All Subdivision Review Comments for Case # 11TS0179




For VDOT’s comments please contact Virginia Department of Transportation at (804) 674-2814 or send e-mail to Boris.Solomonov@VDOT.Virginia.gov

For Tentative Subdivision resubmittals:

1. Please note that submittal fees include the original submittal and two (2) additional reviews.

2. A letter of transmittal is required to accompany each submittal.

3. Please verify that Environmental Engineering, Fire, CDOT, VDOT, and Planning have reviewed the submittal before resubmitting. A resubmittal tendered, prior to receiving all the required departments’ review, will be counted as an additional submittal. Go to Case Selection Form or Go to Project List


 
CASE NO: 11TS0179 STATUS: PENDING APPROVAL
PROJECT NAME: SECOND AVENUE ESTATE - LAST INTERNET UPDATE: 11/22/17
SUBMITTAL TYPE: TENTATIVE SUBDIVISION
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ASSESSOR----: 00 02/08/11 03/01/11 ******** ********
ENVIR.ENGR.-: 00 02/08/11 03/01/11 COMPLETE 02/17/11 LDP 748-1028
FIRE DEPT.--: 00 02/08/11 03/01/11 COMPLETE 02/14/11 GDS 706-2012
HOUSE NUMBER: 00 02/08/11 03/01/11 ******** ********
MAPPING/GIS-: 00 02/08/11 03/01/11 ******** ********
PLANNING----: 00 02/08/11 03/01/11 COMPLETE 02/14/11 RPR 768-7592
PARKS & REC.: 00 02/08/11 03/01/11 ******** ********
SCHOOL BOARD: 00 02/08/11 03/01/11 ******** ********
SOILS-------: 00 02/08/11 03/01/11 ******** ********
TRANSPORT.--: 00 02/08/11 03/01/11 COMPLETE 02/28/11 JWS 748-1037
UTIL.PLAN.--: 00 02/08/11 03/01/11 COMPLETE 02/15/11 TVM 751-4435
UTILITIES---: 00 02/08/11 03/01/11 ******** ********
UTIL.R.O.W.-: 00 02/08/11 03/01/11 ******** ********
VDOT--------: 00 02/08/11 03/01/11 ******** ********
REVIEW DEPARTMENT: UTILITIES
REVIEWER / PHONE # : TERRY MAPLES 751-4435
PLAN NAME: SECOND AVENUE ESTATES
PLAN NUMBER: 11TS0179
ORIGINAL PLAN DATE: 01/28/11
REVIEW DATE: 02/15/11
LATEST SUBMISSION DATE:
SUBMITTAL NUMBER: NEW
STATUS:
TABLE REVIEW:
1. PRIOR TO PLAT RECORDATION, THE SUB DIVIDER OF THIS
PROJECT SHALL BE RESPONSIBLE FOR THE INSTALLATION OF THE
SANITARY SEWER LATERALS AND WATER SERVICES FOR EACH
PROPOSED LOT. (U)
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: JESSE W. SMITH, P.E. (804)748-1998
NAME OF PLAN: SECOND AVENUE ESTATES
CASE NUMBER: 11TS0179
LATEST PLAN DATE: 01/28/11
DEPT. REC'D. DATE: 02/10/11
SUBMITTAL NUMBER: ONE
REVIEW DATE: 02/28/11
RECOMMENDATION: APPROVAL W/ CONDITIONS
TABLE REVIEW: YES
1. PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS,
SIDEWALK SHALL BE PROVIDED ALONG SECOND AVENUE AND JAMES
STREET ADJACENT TO THE PROPERTY.
============================================================
REVIEW DEPARTMENT : PLANNING
REVIEWER / PHONE # : RYAN RAMSEY / 768-7592
PLAN NAME : SECOND AVENUE ESTATES
PLAN NUMBER : 11TS0179
ORIGINAL PLAN DATE : 1/28/2011
REVIEW DATE : 2/14/2011
