Thanksgiving Holiday Closings... MORE

Hover here for Site Tools
Subdivision Review Comments
All Subdivision Review Comments for Case # 14CP0068




For VDOT’s comments please contact Virginia Department of Transportation at (804) 674-2814 or send e-mail to Boris.Solomonov@VDOT.Virginia.gov

For Tentative Subdivision resubmittals:

1. Please note that submittal fees include the original submittal and two (2) additional reviews.

2. A letter of transmittal is required to accompany each submittal.

3. Please verify that Environmental Engineering, Fire, CDOT, VDOT, and Planning have reviewed the submittal before resubmitting. A resubmittal tendered, prior to receiving all the required departments’ review, will be counted as an additional submittal. Go to Case Selection Form or Go to Project List


 
CASE NO: 14CP0068 STATUS: PENDING APPROVAL
PROJECT NAME: CHARLESTON VILLAGE @ - LAST INTERNET UPDATE: 11/22/17
SUBMITTAL TYPE: CONSTRUCTION PLAN
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ENVIR.ENGR.-: 04 04/02/15 04/23/15 ******** 09/05/14 MCJ 751-2335
FIRE DEPT.--: 04 04/02/15 04/23/15 ******** 08/28/14 GDS 706-2012
PLANNING----: 04 04/02/15 04/23/15 ******** 08/19/14 JHL 751-4158
TRANSPORT.--: 04 04/02/15 04/23/15 ******** 08/14/14 SES 751-4912
UTIL.PLAN.--: 04 04/02/15 04/23/15 ******** ********
UTILITIES---: 04 04/02/15 04/23/15 AMENDED* 04/06/15 WBV 748-1343
UTIL.R.O.W.-: 04 04/02/15 04/23/15 ******** ********
VDOT--------: 04 04/02/15 04/23/15 ******** ********
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME:EMERALD POINT AT MAGNOLIA GREEN
PLAN NUMBER:14CP0068
ORIGINAL PLAN DATE:3/19/14
REVIEW DATE:4/1/14
LATEST SUBMISSION DATE:3/24/14
SUBMITTAL NUMBER:1
STATUS: REVISIONS REQUIRED
TABLE REVIEW: NO
IN REGARD TO YOUR SUBMITTAL OF UTILITIES PLANS FOR THE
ABOVE REFERENCED PROJECT DATED MARCH 19, 2014, WE MAKE
THE FOLLOWING COMMENTS AND RECOMMENDATIONS:
1. A COPY OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S
APPROVAL LETTER REGARDING PAVEMENT REPLACEMENT, METHOD OF
CROSSING, AND ALIGNMENT OF UTILITY WITH STATE RIGHT OF WAY,
AND A COPY OF ENVIRONMENTAL ENGINEERING'S INITIAL REVIEW
LETTER MUST BE SUBMITTED BEFORE REVISED PLANS ARE SUBMITTED
FOR RE-REVIEW.
2. PRIOR TO RELEASING TO THE CONSTRUCTION SECTION, A COPY
OF THE STATE HEALTH DEPARTMENT APPROVAL LETTER,
ENVIRONMENTAL ENGINEERING APPROVAL LETTER AND/OR ALL OTHER
APPLICABLE LOCAL STATE AND FEDERAL AGENCIES' APPROVAL
LETTERS MUST BE RECEIVED BY THIS DEPARTMENT. IN ADDITION,
ALL EASEMENTS NOT INCLUDED WITH THE SUBDIVISION PLAT MUST
BE DEDICATED WITH A SEPARATE PLAT AND AGREEMENT TO THE
COUNTY PRIOR TO RELEASING THE PROJECT TO THE CONSTRUCTION
SECTION.
3. SHOW THE COUNTY PROJECT NUMBER 13-0283 ON THE LOWER
RIGHT HAND CORNER OF EACH SHEET.
4. PROVIDE CALCULATIONS TO VERIFY THAT THE FIRE FLOW AND
DOMESTIC FLOWS CAN BE SUSTAINED WITH A RESIDUAL PRESSURE OF
20 PSI.
5. CALL OUT THE VALVE THAT IS TO BE USED FOR CUT-OFF
PURPOSES DURING THE WATERLINE TIE-IN, LABELING IT AS SUCH.
6. "SHORTEN" ALL SEWER CONNECTIONS AS NOTED IN RED.
7. THERE IS A LOCATION ON EMERALD POINT VISTA (SEE PLANS)
WHERE THE TRENCH DUG TO INSTALL THE SANITARY SEWER WILL BE
LOCATED UNDER AND/OR IMMEDIATELY ADJACENT TO THE PROPOSED
CURB AND GUTTER. REVISE AS NECESSARY TO ELIMINATE THIS
UNDESIRABLE SITUATION, OR, IN THE EVENT THAT A REALIGNMENT
OF THIS NATURE IS NOT FEASIBLE, SPECIFY THAT THESE PORTIONS
OF THE SANITARY SEWER TRENCH ARE TO BE BACKFILLED TO THE
TOP WITH THOROUGHLY COMPACTED 21 A STONE. THIS REQUIREMENT
SHALL APPLY FOR A DISTANCE OF 5 LF PRIOR TO, AS WELL AS
AFTER SAID EXPOSURE. IN ADDITION, CLEARLY NOTE THIS AS
SUCH AT EACH APPLICABLE LOCATION IN THE PROFILE VIEWS.
8. CONSPICUOUSLY DISPLAY THE NOTE AS SHOWN IN RED
REGARDING THE WATER METER BOX LOCATION FOR LOTS ?FRONTING"
ON A SIDEWALK.
9. SHOW AND LABEL THE 100 YEAR FLOOD PLAIN IN THE PLAN
VIEW.
10. SHOW AND LABEL THE 100 YEAR FLOOD ELEVATION IN THE
PROFILE VIEW AND ADJUST THE MANHOLE RIM ELEVATIONS, AS WELL
AS THE FRAME AND COVER TYPES AS PER CURRENT COUNTY
SPECIFICATIONS.
11. CHECK ALL SANITARY SEWER SLOPE CALCULATIONS FOR
ACCURACY, REVISING AS NECESSARY.
12. PROVIDE, AS A PART OF THIS SET OF PLANS, A SANITARY
SEWER HYDRAULIC ANALYSIS INCLUDING A DRAINAGE AREA MAP AND
CALCULATION TABLE.
13. FIELD VERIFY THE TOP AND INVERT ELEVATIONS OF THE
PROPOSED TIE-IN MANHOLE AND REFLECT THE FIELD DATA ON THE
PLANS.
14. REVISE ALL DRAFTING AS NOTED IN RED.
15. REVISE THE "MATERIALS LIST" AS NECESSARY.
PLEASE MAKE ALL OF THE SUGGESTED CHANGES PREVIOUSLY MEN
TIONED, AND ANY CONTAINED ON THE ENCLOSED MARKED SET OF
PLANS. SUBMIT TWO (2) SETS OF REVISED PLANS.
THE OWNER MUST ENTER INTO A COUNTY CONTRACT PRIOR TO THE
START OF CONSTRUCTION. PLEASE SEND ME A COPY OF THE
"ACCEPTED" BID PROPOSAL BETWEEN THE DEVELOPER AND THE
CONTRACTOR SO WE MAY PREPARE THE COUNTY CONTRACT. THE BID
PROPOSAL MUST BE BASED ON THE LATEST REVISED UTILITIES
PLANS REFLECTING THE REVIEWER'S STAMP, AND ALL WORK MUST BE
PERFORMED BY AN ACCEPTABLE UTILITIES CONTRACTOR. IF PLANS
ARE REVISED AFTER CONTRACT PREPARATION DUE TO A CHANGE
BECAUSE OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S AND/OR
ENVIRONMENTAL ENGINEERING DEPARTMENT'S APPROVAL OF THE
ROAD, DRAINAGE, AND EROSION CONTROL DESIGN OR BECAUSE OF
STATE AGENCIES' REVIEW AND APPROVAL OF THE UTILITIES
DESIGN, A REVISED BID PROPOSAL MAY BE NECESSARY TO
ACCURATELY REFLECT THE LATEST UTILITIES DESIGN AND A NEW
CONTRACT PREPARATION MAY BE NECESSARY AND EXECUTED PRIOR TO
THE START OF CONSTRUCTION.
IF YOU HAVE ANY QUESTIONS, DO NOT HESITATE TO CONTACT ME AT
748-1343.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME: MAGNOLIA GREEN - CHARLESTON VILLAGE
PLAN NUMBER:14CP0048
ORIGINAL PLAN DATE:3/19/14
REVIEW DATE:6/9/14
LATEST SUBMISSION DATE:5/28/14
SUBMITTAL NUMBER:2
STATUS: REVISIONS REQUIRED
TABLE REVIEW: NO
IN REGARD TO YOUR SUBMITTAL OF UTILITIES PLANS FOR THE
ABOVE REFERENCED PROJECT DATED MARCH 19, 2014, WITH THE
LATEST REVISION DATED MAY 16, 2014 , WE MAKE THE FOLLOWING
COMMENTS AND RECOMMENDATIONS:
1. A COPY OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S
APPROVAL LETTER REGARDING PAVEMENT REPLACEMENT, METHOD OF
CROSSING, AND ALIGNMENT OF UTILITY WITH STATE RIGHT OF WAY,
AND A COPY OF ENVIRONMENTAL ENGINEERING'S INITIAL REVIEW
LETTER MUST BE SUBMITTED BEFORE REVISED PLANS ARE SUBMITTED
FOR RE-REVIEW.
2. PRIOR TO RELEASING TO THE CONSTRUCTION SECTION, A COPY
OF THE ENVIRONMENTAL ENGINEERING APPROVAL LETTER AND/OR ALL
OTHER APPLICABLE LOCAL STATE AND FEDERAL AGENCIES' APPROVAL
LETTERS MUST BE RECEIVED BY THIS DEPARTMENT. IN ADDITION,
ALL EASEMENTS NOT INCLUDED WITH THE SUBDIVISION PLAT MUST
BE DEDICATED WITH A SEPARATE PLAT AND AGREEMENT TO THE
COUNTY PRIOR TO RELEASING THE PROJECT TO THE CONSTRUCTION
SECTION.
3. REVISE ITEM NUMBER 13 UNDER THE "WATER" PORTION OF THE
"CHESTERFIELD COUNTY UTILITY NOTES" EXACTLY AS SHOWN IN RED
AND NOTE THIS CONDITION ON EACH APPLICABLE LOT IN THE PLAN
VIEWS.
4. PROVIDE THE NOTE REGARDING THE 1" WATER SERVICE LINE
REQUIREMENT SEPARATELY ON EACH APPLICABLE LOT IN THE PLAN
VIEWS.
5. PROVIDE "DIRECTION OF FLOW ARROWS" ON EACH RUN OF
SANITARY SEWER IN THE PLAN VIEWS.
6. SHOW ALL EXISTING SEWER USING A ?DARK, DASHED" LINE
TYPE.
7. CHECK ALL SANITARY SEWER SLOPE CALCULATIONS FOR
ACCURACY, REVISING AS NECESSARY.
8. IT DOES NOT APPEAR THAT EITHER MANHOLE NUMBER 8 OR 12
WILL REQUIRE A WATERTIGHT FRAME AND COVER. PLEASE EXAMINE
THOROUGHLY, REVISING AS NECESSARY.
9. USE DETAIL DRAWING NUMBER DES-1 FOR THE SANITARY SEWER
HYDRAULIC ANALYSIS CALCULATIONS TABLE. IN ADDITION,
THOROUGHLY EXAMINE ALL CALCULATIONS FOR ACCURACY, REVISING
AS NECESSARY.
