Thanksgiving Holiday Closings... MORE

Hover here for Site Tools
Subdivision Review Comments
All Subdivision Review Comments for Case # 15CP0082




For VDOT’s comments please contact Virginia Department of Transportation at (804) 674-2814 or send e-mail to Boris.Solomonov@VDOT.Virginia.gov

For Tentative Subdivision resubmittals:

1. Please note that submittal fees include the original submittal and two (2) additional reviews.

2. A letter of transmittal is required to accompany each submittal.

3. Please verify that Environmental Engineering, Fire, CDOT, VDOT, and Planning have reviewed the submittal before resubmitting. A resubmittal tendered, prior to receiving all the required departments’ review, will be counted as an additional submittal. Go to Case Selection Form or Go to Project List


 
CASE NO: 15CP0082 STATUS: PENDING APPROVAL
PROJECT NAME: BEETLE COURT TOWNHOU - LAST INTERNET UPDATE: 11/21/17
SUBMITTAL TYPE: CONSTRUCTION PLAN
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ENVIR.ENGR.-: 03 04/28/16 05/19/16 COMPLETE 06/20/16 MCJ 751-2335
FIRE DEPT.--: 04 06/14/16 07/05/16 COMPLETE 07/07/16 AWB 717-6167
HOUSE NUMBER: 04 06/14/16 07/05/16 ******** ********
MAPPING/GIS-: 04 06/14/16 07/05/16 ******** ********
PLANNING----: 04 06/14/16 07/05/16 ******** 05/18/16 GWK 706-7691
TRANSPORT.--: 04 06/14/16 07/05/16 COMPLETE 06/20/16 SES 751-4912
UTIL.PLAN.--: 04 06/14/16 07/05/16 ******** ********
UTILITIES---: 04 06/14/16 07/05/16 AMENDED* 06/24/16 WBV 748-1343
UTIL.R.O.W.-: 04 06/14/16 07/05/16 ******** ********
VDOT--------: 04 06/14/16 07/05/16 ******** ********
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME: BEETLE COURT TOWNHOUSES
PLAN NUMBER: 15CP0082
ORIGINAL PLAN DATE: 3/13/15
REVIEW DATE: 4/13/15
LATEST SUBMISSION DATE: 4/1/15
SUBMITTAL NUMBER: 1
STATUS: REVISIONS REQUIRED
TABLE REVIEW: NO
IN REGARD TO YOUR SUBMITTAL OF UTILITIES PLANS FOR THE
ABOVE REFERENCED PROJECT DATED MARCH 13, 2015, WE MAKE THE
FOLLOWING COMMENTS AND RECOMMENDATIONS:
1. A COPY OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S
APPROVAL LETTER REGARDING PAVEMENT REPLACEMENT, METHOD OF
CROSSING, AND ALIGNMENT OF UTILITY WITH STATE RIGHT OF
WAY, AND A COPY OF ENVIRONMENTAL ENGINEERING'S INITIAL
REVIEW LETTER MUST BE SUBMITTED BEFORE REVISED PLANS ARE
SUBMITTED FOR RE-REVIEW.
2. PRIOR TO RELEASING TO THE CONSTRUCTION SECTION, A
COPY OF THE ENVIRONMENTAL ENGINEERING APPROVAL LETTER
AND/OR ALL OTHER APPLICABLE LOCAL STATE AND FEDERAL
AGENCIES' APPROVAL LETTERS MUST BE RECEIVED BY THIS
DEPARTMENT. IN ADDITION, ALL EASEMENTS NOT INCLUDED WITH
THE SUBDIVISION PLAT MUST BE DEDICATED WITH A SEPARATE
PLAT AND AGREEMENT TO THE COUNTY PRIOR TO RELEASING THE
PROJECT TO THE CONSTRUCTION SECTION.
3. SHOW THE COUNTY PROJECT NUMBER 15-0098 ON THE LOWER
RIGHT HAND CORNER OF EACH SHEET.
4. PROVIDE CALCULATIONS TO VERIFY THAT THE FIRE FLOW AND
DOMESTIC FLOWS CAN BE SUSTAINED WITH A RESIDUAL PRESSURE
OF 20 PSI.
5. LABEL THE FOLLOWING ITEMS ON SHEET NUMBER 6:
A. BELRUN ROAD.
B. BEETLE COURT.
C. WALDENBROOK COURT.
6. CLEARLY SHOW ALL EXISTING VALVES, FITTINGS, ETC.
ALONG THIS PORTION OF BELRUN ROAD AND SHOW THE COUNTY
PROJECT NUMBER (WTH-38CD). ALSO LABEL THE EXISTING SEWER
IN BEETLE COURT WITH ITS COUNTY PROJECT NUMBER (S73-9D).
7. THE EXISTING WATERLINE IN BEETLE COURT IS TO BE
ABANDONED INCLUDING THE EXISTING TEE IN BELRUN ROAD BY
DIGGING IT UP AND REMOVING IT FROM THE SITE. IN ADDITION
PROVIDE THE FOLLOWING NOTE, CONSPICUOUSLY DISPLAYED ON THE
SHEET DEPICTING THE LIMITS OF WATERLINE TO BE ABANDONED.
ABANDONMENT OF THE EXISTING WATERLINE IS TO OCCUR IN
STRICT ACCORDANCE WITH CURRENT COUNTY SPECIFICATIONS, PART
IV, SECTION 3, ITEM 3.07, ABANDONMENT OF WATER MAINS.
8. THIS OFFICE RECOMMENDS THE INSTALLATION OF A NEW 8"
WATERLINE FROM BELRUN ROAD EXTENDING DOWN THE MIDDLE OF
BEETLE COURT WITH ALL APPLICABLE FITTINGS. PROVIDE
PERMANENT WATERLINE EASEMENTS AS NECESSARY TO FULLY
ENCUMBER THIS LINE AND ALL SERVICES.
9. THE RECORDED LOT NUMBERS AND BLOCK DESIGNATIONS NEED
TO BE SHOWN ON THE PLANS.
10. THE AS-BUILT DATA PER EACH SANITARY SEWER CONNECTION
NEEDS TO BE SHOWN ON THE PLANS.
11. LABEL ALL EXISTING MANHOLES IN A CONSISTENT FASHION.
12. DUE TO THE UNUSUAL NATURE OF THIS PROJECT, THIS
OFFICE RESERVES THE RIGHT TO MAKE ADDITIONAL COMMENTS, NOT
NECESSARILY NOTED HEREIN, ON FUTURE SUBMITTALS OF THIS
PROJECT.
13. THOROUGHLY EXAMINE ALL SHEETS TO CORRECT ALL
EXTRANEOUS MARKINGS, OVERLAPPING TEXT, ILLEGIBLE TEXT AND
DRAWING FEATURES, ETC. IN ORDER TO FACILITATE A CLEAN
DRAWING WITH ALL TEXT AND DRAWING FEATURES COMPLETELY
LEGIBLE AND ABUNDANTLY VISIBLE.
14. REVISE THE "MATERIALS LIST" AS NECESSARY.
PLEASE MAKE ALL OF THE SUGGESTED CHANGES PREVIOUSLY
MENTIONED, AND SUBMIT TWO (2) SETS OF REVISED PLANS.
THE OWNER MUST ENTER INTO A COUNTY CONTRACT PRIOR TO THE
START OF CONSTRUCTION. PLEASE SEND ME A COPY OF THE
"ACCEPTED" BID PROPOSAL BETWEEN THE DEVELOPER AND THE
CONTRACTOR SO WE MAY PREPARE THE COUNTY CONTRACT. THE BID
PROPOSAL MUST BE BASED ON THE LATEST REVISED UTILITIES
PLANS REFLECTING THE REVIEWER'S STAMP, AND ALL WORK MUST
BE PERFORMED BY AN ACCEPTABLE UTILITIES CONTRACTOR. IF
PLANS ARE REVISED AFTER CONTRACT PREPARATION DUE TO A
CHANGE BECAUSE OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S
AND/OR ENVIRONMENTAL ENGINEERING DEPARTMENT'S APPROVAL OF
THE ROAD, DRAINAGE, AND EROSION CONTROL DESIGN OR BECAUSE
OF STATE AGENCIES' REVIEW AND APPROVAL OF THE UTILITIES
DESIGN, A REVISED BID PROPOSAL MAY BE NECESSARY TO
ACCURATELY REFLECT THE LATEST UTILITIES DESIGN AND A NEW
CONTRACT PREPARATION MAY BE NECESSARY AND EXECUTED PRIOR
TO THE START OF CONSTRUCTION.
IF YOU HAVE ANY QUESTIONS, DO NOT HESITATE TO CONTACT ME
AT 748-1343.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME:BEETLE COURT TOWNHOUSES
PLAN NUMBER: 15CP0082
ORIGINAL PLAN DATE: 3/13/15
REVIEW DATE: 6/24/15
LATEST SUBMISSION DATE: 6/11/15
SUBMITTAL NUMBER: 2
STATUS: REVISIONS REQUIRED
TABLE REVIEW: NO
IN REGARD TO YOUR SUBMITTAL OF UTILITIES PLANS FOR THE
ABOVE REFERENCED PROJECT DATED MARCH 13, 2015, WITH THE
LAST REVISION DATED JUNE 1, 2015, WE MAKE THE FOLLOWING
COMMENTS AND RECOMMENDATIONS:
1. A COPY OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S
APPROVAL LETTER REGARDING PAVEMENT REPLACEMENT, METHOD
OF CROSSING, AND ALIGNMENT OF UTILITY WITH STATE RIGHT
OF WAY, AND A COPY OF ENVIRONMENTAL ENGINEERING'S
INITIAL REVIEW LETTER MUST BE SUBMITTED BEFORE REVISED
PLANS ARE SUBMITTED FOR RE-REVIEW.
2. PRIOR TO RELEASING TO THE CONSTRUCTION SECTION, A
COPY OF THE ENVIRONMENTAL ENGINEERING APPROVAL LETTER
AND/OR ALL OTHER APPLICABLE LOCAL STATE AND FEDERAL
AGENCIES' APPROVAL LETTERS MUST BE RECEIVED BY THIS
DEPARTMENT. IN ADDITION, ALL EASEMENTS NOT INCLUDED
WITH THE SUBDIVISION PLAT MUST BE DEDICATED WITH A
SEPARATE PLAT AND AGREEMENT TO THE COUNTY PRIOR TO
RELEASING THE PROJECT TO THE CONSTRUCTION SECTION.
3. PROVIDE CALCULATIONS TO VERIFY THAT THE FIRE FLOW
AND DOMESTIC FLOWS CAN BE SUSTAINED WITH A RESIDUAL
PRESSURE OF 20 PSI.
4. CALL OUT ALL EXISTING VALVES THAT WILL BE USED FOR
CUT OFF PURPOSES DURING THE REMOVAL OF THE EXISTING 8" X
6" TEE AND 6" VALVE LABELING EACH AS SUCH.
5. CLEARLY NOTE THAT THE EXISTING 6" AND 4"
WATERLINES, AS WELL AS, ALL EXISTING WATER SERVICES ARE
TO BE ABANDONED BY DIGGING THEM UP AND REMOVING THEM
FROM THE SITE.
6. PROVIDE A 2" FLUSHING HYDRANT AT THE WATERLINE
TERMINUS POINT.
7. PROVIDE THE AS-BUILT DATA (I.E. STATION, LENGTH AND
DEPTH) FOR EACH EXISTING SEWER CONNECTION.
8. THOROUGHLY EXAMINE ALL SHEETS TO CORRECT ALL
EXTRANEOUS MARKINGS, OVERLAPPING TEST, ILLEGIBLE TEXT
AND DRAWING FEATURES, ETC. IN ORDER TO FACILITATE A
CLEAN DRAWING WITH ALL TEXT AND DRAWING FEATURES
COMPLETELY LEGIBLE AND ABUNDANTLY VISIBLE.
9. REVISE THE "MATERIALS LIST" AS NECESSARY.
PLEASE MAKE ALL OF THE SUGGESTED CHANGES PREVIOUSLY
MENTIONED, AND SUBMIT TWO (2) SETS OF REVISED PLANS.
THE OWNER MUST ENTER INTO A COUNTY CONTRACT PRIOR TO THE
START OF CONSTRUCTION. PLEASE SEND ME A COPY OF THE
"ACCEPTED" BID PROPOSAL BETWEEN THE DEVELOPER AND THE
CONTRACTOR SO WE MAY PREPARE THE COUNTY CONTRACT. THE
BID PROPOSAL MUST BE BASED ON THE LATEST REVISED
UTILITIES PLANS REFLECTING THE REVIEWER'S STAMP, AND ALL
WORK MUST BE PERFORMED BY AN ACCEPTABLE UTILITIES
CONTRACTOR. IF PLANS ARE REVISED AFTER CONTRACT
PREPARATION DUE TO A CHANGE BECAUSE OF VIRGINIA
DEPARTMENT OF TRANSPORTATION'S AND/OR ENVIRONMENTAL
ENGINEERING DEPARTMENT'S APPROVAL OF THE ROAD, DRAINAGE,
AND EROSION CONTROL DESIGN OR BECAUSE OF STATE AGENCIES'
REVIEW AND APPROVAL OF THE UTILITIES DESIGN, A REVISED
BID PROPOSAL MAY BE NECESSARY TO ACCURATELY REFLECT THE
LATEST UTILITIES DESIGN AND A NEW CONTRACT PREPARATION
MAY BE NECESSARY AND EXECUTED PRIOR TO THE START OF
CONSTRUCTION.
IF YOU HAVE ANY QUESTIONS, DO NOT HESITATE TO CONTACT ME
AT 748-1343.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME:BEETLE COURT TOWNHOUSES
PLAN NUMBER: 15CP0082
ORIGINAL PLAN DATE: 3/13/15
REVIEW DATE: 8/10/15
LATEST SUBMISSION DATE: 7/31/15
SUBMITTAL NUMBER: 3
STATUS: REVISIONS REQUIRED
TABLE REVIEW: NO
IN REGARD TO YOUR SUBMITTAL OF UTILITIES PLANS FOR THE
ABOVE REFERENCED PROJECT DATED MARCH 13, 2015, WITH THE
LAST REVISION DATED JULY 29, 2015, WE MAKE THE
FOLLOWING COMMENTS AND RECOMMENDATIONS:
1. A COPY OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S
APPROVAL LETTER REGARDING PAVEMENT REPLACEMENT, METHOD
OF CROSSING, AND ALIGNMENT OF UTILITY WITH STATE RIGHT
OF WAY, AND A COPY OF ENVIRONMENTAL ENGINEERING'S
INITIAL REVIEW LETTER MUST BE SUBMITTED BEFORE REVISED
PLANS ARE SUBMITTED FOR RE-REVIEW.
2. PRIOR TO RELEASING TO THE CONSTRUCTION SECTION, A
COPY OF THE ENVIRONMENTAL ENGINEERING APPROVAL LETTER
AND/OR ALL OTHER APPLICABLE LOCAL STATE AND FEDERAL
AGENCIES' APPROVAL LETTERS MUST BE RECEIVED BY THIS
DEPARTMENT. IN ADDITION, ALL EASEMENTS NOT INCLUDED
WITH THE SUBDIVISION PLAT MUST BE DEDICATED WITH A
SEPARATE PLAT AND AGREEMENT TO THE COUNTY PRIOR TO
RELEASING THE PROJECT TO THE CONSTRUCTION SECTION.
3. PROVIDE CALCULATIONS TO VERIFY THAT THE FIRE FLOW
AND DOMESTIC FLOWS CAN BE SUSTAINED WITH A RESIDUAL
PRESSURE OF 20 PSI.
4. PROVIDE A DETAILED PROFILE VIEW OF THE PROPOSED
WATERLINE INCLUDING ALL APPLICABLE SEPARATION DISTANCES.
5. SEWER LATERALS ARE 6" IN DIAMETER.
6. PROVIDE THE FOLLOWING NOTES ON SHEET NUMBER 8:
A. THE CONTRACTOR IS TO USE A MECHANICAL HOLE
CUTTER AND AN APPROVED SADDLE WHEN TAPPING THE EXISTING
SEWER LINE (LOT NUMBER 16).
B. EXISTING MANHOLE NUMBER 16 IS TO BE CORE
DRILLED AND A KOR-N-SEAL GASKET IS TO BE INSTALLED.
7. THAT PORTION OF THE PROPOSED WATERLINE LOCATED
BEYOND THE FIRE HYDRANT MAY BE REDUCED TO 6" IN
DIAMETER. REVISE AS NECESSARY TO REFLECT AS SUCH
INCLUDING ALL FITTINGS, ETC.
8. THOROUGHLY EXAMINE ALL SHEETS TO CORRECT ALL
EXTRANEOUS MARKINGS, OVERLAPPING TEST, ILLEGIBLE TEXT
AND DRAWING FEATURES, ETC. IN ORDER TO FACILITATE A
CLEAN DRAWING WITH ALL TEXT AND DRAWING FEATURES
COMPLETELY LEGIBLE AND ABUNDANTLY VISIBLE.
19. REVISE THE "MATERIALS LIST" AS NECESSARY.
PLEASE MAKE ALL OF THE SUGGESTED CHANGES PREVIOUSLY
MENTIONED, AND SUBMIT ONE (1) SET OF REVISED PLANS.
