATER COMPLIANCE
CALCULATIONS (SHEET C5.7):
A) PLEASE SPECIFY THE SCALE AND THE NORTH ARROW ON THIS
SHEET.
B) THE PROPOSED/EXISTING CONTOURS ARE MISSING FROM THE
PLAN VIEW TO VERIFY DRAINAGE BREAKS.
C) PLEASE DEPICT AND LABEL THE PROPOSED CULVERTS C1 THRU
C2 ON THE PLAN VIEW.
D) AS PREVIOUSLY REQUESTED, IT APPEARS APPROXIMATELY 1.2
ACRES ONSITE DRAINS TO STR. C2 BY PASSES THE SWM
DETENTION BASIN. PLEASE ADDRESS. REVISE THE ENERGY
BALANCE TABLE ACCORDINGLY.
E) PLEASE REVISE STORMWATER COMPLIANCE TABLE TO INCLUDE
THE BASIN (WET OR DRY).
IN ADDITION, REVISE THE LOCATION BMP FOR BMP#1 AND #2 IN
THE STORMWATER COMPLIANCE TABLE (SHEET C5.7) TO SPECIFY
THE LOTS WHERE SIMPLE ROOF TOP DISCONNECTIONS HAVE BEEN
PROPOSED.
F) PLEASE LABEL LOTS 12 AND 13 AS FUTURE. IN ADDITION,
REVISE THE LOT NUMBERING TO MATCH WITH THE CONSTRUCTION
PLANS.
G) PLEASE DEPICT THE WETLAND AREAS, THE RPA AREA, THE
PROPOSED POND/BMP ACCESS ROAD, ETC. ON THE PLAN VIEW
(SHEET C5.7).
H) PLEASE REMOVE THE BUILDING ENVELOPES, SINCE THE
MEASUREMENTS ARE WRONG.
2. THESE ARE IN REGARDS TO THE VRRM SPREADSHEET:
3. AS PREVIOUSLY REQUESTED, THE DESIGNATION OF LAND AS
FOREST/OPEN SPACE REQUIRES SOME FORM OF A PROTECTIVE
COVENANT. IT IS UNCLEAR HOW THIS HAS BEEN ADDRESSED IN THE
SUBDIVISION CONSTRUCTION PLANS. PLEASE EXPLAIN.
THE APPROXIMATE LIMITS OF FOREST/OPEN SPACE NEED TO BE
SHOWN AS EXHIBIT IS PROTECTIVE COVENANT AND SUBDIVISION
PLAT. FURTHER DISCUSSION MAY BE HELPFUL. A COPY OF THE
RESTRICTIVE COVENANT IS ENCLOSED.
4. AS PREVIOUSLY REQUESTED, THE SIMPLE ROOFTOP DISCONNECT
SPEAKS TO DOWNSPOUTS OR RESIDENTIAL IMPERVIOUS SURFACES
DIRECTED TO PERVIOUS FILTER AREAS COMPLYING WITH THE DESIGN
CRITERIA SPEC. 1. HOW DOES THE IMPERVIOUS ROAD PAVEMENT
PLAY A ROLE IN THE TREATMENT UNDER SIMPLE DISCONNECT?
PROVIDE A TYPICAL DESIGN WITH APPLICABLE DETAILS AND
DIMENSIONS ON THE CONSTRUCTION PLANS. THE LOTS ENCUMBERED
BY THE ROOFTOP DISCONNECT BMP MUST BE SPECIFIED IN THE
PLANS.
5. AS PREVIOUSLY REQUESTED, IN SECTION 4 OF THE ROOFTOP
DISCONNECT SPEC. 1 DOCUMENTATION TO THE HOMEOWNERS AND DEED
RESTRICTION OR OTHER MECHANISM ENFORCEABLE BY THE LOCAL
PROGRAM MUST BE IN PLACE. A DRAFT RESTRICTIVE COVENANT IS
REQUIRED FOR COUNTY REVIEW/APPROVAL PRIOR TO PLAN APPROVAL.