10. PLEASE SEE THE ENCLOSED ADDITIONAL COMMENTS REGARDING
THE SANITARY SEWER HYDRAULIC ANALYSIS. CONTACT MR. RANDY
PHELPS AT 796-7126 WITH ANY QUESTIONS YOU MAY HAVE.
11. REVISE ALL DRAFTING AS NOTED IN RED.
12. REVISE THE "MATERIALS LIST" AS NECESSARY.
PLEASE MAKE ALL OF THE SUGGESTED CHANGES PREVIOUSLY MEN
TIONED, AND ANY CONTAINED ON THE ENCLOSED MARKED SET OF
PLANS. SUBMIT TWO (2) SETS OF REVISED PLANS.
THE OWNER MUST ENTER INTO A COUNTY CONTRACT PRIOR TO THE
START OF CONSTRUCTION. PLEASE SEND ME A COPY OF THE
"ACCEPTED" BID PROPOSAL BETWEEN THE DEVELOPER AND THE
CONTRACTOR SO WE MAY PREPARE THE COUNTY CONTRACT. THE BID
PROPOSAL MUST BE BASED ON THE LATEST REVISED UTILITIES
PLANS REFLECTING THE REVIEWER'S STAMP, AND ALL WORK MUST BE
PERFORMED BY AN ACCEPTABLE UTILITIES CONTRACTOR. IF PLANS
ARE REVISED AFTER CONTRACT PREPARATION DUE TO A CHANGE
BECAUSE OF VIRGINIA DEPARTMENT OF TRANSPORTATION'S AND/OR
ENVIRONMENTAL ENGINEERING DEPARTMENT'S APPROVAL OF THE
ROAD, DRAINAGE, AND EROSION CONTROL DESIGN OR BECAUSE OF
STATE AGENCIES' REVIEW AND APPROVAL OF THE UTILITIES
DESIGN, A REVISED BID PROPOSAL MAY BE NECESSARY TO
ACCURATELY REFLECT THE LATEST UTILITIES DESIGN AND A NEW
CONTRACT PREPARATION MAY BE NECESSARY AND EXECUTED PRIOR TO
THE START OF CONSTRUCTION.
IF YOU HAVE ANY QUESTIONS, DO NOT HESITATE TO CONTACT ME AT
748-1343.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME: MAGNOLIA GREEN - CHARLESTON VILLAGE
PLAN NUMBER:14CP0068
ORIGINAL PLAN DATE:3/19/14
REVIEW DATE:8/12/14
LATEST SUBMISSION DATE:7/29/14
SUBMITTAL NUMBER:3
STATUS: APPROVED AS NOTED
TABLE REVIEW: NO
IN REGARD TO YOUR RECENT SUBMITTAL OF THE REVISED UTILITIES
PLANS ON THE ABOVE REFERENCED PROJECT DATED MARCH 19, 2014,
WITH THE LAST REVISION DATED JULY 28, 2014, THIS IS TO
INFORM YOU THAT THE PLANS HAVE BEEN REVIEWED BY THE
UTILITIES DEPARTMENT WITH EXCEPTIONS AS PER OUR TELEPHONE
CONVERSATION. THIS REVIEW IS EFFECTIVE UNTIL AUGUST 5,
2019.
PLEASE FORWARD TWO (2) ADDITIONAL SETS OF PLANS ONCE ALL
APPROVALS HAVE BEEN OBTAINED. IF, AFTER ALL OTHER
REVIEWS/APPROVALS HAVE BEEN MADE, THE UTILITY PLANS REFLECT
A LATER REVISION DATE THAN THE LAST REVISION NOTED ABOVE,
PLEASE SUBMIT TWO (2) NEW SETS OF UTILITY PLANS FOR FURTHER
REVIEW AND APPROVAL.
YOUR COOPERATION IS GREATLY APPRECIATED. PLEASE CALL ME AT
748-1343 IF YOU HAVE ANY FURTHER QUESTIONS REGARDING THIS
MATTER.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME: MAGNOLIA GREEN - CHARLESTON VILLAGE
PLAN NUMBER:14CP0068
ORIGINAL PLAN DATE:3/19/14
REVIEW DATE:9/2/14
LATEST SUBMISSION DATE:8/28/14
SUBMITTAL NUMBER:4
STATUS: APPROVED
TABLE REVIEW: NO
IN REGARD TO YOUR RECENT SUBMITTAL OF THE REVISED UTILITIES
PLANS ON THE ABOVE REFERENCED PROJECT DATED MARCH 19, 2014,
WITH THE LAST REVISION DATED AUGUST 27, 2014, THIS IS TO
INFORM YOU THAT THE PLANS HAVE BEEN REVIEWED BY THE
UTILITIES DEPARTMENT WITH NO EXCEPTIONS TAKEN. THIS REVIEW
IS EFFECTIVE UNTIL SEPTEMBER 3, 2019.
PLEASE FORWARD TWO (2) ADDITIONAL SETS OF PLANS ONCE ALL
APPROVALS HAVE BEEN OBTAINED. IF, AFTER ALL OTHER
REVIEWS/APPROVALS HAVE BEEN MADE, THE UTILITY PLANS REFLECT
A LATER REVISION DATE THAN THE LAST REVISION NOTED ABOVE,
PLEASE SUBMIT TWO (2) NEW SETS OF UTILITY PLANS FOR FURTHER
REVIEW AND APPROVAL.
YOUR COOPERATION IS GREATLY APPRECIATED. PLEASE CALL ME AT
748-1343 IF YOU HAVE ANY FURTHER QUESTIONS REGARDING THIS
MATTER.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: UTILITIES
REVIEW/PHONE #: BILL VIER/748-1343
PLAN NAME: CHARLESTON VILLAGE AT MAGNOLIA GREEN
PLAN NUMBER: 14CP0068
ORIGINAL PLAN DATE: 3/19/14
REVIEW DATE: 4/6/15
LATEST SUBMISSION DATE: 4/2/15
SUBMITTAL NUMBER: 5
STATUS: APPROVED
TABLE REVIEW: NO
IN REGARD TO YOUR RECENT SUBMITTAL OF THE REVISED
UTILITIES PLANS ON THE ABOVE REFERENCED PROJECT DATED
MARCH 19, 2014, WITH THE LAST REVISION DATED APRIL 1,
2015, THIS IS TO INFORM YOU THAT THE PLANS HAVE BEEN
REVIEWED BY THE UTILITIES DEPARTMENT WITH NO EXCEPTIONS
TAKEN. THIS REVIEW IS EFFECTIVE UNTIL APRIL 6, 2020.
PLEASE FORWARD TWO (2) ADDITIONAL SETS OF PLANS ONCE
ALL APPROVALS HAVE BEEN OBTAINED. IF, AFTER ALL OTHER
REVIEWS/APPROVALS HAVE BEEN MADE, THE UTILITY PLANS
REFLECT A LATER REVISION DATE THAN THE LAST REVISION NOTED
ABOVE, PLEASE SUBMIT TWO (2) NEW SETS OF UTILITY PLANS FOR
FURTHER REVIEW AND APPROVAL.
YOUR COOPERATION IS GREATLY APPRECIATED. PLEASE CALL ME
AT 748-1343 IF YOU HAVE ANY FURTHER QUESTIONS REGARDING
THIS MATTER.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: EMERALD POINT AT MAGNOLIA GREEN
CASE NUMBER: 14CP0068
LATEST PLAN DATE: 03/19/14
DEPT. REC'D. DATE: 03/25/14
SUBMITTAL NUMBER: ONE
REVIEW DATE: 04/07/14
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: EMERALD POINT AT MAGNOLIA GREEN
CASE NUMBER: 14CP0068
LATEST PLAN DATE: 05/16/14
DEPT. REC'D. DATE: 05/28/14
SUBMITTAL NUMBER: TWO
REVIEW DATE: 05/30/14
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: EMERALD POINT AT MAGNOLIA GREEN
CASE NUMBER: 14CP0068
LATEST PLAN DATE: 07/28/14
DEPT. REC'D. DATE: 07/29/14
SUBMITTAL NUMBER: THREE
REVIEW DATE: 08/14/14
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEWER: JEFF LAMSON 804-751-4158 /
NAME OF PLAN : CHARLESTON VILLAGE AT MAGNOLIA GREEN
ADDRESS : AT THE INTERSECTION OF MAGNOLIA GREEN
PWY AND EMERALD POINT VISTA
SITE PLAN NO. : 14CP0068
LATEST PLAN DATE : 07/28/14
DEPT. REC'D DATE : 07/28/14
SUBMITTAL NUMBER : 3
REVIEW DATE : 08/19/14
RECOMMENDATION : PLANNING APPROVED
1. ANY CHANGE IN THE CURRENT PLAN WHETHER IT STEMS FROM
DEPARTMENTS COMMENTS OR AN ENGINEERING CHANGE
REQUESTED BY THE APPLICANT MAY GENERATE ADDITIONAL COMMENTS
FROM REVIEWING DEPARTMENTS RESULTING IN
REQUIRED REVISIONS PLEASE SUBMIT A RESPONSE LETTER
ADDRESSING HOW EACH COMMENT WASADDRESSED AND ADDRESS
ANY CHANGES THAT WERE MADE TO THE PLANS THAT WERE NOT AS A
RESULT OF THE REVIEW COMMENTS RESPONSES HAVE BEEN PROVIDED
FOR EACH DEPARTMENT'S COMMENTS.
2 AT TIME OF FINAL PLAT LANDSCAPING PLANS SHALL BE SUBMITTED
TO THE PLANNING DEPARTMENT FOR APPROVAL PER CASE 89SN0343
TEXTUAL STATEMENT PARAGRAPH 3B CONDITION
A LANDSCAPING AND LANDSCAPE PLANS SHALL COMPLY WITH ARTICLE
VII SUBDIVISION III OF THE ZONING ORDINANCE
B LABEL BUFFER AREAS AND INDICATE REQUIRED PERIMETER
LANDSCAPE STANDARDS
C THE LANDSCAPE PLAN SHALL IDENTIFY THE STATE REGISTERED
LANDSCAPE ARCHITECT NURSERYMAN OR LANDSCAPE DESIGNER
PREPARING THE PLAN
3 IN CONJUNCTION WITH THE SUBMITTAL OF THE FINAL CHECK PLATS
THE SUBDIVIDER SHALL FLAG ALL BUFFERS FOR INSPECTION BY
THE PLANNING DEPARTMENT IF INSUFFICIENT VEGETATION REMAINS
THE SUBDIVIDER SHALL SUBMIT A LANDSCAPELE PLAN TO THE
DIRECTOR OF PLANNING. IF CONDITIONS ON SITE ARE NOT
CONDUCIVE TO PLANT SURVIVAL THE SUBDIVIDER SHALL PROVIDE
SURETY TO THE COUNTY IN THE AMOUNT REQUIRED TO IMPLEMENT THE
PLAN AN ESTIMATE FROM A LANDSCAPE CONTRACTOR SHALL SERVE AS
THE BASIS FOR THE SURETY AMOUNT. ALSO AT TIME OF FINAL
CHECK PLAT A SURETY FOR INSTALLATION OF STREET TREES SHALL
BE PROVIDED TO THE COUNTY.
4. A NOTE SHALL BE PLACED ON THE FINAL CHECK AND RECORD
CUT AND FILL SLOPES AND SETBACKS THE BUFFERS ARE TO REMAIN
THEM TO ANY ADJACENT ROADS.