THE OWNER MUST ENTER INTO A COUNTY CONTRACT PRIOR TO THE
START OF CONSTRUCTION. PLEASE SEND ME A COPY OF THE
"ACCEPTED" BID PROPOSAL BETWEEN THE DEVELOPER AND THE
CONTRACTOR SO WE MAY PREPARE THE COUNTY CONTRACT. THE
BID PROPOSAL MUST BE BASED ON THE LATEST REVISED
UTILITIES PLANS REFLECTING THE REVIEWER'S STAMP, AND ALL
WORK MUST BE PERFORMED BY AN ACCEPTABLE UTILITIES
CONTRACTOR. IF PLANS ARE REVISED AFTER CONTRACT
PREPARATION DUE TO A CHANGE BECAUSE OF VIRGINIA
DEPARTMENT OF TRANSPORTATION'S AND/OR ENVIRONMENTAL
ENGINEERING DEPARTMENT'S APPROVAL OF THE ROAD, DRAINAGE,
AND EROSION CONTROL DESIGN OR BECAUSE OF STATE AGENCIES'
REVIEW AND APPROVAL OF THE UTILITIES DESIGN, A REVISED
BID PROPOSAL MAY BE NECESSARY TO ACCURATELY REFLECT THE
LATEST UTILITIES DESIGN AND A NEW CONTRACT PREPARATION
MAY BE NECESSARY AND EXECUTED PRIOR TO THE START OF
CONSTRUCTION.
IF YOU HAVE ANY QUESTIONS, DO NOT HESITATE TO CONTACT ME
AT 748-1343.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME: BEETLE COURT TOWNHOMES
PLAN NUMBER: 15CP0082
ORIGINAL PLAN DATE: 3/13/15
REVIEW DATE: 5/10/16
LATEST SUBMISSION DATE: 4/29/16
SUBMITTAL NUMBER: 4
STATUS: REVISIONS REQUIRED
TABLE REVIEW: NO
IN REGARD TO YOUR SUBMITTAL OF UTILITIES PLANS FOR THE
ABOVE REFERENCED PROJECT DATED MARCH 13, 2015, WITH
THE LATEST REVISION DATED APRIL 28, 2016, WE MAKE THE
FOLLOWING COMMENTS AND RECOMMENDATIONS:
1. A COPY OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S
APPROVAL LETTER REGARDING PAVEMENT REPLACEMENT, METHOD
OF CROSSING, AND ALIGNMENT OF UTILITY WITH STATE RIGHT
OF WAY, AND A COPY OF ENVIRONMENTAL ENGINEERING'S
INITIAL REVIEW LETTER MUST BE SUBMITTED BEFORE REVISED
PLANS ARE SUBMITTED FOR RE-REVIEW.
2. PRIOR TO RELEASING TO THE CONSTRUCTION SECTION, A
COPY OF THE ENVIRONMENTAL ENGINEERING APPROVAL LETTER
AND/OR ALL OTHER APPLICABLE LOCAL STATE AND FEDERAL
AGENCIES' APPROVAL LETTERS MUST BE RECEIVED BY THIS
DEPARTMENT. IN ADDITION, ALL EASEMENTS NOT INCLUDED
WITH THE SUBDIVISION PLAT MUST BE DEDICATED WITH A
SEPARATE PLAT AND AGREEMENT TO THE COUNTY PRIOR TO
RELEASING THE PROJECT TO THE CONSTRUCTION SECTION.
3. SHOW AND LABEL THE 8" X 6" REDUCER IN EACH OF THE
PLAN AND PROFILE VIEWS.
4. PROVIDE A 6" PLUG AT THE TERMINUS POINT OF THE
PROPOSED WATERLINE, NOTING AS SUCH IN EACH OF THE PLAN
AND PROFILE VIEWS.
5. CLEARLY INDICATE THAT EACH OF THE EXISTING AND
PROPOSED SEWER CONNECTIONS ARE TO TERMINATE 3 LF FROM
THE "HOUSE" SIDE OF THE SIDEWALK. THE EXCESS PORTIONS
OF THE EXISTING SEWER CONNECTIONS ARE TO BE DUG UP AND
REMOVED FROM THE SITE.
6. PROVIDE A CONSPICUOUSLY DISPLAYED NOTE STATING THAT
FOR EACH LOT "FRONTING" ON A SIDEWALK, THE "FRONT" SIDE
OF THE METER BOX IS TO BE LOCATED 3 LF FROM THE HOUSE
SIDE OF THE SIDEWALK.
7. SHOW THE PROFILE OF THE EXISTING SANITARY SEWER
THAT PARALLELS THE PROPOSED WATERLINE, INCLUDING THE
CROSSING OF THE PROPOSED WATERLINE AND THE EXISTING
SANITARY SEWER, WITH THE APPLICABLE VERTICAL SEPARATION
DISTANCE NOTED.
8. NOTE, IN THE PROFILE VIEW, THAT 3.5 VF OF COVER IS
REQUIRED AT ALL LOCATIONS FOR THE WATERLINE.
9. PROVIDE AN ADDITIONAL NOTE UNDER THE "STANDARD
WATER AND SEWER NOTES" STATING THAT ALL WATER SERVICE
CONNECTIONS BELOW THE 173' CONTOUR, OR WHERE THE
PRESSURE IS GREATER THAN 80 PSI, WILL REQUIRE AN
INDIVIDUAL PRESSURE REGULATOR VALVE TO BE INSTALLED ON
THE CUSTOMER'S SIDE OF THE WATER METER AS REQUIRED BY
BOCA CODE.
10. THOROUGHLY EXAMINE ALL SHEETS TO CORRECT ALL
EXTRANEOUS MARKINGS, OVERLAPPING TEXT, ILLEGIBLE TEXT
AND DRAWING FEATURES, ETC. IN ORDER TO FACILITATE A
CLEAN DRAWING WITH ALL TEXT AND DRAWING FEATURES
COMPLETELY LEGIBLE AND ABUNDANTLY VISIBLE.
11. REVISE THE "MATERIALS LIST" AS NECESSARY, INCLUDING
ALL REQUIRED SANITARY SEWER MATERIAL.
PLEASE MAKE ALL OF THE SUGGESTED CHANGES AND SUBMIT
ONE(1) SET OF REVISED PLANS.
THE OWNER MUST ENTER INTO A COUNTY CONTRACT PRIOR TO THE
START OF CONSTRUCTION. PLEASE SEND ME A COPY OF THE
"ACCEPTED" BID PROPOSAL BETWEEN THE DEVELOPER AND THE
CONTRACTOR SO WE MAY PREPARE THE COUNTY CONTRACT. THE
BID PROPOSAL MUST BE BASED ON THE LATEST REVISED
UTILITIES PLANS REFLECTING THE REVIEWER'S STAMP, AND ALL
WORK MUST BE PERFORMED BY AN ACCEPTABLE UTILITIES
CONTRACTOR. IF PLANS ARE REVISED AFTER CONTRACT
PREPARATION DUE TO A CHANGE BECAUSE OF VIRGINIA
DEPARTMENT OF TRANSPORTATION'S AND/OR ENVIRONMENTAL
ENGINEERING DEPARTMENT'S APPROVAL OF THE ROAD, DRAINAGE,
AND EROSION CONTROL DESIGN OR BECAUSE OF STATE AGENCIES'
REVIEW AND APPROVAL OF THE UTILITIES DESIGN, A REVISED
BID PROPOSAL MAY BE NECESSARY TO ACCURATELY REFLECT THE
LATEST UTILITIES DESIGN AND A NEW CONTRACT PREPARATION
MAY BE NECESSARY AND EXECUTED PRIOR TO THE START OF
CONSTRUCTION.
IF YOU HAVE ANY QUESTIONS, DO NOT HESITATE TO CONTACT ME
AT 748-1343.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME: BEETLE COURT TOWNHOMES
PLAN NUMBER: 15CP0082
ORIGINAL PLAN DATE: 3/3/15
REVIEW DATE: 6/23/16
LATEST SUBMISSION DATE: 6/15/16
SUBMITTAL NUMBER: 5
STATUS: APPROVED AS NOTED IN RED
TABLE REVIEW: NO
IN REGARD TO YOUR RECENT SUBMITTAL OF THE REVISED
UTILITIES PLANS ON THE ABOVE REFERENCED PROJECT DATED
MARCH 13, 2015, WITH THE LAST REVISION DATED JUNE 1, 2015,
THIS IS TO INFORM YOU THAT THE PLANS HAVE BEEN REVIEWED BY
THE UTILITIES DEPARTMENT WITH EXCEPTIONS AS PER OUR
TELEPHONE CONVERSATION. THIS REVIEW IS EFFECTIVE UNTIL
JUNE 23, 2021.
PLEASE FORWARD TWO (2) ADDITIONAL SETS OF PLANS ONCE
ALL APPROVALS HAVE BEEN OBTAINED. IF, AFTER ALL OTHER
REVIEWS/APPROVALS HAVE BEEN MADE, THE UTILITY PLANS
REFLECT A LATER REVISION DATE THAN THE LAST REVISION NOTED
ABOVE, PLEASE SUBMIT ONE (1) NEW SET OF UTILITY PLANS FOR
FURTHER REVIEW AND APPROVAL.
YOUR COOPERATION IS GREATLY APPRECIATED. PLEASE CALL ME
AT 748-1343 IF YOU HAVE ANY FURTHER QUESTIONS REGARDING
THIS MATTER.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: BEETLE COURT TOWNHOUSES
CASE NUMBER: 15CP0082
LATEST PLAN DATE: 03/13/15
DEPT. REC'D. DATE: 03/31/15
SUBMITTAL NUMBER: ONE
REVIEW DATE: 04/24/15
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: BEETLE COURT TOWNHOUSES
CASE NUMBER: 15CP0082
LATEST PLAN DATE: 06/01/15
DEPT. REC'D. DATE: 06/12/15
SUBMITTAL NUMBER: TWO
REVIEW DATE: 07/01/15
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: BEETLE COURT TOWNHOUSES
CASE NUMBER: 15CP0082
LATEST PLAN DATE: 07/29/15
DEPT. REC'D. DATE: 07/30/15
SUBMITTAL NUMBER: THREE
REVIEW DATE: 08/11/15
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: BEETLE COURT TOWNHOUSES
CASE NUMBER: 15CP0082
LATEST PLAN DATE: 04/28/2016
DEPT. REC'D. DATE: 04/29/2016
SUBMITTAL NUMBER: FOUR
REVIEW DATE: 05/09/2016
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: BEETLE COURT TOWNHOUSES
CASE NUMBER: 15CP0082
LATEST PLAN DATE: 06/10/2016
DEPT. REC'D. DATE: 06/15/2016
SUBMITTAL NUMBER: FIVE
REVIEW DATE: 06/20/2016
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
PLANNING DEPARTMENT
CONSTRUCTION PLAN: BEETLE COURT TOWNHOUSES
CASE: 15CP0059
REVIEWED BY: WHIT KIRTLEY (706-7691)
SUBMITTAL: 1
REVIEW DATE: 4/28/15
REVISION DATE: XXXXXX
PLANNING REVIEW #: 1
PLANNING STATUS: REVISIONS REQUIRED
COMMENTS & REVISIONS:
1. CHANGE THE TITLE TO SAY "CONSTRUCTION PLAN".
2. CORRECT THE SPELLING ON "BEETLE" ON THE TITLE.
3. THE PLANS SHOW RETAINING WALLS THAT SPAN ACROSS
PROPERTY LINES WHICH CAUSES A MAINTENANCE ISSUE FOR
THE PROPERTY OWNERS. MOVE THE RETAINING WALLS SO
THAT THEY ARE LOCATED WITHIN OPEN SPACE. THIS MAY
REQUIRE A RESBDIVISION.
4. PROVIDE DETAILS FOR THE RETAINING WALL.
5. PROVIDE A NOTE INDICATING WHO WILL MAINTAIN THE
RETAINING WALL.
6. CHANGE THE ZONING DESIGNATION IN THE NOTES TO R-TH.
7 INCLUDE THE CONSTRUCTION PLAN NUMBER 15CP0082
NOTES:
THE MONUMENT & STREET ADDRESS SIGN WILL REQUIRE SIGN
PERMIT APPROVAL.
STANDARD COMMENTS:
RETAINING WALL STANDARD NOTE: APPROVAL OF THESE PLANS
DOES NOT CONSTITUTE APPROVAL OF THE LOCATION OR
CONSTRUCTION OF THE RETAINING WALLS. THE RETAINING WALL IS
SUBJECT TO REVIEW AT TIME OF BUILDING PERMIT. RETAINING
WALLS SHALL BE RECORDED IN OPEN SPACE IF THE WALL IS SEVEN
(7') FEET OR GREATER IN HEIGHT AND SPANS TWO OR MORE LOTS
IN A SINGLE-FAMILY DEVELOPMENT OR IS LOCATED IN A
RESIDENTIAL TOWNHOUSE DEVELOPMENT. PLEASE REFER TO
SECTION 19-554 OF THE CHESTERFIELD COUNTY ZONING
ORDINANCE FOR REQUIREMENTS OF RETAINING WALLS IN
RESIDENTIAL DEVELOPMENT. (ATTACHED BELOW)
RETAINING WALL STANDARD NOTE: PRIOR TO CONSTRUCTION OF
ANY RETAINING WALL(S) WITHIN THIS DEVELOPMENT, A BUILDING
PERMIT IS REQUIRED TO BE REVIEWED AND APPROVED BY
CHESTERFIELD COUNTY. NO CONSTRUCTION OF RETAINING WALLS
IS PERMITTED WITHOUT AN APPROVED BUILDING PERMIT.
----------------------------------------------------------
PLANNING DEPARTMENT
CONSTRUCTION PLAN: BEETLE COURT TOWNHOUSES
CASE: 15CP0059
REVIEWED BY: WHIT KIRTLEY (706-7691)
SUBMITTAL:2
REVIEW DATE: 6/29/15
REVISION DATE: 6/1/15
PLANNING REVIEW #: 2
PLANNING STATUS: APPROVED
NOTES:
THE MONUMENT & STREET ADDRESS SIGN WILL REQUIRE SIGN
PERMIT APPROVAL.
STANDARD COMMENTS:
RETAINING WALL STANDARD NOTE: APPROVAL OF THESE PLANS
DOES NOT CONSTITUTE APPROVAL OF THE LOCATION OR
CONSTRUCTION OF THE RETAINING WALLS. THE RETAINING WALL IS
SUBJECT TO REVIEW AT TIME OF BUILDING PERMIT. RETAINING
WALLS SHALL BE RECORDED IN OPEN SPACE IF THE WALL IS SEVEN
(7') FEET OR GREATER IN HEIGHT AND SPANS TWO OR MORE LOTS
IN A SINGLE-FAMILY DEVELOPMENT OR IS LOCATED IN A
RESIDENTIAL TOWNHOUSE DEVELOPMENT. PLEASE REFER TO
SECTION 19-554 OF THE CHESTERFIELD COUNTY ZONING
ORDINANCE FOR REQUIREMENTS OF RETAINING WALLS IN
RESIDENTIAL DEVELOPMENT. (ATTACHED BELOW)
RETAINING WALL STANDARD NOTE: PRIOR TO CONSTRUCTION OF
ANY RETAINING WALL(S) WITHIN THIS DEVELOPMENT, A BUILDING
PERMIT IS REQUIRED TO BE REVIEWED AND APPROVED BY
CHESTERFIELD COUNTY. NO CONSTRUCTION OF RETAINING WALLS
IS PERMITTED WITHOUT AN APPROVED BUILDING PERMIT.
-------------------------------------------------
PLANNING DEPARTMENT
CONSTRUCTION PLAN: BEETLE COURT TOWNHOUSES
CASE: 15CP0059
REVIEWED BY: WHIT KIRTLEY (706-7691)
SUBMITTAL:3
REVIEW DATE: 8/19/15
REVISION DATE: 7/29/15
PLANNING REVIEW #: 3
PLANNING STATUS: APPROVED
NOTES:
THE MONUMENT & STREET ADDRESS SIGN WILL REQUIRE SIGN
PERMIT APPROVAL.
STANDARD COMMENTS:
RETAINING WALL STANDARD NOTE: APPROVAL OF THESE PLANS
DOES NOT CONSTITUTE APPROVAL OF THE LOCATION OR
CONSTRUCTION OF THE RETAINING WALLS. THE RETAINING WALL IS
SUBJECT TO REVIEW AT TIME OF BUILDING PERMIT. RETAINING
WALLS SHALL BE RECORDED IN OPEN SPACE IF THE WALL IS SEVEN
(7') FEET OR GREATER IN HEIGHT AND SPANS TWO OR MORE LOTS
IN A SINGLE-FAMILY DEVELOPMENT OR IS LOCATED IN A
RESIDENTIAL TOWNHOUSE DEVELOPMENT. PLEASE REFER TO
SECTION 19-554 OF THE CHESTERFIELD COUNTY ZONING
ORDINANCE FOR REQUIREMENTS OF RETAINING WALLS IN
RESIDENTIAL DEVELOPMENT. (ATTACHED BELOW)
RETAINING WALL STANDARD NOTE: PRIOR TO CONSTRUCTION OF
ANY RETAINING WALL(S) WITHIN THIS DEVELOPMENT, A BUILDING
PERMIT IS REQUIRED TO BE REVIEWED AND APPROVED BY
CHESTERFIELD COUNTY. NO CONSTRUCTION OF RETAINING WALLS
IS PERMITTED WITHOUT AN APPROVED BUILDING PERMIT.
WALLS SHALL BE RECORDED IN OPEN SPACE IF THE WALL IS SEVEN
(7') FEET OR GREATER IN HEIGHT AND SPANS TWO OR MORE LOTS
IN A SINGLE-FAMILY DEVELOPMENT OR IS LOCATED IN A
RESIDENTIAL TOWNHOUSE DEVELOPMENT. PLEASE REFER TO
SECTION 19-554 OF THE CHESTERFIELD COUNTY ZONING
ORDINANCE FOR REQUIREMENTS OF RETAINING WALLS IN
RESIDENTIAL DEVELOPMENT. (ATTACHED BELOW)
RETAINING WALL STANDARD NOTE: PRIOR TO CONSTRUCTION OF
ANY RETAINING WALL(S) WITHIN THIS DEVELOPMENT, A BUILDING
PERMIT IS REQUIRED TO BE REVIEWED AND APPROVED BY
CHESTERFIELD COUNTY. NO CONSTRUCTION OF RETAINING WALLS
IS PERMITTED WITHOUT AN APPROVED BUILDING PERMIT.