LATEST SUBMISSION DATE : 2/3/2011
SUBMITTAL NUMBER : 1
STATUS : REVISIONS REQUIRED
TABLE REVIEW : NO
REVISIONS REQUIRED:
1) THE CORNER SIDE YARD SETBACK FOR LOT 2 SHOULD BE 25'
(BACK TO SIDE), NOT 20' AS CURRENTLY SHOWN.
2) ON THE TENTATIVE PLAT, PROVIDE DOCUMENTATION ON HOW
THE FRONT YARD SETBACK IS ESTABLISHED ON LOT 1. PROVIDE A
SURVEY MEASUREMENT OF THE NEAREST ADJACENT RESIDENCE
THAT SERVES AS THE BENCHMARK FOR ESTABLISHING THE
REDUCED SETBACK.
3) IN THE ZONING NOTE, CHANGE THE ZONING FROM "C-3" TO
"C-2".
4) CORRECT THE ORIENTATION OF THE NORTH ARROW ON THE
VICINITY MAP. IT IS CURRENTLY DIRECTED IN THE WRONG
DIRECTION.
5) PROVIDE THE OWNER PHONE NUMBER AND FAX NUMBER ON
THE TENTATIVE PLAT. ALSO PROVIDE A NAME FOR THE OWNER.
6) PROVIDE THE TOTAL LENGTH AND BEARINGS OF EACH EXTERIOR
PROPERTY LINE FOR THE SUBDIVISION.
CONDITIONS:
1) PRIOR TO THE RECORDATION OF LOT 1, THE DWELLING LABELED
AS "EXISTING DWELLING TO BE REMOVED" SHALL BE
DEMOLISHED.
NOTES:
1) INSERT THE TENTATIVE CASE NUMBER IN THE SITE STATISTICS
NOTE ON THE CONSTRUCTION PLANS. (P)
2) STANDARD CONDITIONS PER SECTION 17-62 OF THE
SUBDIVISION ORDINANCE. (P)
END OF COMMENTS.
============================================================
REVIEW DEPARTMENT : FIRE DEPARTMENT
REVIEWER / PHONE # : GREG SMITH / 804-706-2012
PLAN NAME : SECOND AVENUE ESTATES
PLAN NUMBER : 11TS0179
ORIGINAL PLAN DATE : 01/28/11
REVIEW DATE : 02/14/11
LATEST SUBMISSION DATE: 1/28/11
SUBMITTAL NUMBER : 1ST REVIEW
STATUS : APPROVED
TABLE REVIEW: YES
NOTE:
HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE TENTATIVE
PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S) REQUIRED AND THEIR
LOCATION WILL BE EVALUATED AT THE TIME OF CONSTRUCTION PLAN
REVIEW
PLAN NAME: SECOND AVENUE ESTATES
PLAN NUMBER: 11TS0179
CONSULTANT: HIGHMARK ENGINEERING
PLANNER: RYAN RAMSEY
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: L. D. PRITCHARD, JR. / 748-1028
ORIGINAL PLAN DATE: JANUARY 28, 2011
LATEST SUBMISSION DATE: JANUARY 28, 2011
REVIEW DATE: FEBRUARY 17, 2011
SUBMITTAL NUMBER: 1
STATUS: REVISIONS REQUESTED
TABLE REVIEW: NO
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS
THE FOLLOWING PRELIMINARY COMMENTS AND OBSERVATIONS
PERTAINING TO THE ABOVE REFERENCED TENTATIVE PLAT DATED
JANUARY 28, 2011, ACCEPTED FOR REVIEW BY THE PLANNING
DEPARTMENT ON FEBRUARY 3, 2011 AND RECEIVED BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT ON FEBRUARY 9,
2011.
THE EXISTENCE OF WETLANDS MUST BE ADDRESSED ON THE
TENTATIVE PLAT. THE TENTATIVE PLAT SHOULD PROVIDE THE LIMIT
OF DELINEATED WETLANDS OR PROVIDE A STATEMENT FROM A
RECOGNIZED WETLANDS EXPERT THAT THERE ARE NO WETLANDS
WITHIN THE PROJECT LIMITS.
PLEASE PROVIDE ON THE TENTATIVE PLAT THE SPECIFIC NAME
OF THE INDIVIDUAL WHO PERFORMED THE WETLANDS DELINEATION
SO THAT IT MAY BE CONFIRMED THAT HE OR SHE IS ON THE