5. PER SECTION 19-559 A HOMEOWNERS ASSOCIATION WITH
MANDATORY MEMBERSHIP WILL BE REQUIRED THIS SUBDIVISION
WILL BE REQUIRED TO BE A PART OF THE OVERALL MAGNOLIA GREEN
HOA. OWNERSHIP AND MAINTENANCE RESPONSIBILITIES
OF THE ASSOCIATION SHALL BE STATED ON ALL FINAL CHECK AND
RECORDATION PLATS. THE SUBDIVIDER SHALL SUBMIT DRAFT
BYLAWS AND COVENANTS OF THE ASSOCIATION WITH THE STATE
CORPORATION COMMISSION. THE APPROVED BYLAWS AND
COVENANTS SHALL BE RECORDED PRIOR TO OR IN CONJUNCTION WITH
THE RECORD PLAT. THE RECORDATION INFORMATION SHALL
BE SHOWN ON THE RECORD PLAT AND EACH SUBSEQUENT FINAL CHECK
AND RECORD PLAT. THE SUBDIVIDER SHALL FUND THE
FIRST YEAR OPERATIONAL EXPENSES OF THE ASSOCIATION
6. BUILDING ENVELOPES SHOWN ON THE TENTATIVE SHALL BE SHOWN
WITH COMPLETE SETBACK DIMENSIONS ON THE FINAL CHECK AND
7 THE FINAL CHECK AND RECORD PLAT SHALL DISPLAY ALL SPECIAL
SETBACKS LOT WIDTHS AND LOT SIZES FOR EACH TYPE OF
DEVELOPMENT.
8.THE FINAL CHECK AND RECORD PLATS SHALL SHOW ALL APPLICABLE
EASEMENTS PER SECTION 17-68.
***********************************************************
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: GREG SMITH / 706-2012
EMAIL: SMITHGD@CHESTERFIELD.GOV
NAME OF PLAN: EMERALD POINT AT MAGNOLIA GREEN
CASE NUMBER: 14CP0068
LATEST PLAN DATE: 3/19/14
DEPT. REC'D. DATE: 3/24/14
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 3/31/14
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
COMMENTS:
1. THE CONSTRUCTION PLAN IS APPROVED AS SUBMITTED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: GREG SMITH / 706-2012
EMAIL: SMITHGD@CHESTERFIELD.GOV
NAME OF PLAN: CHARLESTON VILLAGE AT MAGNOLIA GREEN
CASE NUMBER: 14CP0068
LATEST PLAN DATE: 5/16/14
DEPT. REC'D. DATE: 5/28/14
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 6/3/14
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
COMMENTS:
1. THE CONSTRUCTION PLAN IS APPROVED AS SUBMITTED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: GREG SMITH / 706-2012
EMAIL: SMITHGD@CHESTERFIELD.GOV
NAME OF PLAN: CHARLESTON VILLAGE AT MAGNOLIA GREEN
CASE NUMBER: 14CP0068
LATEST PLAN DATE: 7/28/14
DEPT. REC'D. DATE: 7/30/14
SUBMITTAL NUMBER: 3RD REVIEW
REVIEW DATE: 8/6/14
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
COMMENTS:
1. THE CONSTRUCTION PLAN IS APPROVED AS SUBMITTED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
REVIEW DEPARTMENT: FIRE
REVIEWER/PHONE#: GREG SMITH / 706-2012
EMAIL: SMITHGD@CHESTERFIELD.GOV
NAME OF PLAN: CHARLESTON VILLAGE AT MAGNOLIA GREEN
CASE NUMBER: 14CP0068
LATEST PLAN DATE: 8/27/14
DEPT. REC'D. DATE: 8/28/14
SUBMITTAL NUMBER: 4TH REVIEW
REVIEW DATE: 8/28/14
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
COMMENTS:
1. THE CONSTRUCTION PLAN IS APPROVED AS SUBMITTED.
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS/751-2335
NAME OF PLAN : EMERALD POINT AT MAGNOLIA GREEN
ADDRESS : AT THE INTERSECTION OF MAGNOLIA GREEN
PWY AND EMERALD POINT VISTA
SITE PLAN NO. : 14CP0068
LATEST PLAN DATE : 03/19/14
DEPT. REC'D DATE : 03/24/14
SUBMITTAL NUMBER : 1
REVIEW DATE : 04/11/14
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : NO
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND/OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR STATE
PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES INCLUDING
BUT NOT LIMITED TO WETLANDS, SURFACE WATERS (E.G. VSMP
PERMIT FOR CONSTRUCTION SITES, GROUND WATER AND AIR
QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT RELIEVE YOU
OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE LAND
DISTURBANCE PERMIT.
2. PLEASE BE AWARE THAT THE STATE STORMWATER POLLUTION
PREVENTION PLAN (SWPPP) REQUIREMENTS CONCERNING THE 10-YEAR
STORM PEAK ATTENUATION AND WATER QUALITY COMPLIANCE VARIES
FROM BAY ACT COMPLIANCE MAY BECOME AN ISSUE DURING THE
STATE SITE INSPECTION PROCESS. COUNTY CONSTRUCTION PLAN
APPROVAL DOES NOT RELIEVE THE OWNER/DEVELOPER OF
RESPONSIBILITY FOR COMPLIANCE WITH STATE REGULATIONS - E.G.
4VAC50-60-80 FLOODING, 4VAC50-60-60 WATER QUALITY, ETC.
TECHNICAL ASSISTANCE FROM DEQ IS RECOMMENDED.
3. THE CHECKLIST MUST BE COMPLETED BY THE LICENSED
PROFESSIONAL AND A COPY RESUBMITTED WITH THE FIRST PLAN
REVISION IN RESPONSE TO REVIEW COMMENTS SHOULD BE PROVIDED
TO EE.
=== EROSION CONTROL ===
1. AN ITEMIZED EROSION CONTROL COST ESTIMATE MUST BE
SUBMITED FOR REVIEW AND/OR APPROVAL.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A DVD/CD OR EMAIL FILES, THE FORMAT OF WHICH
SHALL BE AUTOCAD.DWG OR DXF, OR ARCGIS SHAPEFILES
MUST BE SUBMITTED TO CAROLE CLIBORNE OF ENVIRONMENTAL
ENGINEERING. THE A DVD/CD OR EMAIL FILES MUST CONTAIN
THE FOLLOWING, EACH IN A SEPARATE LAYER:
B) EDGES OF IMPERVIOUS AREA OF ROADS TO INCLUDE C&G AND
EDGES OF SIDEWALKS.
C) THE STORM SEWER SYSTEM AND ALL CULVERTS. A LAYER
REPORT PRINTED FORM AUTOCAD MUST BE SUBMITTED WITH
DISKETTE/CD. ARCGIS SHAPEFILES SHOULD HAVE EACH ITEM
CLEARLY IDENTIFIED IN THE ATTRIBUTE TABLE. BOTH THE
DISKETTE/CD AND THE REPORT MUST BE LABELED WITH THE
SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN NUMBER
AND ENGINEERING FIRM. ALL AUTOCAD FILES MUST BE
REFERENCED DIRECTLY TO THE VIRGINIA SATE PLANE
COORDINATE SYSTEM, SOUTH ZONE, IN THE NAD83 DATUM.
D) ALL JURISDICTIONAL WETLAND AREAS AND/OR WATER OF
THE STATE.
I. STREAMS AND OTHER WATER BODIES.
II. LOCATIONS OF FILED VERIFIED RESOURCE PROTECTION
AREA DESIGNATIONS TO INCLUDE WATER BODIES WITH
PERENNIAL FLOW.
III. LOCATIONS OF PERENNIAL FLOW ORIGINS AND THEIR
ASSOCIATED GPS COORDINATES (NAD83 STATE PLANE VA
SOUTH FEET).
IV. LOCATION(S) OF BREAK POINT(S) IN SURFACE FLOW
AND/OR NON-CONTIGUOUS WETLANDS AND THEIR
ASSOCIATED GPS COORDINATES (NAD83 STATE PLATE VA
SOUTH FEET).
V. FLOOD PLAINS.
E) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
F) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
G) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
H) IF APPLICABLE, A COPY OF VDOT LAND USE PERMIT MUST
BE RECEIVED.
I) AN EROSION CONTROL BOND MUST BE POSTED.
J) THE RISER AND BARREL PIPE (PERMANENT RISER/BARREL)
ASSOCIATED WITH THE SEDIMENT BASIN(S) MUST BE ON-SITE.
K) AN EROSION CONTROL BOND MUST BE POSTED.
3. THESE ARE IN REGARDS TO THE MS-19:
A) PLEASE PROVIDE AN ADDITIONAL SHEET TO THE
CONSTRUCTION PLANS AND LABEL THIS SHEET PRE-DEVELOPMENT
MS-19. THIS SHEET SHOULD BE DRAWN TO SCALE TO SHOW THE
PRE-DEVELOPMENT DRAINAGE AREAS WITH THE AMOUNT OF ACRES
AT THE POINT OF ANALYSIS, WHICH IS AT THE EXISTING STORM
SEWER 18-2-3. IN ADDITION, INCLUDE THE EXISTING STORM
SEWER IN ITS ENTIRETY STR'S 18-2-1 THRU 18-2-3 AND LABEL
THEM ACCORDINGLY.
FURTHERMORE, SHOW/LABEL THE FLOW PATH (SHEET FLOW,
SHALLOW CONCENTRATED FLOW AND CHANNEL FLOW), RUNOFF
COEFFICIENT, ETC. FOR THE PRE-DEVELOPMENT DRAINAGE AREAS
AND INCLUDE THE 2/10-YEAR PRE-DEVELOPMENT DISCHARGES.
ONE MORE MS-19 SECTION-LOCATION SHOULD BE SHOWN ON THE
PLANS, WHICH IS AT THE EXISTING PIPE STR'S 18-2-2/18-2-3
AND UPDATE THE MS-19 TABLE TO INCLUDE THIS LOCATION.
4. WE OFFER, BUT NOT LIMITED TO, THE FOLLOWING COMMENTS:
A) THE EROSION CONTROL MEASURES (I.E. ST1, ST2, SB,
DIVERSION DIKE, SILT FENCE, SUPER SILT FENCE, ETC.) THAT
ARE SPECIFIED ON THE EROSION AND SEDIMENT CONTROL -
PHASE I SHOULD ALSO BE SHOWN ON THE EROSION AND SEDIMENT
CONTROL - PHASE II. THESE TEMPORARY EROSION CONTROL
MEASURES SHOULD REMAIN UNTIL THE UPSTREAM AREAS ARE
COMPLETELY STABILIZED AND WITH AN APPROVAL OF THE COUNTY
INSPECTOR. PLEASE REFLECT THE CHANGES ON THE EROSION AND
SEDIMENT CONTROL PHASE II. ADDITIONAL EROSION CONTROL
MEASURES MAY BE NEEDED.
B) PLEASE INCLUDE THE FOLLOWING NOTE IN BOLD PRINT ON
THE EC PLANS STATING, "THE ENVIRONMENTAL ENGINEERING
DEPARTMENT MAY IMPOSE A MORE RIGOROUS EROSION AND
SEDIMENT CONTROL PROGRAM THAN THAT WHICH IS PROVIDED BY
MINIMUM STANDARDS FOUND IN THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK. THIS WOULD INCLUDE THE
UTILIZATION OF SUPER SILT FENCE AND PAM."
C) PLEASE BE SURE TO USE THE APPROPRIATE LEGEND/STANDARD
SYMBOLS FOR SILT FENCE (-X-X-), SUPER SILT FENCE (-XX-
XX-), ETC. REFER TO CHAPTER 2 - WALL CHART (UNIFIED
CODING SYSTEM) PAGE 11-33 OF THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK. REFLECT THE CHANGES ON THE
EROSION AND SEDIMENT CONTROL PHASE I AND PHASE II.
D) PLEASE SPECIFY THE TOP/BOTTOM ELEVATION FOR THE ST1
AND ST2. REFLECT THE CHANGES ON THE EROSION AND SEDIMENT
CONTROL PHASE I AND PHASE II.