------------------------------------------------------------
PLANNING DEPARTMENT
CONSTRUCTION PLAN: BEETLE COURT TOWNHOUSES
CASE: 15CP0059
REVIEWED BY: WHIT KIRTLEY (706-7691)
SUBMITTAL:4
REVIEW DATE: 5/18/16
REVISION DATE: 4/28/16
PLANNING REVIEW #: 4
PLANNING STATUS: APPROVED
NOTES:
THE MONUMENT & STREET ADDRESS SIGN WILL REQUIRE SIGN
PERMIT APPROVAL.
STANDARD COMMENTS:
RETAINING WALL STANDARD NOTE: APPROVAL OF THESE PLANS
DOES NOT CONSTITUTE APPROVAL OF THE LOCATION OR
CONSTRUCTION OF THE RETAINING WALLS. THE RETAINING WALL IS
SUBJECT TO REVIEW AT TIME OF BUILDING PERMIT. RETAINING
WALLS SHALL BE RECORDED IN OPEN SPACE IF THE WALL IS SEVEN
(7') FEET OR GREATER IN HEIGHT AND SPANS TWO OR MORE LOTS
IN A SINGLE-FAMILY DEVELOPMENT OR IS LOCATED IN A
RESIDENTIAL TOWNHOUSE DEVELOPMENT. PLEASE REFER TO
SECTION 19-554 OF THE CHESTERFIELD COUNTY ZONING
ORDINANCE FOR REQUIREMENTS OF RETAINING WALLS IN
RESIDENTIAL DEVELOPMENT. (ATTACHED BELOW)
RETAINING WALL STANDARD NOTE: PRIOR TO CONSTRUCTION OF
ANY RETAINING WALL(S) WITHIN THIS DEVELOPMENT, A BUILDING
PERMIT IS REQUIRED TO BE REVIEWED AND APPROVED BY
CHESTERFIELD COUNTY. NO CONSTRUCTION OF RETAINING WALLS
IS PERMITTED WITHOUT AN APPROVED BUILDING PERMIT.
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: BEETLE COURT TOWNHOUSES
PLAN NUMBER: 15CP0082
LATEST PLAN DATE: 3/15/15
DEPT. REC'D. DATE: 3/30/15
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 3/30/15
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: YES
COMMENTS:
1. PROVIDE COMPUTER GENERATED WATER FLOW TEST DATA,
PROVIDED BY THE CHESTERFIELD COUNTY UTILITIES
DEPARTMENT, VERIFYING THE REQUIRED WATER FLOW FOR FIRE
PROTECTION IS AVAILABLE AT THE SITE. THE WATERFLOW TEST
RESULTS AND GRAPH SHALL BE SHOWN ON THE SUBMITTED PLAN.
THE MINIMUM REQUIRED FIRE FLOW FOR ALL BUILDINGS, WITH
THE EXCEPTION OF ONE AND TWO-FAMILY DWELLINGS, IS 1500
GPM (SPRINKLER PROTECTED OR NON-SPRINKLER PROTECTED) IN
ACCORDANCE WITH THE INTERNATIONAL FIRE CODE (2012) -
SECTION B105.2 AND TABLE B105.1.
2. PROVIDE AN ELEVATION SHOWING THE HEIGHT OF THE PROPOSED
TOWNHOUSES.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: BEETLE COURT TOWNHOUSES
PLAN NUMBER: 15CP0082
LATEST PLAN DATE: 6/1/15
DEPT. REC'D. DATE: 6/11/15
SUBMITTAL NUMBER: 2ND REVIEW
REVIEW DATE: 6/11/15
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: NO
COMMENTS:
1. PROVIDE COMPUTER GENERATED WATER FLOW TEST DATA,
PROVIDED BY THE CHESTERFIELD COUNTY UTILITIES
DEPARTMENT, VERIFYING THE REQUIRED WATER FLOW FOR FIRE
PROTECTION IS AVAILABLE AT THE SITE. THE WATERFLOW TEST
RESULTS AND GRAPH SHALL BE SHOWN ON THE SUBMITTED PLAN.
THE MINIMUM REQUIRED FIRE FLOW FOR ALL BUILDINGS, WITH
THE EXCEPTION OF ONE AND TWO-FAMILY DWELLINGS, IS 1500
GPM (SPRINKLER PROTECTED OR NON-SPRINKLER PROTECTED) IN
ACCORDANCE WITH THE INTERNATIONAL FIRE CODE (2012) -
SECTION B105.2 AND TABLE B105.1.
2. PROVIDE AN ELEVATION SHOWING THE HEIGHT OF THE PROPOSED
TOWNHOUSES.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: BEETLE COURT TOWNHOUSES
PLAN NUMBER: 15CP0082
LATEST PLAN DATE: 7/29/15
DEPT. REC'D. DATE: 7/31/15
SUBMITTAL NUMBER: 3RD REVIEW
REVIEW DATE: 7/31/15
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: NO
COMMENTS:
1. ELEVATION SHOWING THE HEIGHT OF THE PROPOSED TOWNHOUSES
SHALL BE SUBMITTED PRIOR TO CONSTRUCTION PLAN APPROVAL.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: BEETLE COURT TOWNHOUSES
PLAN NUMBER: 15CP0082
LATEST PLAN DATE: 4/28/16
DEPT. REC'D. DATE: 5/3/16
SUBMITTAL NUMBER: 4TH REVIEW
REVIEW DATE: 5/16/16
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: NO
COMMENTS:
1. ELEVATION SHOWING THE HEIGHT OF THE PROPOSED TOWNHOUSES
SHALL BE SUBMITTED PRIOR TO CONSTRUCTION PLAN APPROVAL.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: ANTHONY BATTEN / 717-6167
EMAIL: BATTENA@CHESTERFIELD.GOV
NAME OF PLAN: BEETLE COURT TOWNHOUSES
PLAN NUMBER: 15CP0082
LATEST PLAN DATE: 6/10/16
DEPT. REC'D. DATE: 6/20/16
SUBMITTAL NUMBER: 5TH REVIEW
REVIEW DATE: 7/7/16
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: NO
COMMENTS:
1. ELEVATION SHOWING THE HEIGHT OF THE PROPOSED TOWNHOUSES
SHALL BE SUBMITTED PRIOR TO CONSTRUCTION PLAN APPROVAL.
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS / 751-2335
NAME OF PLAN : BEETLE COURT TOWNHOUSES
SITE PLAN NO. : 15CP0082
LATEST PLAN DATE : 03/13/15
DEPT. REC'D DATE : 03/16/15
SUBMITTAL NUMBER : 1
REVIEW DATE : 04/22/15
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : NO
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT
RELIEVE YOU OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION
MUST BE RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF
THE LAND DISTURBANCE PERMIT.
2 PRESENTLY, THIS OFFICE IS RECOGNIZING THAT THE 10-YEAR
PRE/10-YEAR POST REQUIREMENTS FOR FLOOD PROTECTION MAY BE
ADDRESSED BY DISCHARGING INTO THE 100-YEAR FLOODPLAIN.
PLEASE ADDRESS.
===================== EROSION CONTROL =====================
1. AN ITEMIZED EROSION CONTROL COST ESTIMATE MUST BE
SUBMITED FOR REVIEW AND/OR APPROVAL.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A COPY OF THE AUTOCAD FILE MUST BE SUBMITTED TO
CAROLE CLIBORNE OF THE ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD
VERSION 2009 OR EARLIER AND REFERENCED DIRECTLY TO THE
VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN
THE NAD83 DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A
CD, DVD, OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH
THE SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN
NUMBER, ENGINEERING FIRM AND CAD FILE PREPARER'S NAME
AND PHONE NUMBER. THE FILE MUST CONTAIN THE FOLLOWING,
EACH CLEARLY LABELED IN SEPARATE LAYERS:
I.EDGES OF ROADS TO INCLUDE CURB AND GUTTER; AND
II. EDGES OF SIDEWALKS;
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
B) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
C) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
D) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
E) A COPY OF VDOT LAND USE PERMIT MUST BE RECEIVED.
F) AN EROSION CONTROL BOND MUST BE POSTED.
G) TWO ADDITIONAL SETS OF CONSTRUCTION PLANS TO BE
STAMPED "APPROVED FOR CONSTRUCTION" MUST BE RECEIVED.
H) THE ENVIRONMENTAL ENGINEERING DEPARTMENT MUST HAVE
RECEIVED SIGNED, WRITTEN NOTIFICATIONS FROM THE
ADJACENT PROPERTY OWNERS, N/F REYES-VILLATORO, J. AT
4014 LAURELWOOD RD., N/F DODSON, C. AT 4020 LAURELWOOD
RD., N/F SPOON, A. AT 4026 LAURELWOOD RD., N/F
CHARLESTON T TRUSTEE ET ALS AT 4032 LAURELWOOD RD., N/F
PORTER, S. AT 4101 WALDERBROOK CT., N/F ROSAS, G. AT
4100 WALDERBROOK CT., N/F MILES, M. AT 4102 WALDERBROOK
CT., AND N/F ADAMS, R. AT 4101 BELRUN RD., WHICH SHOULD
BE SENT U.S. POSTAL CERTIFIED MAIL, RETURN RECEIPT
REQUESTED. INCLUDE AN 8½ X 11 COPY OF THE PROPOSED
CONSTRUCTION ACTIVITY ADJACENT TO THEIR PROPERTIES.
IN ADDITION, PLEASE IDENTIFY/LABEL THE PROPERTY OWNERS
OF BELFAIR TOWNHOUSES SECTION 4 BLOCK H (I.E. ON
4007/4009/4011/4013/4015/4017/4019 BARNACLE COURT) AND
THEY SHOULD BE NOTIFIED OF THE IMPEDING OF CONSTRUCTION
PRIOR TO THE ISSUANCE OF LAND DISTURBANCE PERMIT.
3. THESE ARE IN REGARDS TO SHEET 11:
A) THIS PROJECT IS SUBJECT TO TECHNICAL CRITERIA PART
IIB (4VAC50-60-63). AS A RESULT, INSTEAD OF USING THE 2-
YEAR STORM POST-DEVELOPED TO ANALYZE THE NATURAL CHANNEL
BELOW THE EXISTING STRUCTURES EX39/EX43, CHANNEL
PROTECTION/RUNOFF REDUCTION METHOD SHOULD BE USED TO
COMPLY WITH THE TECHNICAL CRITERIA PART IIB. THE
STORMWATER CONVEYANCE SYSTEMS SHALL BE ANALYZED FOR
COMPLIANCE WITH CHANNEL PROTECTION CRITERIA TO A POINT
WHERE EITHER,
A.1) THE SITE'S CONTRIBUTING DRAINAGE AREA IS LESS THAN
OR EQUAL TO 1.00% OF THE TOTAL WATERSHED, WHICH MAY
OCCUR AT POCOSHOCK CREEK (THE CONTRIBUTING DRAINAGE
AREAS TO THE POINT OF ANALYSIS THAT DRAIN TO POCOSHOCK
CREEK SHOULD BE SHOWN ON THE PLANS WITH PERTINENT
ACREAGE DRAWN TO SCALE AND THE EXISTING CONTOURS WITH
ELEVATIONS SHOULD BE CLEARLY SHOWN ON THE PLANS). THE
EXISTING STORM SEWER AND THE NATURAL DRAINAGEWAY WHERE
THE PROPOSED DEVELOPMENT DRAINS TO, SHOULD BE ANALYZED
BY USING THE POST-DEVELOPED 2-YEAR 24-HR STORM EVENT
WITHOUT CAUSING EROSION OF THE SYSTEM AND FOR THE
NATURAL CONVEYANCE SYSTEM, THE 1-YEAR 24-HR STORM SHOULD
BE CALCULATED AND SHOULD MEET THAT THE Q1-YEAR STORM
POST-DEVELOPED IS LESS OR EQUAL TO I.F. (QPRE-
DEVELOPED*RVPRE-DEVELOPED)RVDEVELOPED. A FURTHER
DISCUSSION IS RECOMMENDED. REFER TO 9VAC25-870-66 WATER
QUANTITY.
A.2)OR BASED ON PEAK FLOW RATE, THE SITE'S PEAK FLOW
RATE FROM THE 1-YEAR 24-HR STORM IS LESS THAN OR EQUAL
TO 1.0% PEAK FLOW RATE FROM THE 1-YEAR 24-HR PRIOR TO
THE IMPLEMENTATION OF ANY STORMWATER QUANTITY CONTROL
MEASURES.
B) PLEASE REVISE THE LABELING IN THE TITLE SHEET TO BE
STORMWATER MANAGEMENT COMPLIANCE AS OPPOSED TO MS-19
COMPLIANCE.
C) IT APPEARS A FILTERRA IS GOING TO BE USED. HOWEVER,
IT WON'T SERVE TO REDUCE RUNOFF VOLUME THAT IS NEEDED TO
COMPLY WITH 1-YEAR 24-HR POST-DEVELOPED PEAK RUNOFF TO
BE LESS OR EQUAL TO THE 1-YEAR 24-HR PRE (ENERGY
BALANCE) FOR CHANNEL PROTECTION. PLEASE RE-CONSIDER
OTHERS BMP'S (I.E. DRY SWALES, BIORETENTION, ETC.) THAT
ARE APPROVED IN THE VRRM TO REDUCE TREATMENT VOLUME.
IN ADDITION, PLEASE SEE THE ENCLOSED COPY OF AN EXAMPLE
WHERE A DRY SWALE WAS USED AS ONE OF THE BMP'S FOR VRRM.
THIS WOULD GIVE YOU AN IDEA HOW THE COUNTY WOULD PREFER
THOSE BMP'S TO BE LABELED, LOCATED AND ENCLOSED IN BMP
DRAINAGE EASEMENT.
D) ANY BMP'S TO BE USED IN THIS PROJECT SHOULD BE SHOWN
ON THE CONSTRUCTION PLANS, WITH DETAIL, SPECIFICATIONS,
GRAPHICALLY SHOW THE INCREMENTAL DRAINAGE AREAS TO EACH
BMP, LOCATION, ETC. A FURTHER DISCUSSION IS RECOMMENDED.
4. WE OFFER, BUT NOT LIMITED TO THE FOLLOWING COMMENTS:
A) PLEASE REVISE THE LEGEND AND ON THE PLANS PERTINENT
TO THE SUPER SILT FENCE TO BE SHOWN WITH TWO X'S "---XX-
--XX---" AS OPPOSED TO ONE.
B) PLEASE LABEL IN GHOSTED LINES THE LOT NUMBERS, BLOCK
AND SECTION ON THE PHASE I/PHASE II E & S CONTROL PLAN.
C) PLEASE REVISE THE EROSION CONTROL PHASE 1 NARRATIVE
(SHEET 3) TO INCLUDE THE FOLLOWING NOTE, "THE COUNTY
INSPECTOR AND CRLD MUST MEET TO INSPECT EC MEASURES
BEFORE PROCEEDING TO PHASE 2."
D) PLEASE REVISE THE EROSION CONTROL PHASE 1 NARRATIVE
(SHEET 3) TO MENTION THAT FLAGGING ALONG
WETLANDS/SENSITIVE AREAS MUST BE VISIBLE BEFORE THE
ISSUANCE OF THE LDP. THIS MAY APPLY TO THE NATURAL
DRAINAGEWAY LOCATED IN THE PROXIMITY OF LOTS 1 THRU 9
BLOCK I SECTION 4.
E) PLEASE PROVIDE A NOTE IN THE PHASE II EROSION &
SEDIMENT CONTROL NARRATIVE (SHEET 4) TO STATE,
"ADDITIONAL EC MEASURES MAY BE REQUIRED BY EE IF
WARRANTED BY FIELD CONDITIONS."
F) PLEASE PROVIDE A SEDIMENT TRAP NEAR THE ENTRANCE
DOWNSTREAM OF LOT 1 BLOCK J SECTION 4 IN CONJUNCTION
WITH DIVERSION DIKES TO BE LOCATED ALONG THE INSIDE OF
THE COMMON PROPERTY LINE ON THE SOUTH-EASTERN. IN
ADDITION PROVIDE RIGHT-OF-WAY DIVERSION/DIVERSION DIKE
NEAR THE ENTRANCE AND CONTINUE UNTIL IT REACHES THE
REQUESTED SEDIMENT TRAP. SEE ATTACHMENT FOR
CLARIFICATION. INCLUDE DIMENSIONS OF THIS TRAP AND
DRAINAGE AREAS INTERCEPTED BY THIS DEVICE. REFLECT THE
CHANGES ON THE PHASE I AND PHASE II EROSION AND SEDIMENT
CONTROL PLAN.
IN ADDITION, PROVIDE DETAIL OF THE DIVERSION DIKE AND
RIGHT-OF-WAY DIVERSION ON THE PLANS.
FURTHERMORE, A NOTE SHOULD BE PROVIDED IN THE PHASE II
EROSION AND SEDIMENT CONTROL NARRATIVE (SHEET 4)
STATING, "NO TEMPORARY SEDIMENT TRAPS SHALL BE REMOVED
UNTIL APPROVED BY EE."
G) PLEASE BE SURE TO SHOW THE OFFSITE 1' EXISTING
CONTOURS WITH ELEVATIONS (I.E. ON THE WEST, NORTH, EAST
AND SOUTH OF THE THIS PROJECT) TO IDENTIFY ANY POTENTIAL
PROBLEM DURING THE PHASE I/PHASE II E & S CONTROL PLANS,
WHICH HAVE BEEN CUT OFF FROM THE PLAN VIEW.