AS PREVIOUSLY REQUESTED, PLEASE PROVIDE AN ENLARGED SCALED
SOIL DELINEATION AND DRAINAGE AREA PLAN THAT DEPICTS THE
MINIMUM 40' DISCONNECTION LENGTH AT <2% SLOPE ON EACH
HOMESITE.
6. AS PREVIOUSLY REQUESTED, THE ENERGY BALANCE APPEARS TO
HAVE BEEN APPLIED TO ONLY ONE PROPOSED OUTFALL BELOW
DETENTION BASIN. THERE ARE TWO NATURAL CONVEYANCE SYSTEMS
DISCHARGING CONCENTRATED STORMWATER BELOW STR. C3 AND THE
EXISTING 12" CPP/LOT 7. THIS HAS NOT BEEN ADDRESSED. IT
DOES NOT APPEAR THE 18.03 ACRES DA B IS CORRECT. PLEASE
ADDRESS.
PER THE PREVIOUS PARAGRAPH AN ADDITIONAL SHEET MAY BE
NEEDED TO SHOW HOW THOSE AREAS MEET THE PART IIB AND IT MAY
SATISFY COMMENTS ITEMS 6, 7, 10, ETC. UNDER VRRM REVIEW
COMMENTS DATED 09/16/15. A FURTHER DISCUSSION IS
RECOMMENDED.
7. AS PREVIOUSLY REQUESTED, THE USE OF FOREST/OPEN SPACE AS
A WATER QUALITY MEASURE REQUIRES THAT THE APPROXIMATE
LIMITS BE SHOWN ON THE CONSTRUCTION PLANS AND RECORD PLAT
THAT ARE FURTHER DEFINED IN THE COVENANT/DEED RESTRICTION
OR OTHER ACCEPTABLE ENCUMBRANCE. A FURTHER DISCUSSION IS
RECOMMENDED.
======= ROAD AND DRAINAGE =======
1. UPON COMPLETION OF A FIELD INSPECTION, ADDITIONAL
COMMENTS MAY ARISE IF INDICATED BY THE EXISTING CONDITIONS.
2. IT APPEARS ADDITIONAL AREAS IN THE WETLANDS ARE GOING TO
BE IMPACTED BY THE STORM SEWER STRUCTURES P9, P11, ETC.
PLEASE SHOW THOSE AREAS WITH CROSS-HATCHED PATTERN. REFLECT
THE CHANGES ON ALL APPLICABLE SHEETS.
3. PLEASE BE SURE TO PROVIDE NORTH ARROW ON EACH SHEET
(I.E. SHEET C2.7, C2.8, C5.7, ETC.). REVISE ACCORDINGLY.
4. AS PREVIOUSLY REQUESTED, IT APPEARS THE PROPOSED OVERALL
DESIGN OF THE ROAD/ROADSIDE DITCHES OF ELEVATING THE ROAD
AT THE NATURAL DRAINAGEWAY WOULD CREATE CONFUSION FOR
MAINTENANCE, SINCE IT DOESN'T FOLLOW THE TYPICAL VDOT
PRACTICE OF CARRYING THE ROADSIDE DITCHES TO THE NATURAL
LOW/DRAINAGEWAYS. THIS OFFICE MUST RECEIVE A WRITTEN
CONFIRMATION FROM VDOT THAT THE PROPOSED DESIGN IS
ACCEPTABLE TO THEM PRIOR TO CONSTRUCTION PLAN APPROVAL.
5. PLEASE LABEL THE EXISTING 16' DRAINAGE EASEMENT THAT IS
ENCLOSING THE EXISTING DITCH ON LOT 2 WITH DEED BOOK AND
PAGE NUMBER. IN ADDITION, PROVIDE A NOTE STATING, "TO BE
VACATED".
6. PLEASE REVISE THE BUILDING SETBACKS OFF THE 100-YEAR
FEMA FLOOPLAIN TO BE DELINEATED 35' AS OPPOSED 25' (I.E. ON
LOTS 12 THRU 14, FUTURE LOT, ETC.). FOR DRAINAGEWAY THAT
EXCEEDS 100 ACRES OF CONTRIBUTING DRAINAGE AREAS A 35'
BUILDING SETBACK SHOULD BE SPECIFIED ON THE AFFECTED LOTS.