E) PLEASE BE SURE TO SHOW IN GHOSTED LINES THE LIMITS OF
ROAD RIGHT-OF-WAY, PROPERTY LINES, LOT NUMBERS,
CENTERLINE STATIONING, ETC. SUCH THAT THE EC MEASURES
AND RELATED ACTIVITY STANDOUT IN THE PLANS (SHEET C-3),
WHICH ARE CURRENTLY MESSING FROM THE EROSION AND
SEDIMENT CONTROL PHASE I. PLEASE ADDRESS.
F) THESE ARE IN REGARDS TO THE TEMPORARY SEDIMENT BASIN:
I. A NOTE SHOULD BE PROVIDED ON EC PLANS THAT TRASH
WOULD BE PROVIDED IN LIEU OF ANTI-VORTEX DEVICE.
II. PLEASE ELIMINATE THE USE OF ANTI-SEEP COLLARS AND
PROVIDE A NOTE ON THE EC PLANS THAT CONCRETE CRADLE
WOULD BE PROVIDED ALONG THE 18" RPC BARREL.
III. PLEASE PROVIDE A DETAIL OF THE TEMPORARY
DEWATERING DEVICE WITH APPLICABLE ELEVATIONS,
DIMENSIONS AND MATERIALS.
V. PLEASE REVISE THE SEDIMENT BASIN SCHEMATIC
ELEVATIONS (SHEET C-7) TO SELECT ONE OF THE TWO
DESIGNS PROVIDED IN THE DETAIL WITH OR WITHOUT
EMERGENCY SPILLWAY. AN X OVER TO ONE OF THIS DESIGN
SHOULD ADDRESS THIS CONCERN.
VI. PLEASE PROVIDE A NOTE STATING, "ONCE THE UPSTREAM
AREAS THAT ARE DRAINING TO THE TEMPORARY SEDIMENT
BASIN ARE COMPLETELY STABILIZED, THE CONVERSION TO
PERMANENT SWM/BMP SHOULD OCCUR. PLEASE SEE AS FOLLOW:
- THE WET STORAGE FROM THE SEDIMENT BASIN MUST BE
DEWATERED FOLLOWING THE APPROVED METHODS IN THE VESCH
1992 EDITION. ALL SILT MUST BE CLEANED FROM THE
TEMPORARY SEDIMENT BASIN AND COMPLETELY STABILIZED
PRIOR TO THE CONVERSION TO PERMANENT SWM/BMP WET POND.
- REMOVE THE TEMPORARY DEWATERING DEVICE AND
PLUG/GROUT THE TEMPORARY 10" ORIFICE IN THE 36" RISER.
- THE CONTRACTOR SHALL ADJUST THE GRADING FOR THE
SWM/BMP'S TO THE FINAL CONTOURS AS SHOWN ON SHEET C-
11.
- ANY ADDITIONAL SEEDING AND STABILIZATION WILL BE
APPLIED AS NEEDED.
- THE SWM/BMP MUST BE CERTIFIED BY A PROFESSIONAL
ENGINEER PRIOR TO THE STATE ACCEPTANCE OF THE ROAD.
- THE 10' AQUATIC BENCH WILL BE PLANTED ACCORDING TO
THE PLANTING SCHEDULE, SHOWN ON SHEET___.
G) PLEASE INCLUDE A DETAIL FOR INLET PROTECTION ON THE
EC PLANS.
H) A NOTE SHOULD BE PROVIDED ON SHEETS C-4 AND C-6
STATING, "THE AREAS OF THE RPA AFFECTED BY THE
INSTALLATION OF THE OFFSITE SANITARY SEWER SHOULD BE
STABILIZED WITH AN APPROVED RPA RESTORATION PLANTING."
IN ADDITION, INCLUDE THE ENCLOSED RPA RESTORATION PLAN
TABLE ON SHEET C-6.
I) PLEASE PROVIDE OPTIC ORANGE SAFETY FENCE ALONG THE
NORTHERN SIDE WITHIN THE LIMITS DISTURBANCE FOR THE
PORTION OF THE RPA TO BE DISTURBED BY THE INSTALLATION
OF THE OFFSITE SANITARY SEWER. SEE ATTACHMENT FOR
CLARIFICATION.
J) PLEASE PROVIDE SUPER SILT FENCE WITH OPTIC ORANGE
FABRIC IN LIEU OF SILT FENCE TO THE SILT FENCE SPECIFIED
WITHIN THE RPA AREA. IN ADDITION, A NOTE SHOULD BE
PROVIDED ON THE SEQUENCE OF CONSTRUCTION PHASE 1 THAT
THE SUPER SILT FENCE WITH OPTIC ORANGE FABRIC SHALL HAVE
BEEN INSTALLED PER THE EC PLANS SHEETS C-4/C-5 AND BE
VISIBLE PRIOR TO THE ISSUANCE OF A LAND DISTURBANCE
PERMIT.
K) PLEASE PROVIDE SUPER SILT FENCE IN LIEU OF SILT FENCE
SPECIFIED ON THE REAR OF LOTS 1 THRU 13. REFLECT THE
CHANGES ON THE EROSION AND SEDIMENT CONTROL PHASE I AND
II.
L) PLEASE REVISE ITEM #8 UNDER EROSION AND SEDIMENT
CONTROL MEASURES - PHASE II (SHEET C-) TO INCLUDE
SEDIMENT TRAPS. IT SHOULD STATE, "THE TEMPORARY SEDIMENT
TRAPS AND SEDIMENT BASIN SHALL NOT BE REMOVED UNTIL
APPROVED BY THE ENVIRONMENTAL ENGINEERING."
M) PLEASE INCLUDE A NOTE IN THE EROSION & SEDIMENT
CONTROL - PHASE II STATING, "ADDITIONAL EROSION CONTROL
MEASURES MAY BE REQUIRED BY EE IF WARRANTED BY FIELD
CONDITIONS."
N) PLEASE REVISE THE TEMPORARY SEDIMENT TRAP DETAIL
(SHEET C-7) TO SPECIFY THE VERTICAL SLOPE OF THE
EXCAVATED VOLUME TO BE "1:1 OR FLATTER". SEE ATTACHMENT
FOR CLARIFICATION.
O) THE FOLLOWING NOTE MUST BE ADDED TO THE PLANS: ALL
DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT
CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING
ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL
STABILIZATION IS ACHIEVED."
P) THE FOLLOWING NOTE MUST BE ADDED TO THE PLANS: "THE
CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF ANY
ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT
EROSION AND SEDIMENTATION AS DETERMINED BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT".
5. IF TIMBERING IS REQUIRED ON THE PROJECT, IT SHOULD BE
INCORPORATED INTO THE EROSION CONTROL PLAN / NARRATIVE AND
SHOULD NOT BEGIN UNTIL AFTER THE ISSUANCE OF A LAND
DISTURBANCE PERMIT AND THE INSTALLATION OF THE APPROVED
EROSION CONTROL DEVICES.
======= CBPA =======
1. PLEASE CORRECT THE REQUIRED REMOVAL (4.75 IN LIEU OF
4.82) AND THE RMA AREA (10.99 IN LIEU O F 4.25) IN THE
CBPA/MS-4 TABLE (SHEET C-12).
2. PLEASE REVISE THE TITLE IN THE TITLE BOX (SHEET C-11) TO
BE "CBPA COMPLIANCE & BMP PLAN.
3. PLEASE SPECIFY STR. 13 IN THE CBPA/MS-4 TABLE (SHEET C-
12) FOR OUTFALL PIPES 30" IN DIAMETER AND GREATER.
==== SWM/BMP ======
1. PLEASE BE SURE TO PROVIDE SEDIMENT FOREBAY AT THE MAJOR
INFLOW POINTS BELOW STR. 13 WITH DIMENSIONS NOT EXCEEDING
20'. REFLECT THE CHANGES ON THE PLANS AND PROFILES.
IN ADDITION, THE FOREBAY SHOULD BE ARMORED WITH RIPRAP AND
6" BELOW THE NORMAL POOL. REFER TO THE ENCLOSURE.
2. PROVIDE 12' WIDE MAINTENANCE CORRIDOR ALONG TOP OF DAM
TO STR'S 26/27. THE EMBANKMENT/GRADING WILL NEED TO BE
REVISED. REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
3. PLEASE PROVIDE THE FOLLOWING NOTE ON SHEET C-11 STATING,
"THE DESIGN AND CONSTRUCTION OF THE SWM/BMP THAT WILL BE A
COUNTY MAINTAINED FACILITY SHALL BE SUBJECT TO DOCUMENTED
GEOTECHNICAL APPROVAL. THE SERVICES THAT MUST BE PROVIDED
BY THE GEOTECHNICAL ENGINEER SHALL INCLUDE FULL TIME
GEOTECHNICAL INSPECTION PAID FOR BY THE DEVELOPER. THAT
FULL TIME INSPECTION SHALL INCLUDE BUT NOT BE LIMITED TO
THE FOLLOWING:
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS
NECESSARY TO FACILITATE THE APPROVAL PROCESS OF THE
INDEPENDENT GEOTECHNICAL CONSULTANT. OBSERVATION,
TENSTING AND DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED
STRUCTURAL FILL FOR EARTH DAM CONSTRUCTION.
II. THE CUT OFF TRENCH, SPILLWAY PIPE, DRAINAGE
BLANKET, RISER STRUCTURE, AND CONCRETE CHUTE
SPILLWAY SUB-GRADES AS APPLICABLE TO EVALUATE
WHETHER SUITABLE SOLI IS PRESENT AT BEARING GRADE TO
VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND
SPECIFICATIONS.
THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL ON THE DAM WILL BE
FURNISHED PRIOR TO THE ISSUANCE OF THE LAND DISTURBANCE
PERMIT."
4. PLEASE PROVIDE A DETAIL OF THE IMPERMEABLE CLAY CORE
KEYED INTO IMPERMEABLE SUBGRADE SPECIFIED WITHIN THE
EMBANKMENT SECTION.
5. PLEASE PROVIDE TRASH RACK DETAIL ON SHEET C-11.
6. THESE ARE IN REGARDS TO THE SWM-BMP PROFILE (SHEET C-
11):
A) PLEASE SPECIFY THE SCALE USED IN THE SWM/BMP PROFILE.
B) THE PROFILE MUST SPECIFY THE WATER QUALITY, 2 YEAR,
10 YEAR, AND 100 YEAR WATER SURFACE ELEVATIONS WITH
THEIR RESPECTIVE VOLUMES. REVISE ACCORDINGLY.
7. THESE ARE IN REGARDS TO THE SWM/BMP GRADING PLAN (SHEET
C-11):
A) PLEASE SHOW/LABEL IN DOTTED LINES THE LIMITS OF THE
NORMAL WSE AND THE LIMITS OF THE 10/100-YEAR WSE.
B) PLEASE SHOW/LABEL THE STATIONED CENTERLINE PROFILE ON
THE SWM/BMP GRADING PLAN. STATIONS SHOWN ON PROFILE MUST
AGREE WITH STATIONS SHOWN ON THE GRADING PLAN.
C) PLEASE LABEL STR. 26 AND AS APPLICABLE THROUGHOUT THE
PLANS.
D) PLEASE SPECIFY THE 10:1 AND 6:1 SLOPES FOR THE
AQUATIC BENCH/SAFETY BENCH RESPECTIVELY.
8. PLEASE RELOCATE THE BOLLARD DETAIL SHOWN ON SHEET C-15
TO BE SHOWN ON SHEET C-11.
9. SIMILARLY, PLEASE RELOCATE THE SWM/BMP ACCESS ROAD
TYPICAL SECTION DETAIL TO BE SHOWN ON SHEET C-11.
10. PLEASE REVISE THE LABELING IN THE TITLE BOX TO READ
"SWM/BMP PLAN."