H) PLEASE PROVIDE ANOTHER SEDIMENT TRAP ON THE
DOWNSTREAM OF LOT 1 BLOCK I SECTION 4. INCLUDE
DIMENSIONS OF THIS TRAP AND DRAINAGE AREA INTERCEPTED BY
THIS DEVICE. REFLECT THE CHANGES ON THE PHASE I/PHASE II
E & S CONTROL PLANS.
I) PLEASE PROVIDE SMALL EXCAVATED PIT ON THE UPSTREAM
SIDE OF THE TEMPORARY GRAVEL OUTLET SPECIFIED ON LOT 8
BLOCK I SECTION 4 AND INCLUDE THE ENCLOSED DETAIL OF THE
EXCAVATED PIT ON THE EC PLANS.
J) AS APPLICABLE REVISE THE EROSION CONTROL PHASE I
NARRATIVE TO MENTION THE EROSION CONTROL MEASURES
REQUESTED IN THIS REVIEW.
K) PLEASE REVISE THE THIRD NOTE IN THE GENERAL NOTES
(SHEETS 3 AND 4) TO ELIMINATE THE WORDING "FINAL OR
SUBSTANTIAL". IT SHOULD STATE, "APPROVAL OF SITE PLANS."
IN ADDITION, REVISE ITEM 1 TO STATE, "ALL ONSITE
DRAINAGE EASEMENTS, INCLUDING STORMWATER/B.M.P. DRAINAGE
EASEMENTS MUST BE RECORDED PRIOR TO ISSUANCE OF ANY
BUILDING PERMIT IN THIS PROJECT."
SIMILARLY, REVISE ITEM 2 TO STATE, "THE STORMWATER/BMP
FACILITY MUST BE CERTIFIED BY A PROFESSIONAL ENGINEERING
PRIOR TO RELEASE OF BONDS AND/OR ISSUANCE OF LAST
BUILDING PERMITS." REVISE AS APPLICABLE.
L) PLEASE REVISE THE PHASE I E & S CONTROL PLAN TO
SHOW/LABEL THE INITIAL LIMITS OF CLEARING. IN ADDITION,
REVISE THE LIMITS OF DISTURBANCE ON THE PHASE I E & S
CONTROL PLANS TO LIMIT TO THE INITIAL PLACEMENT OF THE
EROSION CONTROL MEASURES BEFORE INTENDING TO REMOVE
TREES/GRADING.
M) PLEASE REVISE THE PHASE II E & S CONTROL PLANS TO
SHOW/LABEL CHECKS DAMS ALONG THE PROPOSED
DITCH(ES)/SWALE(S) LOCATED ON THE REAR OF LOTS 1 THRU 8
BLOCK J SECTION 4 AND THE DITCH LOCATED ADJACENT TO LOTS
9 OF BLOCK K SECTION 4/LOT 9 BLOCK I SECTION 4. IN
ADDITION, PROVIDE THE PERTINENT DETAIL OF CHECK DAMS ON
THE PLANS.
IN ADDITION, PROVIDE OUTLET PROTECTION DETAIL, SINCE IT
HAS BEEN REQUESTED AT THE END OF THE DITCH IMPROVEMENT.
REFER TO COMMENT ITEM 11.G UNDER ROAD AND DRAINAGE.
N) IT APPEARS THAT FILTERRA AND BIORETENTION
FACILITIES ARE GOING TO BE USED. PLEASE CLARIFY AND/OR
REVISE ITEM UNDER STORMWATER MANAGEMENT/EROSION CONTROL
NARRATIVE (SHEET 5) TO REMOVE BMP'S THAT ARE NOT GOING
TO BE USED ON THIS PROJECT.
O) PLEASE MENTION IN THE EROSION AND SEDIMENT CONTROL
MEASURES UNDER EROSION AND SEDIMENT CONTROL NARRATIVE
(SHEET 5) THAT SEDIMENT TRAPS ARE GOING TO BE PROVIDED
AS REQUESTED IN THIS REVIEW.
5. ANY TIMBERING THAT IS TO OCCUR AS THE FIRST PHASE OF
INFRASTRUCTURE CONSTRUCTION WILL BE INCORPORATED INTO THE
PROJECT'S EROSION-AND-SEDIMENT CONTROL PLAN NARRATIVE AND
WILL NOT COMMENCE UNTIL THE ISSUANCE OF A LAND DISTURBANCE
PERMIT FOR SUBDIVISION CONSTRUCTION AND PROPER INSTALLATION
OF EROSION CONTROL MEASURES.
======================== CBPA ============================
1. PLEASE REVISE THE CBPA/MS-4 TABLE TO PROVIDE THE
REQUIRED REMOVAL FOR THIS SITE, THE AREA PERTINENT TO RMA
COMPLIANCE, LIST THE BMPS USED FOR THIS SITE WITH PERTINENT
INFORMATION, ETC.
=================== ROAD AND DRAINAGE ======================
1. AS A PRE-REQUISITE TO PLAN APPROVAL, THIS OFFICE MUST
RECEIVE DOCUMENTATION CONFIRMING IF THERE ARE
WETLANDS/WOUS/ETC. WITHIN THE LIMITS OF THIS PROJECT.
2. PLEASE INCLUDE THE STORMWATER POLLUTION PREVENTION PLAN
(SWPPP) IN THE CONSTRUCTION PLANS.
3. PLEASE PROVIDE A NOTE IN BOLD PRINT (SHEET 8) STATING,
"ALL DITCHES/SWALES SHALL BE ROUGHED IN AT TIME OF ROAD
CONSTRUCTION". REFLECT THIS NOTE ON SHEETS 4 AND 8.
4. PRIOR TO PLAN APPROVAL, THE CONDITIONS/INTEGRITY OF THE
EXISTING STORM PIPES/STRUCTURES MUST BE VIDEO INSPECTED FOR
COMPLIANCE WITH VDOT STANDARDS/CRITERIA TO THE SATISFACTION
OF THE ENVIRONMENTAL ENGINEERING DEPARTMENT.
5. PLEASE SHOW THE STIPPLE PATTERN FOR PAVED AREAS LITTLE
DARKER, SINCE IT IS CURRENTLY SHOWING VERY LIGHT AND VERY
HARD TO BE SEEN ON THE PLANS.
6. PLEASE PROVIDE AT LEAST ONE BENCHMARK WITH REFERENCE TO
MEAN SEA LEVEL MUST BE SHOWN ON THE PLANS WITHIN THE LIMITS
OF THIS PROJECT.
7. PLEASE ANNOTATE ALL PROPOSED LOTS WITH "NBP" AND PROVIDE
A NOTE ON THE PLANS STATING, NBP (NO BUILDING PERMIT) SHALL
BE ISSUED UNTIL GRADING AND DRAINAGE COMPLIANCE HAVE BEEN
ACHIEVED TO THE SATISFACTION OF THE ENVIRONMENTAL
ENGINEERING DEPARTMENT."
8. BASED ON THE APPROVED CONSTRUCTION PLANS PERTINENT TO
BELFAIR TOWNHOUSES SECTION 3 & 4 - STAGE 2, IT APPEARS THE
EXISTING NATURAL DRAINAGEWAY LOCATED ON THE REAR OF LOTS 1
THRU 9 OF BLOCK I SECTION 4 MAY BE WATER OF THE U.S. PLEASE
CLARIFY OR LABEL THIS DRAINAGEWAY ACCORDINGLY. IF
APPLICABLE, BE SURE TO PROVIDE 25' SETBACK OFF THE LIMITS
OF THE WOUS/WETLANDS.
FURTHERMORE, PLEASE ESTABLISH THE 100-YEAR FLOODPLAIN
LIMITS ALONG THIS DRAINAGEWAY IN THE PROXIMITY OF LOTS 5
THRU 9 OF BLOCK I SECTION 4. SUBMIT COMPLETE 100-YEAR
FLOODPLAIN CALCULATIONS WITH SCALED X-SECTIONS FOR FURTHER
REVIEW AND/OR APPROVAL, SHOW/LABEL THE 100-YEAR FLOODPLAIN
SECTIONS-LOCATIONS WITH ELEVATIONS ALONG THIS DRAINAGEWAY,
SHOW/LABEL THE LIMITS OF THE 100-YEAR FLOODPLAIN, ETC. ON
THE PLANS AND REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
BE SURE TO PROVIDE 25' BUILDING SETBACK OFF THE 100-YEAR
FLOODPLAIN LIMITS WITH MINIMUM FINISH FLOOR TO BE 1' ABOVE
THE 100-YEAR FLOODPLAIN ELEVATIONS WHERE THE LIMITS OF THE
100-YEAR FLOODPLAIN ENCROACH THE LOTS.
9. PLEASE SPECIFY ROOF GUTTERS/LEADER LINES/DOWNSPOUTS/ETC.
TO CONVEY THE STORM RUNOFF FROM THE ROOF OF THE TOWNHOUSES
TO THE STORM SEWER AND/OR DISCHARGE IN A NON-ERODIBLE
MANNER WITH TYPICAL ENLARGED DETAIL OF THE CONNECTION
BETWEEN THE ROOF GUTTER, DOWNSPOUTS, ETC. WITH APPLICABLE
INFORMATION (I.E. MATERIAL, DIAMETER, ETC.) ON THE PLANS.
IN ADDITION, A SIDE VIEW OF THE ROOF
GUTTER/DOWNSPOUT/LEADER LINES WITH PERTINENT INFORMATION
SHOULD ALSO BE PROVIDED ON THE PLANS AND REFLECT ON THE
PLANS, PROFILES AND IN THE STORM SEWER DESCRIPTION TABLE.
THE FOLLOWING CONCERNS SHOULD ALSO BE CONSIDERED INTO THE
DESIGN FOR THE CONNECTION OF THE ROOF GUTTER/LEADER
LINES/ETC.
A) SPLASH BLOCK ARE ACCEPTABLE FOR FRONT AREAS OF THE
TOWNHOUSES AS LONG AS THEY ARE DISCHARGING INTO PAVED
PARKING AREA.
B) BE SURE TO SPECIFY CLEANOUT LOCATION ALONG THE ROOF
DRAIN LEADERS WHERE CHANGES IN PIPE DIRECTION OCCUR. IN
ADDITION, PROFILE OF THE 12" LINES SHOULD BE PROVIDED ON
THE PLANS WITH PERTINENT INFORMATION (I.E. MATERIAL,
DIAMETER, INVERTS, SLOPES, ETC.) AND SUBMIT SUPPORT 10/100-
YEAR STORM SEWER/HGL CALCULATIONS FOR FURTHER REVIEW AND/OR
APPROVAL.
REAR YARD DRAINAGE SHOULD BE DESIGNED SIMILAR TO THAT
APPROVED IN THE ADJACENT BLOCK H. A FURTHER DISCUSSION IS
RECOMMENDED.
C) IF APPLICABLE, SPECIFY BOOT CONNECTORS FOR ALL PLASTIC
PIPES THAT TIE INTO CONCRETE STRUCTURES AND INCLUDE THE
PERTINENT DETAIL OF THE BOOT CONNECTORS ON THE PLANS.
REFLECT THE CHANGES ON THE PLANS, DRAINAGE DESCRIPTION
TABLE, ETC.
D) ADD A NOTE ON THE PLANS IN BOLD PRINT THAT THE ROOF
DRAIN SYSTEMS ARE OWNED AND MAINTAINED BY THE HOA.
E) IF APPLICABLE, PLEASE SPECIFY THAT THE LEADER LINES ARE
TO BE PVC OR HDPE DOUBLE WALL OR EQUIVALENT ON THE PLANS.
10. IN LIEU OF THE NOTE "DESIGN BY OTHERS" ON SHEET 6,
PLEASE PROVIDE AN APPROVABLE RETAINING WALL DESIGN. WE
SUGGEST A STOCKED BLOCK RETAINING WALL BE CONSIDERED. THE
ENCLOSED DETAIL MAY BE HELPFUL. REFLECT THE CHANGES ON ALL
APPLICABLE SHEETS.
IN ADDITION, IT MAY BE NECESSARY TO RELOCATE THE PROPOSED
RETAINING WALL SPECIFIED ON THE REAR OF LOTS 1 THRU 8 OF
BLOCK J SECTION 4 AND LOTS 1 THRU 9 OF BLOCK F SECTION 4 IN
OPEN SPACE. SEE ATTACHMENT FOR CLARIFICATION AND REFLECT THE
CHANGES ON ALL APPLICABLE SHEETS. A FURTHER DISCUSSION IS
RECOMMENDED.
A NOTE SHOULD BE PROVIDED ON THE PLANS STATING, "RETAINING
WALLS ARE TO BE MAINTAINED BY THE HOMEOWNER ASSOCIATION".
11. THESE ARE IN REGARDS TO THE GRADING PLAN (SHEET 8):
A) PLEASE SPECIFY THE SIDE SLOPE OF THE PROPOSED FILL
GRADING WITH DIRECTIONAL FLOW ARROWS SPECIFIED ON THE
REAR OF LOTS 1 THRU 9 OF BLOCK I SECTION 4. REFLECT THE
CHANGES ON ALL APPLICABLE SHEETS.
B) PLEASE LABEL THE LOTS WITH NUMBERS WITH PERTINENT
BLOCK LETTER/SECTION ON THIS SHEET AND ON THE EROSION
CONTROL PLANS PHASE I AND PHASE II.
C) PLEASE BE SURE TO INDICATE WITH ARROWS THE DIRECTION
OF FLOW IN ALL GUTTERS, DITCHES, STREAM, CREEKS, ETC.
REFLECT THE CHANGES ON ALL APPLICABLE SHEETS (I.E.
SHEETS 3, 4, 8 THRU 11, ETC.).
D) PLEASE SHOW THE 1' OFFSITE EXISTING CONTOURS WITH
ELEVATIONS ON THE SOUTHERN SIDE AND EASTERN SIDE OF THIS
PROJECT, WHICH HAVE BEEN CUT OFF FROM THE PLAN VIEW. SEE
ATTACHMENT FOR CLARIFICATION.
E) PLEASE PROVIDE A SERIES OF NYLOPLAST DRAIN INLETS AT
EVERY OTHER LOT PERTINENT TO LOTS 1 THRU 8 BLOCK J
SECTION 4 AND LOTS 1 THRU 9 BLOCK K SECTION 4 CREATING A
LOW POINT AT THE DRAIN INLETS WITH DRAIN PIPE SYSTEMS TO
CARRY THE FLOW FROM THE BACK OF THESE LOTS TO AN
EXISTING STORM SEWER AND/DISCHARGING TO NATURAL
DRAINAGEWAY. THE OVERALL PROPOSED GRADING SHOULD BE
REVISED TO INCREASE THE USABLE YARD AREA ON THESE LOTS.
CROSS LOT DRAINAGE AS PROPOSED IS NOT ACCEPTABLE. SEE
ATTACHMENT FOR CLARIFICATION. A FURTHER DISCUSSION IS
RECOMMENDED.
IN ADDITION, THE NYLOPLAST INLETS/DRAINPIPE SYSTEMS
SHOULD BE LOCATED 8' OFF THE STACKED BLOCK RETAINING
WALL AND SHOULD BE ENCLOSED IN A 16' DRAINAGE EASEMENT
(PRIVATE). INCLUDE 10/100-YEAR STORM SEWER/HGL
CALCULATIONS FOR FURTHER REVIEW AND/OR APPROVAL AND
REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
FURTHERMORE, THE PROPOSED SWALES SPECIFIED ON THESE LOTS
SHOULD BE RELOCATED ALONG THE NYLOPLAST INLETS/DRAINPIPE
SYSTEM. INCLUDE THE 10/100-YEAR DITCH CALCULATIONS FOR
REVIEW AND/OR APPROVAL AND PROVIDE THE TYPICAL DITCH
DESIGN WITH PERTINENT INFORMATION (I.E. DESIGN DEPTH,
SIDE SLOPES, LINING, %SLOPE, ETC.) ON THE PLANS. A
PROFILE OF THIS DITCH AND STORM SEWER SHALL BE SHOWN ON
THE PLANS WITH PERTINENT INFORMATION.
PLEASE BE SURE THAT WHERE THE PROPOSED DRAINAGE
IMPROVEMENTS TIE INTO THE EXISTING STORM SEWERS MEET THE
10-YEAR STORM DESIGN CAPACITY. THE EXISTING STRUCTURES
35/36 DO NOT HAVE 10-YEAR STORM DESIGN CAPACITY AND IF
THIS EXISTING SYSTEM IS GOING TO BE USED IN THE FUTURE
IT SHOULD BE UPGRADED TO MEET THE 10-YEAR STORM DESIGN
CAPACITY.
F) PLEASE BE SURE THAT THE FINISH FLOOR SPECIFIED ON
THESE LOTS ARE 1' ABOVE THE PROPOSED GRADE (I.E. LOTS 1
THRU 9 BLOCK K SECTION 4 DO NOT PROVIDE 1' ABOVE THE
PROPOSED GRADE AND LOTS 1 THRU 9 BLOCK I SECTION 4 ONLY
6" ABOVE THE PROPOSED GRADE HAVE BEEN PROVIDED). REVISE
ACCORDINGLY.