CONSEQUENTLY, LOT 12 DOES NOT ACHIEVE THE 25'X25' MINIMUM
BUILDABLE AREA. PLEASE REVISE THE PLANS TO ELIMINATE LOT
12.
7. PLEASE BE SURE TO LABEL THE STORM SEWER AND THE PROPOSED
CULVERTS WITH STR. NUMBERS ON SHEETS C3.0, C3.1, C3.4,
C5.1, C5.2, C5.3, ETC.
8. PLEASE BE SURE TO SHOW/LABEL THE 100-YEAR FEMA
FLOODPLAIN SECTIONS-LOCATIONS WITH ELEVATIONS SHOWN ON
SHEET C5.5 TO BE SHOWN ON SHEET C3.0 THRU C3.4.
9. SIMILARLY, PLEASE SHOW/LABEL THE 100-YEAR FLOODPLAIN
SECTIONS-LOCATIONS WITH ELEVATIONS (I.E. SECTIONS A1-A1
THRU C4-C4) ON SHEETS C3.0 THRU C3.4 TO VERIFY WHICH IS THE
MOST RESTRICTIVE (I.E. FP, BW OR SAG).
10. AS PREVIOUSLY REQUESTED, IT APPEARS THE PROPOSED FILLING
IN THE 100-YEAR FEMA FLOODPLAIN TO ACHIEVE BUILDING
ENVELOPE ON LOT 12 IS PROHIBITED BY ORDINANCE. REFER TO
SECTION 19-58 ITEM 18. THEREFORE, LOT 12 IS NOT BUILDABLE
AND IT SHOULD BE REMOVED FROM THE PROPOSED LOTS. A FURTHER
DISCUSSION IS RECOMMENDED.
IN ADDITION, REMOVE THE LABELING OF "EXISTING FLOODPLAIN TO
BE RELOCATED" FROM ALL APPLICABLE PLAN VIEWS.
11. AS PREVIOUSLY REQUESTED, PLEASE PROVIDE EC-1 RIPRAP AT
THE BEGINNING/ENDING OF THE PROPOSED CULVERTS STRUCTURES
C2/C3. INCLUDE DIMENSIONS OF THE EC-1 RIPRAP (I.E. WIDTH,
LENGTH AND 24" THICK LAYER OF RIPRAP OVER FILTER FABRIC) ON
THE PLANS AND PROFILES.
12. PLEASE BE SURE TO LABEL THE STORM SEWER AND THE PROPOSED
CULVERTS WITH STR. NUMBERS ON SHEETS C3.0, C3.1, C3.4, C5.1,
C5.2, C5.3, ETC.
13. THESE ARE IN REGARDS TO THE ROADSIDE DITCH DRAINAGE
AREAS PLAN (SHEET C5.2):
A) PLEASE REVISE THE RUNOFF COEFFICIENTS IN THE
GILLINGHAM DRIVE LEFT FROM STATIONS 17+00 TO 20+08 TO BE
HIGHER OF 0.85. SINCE IT APPEARS ONLY THE ROAD DRAINS TO
THIS DITCH. REVISE ACCORDINGLY.
B) A SIMILAR SITUATION EXIST WITH GILLINGHAM DRIVE RIGHT
FROM STATIONS 15+00 TO 20+08 TO USE A C=0.85. REVISE THE
TABLE ACCORDINGLY.
C) SIMILARLY, ON GILLINGHAM COURT RIGHT FROM STATION
12+00 TO 14+00, THE RUNOFF COEFFICIENT SHOULD BE AROUND
0.85. REVISE THE TABLE ACCORDINGLY.
D) PLEASE BE SURE TO SPECIFY EC-2 LINING FOR THE
PORTIONS OF THE PROPOSED DITCHES THAT REQUIRES LINING.
REFLECT THE CHANGES UNDER REMARKS IN THE ROADSIDE
DITCH(ES) SCHEDULES.
E) PLEASE BE SURE TO SPECIFY THE DITCHES TO BE PAVED IN
THE ROADSIDE DITCH SCHEDULES FOR SLOPES LESS THAN 0.75%.