11. PLEASE PROVIDE AN ENLARGED DETAIL DRAWN TO SCALE OF THE
PRINCIPAL SPILLWAY WITH APPLICABLE ELEVATIONS, DIMENSIONS, M
12. PERFORATIONS IN THE RISER MUST BE PRECAST, NOT FIELD
MADE. PLEASE ADD A NOTE TO THE RISER DETAIL.
13. AN AUXILIARY SPILLWAY SHOULD BE CONSIDERED THAT IS NOT
WITHIN THE EMBANKMENT FILL SECTION. REFLECT THE CHANGES ON
ALL APPLICABLE SHEETS.
14. PLEASE PROVIDE CONCRETE CRADLE ALONG THE 18" RCP BARREL
AND INCLUDE THE ENCLOSED DETAIL OF CONCRETE CRADLE ON SHEET
C-11.
15. PLEASE PROVIDE VALVE BOX DETAIL FOR THE 12" GATE VALVE.
16. OUTLET PROTECTION MUST BE PROVIDED IN ACCORDANCE
WITH STD. & SPEC. 3.18 OF THE VESCH FOR ALL PIPES
DISCHARGING INTO THE SWM/BMP FACILITY (I.E. STR. 13). A
DETAIL MUST BE SHOWN FOR KEYING CLASS I RIP-RAP INTO THE
GROUND AT LEAST 2 FEET AND PLACING IT OVER FILTER CLOTH.
DIMENSIONS MUST BE SHOWN ON THE PLAN VIEW AND PROFILE.
17. PLEASE CORRECT THE DIMENSIONS OF THE CONCRETE SLAB FOR
THE 12" PVC DRAIN PIPE (SHEET C-11) TO BE 4'X4'. A 90-DEGREE
ELBOW POINTING VERTICAL SHOULD BE PROVIDED AT THE END OF THE
12" PVC PIPE. SEE ATTACHMENT FOR CLARIFICATION.
18. THE SWM/BMP EASEMENT SHOULD BE REVISED TO INCLUDE STR.
28. HOWEVER, MAINTENANCE OF SURFACE GRATE INLET SHALL BE
RESPONSIBILITY BY OTHERS. REVISE ALL APPLICABLE SHEETS TO
REFLECT THESE CHANGES.
19. PLEASE LOCATE THE BOLLARDS JUST OUTSIDE THE RIGHT-OF-WAY
AT LOTS 16/17. REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
20. PLEASE SPECIFY THE DIAMETER, MATERIAL, INVERTS, ETC. OF
THE EXISTING PIPE SERVING AS THE OUTFALL BELOW STR. 28.
REVISE THE SWM-BMP PROFILE TO REFLECT THE CHANGES.
21. PLEASE SHOW/LABEL THE APPROXIMATE LOCATION OF THE TYP.
PLANTED AQUATIC BENCH SIGN WITHIN THE 10' AQUATIC BENCH NEAR
TO THE VEHICULAR GRAVEL ACCESS ROAD. SEE ATTACHMENT FOR
CLARIFICATION.
22. THE FOLLOWING COMMENTS PERTAIN TO THE 2/10/100-YEAR
HYDROCAD ROUTING:
A) THE DESCENDING LEG OF THE INFLOW HYDROGRAPH FOR
MODIFIED RATIONAL SHOULD REFLECT 1.5XTC.
B) IN LIEU OF 0.5 HR INCREMENTS, IT SHOULD USE 0.1 HR
FOR MORE ACCURATE INFLOW/OUTFLOW RESULTS. SUBMIT REVISED
ROUNDING FOR FURTHER REVIEW AND/OR APPROVAL.
C) IT IS UNCLEAR IF THE CRITICAL STORM DURATION HAS BEEN
TARGETED FOR ALLOWING RELEASE TO PRE-DEVELOPMENT RATES
FROM THE CALCULATIONS PROVIDED. PLEASE CLARIFY AND
PROVIDE SUPPORT CALCULATIONS TO ADDRESS THIS CONCERN.
23. PLEASE PROVIDE AN ADDITIONAL SHEET TO BE LABELED AS CBPA
COMPLIANCE & BMP LANDSCAPE. THIS SHEET SHOULD HAVE A PLAN
VIEW DRAWN TO SCALE (I.E. 1"=20) OF THE SMW/BMP THAT SHOW
THE ARRANGEMENT OF THE SPECIES OF PLANTS WITHIN THE 10'
AQUATIC BENCH.
IN ADDITION, PLEASE USE AS GUIDANCE THE ENCLOSED COPY OF THE
APPROVED SWM/BMP LANDSCAPE PLAN FROM WYNWOOD SECTION 3 TO
INCLUDE THE PLANTING SCHEDULE, PLANS LAYOUT, NOTES, PLANTING
REQUIREMENTS, ETC. A FURTHER DISCUSSION MAY BE HELPFUL.
======= ROAD AND DRAINAGE =======
1. THIS OFFICE WAS NOT ABLE TO PERFORM A FIELD INSPECTION.
ADDITIONAL COMMENTS MAY ARISE IF INDICATED BY THE EXISTING
CONDITIONS.
2. NO FURTHER APPROVALS FOR CONSTRUCTION IN MAGNOLIA GREEN
SUBDIVISION WOULD BE ALLOWED UNTIL THE ISSUES CONCERNING
THE PONDING IN THE RAIN GARDENS ON MAGNOLIA GREEN SECTION J
HAVE BEEN SATISFACTORILY ADDRESSED.
3. PLEASE SHOW/LABEL THE START CONSTRUCTION WITH PERTINENT
STATION ON THE PLANS AND PROFILES.
4. PLEASE BE SURE ALL EXISTING/PROPOSED CONTOURS HAVE BEEN
LABELED WITH ELEVATIONS (I.E. SHEETS C-2 THRU C-12, C-18,
ETC.). PLEASE ADDRESS.
5. THESE ARE IN REGARDS TO THE PROPOSED DITCH(ES):
A) PLEASE SHOW THE FLOW LINE AND ARROW THE FLOW
DIRECTION ALONG THE CENTERLINE OF THE PROPOSED
DITCH(ES).
B) PLEASE BE SURE TO SPECIFY THE RADIUS AT THE TURNS
WHERE CHANGES ON FLOW DIRECTION EXIST ON ALL PROPOSED
DITCHES.
C) PLEASE ADD A NOTE IN BOLD PRINT STATING, "IF UNABLE
TO ACHIEVE SUITABLE STAND OF GRASS VEGETATION OR FAILS
TO PROVIDE POSITIVE DRAINAGE OR SECTIONS NOT MAINTAINED,
UP TO 1 YEAR AFTER THE STATE ACCEPTANCE OF THE ROAD EE
MAY REQUIRED THE DITCH TO BE PAVED (PG-2A)." ADD THIS
NOTE ON SHEETS C-2, C-5, C-10, C-14A, ETC.
D) PLEASE REDUCE THE PROPOSED 20' DRAINAGE EASEMENT THAT
IS ENCLOSING THE DITCH LOCATED ON THE REAR OF LOTS 20
THRU 26 AND 1 THRU 13 TO BE 16' DRAINAGE EASEMENT.
REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
E) PLEASE REVISE THE PROPOSED DITCH LOCATED ON THE REAR
OF LOTS 20 THRU 27 TO START ON LOT 26. IN ADDITION,
ADJUST THE PROPOSED DRAINAGE EASEMENT TO START ON LOT
26. REVISE THE PLANS AND PROFILES TO REFLECT THE
CHANGES.
F) PLEASE REVISE A PORTION OF THE PROPOSED DRAINAGE
EASEMENT IN THE VICINITY OF LOTS 7/8 TO EXTEND THE
EASEMENT NEAR THE LIMITS OF THE 100-YEAR FLOODPLAIN AND
AND LABEL THIS PORTION VARIABLE WIDTH DRAINAGE EASEMENT.
SEE ATTACHMENT FOR CLARIFICATION AND REFLECT THE CHANGES
ON ALL APPLICABLE SHEETS.
G) BASED ON THE DITCH HYDRAULIC ANALYSIS, PORTIONS OF
THE PROPOSED DITCH(ES) (I.E. THE PROPOSED DITCH LOCATED
ON THE REAR OF LOTS 1 THRU 13, ON THE REAR OF LOTS 21
THRU 26, ETC.) HAVE BEEN SPECIFIED WITH EC-2 LINING.
PLEASE REVISE THE PLANS AND PROFILES TO INDICATE FROM
BEGINNING STATION TO END STATION THE PORTIONS THAT
REQUIRE EC-2 LINING.
H) BASED ON THE TYPICAL DITCH GRASS, 1' DESIGN DEPTH
WOULD BE PROVIDED ALONG THE PROPOSED DITCHES. PLEASE BE
SURE THE 1' DEPTH OF CONTAINMENT IS REFLECTED ON ALL
PROFILES (I.E. STORM STR. 10 TO BMP PROFILE, STORM STR.
1 THRU 7 PROFILE, ETC.).
I) PLEASE REVISE DITCH BEHIND LOTS 1 - 13 PROFILE AND
DITCH BEHIND LOTS 1 - 13 PROFILE (SHEET C-14A) TO SHOW
TOP OF BANK OF THE PROPOSED DITCH(ES) TO PROVIDE CHANNEL
SECTION ABOVE. REVISE ACCORDINGLY.
6. PLEASE ENCLOSE THE STORM SEWER 24/25 IN A 16' DRAINAGE
EASEMENT AND END THIS EASEMENT UNTIL IT REACHES THE
VARIABLE WIDTH SWM/BMP EASEMENT.
7. PLEASE CORRECT THE STRUCTURE NUMBERING SPECIFIED IN THE
DI-6 DETAIL (SHEET C-15) TO BE STR'S 14/22/23/24/29, ETC.
AS OPPOSED TO STR'S 424/426/429/ETC. REVISE ACCORDINGLY.
8. PLEASE PROVIDE 25' BUILDING SETBACK OFF THE PROPOSED 16'
DRAINAGE EASEMENT ON LOT 12/13 TO PROVIDE USABLE LOT AREA.
IN ADDITION, PLEASE SHOW DIMENSION BUILDING ENVELOPE ON
LOTS 12/13. REFLECT CHANGES ON ALL APPLICABLE SHEETS.
9. PLEASE SPECIFY CG-19 ON LOT 16.
10. BASED ON THE 10-YEAR HGL CALCULATIONS, INLET SHAPING HAS
BEEN SPECIFIED FOR SOME STRUCTURES (I.E. STR'S 9, 16, 14,
ETC.). PLEASE BE SURE TO SPECIFY INLET SHAPING IS-1 AT THOSE
STRUCTURES THAT REQUIRED IN THE DRAINAGE STRUCTURE SUMMARY
TABLE. REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
IN ADDITION, A DETAIL MUST BE SHOWN ON THE PLANS FOR INLET
SHAPING STD. IS-1.
11. BOOT CONNECTORS MUST BE SPECIFIED IN THE TABULAR
DRAINAGE DESCRIPTION FOR ALL PLASTIC PIPES THAT TIE INTO
A CONCRETE STRUCTURE (I.E. STR. 28). IN ADDITION, INCLUDE
THE PERTINENT DETAIL OF BOOT CONNECTOR ON THE PLANS.
12. THE DEED BOOK AND PAGE NUMBER OF ALL EXISTING DRAINAGE
EASEMENTS MUST BE SHOWN ON THE PLAN.
13. THESE ARE IN REGARDS TO THE OFFSITE FLOODPLAIN &
DRAINAGE AREA (SHEET C-18)/100-YEAR FLOODPLAIN:
A) PLEASE SHOW THE APPROXIMATE LOCATION OF WYNSTONE PARK
DEVELOPMENT.