G) PLEASE REVISE THE SWALE SPECIFIED ON THE EASTERN SIDE
OF LOT 9 BLOCK K SECTION 4 TO CONTINUE THIS SWALE
OUTSIDE OF LOT 9 BLOCK I SECTION 4 UNTIL IT REACHES THE
EXISTING NATURAL DRAINAGEWAY/WATER OF THE U.S. DUE TO
THE PHYSICAL CONSTRAINT A WELL-DEFINED DITCH OF 3:1
SHOULD BE SPECIFIED NEAR THE PROPOSED STACKED BLOCK
RETAINING WALL AND PROVIDE OUTLET PROTECTION AT 0% SLOPE
AT THE END OF THIS DITCH IMPROVEMENT WITH PERTINENT
INFORMATION (I.E. WIDTH, LENGTH AND 24" THICK LAYER OF
RIPRAP OVER FILTER FABRIC). SEE ATTACHMENT FOR
CLARIFICATION. SUBMIT 10/100-YEAR DITCH CALCULATIONS,
TYPICAL DITCH DESIGN AND PROFILE OF THIS DITCH ON THE
PLANS.
H) BASED ON A FIELD INSPECTION, PLEASE PROVIDE THE TYPE
OF THE EXISTING FENCES LOCATED ALONG LOTS 15 THRU 18 OF
BELFAIR SECTION A SUBDIVISION, AND LOTS 11 THRU 13 OF
BELFAIR VILLAGE SUBDIVISION. REFLECT THE CHANGES ON ALL
APPLICABLE SHEETS.
I) PLEASE LABEL ALL THE EXISTING EASEMENTS WITH DEED
BOOK/PAGE NUMBER THAT ARE LOCATED NEAR OR ARE WITHIN THE
LIMITS OF THIS PROJECT.
J) PLEASE CLARIFY HOW REAR LOT RUNOFF FROM BLOCK I WILL
BE INTERCEPTED AT THE PROPOSED STACKED RETAINING WALL.
WILL UNDERDRAIN WITH OPENING BE SPECIFIED THROUGH THE
BASE OF THE WALL? PLEASE ADDRESS.
12. PLEASE PROVIDE ONSITE DRAINAGE AREA PLAN DRAWN TO A
SCALE 1"=50". THE 1' EXISTING/PROPOSED CONTOURS WITH
ELEVATIONS SHOULD BE SHOWN ON THIS SHEET TO VERIFY DRAINAGE
PATTERNS/BREAKS, LIMITS OF DRAINAGE AREAS/ACREAGE OF EACH
AREA WITH PERTINENT RUNOFF COEFFICIENT, FLOW PATH
SHOW/LABELED (I.E. SHEET FLOW, SHALLOW CONCENTRATED FLOW,
CHANNEL FLOW), ETC. ON THE PLANS. PLEASE ADDRESS.
13. THESE ARE IN REGARDS TO THE DRAINAGE AREA MAP:
A) PLEASE REVISE THE EXISTING STORM SEWER STRUCTURES 33
THRU 44. IT APPEARS ADDITIONAL STORM SEWER SYSTEM FROM
BELFAIR VILLAGE HAS BEEN INSTALLED AND CONNECTED TO THE
STR. EX40 THAT NOW CONVEY ABOUT 37.32 ACRES AS OPPOSED
TO 32.50 ACRES. THE LIMITS OF THE OVERALL DRAINAGE AREA
INTERCEPTED BY THE STR. EX. 40 SHOULD BE DEPICTED ON THE
PLANS WITH AN AVERAGE RUNOFF COEFFICIENT. A FURTHER
DISCUSSION IS RECOMMENDED AND REVISE ALL APPLICABLE
SHEETS (I.E. SHEETS 10, 11, ETC.) TO REFLECT THE
CHANGES.
B) PLEASE SUBMIT REVISED 10-YEAR STORM SEWER/HGL
CALCULATIONS OF THE EXISTING STORM SEWER WHERE THE
PROPOSED PROJECT DRAINS TO ENSURE IS ADEQUATE AND TO
ACCOUNT FOR ADDITIONAL DRAINAGE AREAS. IN ADDITION,
SUBMIT THE 100-YEAR STORM SEWER/HGL CALCULATIONS FOR
100-YEAR PROPERTY PROTECTION, WHICH WERE OMITTED FROM
THE SUBMITTAL PACKAGE.
C) IT APPEARS THE LABELING OF POCOSHOCK CREEK IS
CURRENTLY SHOWING TWICE AND OVERLAPPING. REVISE
ACCORDINGLY AND REFLECT THE CHANGES ON SHEETS 9 AND 10.
14. AS A PREREQUISITE TO THE RELEASE OF ANY BUILDING PERMIT:
A) A $100/LOT BMP MAINTENANCE FEE MUST BE RECEIVED.
B) THE PROPOSED ONSITE DRAINAGE EASEMENTS MUST BE
RECORDED WITH DEED BOOK AND PAGE NUMBER PROVIDED.
C) ALL IMPROVEMENTS MUST BE BONDED IN A FORM APPROVED BY
ENVIRONMENTAL ENGINEERING.
D) CBPA COMPLIANCE MUST BE ACHIEVED EITHER BY
APPROVED/BONDING/EASEMENT FOR THE PROPOSED BMP'S OR
COMPLIANCE WITH VSMP REGULATIONS FOR PURCHASE OFFSITE
POLLUTANT CREDITS.
=================== END OF COMMENTS ======================
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS / 751-2335
NAME OF PLAN : BEETLE COURT TOWNHOUSES
SITE PLAN NO. : 15CP0082
LATEST PLAN DATE : 06/01/15
DEPT. REC'D DATE : 06/12/15
SUBMITTAL NUMBER : 2
REVIEW DATE : 06/30/15
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : NO
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT
RELIEVE YOU OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION
MUST BE RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF
THE LAND DISTURBANCE PERMIT.
2 THIS OFFICE RECOGNIZES THAT THE 10-YEAR PRE/10-YEAR POST
REQUIREMENTS FOR FLOOD PROTECTION MAY BE ADDRESSED BY
DISCHARGING INTO THE 100-YEAR FLOODPLAIN.
3. BASED ON THE PREVIOUS APPROVED PLANS FOR BELFAIR
TOWNHOUSES SECTIONS 3 & 4, THE 100-YEAR FLOOD PROTECTION
WAS ADDRESSED WITH ESTABLISMENT OF THE CONSERVATION AREA
EASEMENT AND JURISDICTIONAL FEATURES ALONG THE NATURAL
CONVEYANCE SYSTEM BELOW THE EXISTING OUTFALL STR. EX44.
===================== EROSION CONTROL =====================
1. AN ITEMIZED EROSION CONTROL COST ESTIMATE MUST BE
SUBMITED FOR REVIEW AND/OR APPROVAL.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A COPY OF THE AUTOCAD FILE MUST BE SUBMITTED TO
CAROLE CLIBORNE OF THE ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD
VERSION 2009 OR EARLIER AND REFERENCED DIRECTLY TO THE
VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN
THE NAD83 DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A
CD, DVD, OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH
THE SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN
NUMBER, ENGINEERING FIRM AND CAD FILE PREPARER'S NAME
AND PHONE NUMBER. THE FILE MUST CONTAIN THE FOLLOWING,
EACH CLEARLY LABELED IN SEPARATE LAYERS:
I.EDGES OF ROADS TO INCLUDE CURB AND GUTTER; AND
II. EDGES OF SIDEWALKS;
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
B) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
C) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
D) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
E) A COPY OF VDOT LAND USE PERMIT MUST BE RECEIVED.
F) AN EROSION CONTROL BOND MUST BE POSTED.
G) TWO ADDITIONAL SETS OF CONSTRUCTION PLANS TO BE
STAMPED "APPROVED FOR CONSTRUCTION" MUST BE RECEIVED.
H) THE ENVIRONMENTAL ENGINEERING DEPARTMENT MUST HAVE
RECEIVED SIGNED, WRITTEN NOTIFICATIONS FROM THE
ADJACENT PROPERTY OWNERS, N/F REYES-VILLATORO, J. AT
4014 LAURELWOOD RD., N/F DODSON, C. AT 4020 LAURELWOOD
RD., N/F SPOON, A. AT 4026 LAURELWOOD RD., N/F
CHARLESTON T TRUSTEE ET ALS AT 4032 LAURELWOOD RD., N/F
PORTER, S. AT 4101 WALDERBROOK CT., N/F ROSAS, G. AT
4100 WALDERBROOK CT., N/F MILES, M. AT 4102 WALDERBROOK
CT., AND N/F ADAMS, R. AT 4101 BELRUN RD., WHICH SHOULD
BE SENT U.S. POSTAL CERTIFIED MAIL, RETURN RECEIPT
REQUESTED. INCLUDE AN 8½ X 11 COPY OF THE PROPOSED
CONSTRUCTION ACTIVITY ADJACENT TO THEIR PROPERTIES.
IN ADDITION, PLEASE IDENTIFY/LABEL THE PROPERTY OWNERS
OF BELFAIR TOWNHOUSES SECTION 4 BLOCK H (I.E. ON
4007/4009/4011/4013/4015/4017/4019 BARNACLE COURT) AND
THEY SHOULD BE NOTIFIED OF THE IMPEDING OF CONSTRUCTION
PRIOR TO THE ISSUANCE OF LAND DISTURBANCE PERMIT.
3. THESE ARE IN REGARDS TO SHEET 14:
A) PLEASE REFER TO COMMENT #2 UNDER CBPA. REVISE THIS
SHEET TO REFLECT THE UNDERGROUND STORMWATER DETENTION
WITH APPLICABLE INFORMATION (I.E. DRAINAGE AREAS FOR THE
UNDERGROUND STORMWATER DETENTION FOR THE POST-DEVELOPED,
DRAINAGE AREAS FOR THE PRE-DEVELOPED, ETC.). A FURTHER
DISCUSSION IS RECOMMENDED.
4. WE OFFER, BUT NOT LIMITED TO THE FOLLOWING COMMENTS:
A) PLEASE PROVIDE SEDIMENT TRAPS SCHEDULE ON THE EC
PLANS WITH PERTINENT INFORMATION. REFER THE ENCLOSED
COPY OF SEDIMENT TRAP TABLE FOR YOU TO USE AS GUIDANCE.
B) PLEASE REVISE THE SEDIMENT TRAP DETAIL (SHEET 7) TO
INDICATE THE SIDE SLOPES OF THE EXCAVATED VOLUME TO BE
"1:1 OR FLATTER".
C) IT APPEARS THAT NOW FILTERRA AND DRY SWALE ARE NOT
GOING TO BE USED. PLEASE REVISE IN ITEM STORMWATER
MANAGEMENT UNDER EROSION CONTROL NARRATIVE (SHEET 7) TO
REMOVE THESE BMP'S THAT ARE NOT GOING TO BE USED ON THIS
PROJECT.
5. ANY TIMBERING THAT IS TO OCCUR AS THE FIRST PHASE OF
INFRASTRUCTURE CONSTRUCTION WILL BE INCORPORATED INTO THE
PROJECT'S EROSION-AND-SEDIMENT CONTROL PLAN NARRATIVE AND
WILL NOT COMMENCE UNTIL THE ISSUANCE OF A LAND DISTURBANCE
PERMIT FOR SUBDIVISION CONSTRUCTION AND PROPER INSTALLATION
OF EROSION CONTROL MEASURES.
======================== CBPA ============================
1. PLEASE REVISE THE SHEET 13 TO CLEARLY SHOW/LABEL EACH
DRAINAGE AREA WITH THE AMOUNT OF ACRES PERTINENT TO THE
TURF AREAS AND IMPERVIOUS AREAS FOR THIS PROJECT.
2. PER MEETING ON 06/23/15 WITH EDDIE, KIRK, ROBERT AND
MARIA, THE FOLLOWING SHOULD BE CONSIDERED:
A) UNDERGROUND STORMWATER DETENTION SHOULD BE PROVIDED
TO CAPTURE AND DETAIN STORMWATER BY PROVIDING DROP
INLET/LARGE DIAMETER O-RING CONCRETE PIPE. AN ORIFICE
PLATE/MH/OUTFALL PIPE AT RATES DESIGNED TO REDUCE THE 1-
YEAR 24-YEAR POST DEVELOPED FLOW TO BE EQUAL OR LESS
THAN THE 1-YEAR 24-HR PRE-DEVELOPED FLOW SHOULD BE
CONSIDERED. THE ENERGY BALANCE SHOULD BE USED WITH
IMPROVEMENT FACTOR (I.F.) OF 0.8 FOR SITES > 1 ACRE. A
FURTHER DISCUSSION MAY BE HELPFUL.
IN ADDITION, THE STORMWATER DETENTION PIPE SHOULD BE
ENCLOSED IN A 20' DRAINAGE AND SWM EASEMENT.
FURTHERMORE, SUBMIT REVISED VIRGINIA RUNOFF REDUCTION
METHOD FOR FURTHER REVIEW AND/OR APPROVAL.
B) PLEASE INCLUDE THE ENCLOSED STORMWATER OUTFALL TABLE
ON SHEET 14 AND FILL IN THE TABLE ACCORDINGLY.
C) PLEASE REVISE THE CBPA/MS-4 TABLE TO ELIMINATE THE
DRY SWALE AND FILTERRRA. SINCE, IT APPEARS PURCHASE
OFFSITE CREDITS WOULD BE CONSIDERED.
IN ADDITION, REVISE ALL APPLICABLE SHEETS TO ELIMINATE
THE DRY SWALE AND FILTERRA FROM THE CONSTRUCTION PLANS.
D) AS DISCUSSED, THE PROPOSED DRY SWALE SHOULD BE
REPLACED WITH YARD SWALES/NYLOPLAST GRATE INLETS BY
HAVING THE GRATE INLETS AT THE LOW INTERCEPTING THE
SWALES FROM EACH ADJACENT LOT TO DRAIN TO THIS GRATE
INLET (ONE GRATE INLET FOR TWO LOTS) AND ENCLOSE THESE
DRAINAGE IMPROVEMENTS IN A 16' DRAINAGE EASEMENT
(PRIVATE). SEE ATTACHMENT FOR CLARIFICATION. REVISE THE
PLANS, PROFILES AND COMPUTATION SHEETS TO REFLECT THE
CHANGES.
IN ADDITION, PROVIDE A TYPICAL SWALE DETAIL OF 5:1 SIDE
SLOPES, DESIGN DEPTH, ETC. TO THESE PROPOSED SWALES
LOCATED ON THE REAR OF LOTS 1 THRU 9 OF BLOCK K AND LOTS
1 THRU 8 OF BLOCK J.
E) IT WAS SUGGESTED TO CONTACT DEQ TO SEE IF THIS
PROJECT MAY BE CONSIDERED GRANDFATHERED AND BE SUBJECT
TO THE TECHNICAL CRITERIA PART IIC.
=================== ROAD AND DRAINAGE ======================
1. PLEASE INCLUDE OUR STANDARD STORMWATER POLLUTION
PREVENTION PLAN (SWPPP) IN THE CONSTRUCTION PLANS. THE
GENERIC PLAN IS ON THE COUNTY WEBSITE, EE DEPARTMENT, UNDER
FORMS.
2. PRIOR TO PLAN APPROVAL, THE CONDITIONS/INTEGRITY OF THE
EXISTING ONSITE STORM PIPES/STRUCTURES MUST BE VIDEO
INSPECTED FOR COMPLIANCE WITH VDOT STANDARDS/CRITERIA TO
THE SATISFACTION OF THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
3. AS PREVIOUSLY REQUESTED, A NOTE SHOULD BE PROVIDED ON
THE PLANS STATING, "RETAINING WALLS ARE TO BE MAINTAINED BY
THE HOMEOWNERS ASSOCIATION".
4. THESE ARE IN REGARDS TO THE GRADING PLAN (SHEET 10):
A) AS PER MEETING ON 06/23/15 WITH EDDIE, KIRK, ROBERT
AND MARIA, THE PROPOSED GRADING SPECIFIED ON THE REAR OF
THE TOWNHOUSES PERTINENT TO LOTS 1 THRU 9 OF BLOCK I
SHOULD PROVIDE A USABLE PLATEAU AREA. PLEASE REVISE
ACCORDINGLY.
B) AS PREVIOUSLY REQUESTED, PLEASE BE SURE THAT THE
FINISH FLOORS SPECIFIED ON THESE LOTS ARE 1' ABOVE THE
PROPOSED GRADE (I.E. LOTS 1 THRU 9 BLOCK I SECTION 4 DO
NOT PROVIDE 1' ABOVE THE PROPOSED GRADE). REVISE
ACCORDINGLY.
C) BASED ON A FIELD INSPECTION, PLEASE PROVIDE THE TYPE
OF THE EXISTING FENCES LOCATED ALONG LOTS 15 THRU 18 OF
BELFAIR SECTION A SUBDIVISION, AND LOTS 11 THRU 13 OF
BELFAIR VILLAGE SUBDIVISION. REFLECT THE CHANGES ON ALL
APPLICABLE SHEETS.
5. PLEASE PROVIDE A DETAIL OF THE FENCE TO BE INSTALLED TO
THE TOP OF THE RETAINING WALL. INCLUDE DIMENSIONS AND
MATERIALS.
6. AS PREVIOUSLY REQUESTED, PLEASE PROVIDE ROOF DRAIN
SYSTEM (I.E. ROOF GUTTER/DOWNSPOUT/LEADER LINES/CLEANOUT
LOCATIONS/ETC.) TO THE PROPOSED TOWNHOUSES LOTS 1 THRU 9 OF
BLOCK K, LOTS 1 THRU 9 OF BLOCK I, AND LOTS 1 THRU 8 OF
BLOCK J.
7. PLEASE SHOW THE CONNECTION OF THE DOWNSPOUT 4" PVC LINES
TO 12" LINES WITH CLEANOUT LOCATIONS WHERE CHANGES IN PIPE
DIRECTION OCCUR ON THE PLAN VIEW. IN ADDITION, A DETAIL OF
THE ROOF DRAIN DOWNSPOUT CONNECTION SHOULD BE PROVIDED ON
THE PLANS. REFER TO THE ENCLOSED COPY OF THE ROOF
CONNECTION FOR YOU TO USE AS GUIDANCE AND INCLUDE THE
ENCLOSED DETAIL OF INSERTA TEE ON THE PLANS.