REVISE ACCORDINGLY.
14. PLEASE REVISE THE MFF ON LOT 10 TO BE THE ROAD SAG. IT
SHOULD BE LABELED AS MFF(SAG)=196.41.
15. THESE ARE IN REGARDS TO THE 100-YEAR FLOODPLAIN DRAINAGE
AREAS AND CROSS-SECTIONS PLANS (SHEETS C5.5):
A) PLEASE PROVIDE THE DISCHARGE CALCULATIONS FOR X-
SECTIONS A1 THRU A6/B1 THRU B9/C1 THRU C4. INCLUDE IN
THE CALCULATIONS THE TIME OF CONCENTRATION, ETC.
B) PLEASE REVISE WORKSHEET CALCULATIONS FOR X-SECTIONS
A1 THRU A6/B1 THRU B9/C1 THRU C4 TO USE AN AVERAGE
MANNING ROUGHNESS COEFFICIENT OF 0.065 AS OPPOSED TO
USING A BREAKDOWN FOR DIFFERENT SECTION OF THE CHANNEL.
SINCE A ROUGHNESS COEFFICIENT OF 0.03 SHOULD BE A WIDTH
OF SEVERAL FEET AS OPPOSED TO 40' TO 55'. REVISE THE
PLANS AND COMPUTATION SHEETS TO REFLECT THE CHANGES.
C) UPON REVISING THE 100-YEAR FLOODPLAIN ELEVATIONS, BE
SURE TO MAKE THE NECESSARY CORRECTIONS TO MFF'S FOR ALL
IMPACTED LOTS. IF THE FLOODPLAIN IS MOST RESTRICTIVE,
ANNOTATE THESE LOTS USING MFF(FP)=_____. REVISE AS
APPLICABLE.
BE SURE TO SPECIFY MFF(FP) ON LOT 1 AND REVISE THE MFF
ON LOT 3 TO BE 205.00 [MFF(FP)=205.00] AS OPPOSED TO
200.90.
16. IT APPEARS THE 100-YEAR FLOODPLAIN X-SECTIONS C-1 THRU
C-4 HAVE BEEN OMITTED FROM SHEETS C5.5/C5.6. PLEASE ADDRESS.
17. IF NOT IMPACTED BY THE 100-YEAR FEMA FLOODPLAIN, THE
ASTERISK NOTATION REQUIRING ELEVATION CERTIFICATE SHOULD BE
REMOVED FROM LOTS 8/11. REVISE ACCORDINGLY.
18. THESE ARE IN REGARDS TO THE PROFILES:
A) AS PREVIOUSLY REQUESTED, PLEASE BE SURE TO SHOW/LABEL
THE LIMITS OF THE 100-YEAR FLOODPLAIN, WETLAND, RPA,
ROW, ETC. ON ALL APPLICABLE PROFILES.
19. AS A PREREQUISITE TO SUBDIVISION PLAT RECORDATION:
A) THE $100/LOT BMP MAINTENANCE FEE MUST BE RECEIVED.
B) APPROVED BONDING AND RECORDED EASEMENTS WITH DEED
BOOK AND PAGE NUMBER FOR THE SWM DETENTION POND MUST BE
PROVIDED.
C) A COPY OF THE COVENANTS AND ARTICLES OF INCORPORATION
OF THE HOMEOWNERS' ASSOCIATION SHALL BE PROVIDED TO THE
ENVIRONMENTAL ENGINEERING DEPARTMENT FOR APPROVAL. THE
ENVIRONMENTAL ENGINEERING DEPARTMENT WILL DETERMINE
WHETHER THE SUBDIVISION HAS BEEN PROVIDED WITH THE
INFORMATION TO DEVELOP AND IMPLEMENT A
FERTILIZATION/LAWN CARE PROGRAM TO MINIMIZE PHOSPHOROUS
RUNOFF. THE REQUIREMENTS OF THE PROGRAM SHALL BECOME A
PART OF THE COVENANTS FOR THE PROJECT AFFECTING ALL
PROPERTIES WITHIN THE DEVELOPMENT.