B) PLEASE SHOW/LABEL THE FLOW PATH (I.E. SHEET FLOW,
SHALLOW CONCENTRATED FLOW AND CHANNEL FLOW) ON THE PLAN
VIEW.
C) PLEASE ELIMINATE A PORTION OF THE 100-YEAR FLOODPLAIN
LIMITS IN THE VICINITY OF LOTS 1 THRU 4, SINCE THAT
PORTION OF THE FLOODPLAIN IS LOCATED WITHIN THE 35'
BUILDING SETBACK/OPEN SPACE/PROPOSED DRAINAGE EASEMENT.
SEE ATTACHMENT FOR CLARIFICATION AND REFLECT THE CHANGES
ON ALL APPLICABLE SHEETS.
D) PLEASE REVISE THE RUNOFF COEFFICIENT AT X-SECTIONS 2
THRU 7 TO USE THE ULTIMATE DEVELOPED CONDITION OF 0.45.
SUBMIT REVISED 100-YEAR FLOODPLAIN COMPUTATIONS AT THOSE
X-SECTIONS PREVIOUSLY MENTIONED FOR FURTHER REVIEW
AND/OR APPROVAL AND REVISE THE PLANS AND PROFILES TO
REFLECT THE CHANGES.
IN ADDITION, REVISE THE WORKSHEET OF THE 100-YEAR
FLOODPLAIN PERTINENT TO X-SECTIONS 3 THRU 7 TO USE A
HIGHER MANNING COEFFICIENT. THE AVERAGE MANNING
COEFFICIENT FOR A NATURAL CHANNEL/OPEN SPACE SHOULD BE
0.06 OR IF SECTION OF THE NATURAL CHANNEL IS GOING TO BE
SPECIFIED, IT SHOULD USE FOR OVERBANKS/BANKS TO BE 0.1-
0.065 AND 7' WIDE BOTTOM OF CHANNEL TO BE 0.035. PLEASE
SUBMIT REVISED WORKSHEET FOR THE 100-YEAR FLOODPLAIN AT
X-SECTIONS 3 THRU 7 FOR FURTHER REVIEW AND/OR APPROVAL
AND REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
F) PLEASE REVISE THE 100-YEAR FLOODPLAIN SECTION-
LOCATIONS TO INCLUDE THE 100-YEAR FLOODPLAIN ELEVATIONS
AT EACH X-SECTION. SEE ATTACHMENT FOR CLARIFICATION AND
REFLECT THE CHANGES ON ALL APPLICABLE SHEETS.
E) THE NUMBER OF ACRES SHOULD BE SPECIFIED AT EACH X-
SECTION (X-SECTIONS 3 THRU 7, ETC.) ON SHEET C-18.
PLEASE ADDRESS.
14. THESE ARE IN REGARDS TO THE PROFILES:
A) PLEASE BE SURE TO SHOW/LABEL THE 100-YEAR FLOODPLAIN,
WETLANDS, ROW, ETC. ON ALL PROFILES (I.E. STORM STR. 10
TO BMP PROFILE, STORM STR. 1 THRU 7 PROFILE, ETC.).
15. AS A PREREQUISITE TO SUBDIVISION PLAT RECORDATION:
A) THE $100/LOT BMP MAINTENANCE FEE MUST BE RECEIVED.
B) APPROVED BONDING AND RECORDED EASEMENTS WITH DEED
BOOK AND PAGE NUMBER FOR THE SWM/BMP WETPOND MUST BE
PROVIDED.
==========================================================
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS/751-2335
NAME OF PLAN : CHARLESTON VILLAGE AT MAGNOLIA GREEN
ADDRESS : AT THE INTERSECTION OF MAGNOLIA GREEN
PWY AND EMERALD POINT VISTA
SITE PLAN NO. : 14CP0068
LATEST PLAN DATE : 05/16/14
DEPT. REC'D DATE : 05/28/14
SUBMITTAL NUMBER : 2
REVIEW DATE : 06/16/14
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : NO
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND/OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR STATE
PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES INCLUDING
BUT NOT LIMITED TO WETLANDS, SURFACE WATERS (E.G. VSMP
PERMIT FOR CONSTRUCTION SITES, GROUND WATER AND AIR
QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT RELIEVE YOU
OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE LAND
DISTURBANCE PERMIT.
2. PLEASE BE AWARE THAT THE STATE STORMWATER POLLUTION
PREVENTION PLAN (SWPPP) REQUIREMENTS CONCERNING THE 10-YEAR
STORM PEAK ATTENUATION AND WATER QUALITY COMPLIANCE VARIES
FROM BAY ACT COMPLIANCE MAY BECOME AN ISSUE DURING THE
STATE SITE INSPECTION PROCESS. COUNTY CONSTRUCTION PLAN
APPROVAL DOES NOT RELIEVE THE OWNER/DEVELOPER OF
RESPONSIBILITY FOR COMPLIANCE WITH STATE REGULATIONS - E.G.
4VAC50-60-80 FLOODING, 4VAC50-60-60 WATER QUALITY, ETC.
TECHNICAL ASSISTANCE FROM DEQ IS RECOMMENDED.
3.PLEASE ENSURE ALL COMPONENTS OF THE POLLUTION PREVENTION
PLAN ARE INCORPORATED INTO THE PLANS AS PER THE UPDATED
VSMP REGULATIONS.
=== EROSION CONTROL ===
1. AN ITEMIZED EROSION CONTROL COST ESTIMATE MUST BE
SUBMITED FOR REVIEW AND/OR APPROVAL.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A DVD/CD OR EMAIL FILES, THE FORMAT OF WHICH
SHALL BE AUTOCAD.DWG OR DXF, OR ARCGIS SHAPEFILES
MUST BE SUBMITTED TO CAROLE CLIBORNE OF ENVIRONMENTAL
ENGINEERING. THE A DVD/CD OR EMAIL FILES MUST CONTAIN
THE FOLLOWING, EACH IN A SEPARATE LAYER:
B) EDGES OF IMPERVIOUS AREA OF ROADS TO INCLUDE C&G AND
EDGES OF SIDEWALKS.
C) THE STORM SEWER SYSTEM AND ALL CULVERTS. A LAYER
REPORT PRINTED FORM AUTOCAD MUST BE SUBMITTED WITH
DISKETTE/CD. ARCGIS SHAPEFILES SHOULD HAVE EACH ITEM
CLEARLY IDENTIFIED IN THE ATTRIBUTE TABLE. BOTH THE
DISKETTE/CD AND THE REPORT MUST BE LABELED WITH THE
SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN NUMBER
AND ENGINEERING FIRM. ALL AUTOCAD FILES MUST BE
REFERENCED DIRECTLY TO THE VIRGINIA SATE PLANE
COORDINATE SYSTEM, SOUTH ZONE, IN THE NAD83 DATUM.
D) ALL JURISDICTIONAL WETLAND AREAS AND/OR WATER OF
THE STATE.
I. STREAMS AND OTHER WATER BODIES.
II. LOCATIONS OF FILED VERIFIED RESOURCE PROTECTION
AREA DESIGNATIONS TO INCLUDE WATER BODIES WITH
PERENNIAL FLOW.
III. LOCATIONS OF PERENNIAL FLOW ORIGINS AND THEIR
ASSOCIATED GPS COORDINATES (NAD83 STATE PLANE VA
SOUTH FEET).
IV. LOCATION(S) OF BREAK POINT(S) IN SURFACE FLOW
AND/OR NON-CONTIGUOUS WETLANDS AND THEIR
ASSOCIATED GPS COORDINATES (NAD83 STATE PLATE VA
SOUTH FEET).
V. FLOOD PLAINS.
E) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
F) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
G) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
H) IF APPLICABLE, A COPY OF VDOT LAND USE PERMIT MUST
BE RECEIVED.
I) AN EROSION CONTROL BOND MUST BE POSTED.
J) THE RISER AND BARREL PIPE (PERMANENT RISER/BARREL)
ASSOCIATED WITH THE SEDIMENT BASIN(S) MUST BE ON-SITE.
K) AN EROSION CONTROL BOND MUST BE POSTED.
3. THESE ARE IN REGARDS TO THE MS-19 (SHEET C-19). PER
RECENT TELEPHONE CONVERSATION ON 06/16/14 BETWEEN MS. J.
SEESE, R. BOSWELL AND M. JENKINS, SUPPORT DATA THAT JUSTIFY
THE PRE-DEVELOPMENT RUNOFF OF 0.25 SHOULD BE PROVIDED TO
THIS OFFICE OR REVISE THE PRE-DEVELOPMENT RUNOFF TO BE
0.20. IF THE PRE-DEVELOPMENT RUNOFF CHANGES TO 0.20, THE
MS-19 CALCULATIONS, ROUTING, ETC. SHOULD BE REVISED TO
REFLECT THE REVISED DATA.
4. WE OFFER, BUT NOT LIMITED TO, THE FOLLOWING COMMENTS:
A) PLEASE REVISE THE LIMITS OF DISTURBANCE ON THE
EROSION & SEDIMENT CONTROL - PHASE II TO INCLUDE THE
PROPOSED GRADING SPECIFIED ON THE REAR OF LOTS 13/14.
PROVIDE ADDITIONAL EROSION CONTROL MEASURES SUCH AS SILT
FENCE, ETC. TO ADDRESS THE DISTURBED AREAS DUE TO
GRADING SPECIFIED ON THESE LOTS PREVIOUSLY MENTIONED.
B) THESE ARE IN REGARDS TO THE TEMPORARY SEDIMENT BASIN:
I. PLEASE REVISE THE SEDIMENT BASIN-RISER DETAIL
(SHEET C-7) TO SHOW THE TEMPORARY 12" FLEXIBLE
PERFORATED TUBING TO BE ON THE OUTSIDE OF THE 36" RCP
RISER. SEE ATTACHMENT FOR CLARIFICATION.
II. PLEASE REVISE ITEM #18 UNDER CONSTRUCTION
SEQUENCE/EROSION AND SEDIMENT CONTROL MEASURES -
PHASE II (SHEET C-5) TO REMOVE THE WORDING "PERMANENT
TRASH RACK INSTALLED". THE PERMANENT PLASTIC TRASH
RACK SHOULD HAVE BEEN INSTALLED IN THE INITIAL PHASES
OF THE EROSION AND SEDIMENT CONTROL PLANS.
5. IF TIMBERING IS REQUIRED ON THE PROJECT, IT SHOULD BE
INCORPORATED INTO THE EROSION CONTROL PLAN / NARRATIVE AND
SHOULD NOT BEGIN UNTIL AFTER THE ISSUANCE OF A LAND
DISTURBANCE PERMIT AND THE INSTALLATION OF THE APPROVED
EROSION CONTROL DEVICES.
==== SWM/BMP ======
1. THESE ARE IN REGARDS TO THE STR. #11-SWM-BMP-STR. #28
PROFILE (SHEET C-11):
A) PLEASE BE SURE TO SHOW THE RISER TO START AT 255.00.
IT IS CURRENTLY SHOWN AT 254.50. REVISE ACCORDINGLY.
2. THESE ARE IN REGARDS TO THE SWM/BMP GRADING PLAN (SHEET
C-11):
A) AS PREVIOUSLY REQUESTED, PLEASE SHOW/LABEL THE
STATIONED CENTERLINE PROFILE ON THE SWM/BMP GRADING
PLAN. STATIONS SHOWN ON PROFILE MUST AGREE WITH STATIONS
SHOWN ON THE GRADING PLAN.
3. AS PREVIOUSLY REQUESTED, THE PRINCIPAL SPILLWAY DETAIL
SHOULD BE SHOWN TO SCALE WITH APPLICABLE DIMENSIONS (I.E.
WALL THICKNESS, ETC.).