IN ADDITION, SHOW/LABEL SPLASH BLOCK LOCATION TO THE FRONT
OF THE TOWNHOUSES ON THE PLAN VIEW. PLEASE ADDRESS.
8. THESE ARE IN REGARDS TO THE PROPOSED DITCH LOCATED
ADJACENT TO LOTS 9 OF BLOCK K AND 9 OF BLOCK I:
A) PLEASE PROVIDE COMPLETE HYDROLOGIC CALCULATIONS FOR
2/10/100-YEAR DISCHARGES USED TO CALCULATE THE PROPOSED
DITCH.
IN ADDITION, THE TRAVEL PATH (I.E. SHEET FLOW,
CONCENTRATED SHEET FLOW, CHANNEL FLOW, ETC.) MUST BE
SHOWN ON THE PLANS.
B) BASED ON THE DITCH CALCULATIONS, IT APPEARS A
TRAPEZOIDAL DITCH OF 5:1 SIDE SLOPES WAS USED IN THE
ANALYSIS AS OPPOSED TO V DITCH OF 3:1 SIDE SLOPES.
PLEASE SUBMIT REVISED 2/10/100-YEAR DITCH CALCULATIONS
FOR FURTHER REVIEW AND DOCUMENTATION.
IN ADDITION, JUTE LINING SHOULD BE SPECIFIED, SINCE THE
2-YEAR FLOW VELOCITY APPEARS TO EXCEED THE PERMISSIBLE
FLOW VELOCITY FOR GRASS DITCH. PLEASE SPECIFY ON THE
PLANS THAT JUTE LINING WOULD BE PROVIDED ALONG THIS
PROPOSED DITCH.
C) PLEASE PROVIDE A PROFILE OF THIS PROPOSED DITCH ON
THE PLANS WITH PERTINENT INFORMATION (I.E. SLOPES,
LINING, ETC.
D) PLEASE PROVIDE A TYPICAL V DITCH OF 3:1 SIDE SLOPES
WITH PERTINENT INFORMATION (I.E. DISCHARGE, DEPTH,
LINING, ETC.) ON THE PLANS AND PROFILES. SEE ATTACHMENT
FOR CLARIFICATION.
ON LOT 9 OF BLOCK K SHOULD BE A SWALE OF 5:1 SIDE SLOPES
AND OUTSIDE OF THIS LOT SHOULD TRANSITION TO V DITCH OF
3:1 SIDE SLOPES. PLEASE REVISE THE PLANS ACCORDINGLY.
E) PLEASE SPECIFY THE DIMENSIONS OF OUTLET PROTECTION
SHOWN AT THE END OF THIS DITCH IMPROVEMENT (I.E. WIDTH,
LENGTH AND 24" THICK LAYER OF RIPRAP OVER FILTER
FABRIC.).
F) PLEASE ESTABLISH THE 100-YEAR FLOODPLAIN DOWNSTREAM
OF THIS PROPOSED DITCH TO COMPLY WITH FLOOD PROTECTION
REQUIREMENTS.
SHOW/LABEL THE 100-YEAR FLOODPLAIN SECTIONS-LOCATIONS
WITH ELEVATIONS ALONG THE NATURAL DRAINAGEWAY ON THE
PLAN VIEWS. INCLUDE COMPLETE 100-YEAR FLOODPLAIN
CALCULATIONS WITH SCALED X-SECTIONS FOR FURTHER REVIEW
AND/OR APPROVAL.
IN ADDITION, IF THE 100-YEAR FLOODPLAIN LIMITS
ENCROACHES THE LOTS, A 25' BUILDING SETBACK OFF THE
LIMITS OF THE 100-YEAR FLOODPLAIN AND 1' ABOVE THE 100-
YEAR FLOODPLAIN ELEVATIONS SHOULD BE SPECIFIED ON THE
AFFECTED LOTS. PLEASE ADDRESS.
9. IT APPEARS THE OFFSITE DRAINAGE AREAS PERTINENT TO THE
EXISTING LOTS 1, 11 THRU 14 OF BELFAIR VILLAGE WERE NOT
INCLUDED IN THE 10/100-YEAR STORM SEWER/HGL CALCULATIONS AT
STRUCTURES A THRU I. SINCE, BASED ON THE BELFAIR VILLAGE
CONSTRUCTION PLANS SHOW THESE AREAS TO DRAIN TOWARDS THIS
PROPOSED STORM SEWER/SWALES. PLEASE REVISE ACCORDINGLY TO
ACCOUNT FOR ADDITIONAL DRAINAGE AREAS AND SUBMIT REVISED
10/100-YEAR STORM SEWER/HGL CALCULATIONS FOR FURTHER REVIEW
AND/OR APPROVAL. IN ADDITION, REVISE THE PLANS AND PROFILES
TO REFLECT THE CHANGES. SEE ATTACHMENT.
IN ADDITION, BASED ON THE 10-YEAR HGL CALCULATIONS AT THE
EXISTING STRUCTURES EX35/EX36, THE 10-YEAR STORM DESIGN IS
CONTAINED WITHIN THE SYSTEM AND SATISFIES THE 10-YEAR STORM
DESIGN CRITERIA.
10. PER OUR MEETING ON 06/23/15 WITH EDDIE, KIRK, ROBERT AND
MARIA, THE PROPOSED GRADING PERTINENT TO THE PROPOSED
SWALES/NYLOPLAST GRATE INLETS LOCATED ON THE REAR OF LOTS 1
THRU 9 OF BLOCK K AND LOTS 1 THRU 8 OF BLOCK J WOULD BE
REVISED TO ELIMINATE HAVING SWALES GOING DOWN
GRADIENT/CROSSING MULTIPLE LOTS AND INSTEAD HAVING THE GRATE
INLET AT THE LOW TO INTERSECT TWO SWALES FROM EACH ADJACENT
LOT. SEE ATTACHMENT FOR CLARIFICATION.
IN ADDITION, PROVIDE CALCULATIONS TO ENSURE THE 100-YEAR
STORM DESIGN IS CONTAINED WITHIN THE PROPOSED SWALE/16'
DRAINAGE EASEMENT (PRIVATE).
11. PLEASE REVISE THE PIPE SPECIFICATION IN THE PROPOSED
PIPE SCHEDULE (SHEETS 10 AND 11) AT STRUCTURES A THRU J TO
BE "HDPE DOUBLE WALL OR EQUIVALENT".
12. AS A PREREQUISITE TO THE RELEASE OF ANY BUILDING PERMIT:
A) A $100/LOT BMP MAINTENANCE FEE MUST BE RECEIVED.
B) THE PROPOSED ONSITE DRAINAGE EASEMENTS MUST BE
RECORDED WITH DEED BOOK AND PAGE NUMBER PROVIDED.
C) ALL IMPROVEMENTS MUST BE BONDED IN A FORM APPROVED BY
ENVIRONMENTAL ENGINEERING.
D) CBPA COMPLIANCE MUST BE ACHIEVED EITHER BY
APPROVED/BONDING/EASEMENT FOR THE PROPOSED BMP'S OR
COMPLIANCE WITH VSMP REGULATIONS FOR PURCHASE OFFSITE
POLLUTANT CREDITS.
=================== END OF COMMENTS ======================
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS / 751-2335
NAME OF PLAN : BEETLE COURT TOWNHOUSES
SITE PLAN NO. : 15CP0082
LATEST PLAN DATE : 07/29/15
DEPT. REC'D DATE : 07/30/15
SUBMITTAL NUMBER : 3
REVIEW DATE : 08/20/15
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : NO
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT
RELIEVE YOU OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION
MUST BE RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF
THE LAND DISTURBANCE PERMIT.
2 THIS OFFICE RECOGNIZES THAT THE 10-YEAR PRE/10-YEAR POST
REQUIREMENTS FOR FLOOD PROTECTION MAY BE ADDRESSED BY
DISCHARGING INTO THE 100-YEAR FLOODPLAIN.
3. BASED ON THE PREVIOUS APPROVED PLANS FOR BELFAIR
TOWNHOUSES SECTIONS 3 & 4, THE 100-YEAR FLOOD PROTECTION
WAS ADDRESSED WITH ESTABLISMENT OF THE CONSERVATION AREA
EASEMENT AND JURISDICTIONAL FEATURES ALONG THE NATURAL
CONVEYANCE SYSTEM BELOW THE EXISTING OUTFALL STR. EX44.
===================== EROSION CONTROL =====================
1. AN ITEMIZED EROSION CONTROL COST ESTIMATE MUST BE
SUBMITED FOR REVIEW AND/OR APPROVAL.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A COPY OF THE AUTOCAD FILE MUST BE SUBMITTED TO
CAROLE CLIBORNE OF THE ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD
VERSION 2009 OR EARLIER AND REFERENCED DIRECTLY TO THE
VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN
THE NAD83 DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A
CD, DVD, OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH
THE SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN
NUMBER, ENGINEERING FIRM AND CAD FILE PREPARER'S NAME
AND PHONE NUMBER. THE FILE MUST CONTAIN THE FOLLOWING,
EACH CLEARLY LABELED IN SEPARATE LAYERS:
I.EDGES OF ROADS TO INCLUDE CURB AND GUTTER; AND
II. EDGES OF SIDEWALKS;
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
B) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
C) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
D) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
E) A COPY OF VDOT LAND USE PERMIT MUST BE RECEIVED.
F) AN EROSION CONTROL BOND MUST BE POSTED.
G) TWO ADDITIONAL SETS OF CONSTRUCTION PLANS TO BE
STAMPED "APPROVED FOR CONSTRUCTION" MUST BE RECEIVED.
H) THE ENVIRONMENTAL ENGINEERING DEPARTMENT MUST HAVE
RECEIVED SIGNED, WRITTEN NOTIFICATIONS FROM THE
ADJACENT PROPERTY OWNERS, N/F REYES-VILLATORO, J. AT
4014 LAURELWOOD RD., N/F DODSON, C. AT 4020 LAURELWOOD
RD., N/F SPOON, A. AT 4026 LAURELWOOD RD., N/F
CHARLESTON T TRUSTEE ET ALS AT 4032 LAURELWOOD RD., N/F
PORTER, S. AT 4101 WALDERBROOK CT., N/F ROSAS, G. AT
4100 WALDERBROOK CT., N/F MILES, M. AT 4102 WALDERBROOK
CT., AND N/F ADAMS, R. AT 4101 BELRUN RD., WHICH SHOULD
BE SENT U.S. POSTAL CERTIFIED MAIL, RETURN RECEIPT
REQUESTED. INCLUDE AN 8½ X 11 COPY OF THE PROPOSED
CONSTRUCTION ACTIVITY ADJACENT TO THEIR PROPERTIES.
IN ADDITION, PLEASE IDENTIFY/LABEL THE PROPERTY OWNERS
OF BELFAIR TOWNHOUSES SECTION 4 BLOCK H (I.E. ON
4007/4009/4011/4013/4015/4017/4019 BARNACLE COURT) AND
THEY SHOULD BE NOTIFIED OF THE IMPEDING OF CONSTRUCTION
PRIOR TO THE ISSUANCE OF LAND DISTURBANCE PERMIT.
4. ANY TIMBERING THAT IS TO OCCUR AS THE FIRST PHASE OF
INFRASTRUCTURE CONSTRUCTION WILL BE INCORPORATED INTO THE
PROJECT'S EROSION-AND-SEDIMENT CONTROL PLAN NARRATIVE AND
WILL NOT COMMENCE UNTIL THE ISSUANCE OF A LAND DISTURBANCE
PERMIT FOR SUBDIVISION CONSTRUCTION AND PROPER INSTALLATION
OF EROSION CONTROL MEASURES.
======================== CBPA ============================
1. PLEASE REVISE THE REQUIRED REMOVAL IN THE CBPA/MS-4
TABLE (SHEET 14) TO BE 1.83 LB/YR AS OPPOSED TO 1.82 LB/YR.
======================== SWM PLAN =========================
1. PLEASE CONSIDER THE FOLLOWING REGARDING THE
IMPLEMENTATION OF THE TECHNICAL CRITERIA PART IIB FOR WATER
QUANTITY REQUIREMENTS:
A) INSTEAD OF APPLYING THE ENERGY BALANCE AT EACH POINT OF
CONCENTRATED DISCHARGE (I.E. EXISTING PIPES AND AT THE
PROPOSED DITCH, CONSIDER ONE LOCATION FOR THE OVERALL
PROJECT WHERE THE MAJORITY OF AREAS DRAIN. THIS APPEARS TO
BE AT STR. 1 AND THE REMAINING ONSITE DRAINAGE AREAS SHOULD
ALSO BE ADDED TO THIS LOCATION, WHICH APPEARS TO BE FOR
OVERALL 2.40 ACRES OF DRAINAGE AREAS.
B) PLEASE CONSIDER THE SAME DRAINAGE AREAS OF 2.40 ACRES
FOR THE PRE-DEVELOPMENT/POST-DEVELOPMENT/FORESTED CONDITION
PLUS THE OFFSITE DRAINAGES AREAS THAT DRAIN TO THIS PROJECT
OF 2.80 ACRES TO CALCULATE THE 1-YEAR 24-HOUR PEAK FLOW.
HOWEVER, THE CURVE NUMBERS AND THE TIME OF CONCENTRATION
WOULD BE DIFFERENT FOR THESE THREE CONDITIONS.
C) PLEASE BE SURE TO CONSIDER THE LONGEST PATH TO CALCULATE
THE TIME OF CONCENTRATION FOR THE PRE-DEVELOPMENT/POST-
DEVELOPED/FORESTED CONDITION.
FOR INSTANCE, THE TIME OF CONCENTRATION FOR PRE-DEVELOPMENT
CONDITION APPEARS TO BE AROUND 20 MIN. BASED ON AN IN-HOUSE
CHECK.
IN ADDITION, PLEASE SHOW/LABEL THE FLOW PATH (I.E. OVERLAND
SHEET FLOW, SHALLOW CONCENTRATED FLOW AND CHANNEL FLOW)
WITH PERTINENT INFORMATION FOR ALL THREE CONDITIONS ON THE
PLANS.
D) PLEASE GENERATE THREE HYDROGRAPH FOR THE 1-YEAR 24-HOUR
PEAK FLOW FOR PRE-DEVELOPED, POST-DEVELOPED AND FORESTED
CONDITIONS TO VERIFY THAT THE Q1-YEAR 24-HOUR POST-
DEVELOPED CONDITION IS LESS THAN THE Q1-YEAR 24-HOUR
FORESTED CONDITION.
E) PLEASE BE SURE TO USE THE MOST CURRENT DATA FOR THE 24-
HR RAINFALL DEPTHS. REFER TO THE ENCLOSED COPY.
F) ASSUMING THAT DETENTION WOULD BE REQUIRED, PLEASE
PROVIDE A DESIGN (PREVIOUSLY STATED IN THE REVIEW
COMMENTS DATED 06/30/15), DETAILS, ETC. ON THE PLANS AND
SUPPORT ROUTING CALCULATIONS FOR FURTHER REVIEW AND/OR
APPROVAL.
G) PLEASE REVISE SHEETS 14 THRU 16 TO ELIMINATE ANY
INFORMATION THAT WILL NOT APPLY TO THIS PROJECT (I.E. SITE
RESULT CHART OF THE VRRM, SITE SUMMARY OF THE VRRM, ETC.).
=================== ROAD AND DRAINAGE ======================
1. AS PREVIOUSLY REQUESTED, PLEASE INCLUDE OUR STANDARD
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN THE
CONSTRUCTION PLANS. THE GENERIC PLAN IS ON THE COUNTY
WEBSITE, EE DEPARTMENT, UNDER FORMS.
2. PRIOR TO PLAN APPROVAL, THE CONDITIONS/INTEGRITY OF THE
EXISTING ONSITE STORM PIPES/STRUCTURES MUST BE VIDEO
INSPECTED FOR COMPLIANCE WITH VDOT STANDARDS/CRITERIA TO
THE SATISFACTION OF THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
3. THESE ARE IN REGARDS TO THE GRADING PLAN (SHEET 10):
A) PLEASE DEFINE "FG" SPECIFIED ON SEVERAL LOCATIONS ALONG
THE PROPOSED SWALE LOCATED ON THE REAR OF LOTS 1 THRU 9 OF
BLOCK K/1 THRU 9 OF BLOCK J, WHICH APPEARS TO BE "FINISH
GRADE".
B) AS PREVIOUSLY REQUESTED, PLEASE BE SURE THAT THE
FINISH FLOORS SPECIFIED ON THESE LOTS ARE 1' ABOVE THE
PROPOSED GRADE (I.E. LOTS 1 THRU 9 BLOCK I SECTION 4 DO
NOT PROVIDE 1' ABOVE THE PROPOSED GRADE). REVISE
ACCORDINGLY.
C) AS PREVIOUSLY REQUESTED, PLEASE LABEL THE TYPE/MATERIAL
TO THE EXISTING FENCES LOCATED ALONG THE BOUNDARIES OF THIS
PROJECT ON THE PLANS. REFLECT THE CHANGES ON ALL APPLICABLE
SHEETS.
D) PLEASE REMOVE THE LABELING OF "PROPOSE FILTERRA (SEE
SHEET 16 FOR DETAILS)" WITH LEADER LINE LOCATED NEAR LOT 1
OF BLOCK I. REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
4. PLEASE REVISE THE LOCATION OF THE 12" LEADER LINE HDPE
SPECIFIED ON THE REAR OF THE TOWNHOUSES TO BE RELOCATED
OUTSIDE OF THE CONCRETE PATIO/STORAGE AREA.
5. IT APPEARS THE ANGLE FROM THE INCOMING LINE/12" HDPE
LEADER LINE FROM LOT 1 OF BLOCK J TO THE OUTGOING
LINE/STORM SEWER STR. J EXCEEDS 90-DEGREES, WHICH IS NOT AN
ACCEPTABLE DESIGN. PLEASE REVISE THE DESIGN AND SUBMIT
REVISED 10/100-YEAR STORM SEWER/HGL CALCULATIONS FOR
FURTHER REVIEW AND/OR APPROVAL.
6. PLEASE BE SURE THE STORM SEWER PIPE(S) LOCATED UNDER THE
PAVED PARKING AREAS TO BE 15" RCP CLASS III AS OPPOSED TO
12" HDPE (I.E. STRUCTURES K THRU EX34). REVISE THE PLANS,
PROFILES, ETC. AND SUBMIT REVISED 10/100-YEAR STORM
SEWER/HGL CALCULATIONS FOR FURTHER REVIEW AND/OR APPROVAL.
7. AS PREVIOUSLY REQUESTED, PLEASE PROVIDE A DETAIL OF
THE ROOF DRAIN DOWNSPOUT CONNECTION ON THE PLANS. REFER TO
THE ENCLOSED COPY OF THE ROOF CONNECTION FOR YOU TO USE AS
GUIDANCE.
8. THESE ARE IN REGARDS TO THE PROPOSED DITCH LOCATED
ADJACENT TO LOTS 9 OF BLOCK K AND 9 OF BLOCK I:
A) AS PREVIOUSLY REQUESTED, PLEASE PROVIDE COMPLETE
HYDROLOGIC CALCULATIONS FOR 10/100-YEAR DISCHARGES USED
TO CALCULATE THE PROPOSED DITCH.
IN ADDITION, THE TRAVEL PATH (I.E. SHEET FLOW, CONCENTRATED
SHEET FLOW, CHANNEL FLOW, ETC.) MUST BE SHOWN ON THE PLANS.
B) PLEASE SPECIFY TO THE PORTION OF THE PAVED DITCH TO BE
PG-2A AND PROVIDE THE PERTINENT DETAIL FOR PG-2A ON THE
PLANS. REFLECT THE CHANGES ON SHEETS 10 AND 19.
C) PLEASE REVISE THE PROPOSED DITCH PROFILE (SHEET 19) TO
SHOW THE OUTLET PROTECTION. IN ADDITION, SHOW AT THE
STARTING OF THIS PROPOSED DITCH, THE PROPOSED GRADE TYING
BACK TO THE EXISTING GROUND.
FURTHERMORE, PLEASE LABEL THE LIMITS OF THE 100-YEAR
FLOODPLAIN AT THE END OF THIS DITCH IMPROVEMENT ON THIS
PROFILE.
D) PLEASE SHOW/LABEL THE CENTERLINE STATIONING ALONG THIS
PROPOSED DITCH ON ALL APPLICABLE PLAN VIEWS AND BE SURE THE
STATIONS SHOWN ON PLAN VIEW AGREE WITH STATIONS SHOWN ON
PROFILE VIEW.
E) PLEASE RELOCATE A PORTION OF THIS DITCH TO BE FEW FEET
OUTSIDE OF LOT 9 OF BLOCK K, SINCE IT APPEARS THE STARTING
PORTION OF THIS DITCH TO HAVE STEEPER SIDE SLOPES OF 2:1.
PERHAPS A PAVED DITCH ON ONE SIDE HAVING 2:1 AND THE OTHER
SIDE 3:1 SHOULD BE CONSIDERED. INCLUDE APPLICABLE NOTES,
DETAILS, ETC. ON THE PLANS AND PROVIDE 10/100-YEAR DITCH
CALCULATIONS FOR FURTHER REVIEW AND DOCUMENTATION.
F) BASED ON THE HYDRAULIC DITCH CALCULATIONS, IT APPEARS
THE LIMITS OF THE 100-YEAR STORM EVENT ARE CONTAINED WITHIN
THE PROPOSED DITCH. THEREFORE, REMOVE THE LIMITS OF 100-
YEAR STORM WITHIN THE PROPOSED DITCH AND SHOW THE LIMITS OF
THE 100-YEAR FLOODPLAIN TO START NEAR THE OUTLET
PROTECTION. REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
9. BASED ON THE RESPONSE LETTER DATED 07/29/15 COMMENT #9
UNDER ROAD AND DRAINAGE. IT APPEARS THE SURFACE RUNOFF FROM
UPSTREAM OFFSITE DRAINAGE AREAS PERTINENT TO BELFAIR
VILLAGE SUBDIVISION WOULD BE DIVERTED PRIOR TO BEING
INTERCEPTED BY THE STORM SEWER SYSTEM STRUCTURES A THRU J.
HOWEVER, THERE IS NO INDICATION ON THE PLANS HOW THIS
SURFACE WATER WOULD BE DIVERTED NOR THE RETAINING WALL
DETAIL PROVIDED SHOWS ANY DRAINAGE SYSTEM OR WEEP HOLES TO
RELEASE THIS SURFACE RUNOFF WATER. PLEASE ADDRESS. A
FURTHER DISCUSSION IS RECOMMENDED.
OTHERWISE THE PROPOSED STORM SEWER SYSTEM SHOULD BE REVISED
TO ACCOUNT FOR ADDITIONAL DRAINAGE AREAS. AS APPLICABLE,
REVISE THE PLANS, PROFILES AND COMPUTATION SHEETS TO
REFLECT THE CHANGES.
10. THESE ARE IN REGARDS TO THE SWALES SPECIFIED ON THE REAR
OF LOTS 1 THRU 9 OF BLOCK K/1 THRU 9 OF BLOCK J:
A) AS A REMINDER, THE LIMITS OF THE 100-YEAR STORM SHOULD
BE SHOWN ON THE PLANS IF IT IS NOT CONTAINED WITHIN
SWALES/DRAINAGE EASEMENT (PRIVATE).
B) PLEASE PROVIDE A TYPICAL GRASS SWALE OF 5:1 SIDE SLOPES
WITH MAXIMUM 12" DEPTH FOR THESE SWALES ON THE PLANS AND
PROFILES. IN ADDITION, INDICATE EITHER ON PLAN VIEW OR
PROFILE VIEW THE % SLOPE OF THE PROPOSED GRADE ALONG THESE
SWALES.
C) PLEASE SHOW/LABEL THE CENTERLINE STATIONING ALONG THESE
PROPOSED SWALES/STORM SEWER ON ALL APPLICABLE PLAN VIEWS
AND BE SURE THE STATIONS SHOWN ON PLAN VIEW AGREE WITH
STATIONS SHOWN ON PROFILE VIEW.
D) PLEASE REMOVE PART OF THE PROPOSED 16' DRAINAGE EASEMENT
THAT IS ENCLOSING THE STORM SEWER STRUCTURES J THRU K, SINCE
THIS STORM SYSTEM IS LOCATED IN THE OPEN SPACE.
E) PLEASE REVISE THE LABELING AND THE WIDTH OF THIS
PROPOSED DRAINAGE EASEMENT TO BE "10' DRAINAGE EASEMENT
(PRIVATE)".
11. THESE ARE IN REGARDS TO THE 100-YEAR FLOODPLAIN:
A) SINCE THIS CHANNEL LOCATED DOWNSTREAM OF THE PROPOSED
DITCH IN THE PROXIMITY OF LOT 9 OF BLOCK I IS NOT IN A
COUNTY DRAINAGE EASEMENT AND IT WILL NOT BE MAINTAINED. IT
SHOULD BE ANALYZED AS A NATURAL CONVEYANCE SYSTEM USING A
HIGHER MANNING ROUGHNESS COEFFICIENT IN THE RANGE OF 0.06 TO
0.1 FOR THE BANKS/OVERBANKS AND 0.035 FOR BOTTOM OF THE
CHANNEL.
IN ADDITION, INCREASE THE LENGTH TO 30' OF THE X-SECTIONS AA
AND BB TO INCLUDE THE BANKS/OVERBANKS OF THIS NATURAL
CHANNEL AND SUBMIT REVISE ANALYSIS FOR FURTHER REVIEW AND/OR
APPROVAL FOR X-SECTIONS AA/BB.
FURTHERMORE, REMOVE THE WORDING "TRAPEZOIDAL DITCH" FROM THE
TITLE FOR X-SECTIONS AA/BB (SHEET 19).
ADDITIONALLY, INSTEAD OF SHOWING A TYPICAL TRAPEZOIDAL
DITCH, PLEASE SHOW/PROVIDE SCALED FIELD X-SECTIONS FOR AA/BB
ON THE PLANS (SHEET 19) AND SUBMIT REVISED CALCULATIONS FOR
FURTHER REVIEW AND/OR APPROVAL.
B) PLEASE SUBMIT COMPLETE HYDROLOGIC CALCULATIONS OF THE
10/100-YEAR DISCHARGES FOR X-SECTIONS AA AND BB, WHICH WERE
NOT INCLUDED IN THIS SUBMITTAL FOR FURTHER REVIEW AND/OR
APPROVAL.
IN ADDITION, BE SURE TO SHOW/LABEL THE FLOW PATH FOR EACH
MAJOR DRAINAGE AREAS OF THE POINT OF ANALYSIS (I.E. SHEET
FLOW, SHALLOW CONCENTRATED FLOW AND CHANNEL FLOW) ON SHEET
13.
C) PLEASE REVISE THE OVERALL DRAINAGE MAP TO INCREASE THE
LETTER SIZES PERTINENT TO THE ELEVATIONS OF THE EXISTING
CONTOURS TO BE MORE LEGIBLE. THEY ARE CURRENTLY TOO SMALL TO
BE READ ON THE PLANS.
D) PLEASE REVISE THE LABELING OF THE "100-YEAR CHANNEL
ELEVATION" TO BE LABELED AS "100-YEAR FLOODPLAIN LIMITS".
REFLECT THE CHANGES ON ALL APPLICABLE SHEETS (I.E. SHEETS
4, 5, 6, 8, 10, 11, 12, 13, 15, ETC.).
E) PLEASE CLEARLY SHOW/LABEL THE LIMITS OF THE 25' BUILDING
SETBACK OFF THE 100-YEAR FLOODPLAIN LIMITS ON LOTS 8, 9,
ETC. OF BLOCK I. REFLECT THE CHANGES ON ALL APPLICABLE
SHEETS (I.E. SHEETS 8, 10, ETC.).
F) PLEASE REVISE THE LABELING OF THE FINISH FLOOR ON LOTS 8
AND 9 OF BLOCK I TO BE LABELING AS "MFF(FP)=197.50". REFLECT
THE CHANGES ON ALL APPLICABLE SHEETS.
12. AS PREVIOUSLY REQUESTED, PLEASE REVISE THE PIPE
SPECIFICATION IN THE PROPOSED PIPE SCHEDULE (SHEETS 10 AND
11) AT STRUCTURES A THRU J TO BE "HDPE DOUBLE WALL OR
EQUIVALENT".
13. AS A PREREQUISITE TO THE RELEASE OF ANY BUILDING PERMIT:
A) A $100/LOT SWM MAINTENANCE FEE MUST BE RECEIVED.
B) THE PROPOSED ONSITE DRAINAGE EASEMENTS MUST BE RECORDED
WITH DEED BOOK AND PAGE NUMBER PROVIDED.
C) ALL IMPROVEMENTS MUST BE BONDED IN A FORM APPROVED BY
ENVIRONMENTAL ENGINEERING.
D) CBPA COMPLIANCE MUST BE ACHIEVED EITHER BY
APPROVED/BONDING/EASEMENT FOR THE PROPOSED BMP'S OR
COMPLIANCE WITH VSMP REGULATIONS FOR PURCHASE OFFSITE
POLLUTANT CREDITS.
=================== END OF COMMENTS ======================
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS / 751-2335
NAME OF PLAN : BEETLE COURT TOWNHOUSES
SITE PLAN NO. : 15CP0082
LATEST PLAN DATE : 04/28/16
DEPT. REC'D DATE : 04/29/16
SUBMITTAL NUMBER : 4
REVIEW DATE : 05/19/16
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : NO
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT
RELIEVE YOU OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION
MUST BE RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF
THE LAND DISTURBANCE PERMIT.
2 THIS OFFICE RECOGNIZES THAT THE 10-YEAR PRE/10-YEAR POST
REQUIREMENTS FOR FLOOD PROTECTION MAY BE ADDRESSED BY
DISCHARGING INTO THE 100-YEAR FLOODPLAIN.
3. BASED ON THE PREVIOUS APPROVED PLANS FOR BELFAIR
TOWNHOUSES SECTIONS 3 & 4, THE 100-YEAR FLOOD PROTECTION
WAS ADDRESSED WITH ESTABLISMENT OF THE CONSERVATION AREA
EASEMENT AND JURISDICTIONAL FEATURES ALONG THE NATURAL
CONVEYANCE SYSTEM BELOW THE EXISTING OUTFALL STR. EX44.
===================== EROSION CONTROL =====================
1. AN ITEMIZED EROSION CONTROL COST ESTIMATE MUST BE
SUBMITED FOR REVIEW AND/OR APPROVAL.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A COPY OF THE AUTOCAD FILE MUST BE SUBMITTED TO
CAROLE CLIBORNE OF THE ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD
VERSION 2009 OR EARLIER AND REFERENCED DIRECTLY TO THE
VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN
THE NAD83 DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A
CD, DVD, OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH
THE SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN
NUMBER, ENGINEERING FIRM AND CAD FILE PREPARER'S NAME
AND PHONE NUMBER. THE FILE MUST CONTAIN THE FOLLOWING,
EACH CLEARLY LABELED IN SEPARATE LAYERS:
I.EDGES OF ROADS TO INCLUDE CURB AND GUTTER; AND
II. EDGES OF SIDEWALKS;
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
B) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
C) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
D) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
E) A COPY OF VDOT LAND USE PERMIT MUST BE RECEIVED.
F) AN EROSION CONTROL BOND MUST BE POSTED.
G) TWO ADDITIONAL SETS OF CONSTRUCTION PLANS TO BE
STAMPED "APPROVED FOR CONSTRUCTION" MUST BE RECEIVED.
H) THE ENVIRONMENTAL ENGINEERING DEPARTMENT MUST HAVE
RECEIVED SIGNED, WRITTEN NOTIFICATIONS FROM THE
ADJACENT PROPERTY OWNERS, N/F REYES-VILLATORO, J. AT
4014 LAURELWOOD RD., N/F DODSON, C. AT 4020 LAURELWOOD
RD., N/F SPOON, A. AT 4026 LAURELWOOD RD., N/F
CHARLESTON T TRUSTEE ET ALS AT 4032 LAURELWOOD RD., N/F
PORTER, S. AT 4101 WALDERBROOK CT., N/F ROSAS, G. AT
4100 WALDERBROOK CT., N/F MILES, M. AT 4102 WALDERBROOK
CT., AND N/F ADAMS, R. AT 4101 BELRUN RD., WHICH SHOULD
BE SENT U.S. POSTAL CERTIFIED MAIL, RETURN RECEIPT
REQUESTED. INCLUDE AN 8½ X 11 COPY OF THE PROPOSED
CONSTRUCTION ACTIVITY ADJACENT TO THEIR PROPERTIES.
IN ADDITION, PLEASE IDENTIFY/LABEL THE PROPERTY OWNERS
OF BELFAIR TOWNHOUSES SECTION 4 BLOCK H (I.E. ON
4007/4009/4011/4013/4015/4017/4019 BARNACLE COURT) AND
THEY SHOULD BE NOTIFIED OF THE IMPEDING OF CONSTRUCTION
PRIOR TO THE ISSUANCE OF LAND DISTURBANCE PERMIT.
3. SINCE THIS PROJECT IS GOING TO COMPLY WITH PART IIC, MS-
19 ANALYSIS MUST BE PERFORMED AT THE FOLLOWING LOCATIONS:
A) PERFORM MS-19 ANALYSIS AT THE NATURAL DRAINAGEWAY
LOCATED DOWNSTREAM OF THE OUTLET PROTECTION/PROPOSED
DITCH LOCATED ADJACENT TO LOT 9 OF BLOCK I. INCLUDE 2-
YEAR STORM HYDROLOGIC/HYDRAULIC CALCULATIONS WITH SCALED
X-SECTIONS AT THE EXISTING CHANNEL, SHOW/LABEL THE MS-19
SECTION-LOCATION ON THE PLANS (I.E. SHEETS 11, 12,
ETC.), ETC.
IN ADDITION, INCLUDE THE ENCLOSED MS-19 TABLE WITH
PERTINENT INFORMATION ON THE PLANS.
ONE MORE MS-19 ANALYSIS SHOULD BE PERFORMED ALONG THIS
NATURAL DRAINAGEWAY IN THE PROXIMITY OF LOTS 7/8 OF
BLOCK I. INCLUDE 2-YEAR HYDROLOGIC/HYDRAULIC
CALCULATIONS WITH SCALED X-SECTIONS, SHOW/LABEL THE MS-
19 SECTION-LOCATION ON THE PLANS (I.E. SHEETS 11, 12,
ETC.), AND UPDATE THE MS-19 TABLE TO INCLUDE THIS
LOCATION.
B) PLEASE SHOW/LABEL THE MS-19 SECTION-LOCATION AT THE
EXISTING 15" RCP PERTINENT TO STRUCTURES EX34/EX43 AND
UPDATE THE MS-19 TABLE TO INCLUDE THIS LOCATION. IN
ADDITION, ADD A NOTE AT THIS LOCATION IN THE MS-19 TABLE
STATING, "THE 10-YEAR STORM IS CONTAINED WITHIN THE
SYSTEM STR. EX.34". REFLECT THE CHANGES ON ALL
APPLICABLE SHEETS.