IN ADDITION, IF THE PRINCIPAL SPILLWAY IS GOING TO BE PRE-
CAST, A FOOTING SHOULD BE SPECIFIED. PLEASE PROVIDE THE
MINIMUM FOOTING DIMENSIONS IN THE DETAIL OF THE PRINCIPAL
SPILLWAY AND IN PROFILE VIEW. IN ADDITION, SPECIFY THAT THE
RISER IS GOING TO BE PRE-CAST.
4. IN THE EVENT THE PRINCIPAL SPILLWAY BECOMES CLOGGED AN
AUXILIARY SPILLWAY SHOULD BE PROVIDED AND THIS SHOULD BE
DESIGNED TO PASS THE MAXIMUM PRACTICABLE DISCHARGE. PLEASE
PROVIDE THE NECESSARY DETAILS (I.E. TRAPEZOIDAL DITCH OF
3:1 SIDE SLOPES, INVERTS, LINING, ETC.) AND INFORMATION ON
THE PLANS. IN ADDITION, SUBMIT CALCULATIONS FOR FURTHER
REVIEW AND/OR APPROVAL.
5. SINCE THE DETAILS OF THE 12" VALVE BOX, VALVE KEY
EXTENSION, PLASTIC TRASH RACK, ETC. TO BE USED FOR THE
SWM/BMP FACILITY ARE CURRENTLY SHOWING ON A DIFFERENT SHEET
OTHER THAN THE SWM/BMP PLAN SHEET, PLEASE PROVIDE A NOTE IN
BOLD PRINT ON SHEET C-11 STATING, "REFER TO SHEETS C-15 AND
C-15A FOR DETAILS OF THE 12" VALVE BOX, VALVE KEY
EXTENSION, PLASTIC TRASH RACK, ETC."
6. PLEASE BE SURE THE ENTIRE SWM/BMP FACILITY IS ENCLOSED
IN THE PROPOSED SWM/BMP EASEMENT (I.E. A PORTION OF THE BMP
GRAVEL ACCESS IS OUTSIDE THE PROPOSED VARIABLE SWM/BMP AND
THE PROPOSED 20' BMP ACCESS EASEMENT, ETC.). SEE ATTACHMENT
FOR CLARIFICATION. REFLECT THE CHANGES ON ALL APPLICABLE
SHEETS.
7. THERE APPEARS TO BE A DISCREPANCY IN REGARDS TO THE
EXISTING 16' DRAINAGE EASEMENT THAT IS ENCLOSING STR. 28
AND THE 12" PVC DRAIN PIPE/CLEANOUT STRUCTURE. ON SHEETS C-
3, C-5, C-8, C-9, C-10 SHOWS THE 12" PVC PIPE/CLEANOUT
STRUCTURE TO BE WITHIN THE EXISTING 16' DRAINAGE EASEMENT
AND ON SHEET C-11 SHOWS THE 12" PVC PIPE/CLEANOUT STRUCTURE
TO BE OUTSIDE THE EXISTING 16' DRAINAGE EASEMENT. PLEASE BE
SURE THE INFORMATION IS CONSISTENT THROUGHOUT THE PLAN SET.
REVISE ACCORDINGLY.
======= ROAD AND DRAINAGE =======
1. DUE TO THE ABSENCE OF CENTERLINE STAKING AND HEAVY
VEGETATION, OUR CONCERNS ARE BASED ON THE INFORMATION SHOWN
IN THE CONSTRUCTION PLANS. THE RESPONSIBILITY FOR
IDENTIFYING CRITICAL AREAS IS PLACED ON THE PROFESSIONAL
ENGINEER WHO SEALS THE CONSTRUCTION PLANS APPROVED. WE
RESERVE THE RIGHT TO INSPECT CONVEYANCE SYSTEMS PRIOR TO
PLAT RECORDATION AND/OR STATE ACCEPTANCE TO DETERMINE IF
ADDITIONAL IMPROVEMENTS ARE REQUIRED.
2. NO FURTHER APPROVALS FOR CONSTRUCTION IN MAGNOLIA GREEN
SUBDIVISION MAY BE ALLOWED UNTIL THE ISSUES CONCERNING
THE PONDING IN THE RAIN GARDENS ON MAGNOLIA GREEN SECTION J
HAVE BEEN SATISFACTORILY ADDRESSED.
3. THESE ARE IN REGARDS TO THE PROPOSED DITCH(ES):
A) AS PREVIOUSLY REQUESTED, PLEASE SHOW THE FLOW LINE
ALONG THE CENTERLINE OF THE PROPOSED DITCH(ES).
B) AS PREVIOUSLY REQUESTED, PLEASE BE SURE TO SPECIFY
THE RADIUS AT THE TURNS WHERE CHANGES ON FLOW DIRECTION
EXIST ON ALL PROPOSED DITCHES (I.E. THE RADIUS OF THE
PROPOSED DITCH SPECIFIED ON THE REAR OF LOTS 1 WAS
OMITTED FROM THE PLAN VIEWS, ETC.).
C) BASED ON THE TYPICAL GRASS DITCH, 1' DESIGN DEPTH
WOULD BE PROVIDED ALONG THE PROPOSED DITCHES. PLEASE BE
SURE THE 1' DEPTH OF CONTAINMENT IS REFLECTED ON ALL
PROFILES (I.E. STORM STR. 14 - STR. 11 PROFILE ON SHEET
C-14, ETC.).
4. ALTHOUGH NOT PREVIOUSLY REQUESTED, PLEASE EXTEND THE 16'
DRAINAGE EASEMENT THAT IS ENCLOSING STRUCTURES 10/11 UNTIL
IT REACHES THE VARIABLE WIDTH SWM/BMP EASEMENT. REFLECT THE
CHANGES ON ALL APPLICABLE SHEETS.
5. IT APPEARS THE SLOPE PERTINENT TO THE FILL SLOPE ALONG
THE REAR OF LOTS 12 THRU 14 HAS BEEN STEEPEN TO 2:1. FREE
MAINTENANCE VEGETATIONS SUCH AS TREES/BUSHES/ETC. SHOULD BE
PROVIDED TO THE FILL SLOPE STEEPER THAN 3:1 SLOPE ALONG THE
REAR OF LOTS 9 THRU 14. PLEASE SPECIFY THE TYPE OF
VEGETATION TO BE USED TO STABILIZE THE FILL SLOPES STEEPER
THAN 3:1.
IN ADDITION, PLEASE SPECIFY THE FILL SLOPE AND ARROW THE
DIRECTION OF THE SLOPE ALONG THE REAR OF LOTS 9 THRU 14 ON
SHEET C-10. SEE ATTACHMENT FOR CLARIFICATION.
6. ALTHOUGH NOT PREVIOUSLY REQUESTED PLEASE SHOW THE LINE
PERTINENT TO ALL PROPOSED DRAINAGE EASEMENTS IN DARKER AND
SLIGHTLY THICKER LINES TO BE DIFFERENTIATED FROM THE
EXISTING AND/OR PROPOSED CONTOURS, WHICH ARE CURRENTLY
SHOWN TOO LIGHT ON THE PLAN VIEWS. REFLECT THE CHANGES ON
ALL APPLICABLE SHEETS.
7. BASED ON THE PROFILE VIEW OF THE STORM SEWER STRUCTURES
1 THRU 7 (SHEET C-14). IT APPEARS STR. 1 IS BEYOND THE FLOW
LINE OF THE PROPOSED DITCH. THE LENGTH OF PIPE STR'S 1/2
SHOULD BE SHORTER TO ENSURE IT WOULD INTERCEPT THE PROPOSED
DITCH. SEE ATTACHMENT FOR CLARIFICATION. REVISE THE PLANS,
PROFILES, ETC. AND SUBMIT REVISED 10/100-YEAR STORM
SEWER/HGL CALCULATIONS FOR FURTHER REVIEW AND/OR APPROVAL.
8. THESE ARE IN REGARDS TO THE OFFSITE FLOODPLAIN &
DRAINAGE AREA (SHEET C-18)/100-YEAR FLOODPLAIN:
A) AS PREVIOUSLY REQUESTED, PLEASE SHOW THE APPROXIMATE
LOCATION OF WYNSTONE PARK DEVELOPMENT. THE FOOTPRINT OF
THE DEVELOPMENT SHOULD BE SHOWN ON THE PLAN VIEW AND THE
RUNOFF COEFFICIENT AT X-SECTIONS 2 THRU 4 MAY CHANGE TO
CONSIDER THE TOWNHOMES OF APPROXIMATELY C=0.60. AS
APPLICABLE, REVISE THE 100-YEAR DISCHARGE AT THOSE X-
SECTIONS PREVIOUSLY MENTION, PLANS, PROFILES, ETC. TO
REFLECT THE CHANGES.
9. THESE ARE IN REGARDS TO THE PROFILES:
A) AS PREVIOUSLY REQUESTED, PLEASE BE SURE TO SHOW/LABEL
THE 100-YEAR FLOODPLAIN, WETLANDS, ROW, ETC. ON ALL
PROFILES (I.E. STORM STR. 1 THRU 7 PROFILE, ETC.).
10. AS A PREREQUISITE TO SUBDIVISION PLAT RECORDATION:
A) THE $100/LOT BMP MAINTENANCE FEE MUST BE RECEIVED.
B) APPROVED BONDING AND RECORDED EASEMENTS WITH DEED
BOOK AND PAGE NUMBER FOR THE SWM/BMP WETPOND MUST BE
PROVIDED.
==========================================================
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS/751-2335
NAME OF PLAN : CHARLESTON VILLAGE AT MAGNOLIA GREEN
ADDRESS : AT THE INTERSECTION OF MAGNOLIA GREEN
PWY AND EMERALD POINT VISTA
SITE PLAN NO. : 14CP0068
LATEST PLAN DATE : 07/28/14
DEPT. REC'D DATE : 07/29/14
SUBMITTAL NUMBER : 3
REVIEW DATE : 08/19/14
RECOMMENDATION : REVISIONS REQUIRED
TABLE REVISION : NO
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND/OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR STATE
PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES INCLUDING
BUT NOT LIMITED TO WETLANDS, SURFACE WATERS (E.G. VSMP
PERMIT FOR CONSTRUCTION SITES, GROUND WATER AND AIR
QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT RELIEVE YOU
OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE LAND
DISTURBANCE PERMIT.
=== EROSION CONTROL ===
1. AN ITEMIZED EROSION CONTROL COST ESTIMATE MUST BE
SUBMITED FOR REVIEW AND/OR APPROVAL.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A DVD/CD OR EMAIL FILES, THE FORMAT OF WHICH
SHALL BE AUTOCAD.DWG OR DXF, OR ARCGIS SHAPEFILES
MUST BE SUBMITTED TO CAROLE CLIBORNE OF ENVIRONMENTAL
ENGINEERING. THE A DVD/CD OR EMAIL FILES MUST CONTAIN
THE FOLLOWING, EACH IN A SEPARATE LAYER:
B) EDGES OF IMPERVIOUS AREA OF ROADS TO INCLUDE C&G AND
EDGES OF SIDEWALKS.
C) THE STORM SEWER SYSTEM AND ALL CULVERTS. A LAYER
REPORT PRINTED FORM AUTOCAD MUST BE SUBMITTED WITH
DISKETTE/CD. ARCGIS SHAPEFILES SHOULD HAVE EACH ITEM
CLEARLY IDENTIFIED IN THE ATTRIBUTE TABLE. BOTH THE
DISKETTE/CD AND THE REPORT MUST BE LABELED WITH THE
SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN NUMBER
AND ENGINEERING FIRM. ALL AUTOCAD FILES MUST BE
REFERENCED DIRECTLY TO THE VIRGINIA SATE PLANE
COORDINATE SYSTEM, SOUTH ZONE, IN THE NAD83 DATUM.
D) ALL JURISDICTIONAL WETLAND AREAS AND/OR WATER OF
THE STATE.
I. STREAMS AND OTHER WATER BODIES.
II. LOCATIONS OF FILED VERIFIED RESOURCE PROTECTION
AREA DESIGNATIONS TO INCLUDE WATER BODIES WITH
PERENNIAL FLOW.
III. LOCATIONS OF PERENNIAL FLOW ORIGINS AND THEIR
ASSOCIATED GPS COORDINATES (NAD83 STATE PLANE VA
SOUTH FEET).
IV. LOCATION(S) OF BREAK POINT(S) IN SURFACE FLOW
AND/OR NON-CONTIGUOUS WETLANDS AND THEIR
ASSOCIATED GPS COORDINATES (NAD83 STATE PLATE VA
SOUTH FEET).
V. FLOOD PLAINS.
E) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
F) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
G) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
H) IF APPLICABLE, A COPY OF VDOT LAND USE PERMIT MUST
BE RECEIVED.
I) AN EROSION CONTROL BOND MUST BE POSTED.
J) THE RISER AND BARREL PIPE (PERMANENT RISER/BARREL)
ASSOCIATED WITH THE SEDIMENT BASIN(S) MUST BE ON-SITE.
K) AN EROSION CONTROL BOND MUST BE POSTED.
3. IF TIMBERING IS REQUIRED ON THE PROJECT, IT SHOULD BE
INCORPORATED INTO THE EROSION CONTROL PLAN / NARRATIVE AND
SHOULD NOT BEGIN UNTIL AFTER THE ISSUANCE OF A LAND
DISTURBANCE PERMIT AND THE INSTALLATION OF THE APPROVED
EROSION CONTROL DEVICES.
==== SWM/BMP ======
1. IT APPEARS THE TOP OF THE RISER ELEVATION HAS BEEN
REVISED TO 260.50. PLEASE BE SURE TO REFLECT THE REVISED
DATA ON ALL APPLICABLE VIEWS (I.E. AT STR. 26 IN THE
DRAINAGE STRUCTURE SUMMARY SHEET C-10, ETC.).
2. IT APPEARS THE BMP ACCESS ROAD WILL BE PAVED (SHEET C-
11). PLEASE LABEL AS SUCH ON ALL APPLICABLE VIEWS.
======= ROAD AND DRAINAGE =======
1. DUE TO THE ABSENCE OF CENTERLINE STAKING AND HEAVY
VEGETATION, OUR CONCERNS ARE BASED ON THE INFORMATION SHOWN
IN THE CONSTRUCTION PLANS. THE RESPONSIBILITY FOR
IDENTIFYING CRITICAL AREAS IS PLACED ON THE PROFESSIONAL
ENGINEER WHO SEALS THE CONSTRUCTION PLANS APPROVED. WE
RESERVE THE RIGHT TO INSPECT CONVEYANCE SYSTEMS PRIOR TO
PLAT RECORDATION AND/OR STATE ACCEPTANCE TO DETERMINE IF
ADDITIONAL IMPROVEMENTS ARE REQUIRED.
2. THE WATER QUALITY DEPARTMENT IS CURRENTLY REVIEWING THE
APPROPRIATE PLANTING TO BE PROVIDED ALONG THE FILL SLOPES
STEEPER THAN 3:1 TO PROVIDE LONG-TERM FREE MAINTENANCE.
THIS OFFICE IS UNSURE IF THE LOVEGRASS VEGETATION WOULD BE
ENOUGH TO PROTECT THE FILL SLOPE AREAS.
IN ADDITION, PROVIDE A NOTE IN BOLD PRINT ON THE COVER
SHEET (SHEET C-1) STATING, "THE DEVELOPER IS RESPONSIBLE
FOR THE IMMEDIATE STABILIZATION AND MAINTENANCE OF THE 2:1
SLOPE ALONG THE REAR OF LOTS 9 THRU 14 FOR A PERIOD OF ONE
YEAR AFTER STATE ACCEPTANCE OF THE ROADS."
3. THESE ARE IN REGARDS TO THE PROFILES:
A) IT APPEARS THE STORM STR. 1 THRU 7 PROFILE (SHEET C-
14) HAS BEEN REVISED TO REDUCE THE LENGTH OF STORM SEWER
STR'S 1/2. HOWEVER, THE PROPOSED GRADING PERTINENT TO
THE FILL SLOPE 2:1 THAT WAS SHOWN TO TIE TO THE EXISTING
GRADE HAS BEEN CUT OFF FROM THE PROFILE VIEW. PLEASE
EXTEND THE PROFILE WITH SUFFICIENT LENGTH TO SHOW THE
PROPOSED GRADE TYING BACK TO THE EXISTING GRADE.
IN ADDITION, INCLUDE, PART OF THE EXISTING CHANNEL AND
LABEL THE LIMITS OF THE 100-YEAR FLOODPLAIN ON THIS
PROFILE. REVISE ACCORDINGLY.
4. AS A PREREQUISITE TO SUBDIVISION PLAT RECORDATION:
A) THE $100/LOT MAINTENANCE FEE MUST BE RECEIVED.
B) APPROVED BONDING AND RECORDED EASEMENTS WITH DEED
BOOK AND PAGE NUMBER FOR THE SWM/BMP WETPOND MUST BE
PROVIDED.
==========================================================
============================================================
============================================================
REVIEW DEPARTMENT : ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE # : MARIA JENKINS/751-2335
NAME OF PLAN : CHARLESTON VILLAGE AT MAGNOLIA GREEN
ADDRESS : AT THE INTERSECTION OF MAGNOLIA GREEN
PWY AND EMERALD POINT VISTA
SITE PLAN NO. : 14CP0068
LATEST PLAN DATE : 08/27/14
DEPT. REC'D DATE : 08/28/14
SUBMITTAL NUMBER : 4
REVIEW DATE : 09/05/14
RECOMMENDATION : APPROVED
TABLE REVISION : YES
PLAT PROCESSING : NO
1. IT IS THE RESPONSIBILITY OF THE APPLICANT TO COMPLY
WITH AND/OR ACQUIRE ALL APPLICABLE FEDERAL AND/OR STATE
PERMITS IN RELATIONSHIP TO ENVIRONMENTAL FEATURES INCLUDING
BUT NOT LIMITED TO WETLANDS, SURFACE WATERS (E.G. VSMP
PERMIT FOR CONSTRUCTION SITES, GROUND WATER AND AIR
QUALITY) FINAL APPROVAL OF THESE PLANS WILL NOT RELIEVE YOU
OF YOUR RESPONSIBILITY. WETLANDS DOCUMENTATION MUST BE
RECEIVED BY THIS DEPARTMENT PRIOR TO ISSUANCE OF THE LAND
DISTURBANCE PERMIT.
=== EROSION CONTROL ===
1. AN EROSION CONTROL BOND IN THE AMOUNT OF $74,468.00 IS
SATISFACTORY.
2. AS A PREREQUISITE TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT:
A) A DVD/CD OR EMAIL FILES, THE FORMAT OF WHICH
SHALL BE AUTOCAD.DWG OR DXF, OR ARCGIS SHAPEFILES
MUST BE SUBMITTED TO CAROLE CLIBORNE OF ENVIRONMENTAL
ENGINEERING. THE A DVD/CD OR EMAIL FILES MUST CONTAIN
THE FOLLOWING, EACH IN A SEPARATE LAYER:
B) EDGES OF IMPERVIOUS AREA OF ROADS TO INCLUDE C&G AND
EDGES OF SIDEWALKS.
C) THE STORM SEWER SYSTEM AND ALL CULVERTS. A LAYER
REPORT PRINTED FORM AUTOCAD MUST BE SUBMITTED WITH
DISKETTE/CD. ARCGIS SHAPEFILES SHOULD HAVE EACH ITEM
CLEARLY IDENTIFIED IN THE ATTRIBUTE TABLE. BOTH THE
DISKETTE/CD AND THE REPORT MUST BE LABELED WITH THE
SUBDIVISION NAME AND SECTION, SUBDIVISION PLAN NUMBER
AND ENGINEERING FIRM. ALL AUTOCAD FILES MUST BE
REFERENCED DIRECTLY TO THE VIRGINIA SATE PLANE
COORDINATE SYSTEM, SOUTH ZONE, IN THE NAD83 DATUM.
D) ALL JURISDICTIONAL WETLAND AREAS AND/OR WATER OF
THE STATE.
I. STREAMS AND OTHER WATER BODIES.
II. LOCATIONS OF FILED VERIFIED RESOURCE PROTECTION
AREA DESIGNATIONS TO INCLUDE WATER BODIES WITH
PERENNIAL FLOW.
III. LOCATIONS OF PERENNIAL FLOW ORIGINS AND THEIR
ASSOCIATED GPS COORDINATES (NAD83 STATE PLANE VA
SOUTH FEET).
IV. LOCATION(S) OF BREAK POINT(S) IN SURFACE FLOW
AND/OR NON-CONTIGUOUS WETLANDS AND THEIR
ASSOCIATED GPS COORDINATES (NAD83 STATE PLATE VA
SOUTH FEET).
V. FLOOD PLAINS.
E) FLAGGING AROUND USACOE JURISDICTIONAL WETLANDS,
BUFFERS, AND SENSITIVE AREAS MUST BE VISIBLE.
F) DOCUMENTATION FROM THE USACOE/DEQ MUST BE RECEIVED
VERIFYING COMPLIANCE TO WETLAND PERMIT REGULATIONS.
G) A PROCESSED VSMP REGISTRATION AND FEE FORM MUST BE
RECEIVED.
H) IF APPLICABLE, A COPY OF VDOT LAND USE PERMIT MUST
BE RECEIVED.
I) AN EROSION CONTROL BOND IN THE AMOUNT OF $74,468.00
MUST BE POSTED.
J) THE RISER AND BARREL PIPE (PERMANENT RISER/BARREL)
ASSOCIATED WITH THE SEDIMENT BASIN(S) MUST BE ON-SITE.
K) AN EROSION CONTROL BOND MUST BE POSTED.
3. IF TIMBERING IS REQUIRED ON THE PROJECT, IT SHOULD BE
INCORPORATED INTO THE EROSION CONTROL PLAN / NARRATIVE AND
SHOULD NOT BEGIN UNTIL AFTER THE ISSUANCE OF A LAND
DISTURBANCE PERMIT AND THE INSTALLATION OF THE APPROVED
EROSION CONTROL DEVICES.
======= ROAD AND DRAINAGE =======
1. DUE TO THE ABSENCE OF CENTERLINE STAKING AND HEAVY
VEGETATION, OUR CONCERNS ARE BASED ON THE INFORMATION SHOWN
IN THE CONSTRUCTION PLANS. THE RESPONSIBILITY FOR
IDENTIFYING CRITICAL AREAS IS PLACED ON THE PROFESSIONAL
ENGINEER WHO SEALS THE CONSTRUCTION PLANS APPROVED. WE
RESERVE THE RIGHT TO INSPECT CONVEYANCE SYSTEMS PRIOR TO
PLAT RECORDATION AND/OR STATE ACCEPTANCE TO DETERMINE IF
ADDITIONAL IMPROVEMENTS ARE REQUIRED.
3. THESE ARE IN REGARDS TO THE PROFILES:
4. AS A PREREQUISITE TO SUBDIVISION PLAT RECORDATION:
A) THE $100/LOT BMP MAINTENANCE FEE MUST BE RECEIVED.
B) APPROVED BONDING AND RECORDED EASEMENTS WITH DEED
BOOK AND PAGE NUMBER FOR THE SWM/BMP WETPOND MUST BE
PROVIDED.
==========================================================