4. ANY TIMBERING THAT IS TO OCCUR AS THE FIRST PHASE OF
INFRASTRUCTURE CONSTRUCTION WILL BE INCORPORATED INTO THE
PROJECT'S EROSION-AND-SEDIMENT CONTROL PLAN NARRATIVE AND
WILL NOT COMMENCE UNTIL THE ISSUANCE OF A LAND DISTURBANCE
PERMIT FOR SUBDIVISION CONSTRUCTION AND PROPER INSTALLATION
OF EROSION CONTROL MEASURES.
======================== CBPA ============================
1. PLEASE REMOVE THE WORKSHEET 1 CALCULATIONS PAGES 1 THRU
3 AND WORKSHEET 3 CALCULATIONS PAGES 1 THRU 3 FROM SHEET 15
AND INSTEAD USE WORKSHEET A CALCULATIONS FROM THE
ENVIRONMENTAL ENGINEERING REFERENCE MANUAL.
IN ADDITION, AN IN-HOUSE CHECK WAS PERFORMED FOR THE
REMOVAL REQUIREMENT AND IT APPEARS TO BE 1.30 LBS/YEAR.
REFER TO THE ENCLOSED COPY. AS APPLICABLE, REVISE THE
CBPA/MS-4 TABLE, PLANS, ETC. TO REFLECT THE CHANGES.
2. PLEASE SPECIFY THE RMA COMPLIANCE FOR THE SITE AREAS TO
BE 2.45 IN THE CBPA/MS-4 TABLE (SHEET 13).
3. CBPA COMPLIANCE MUST BE ACHIEVED BY PURCHASE OFFSITE
POLLUTANT CREDITS FROM STATE APPROVED NUTRIENT BANK.
EVIDENCE OF THE PURCHASE MUST BE PROVIDED TO EE PRIOR TO
PLAN APPROVAL.
=================== ROAD AND DRAINAGE ======================
1. THIS OFFICE WOULD BE PERFORMING A SITE INSPECTION OF THE
EXISTING STORM SEWER SINCE A VIDEO INSPECTION WAS NOT
AVAILABLE. IF EVIDENCE OF SEPARATION AND/OR ROOTING SYSTEM
SHOWS IN THE PIPE, THE EXISTING STORM SEWER MUST BE
REPLACED AND THE CHANGES SHOULD BE REFLECTED ON THE PLANS,
PROFILES AND COMPUTATION SHEETS.
2. THESE ARE IN REGARDS TO THE STORM SEWER/12" HDPE DOUBLE
WALL/ETC.
A) PLEASE BE SURE TO SPECIFY BOOT CONNECTORS FOR ALL
CONCRETE PIPES THAT TIE INTO PLASTIC STRUCTURES (I.E.
STR. L, ETC.) AND INCLUDE THE PERTINENT DETAIL OF THE
BOOT CONNECTORS ON THE PLANS.
3. THESE ARE IN REGARDS TO SHEET 14:
A) PLEASE PROVIDE A NOTE AT EX. STR. 31 STATING, "THERE
IS NO INCREASE OF IMPERVIOUS AREA FROM THE PROPOSED
DESIGN WHEN COMPARED WITH THE RECORDED PLAT AT THE EX.
STR. 31. IT APPEARS THE INCREASE OF IMPERVIOUS FOR THE
ENLARGED ENTRANCE AT THE INTERSECTION OF BELRUN
ROAD/BEETLE COURT EVENS OUT BY REDUCING THE PAVED AREAS
IN THE PARKING LOT."
B) PLEASE REVISE THE LABELING IN THE TITLE BOX TO STATE,
"COMPLIANCE VSMP PART IIC PLAN" AS OPPOSED TO MS-19
COMPLIANCE PLAN.
4. PLEASE REVISE THE RETAINING WALL DETAIL TO SPECIFY WEEP
HOLES. INCLUDE DIMENSIONS AND MATERIALS OF THE PROPOSED
WEEP HOLES.
IN ADDITION, SPECIFY THE NUMBER OF WEEP HOLES ALONG THE
WALL AND THE DISTANCE FROM EACH WEEP HOLE ALONG THE WALL.
AN ENLARGED PLAN VIEW OF THE PORTION OF THE WALL DRAWN TO
SCALE MAY BE NEEDED TO SHOW THE LOCATION AND DISTANCE OF
PROPOSED WEEP HOLES.
5. THESE ARE IN REGARDS TO THE SWALES SPECIFIED ON THE REAR
OF LOTS 1 THRU 9 OF BLOCK K/1 THRU 9 OF BLOCK J:
A) PLEASE REVISE THE TYPICAL SWALE SHOWN ON SHEET 17 TO
BE A "V" SWALE OF 5:1 SIDE SLOPES. IT IS CURRENTLY
SHOWING AS A TRAPEZOIDAL DITCH.
ADDITIONALLY, INCLUDE A NOTE TO THE TYPICAL SWALE
SECTION, STATING, "12" MAXIMUM DEPTH".
IN ADDITION, SUBMIT 2/100-YEAR CALCULATIONS TO VERIFY
THE 100-YEAR STORM IS CONTAINED WITHIN THE SWALE SECTION
AND THE 2-YEAR TO VERIFY THE FLOW VELOCITIES FOR LINING
REQUIREMENTS. PROVIDE THE WORST CASE SCENARIO IN THE
SWALE CALCULATIONS FOR FLATTER AND STEEPER GRADE.
AS A REMINDER, THE LIMITS OF THE 100-YEAR STORM SHOULD
BE SHOWN ON THE PLANS IF IT IS NOT CONTAINED WITHIN
SWALES/DRAINAGE EASEMENT (PRIVATE).
B) PLEASE REVISE THE SLOPE ALONG THIS SWALE IN THE STORM
PROFILE: EX34 TO A (SHEET 17) TO BE SHOWN IN PERCENTAGE
SLOPE AS OPPOSED TO SLOPE RATIO. REVISE ACCORDINGLY.
6. THESE ARE IN REGARDS TO THE 100-YEAR FLOODPLAIN:
A) PLEASE REVISE THE ROUGHNESS COEFFICIENT FOR X-
SECTIONS A-A/B-B IN THE HYDRAULIC CALCULATIONS TO USE A
VALUE OF 0.06 AS OPPOSED TO 0.035. SUBMIT REVISED 100-
YEAR HYDRAULIC CALCULATIONS OF THE NATURAL CHANNEL FOR
FURTHER REVIEW AND APPROVAL. AS APPLICABLE, REVISE ALL
APPLICABLE SHEETS TO REFLECT THE CHANGES.
B) PLEASE REVISE THE SCALED X-SECTIONS FOR A-A AND B-B
(SHEET 18) TO REMOVE THE SIDE SLOPES RATIO (I.E.
2:1/3:1, 3:1/3:1, ETC.) AND THE WIDTH DIMENSIONS (I.E.
1.8', 3.3', ETC.).
IN ADDITION, SPECIFY THE VERTICAL/HORIZONTAL SCALE FOR
THESE X-SECTIONS ON THE PLANS.
FURTHERMORE, PLEASE ILLUSTRATE THE LIMITS OF THE 100-
YEAR WSE IN THE SCALED X-SECTIONS AA/BB (SHEET 18).
C) PLEASE SUBMIT A VARIANCE REQUEST LETTER FOR REDUCTION
IN THE 25' BUILDING SETBACK OFF THE 100-YEAR FLOODPLAIN
TO 20' BUILDING SETBACK TO SCOTT DUNN ASSISTANT DIRECTOR
FOR APPROVAL. THIS CONCERN MUST BE ADDRESSED PRIOR TO
PLAN APPROVAL.
AS APPLICABLE, REVISE THE PLANS TO SHOW/LABEL THE 20'
BUILDING SETBACK REDUCTION OFF THE 100-YEAR FLOODPLAIN
ON LOTS 8, 9, ETC. OF BLOCK I ON ALL APPLICABLE SHEETS.
7. AS A PREREQUISITE TO THE RELEASE OF ANY BUILDING PERMIT:
A) THE PROPOSED ONSITE 10' DRAINAGE EASEMENT (PRIVATE)
MUST BE RECORDED BY SEPARATE INSTRUMENT. PLEASE CONTACT
KIM PULLEY AT THE RIGHT-OF-WAY OFFICE UTILITIES
DEPARTMENT TO ACQUIRE THE DRAINAGE EASEMENT (PRIVATE)
AGREEMENT.
B) THE EXISTING RECORDED PLAT NEEDS TO BE AMENDED THROUGH
SUBDIVISION PLAT PROCESS TO RECORD THE 100-YEAR
FLOODPLAIN LIMITS AND VACATE THE EXISTING 20' DRAINAGE &
UTILITY EASEMENT (PUBLIC) P.B. 20/P.G. 1-8.
C) ALL IMPROVEMENTS MUST BE BONDED IN A FORM APPROVED BY
ENVIRONMENTAL ENGINEERING.
=================== END OF COMMENTS ======================
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS / 751-2335
NAME OF PLAN : BEETLE COURT TOWNHOUSES
SITE PLAN NO. : 15CP0082
LATEST PLAN DATE : 06/10/16
DEPT. REC'D DATE : 06/13/16
SUBMITTAL NUMBER : 5
REVIEW DATE : 06/20/16
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : YES
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND / OR ACQUIRE ALL APPLICABLE FEDERAL AND / OR
STATE PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES
INCLUDING BUT NOT LIMITED TO WETLANDS, SURFACE WATERS
(E.G. VSMP PERMIT FOR CONSTRUCTION SITES, GROUND WATER
AND AIR QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT
RELIEVE YOU OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION
MUST BE RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF
THE LAND DISTURBANCE PERMIT.
2 THIS OFFICE RECOGNIZES THAT THE 10-YEAR PRE/10-YEAR POST
REQUIREMENTS FOR FLOOD PROTECTION MAY BE ADDRESSED BY
DISCHARGING INTO THE 100-YEAR FLOODPLAIN.
3. BASED ON THE PREVIOUS APPROVED PLANS FOR BELFAIR
TOWNHOUSES SECTIONS 3 & 4, THE 100-YEAR FLOOD PROTECTION
WAS ADDRESSED WITH ESTABLISMENT OF THE CONSERVATION AREA
EASEMENT AND JURISDICTIONAL FEATURES ALONG THE NATURAL
CONVEYANCE SYSTEM BELOW THE EXISTING OUTFALL STR. EX44.
===================== EROSION CONTROL =====================
1. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A COPY OF THE AUTOCAD FILE MUST BE SUBMITTED TO
CAROLE CLIBORNE OF THE ENVIRONMENTAL ENGINEERING. THE
AUTOCAD FILE MUST BE SAVED AS A .DWG OR .DXF IN AUTOCAD
VERSION 2009 OR EARLIER AND REFERENCED DIRECTLY TO THE
VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE IN
THE NAD83 DATUM. THE AUTOCAD FILE MAY BE SUBMITTED ON A
CD, DVD, OR VIA EMAIL AND MUST BE CLEARLY LABELED WITH
THE SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN
NUMBER, ENGINEERING FIRM AND CAD FILE PREPARER'S NAME
AND PHONE NUMBER. THE FILE MUST CONTAIN THE FOLLOWING,
EACH CLEARLY LABELED IN SEPARATE LAYERS:
I.EDGES OF ROADS TO INCLUDE CURB AND GUTTER; AND
II. EDGES OF SIDEWALKS;
THE FILE MUST BE APPROVED BY ENVIRONMENTAL ENGINEERING
PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT.
B) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
C) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
D) A COPY OF VDOT LAND USE PERMIT MUST BE RECEIVED.
E) AN EROSION CONTROL BOND IN THE AMOUNT OF $23,915.00
MUST BE POSTED.
F) TWO ADDITIONAL SETS OF CONSTRUCTION PLANS TO BE
STAMPED "APPROVED FOR CONSTRUCTION" MUST BE RECEIVED.
G) AS APPLICABLE, A SWPPP BOOKLET (3 RING BINDER) MUST
BE PROVIDED.
H) THE ENVIRONMENTAL ENGINEERING DEPARTMENT MUST HAVE
RECEIVED SIGNED, WRITTEN NOTIFICATIONS FROM THE
ADJACENT PROPERTY OWNERS, N/F REYES-VILLATORO, J. AT
4014 LAURELWOOD RD., N/F DODSON, C. AT 4020 LAURELWOOD
RD., N/F SPOON, A. AT 4026 LAURELWOOD RD., N/F
CHARLESTON T TRUSTEE ET ALS AT 4032 LAURELWOOD RD., N/F
PORTER, S. AT 4101 WALDERBROOK CT., N/F ROSAS, G. AT
4100 WALDERBROOK CT., N/F MILES, M. AT 4102 WALDERBROOK
CT., AND N/F ADAMS, R. AT 4101 BELRUN RD., WHICH SHOULD
BE SENT U.S. POSTAL CERTIFIED MAIL, RETURN RECEIPT
REQUESTED. INCLUDE AN 8½ X 11 COPY OF THE PROPOSED
CONSTRUCTION ACTIVITY ADJACENT TO THEIR PROPERTIES.
IN ADDITION, PLEASE IDENTIFY/LABEL THE PROPERTY OWNERS
OF BELFAIR TOWNHOUSES SECTION 4 BLOCK H (I.E. ON
4007/4009/4011/4013/4015/4017/4019 BARNACLE COURT) AND
THEY SHOULD BE NOTIFIED OF THE IMPEDING OF CONSTRUCTION
PRIOR TO THE ISSUANCE OF LAND DISTURBANCE PERMIT.
2. THESE ARE IN REGARDS TO THE MS-19:
A) IT APPEARS THE DESCRIPTION OF ADEQUACY SITUATIONS A
THRU H WERE NOT INCLUDED WITH THE MS-19 TABLE. A COPY OF
THE DESCRIPTION OF ADEQUACY SITUATIONS CAN BE STAPLED BY
THIS OFFICE TO THE SETS OF CONSTRUCTION PLANS DATED
6/10/16. BE SURE THAT FUTURE PLANS SUBMITTAL THE
DESCRIPTION OF ADEQUACY SITUATIONS A - H ARE INCLUDED
WITH THE MS-19 TABLE ON SHEET 14.
3. ANY TIMBERING THAT IS TO OCCUR AS THE FIRST PHASE OF
INFRASTRUCTURE CONSTRUCTION WILL BE INCORPORATED INTO THE
PROJECT'S EROSION-AND-SEDIMENT CONTROL PLAN NARRATIVE AND
WILL NOT COMMENCE UNTIL THE ISSUANCE OF A LAND DISTURBANCE
PERMIT FOR SUBDIVISION CONSTRUCTION AND PROPER INSTALLATION
OF EROSION CONTROL MEASURES.
======================== CBPA ============================
1. CBPA COMPLIANCE MUST BE ACHIEVED BY PURCHASE OFFSITE
POLLUTANT CREDITS FROM STATE APPROVED NUTRIENT BANK.
EVIDENCE OF THE PURCHASE MUST BE PROVIDED TO EE PRIOR TO
PLAN APPROVAL.
=================== ROAD AND DRAINAGE ======================
1. THESE ARE IN REGARDS TO THE 100-YEAR FLOODPLAIN:
A) PLEASE SHOW/LABEL THE 21' DIMENSION FROM THE CORNER
OF THE PROPOSED BUILDING ON LOT 9 OF BLOCK I - SECTION 4
TO THE 100-YEAR FLOODPLAIN LIMITS.
IN ADDITION, REVISE THE LIMITS PERTINENT TO BUILDING
SETBACK TO BE DELINEATED 25' OFF THE 100-YEAR FLOODPLAIN
LIMITS AS OPPOSED TO 20'. HOWEVER, THE BUILDING SETBACK
SHOULD BE LESS THAN 25' TO INCLUDE THE BUILDING ON LOT
#9. SEE THE ENCLOSED SKETCH. A SHEET INSERTION OF SHEET
8 TO THE SETS OF CONSTRUCTION PLANS DATED 06/10/16 IS
ACCEPTABLE TO EE AND THE REMAINING SHEETS WOULD BE
RED MARKED WITH A NOTE WITH YOUR CONSENT. PLEASE CONSULT
WITH PLANNING IF A TABLE REVIEW WOULD BE ACCEPTABLE TO
THEM WITH SLIP SHEET INSERTION.
PLEASE BE SURE THAT THESE CHANGES ARE REFLECTED ON ALL
APPLICABLE SHEETS (I.E. SHEETS 8, 10, 11, 13, ETC.) IN
FUTURE PLANS SUBMITTALS.
2. AS A REMINDER, THIS OFFICE MUST RECEIVE A FORMAL
VARIANCE APPROVAL LETTER FOR THE REDUCTION OF THE 25'
SETBACK OFF THE 100-YEAR FLOODPLAIN LIMITS PRIOR TO PLAN
APPROVAL.
3. AS A PREREQUISITE TO THE RELEASE OF ANY BUILDING PERMIT:
A) THE PROPOSED ONSITE 10' DRAINAGE EASEMENT (PRIVATE)
MUST BE RECORDED BY SEPARATE INSTRUMENT. PLEASE CONTACT
KIM PULLEY AT THE RIGHT-OF-WAY OFFICE UTILITIES
DEPARTMENT TO ACQUIRE THE DRAINAGE EASEMENT (PRIVATE)
AGREEMENT.
B) THE EXISTING RECORDED PLAT NEEDS TO BE AMENDED
THROUGH SUBDIVISION PLAT PROCESS TO RECORD THE 100-YEAR
FLOODPLAIN LIMITS AND VACATE THE EXISTING 20' DRAINAGE &
UTILITY EASEMENT (PUBLIC) P.B. 20/P.G. 1-8.
C) ALL IMPROVEMENTS MUST BE BONDED IN A FORM APPROVED BY
ENVIRONMENTAL ENGINEERING.
=================== END OF COMMENTS ======================