APPROVED WETLANDS DELINEATOR LIST AND INDICATE THE STATUS
OF CONFIRMATION OF THE WETLANDS BY THE U.S. ARMY CORPS
OF ENGINEERS.
A DISCUSSION ON THE SIDEWALK IMPROVEMENTS CALLED FOR
ALONG JAMES STREET NEEDS TO BE HELD. RATHER THAN THERE
BEING A SIX INCH CURB SEPARATING THE ELEVATION OF THE
SIDEWALK FROM THE ELEVATION OF THE GUTTER WHICH TIES INTO TH
PAVEMENT. THE EXISTING SIDEWALK ALONG MUCH OF ITS LENGTH
IS VIRTUALLY FLUSH WITH THE EDGE OF PAVEMENT. THE
IMPROVEMENT TO THE SIDEWALKS MUST ALSO INCORPORATE THE
CG-9D ENTRANCES INTO LOTS 2 THROUGH 5 FRONTING ON JAMES
STREET.
WITH RESPECT TO CHESAPEAKE BAY, PLEASE SPECIFY THE
PERMITTED IMPERVIOUS SQUARE FOOTAGE ON EACH LOT WHICH WILL
RESULT IN AN IMPERVIOUS FOOTPRINT OF NO MORE THAN 16% AND
PROVIDE A TYPICAL REQUIRED LAYOUT THAT WOULD CONFORM TO THIS
BMP.
PLEASE PROVIDE THE STANDARD CHESAPEAKE BAY CALCULATIONS IF
IT IS REALIZED THAT THE ABOVE REDUCED IMPERVIOUSNESS BMP
WILL BECOME TOO RESTRICTIVE AND THE PRODUCT ENVISIONED IS
NOT FEASIBLE.
THE ACROSS THE BOARD SPECIFICATION FOR CURB AND GUTTER IS
QUESTIONED, PARTICULARLY ON SECOND AVENUE BECAUSE IT WILL
HAVE NO OTHER ENTRANCES OTHER THAN THE ENTRANCE INTO THE
EXISTING DWELLING UNIT. IF CURB AND GUTTER IS USED ON JAMES
STREET, DOES THAT MEAN THAT THE ENTIRE EXISTING SIDEWALK
WOULD BE REMOVED, PAVEMENT WIDENED, CURB AND GUTTER
PLACED AND THEN NEW SIDEWALK PLACED BEHIND THAT? WOULD
THE EXISTING DI AT THE INTERSECTION OF JAMES AND SECOND
STREET HAVE TO BE REBUILT?
PRIOR TO APPROVAL OF THE SECOND AVENUE ESTATES
TENTATIVE, THE DEVELOPER WILL SUBMIT A LETTER OF
ACKNOWLEDGEMENT OF THE CONDITION REGARDING MASONRY
EMBELLISHMENTS WITHIN THE VDOT CLEAR ZONE. THIS
ACKNOWLEDGEMENT IS THE RESPONSIBILITY OF THE DEVELOPER
AND NOT HIS REPRESENTATIVE AS HE IS ULTIMATELY RESPONSIBLE
FOR REMOVAL OF HEADWALLS IN ALL NEW SUBDIVISIONS SHOULD IT
BECOME NECESSARY. A DRAFT OF THAT LETTER IS ENCLOSED FOR
YOUR CONVENIENCE.
TENTATIVE CONDITIONS COULD INCLUDE BUT NOT BE LIMITED TO THE
FOLLOWING.
1. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS SHOWN ON THE
TENTATIVE SHALL BE INCLUDED IN THE ROAD AND DRAINAGE PLANS
THAT MUST BE APPROVED BY BOTH VDOT AND THE
ENVIRONMENTAL ENGINEERING DEPARTMENT. ROAD RIGHT-OF-
WAY SHALL BE WIDE ENOUGH TO ENCOMPASS THE PEDESTRIAN-
ACCESS FACILITIES IF THE SIDEWALKS MEET STATE CRITERIA.
2. GRADING ON INDIVIDUAL LOTS WILL BE PROVIDED SO THAT
EACH PROPERTY WILL HAVE A SURFACE DRAINAGE CONFIGURATION
FUNCTIONING INDEPENDENTLY FROM ITS ADJACENT PROPERTIES.
3. BUILDING ENVELOPES AS SHOWN ON THE TENTATIVE PLAN
ALONG WITH ANY OTHER DIRECTED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT SHALL BE PLACED ON THE
CONSTRUCTION PLANS AND SUBDIVISION PLAT.
4. THE ACHIEVEMENT OF ADEQUATE SURFACE DRAINAGE ON LOTS
WILL BE THE RESPONSIBILITY OF THE SUBDIVIDER. THE SALE OF
LOTS DOES NOT ABSOLVE THE SUBDIVIDER FROM THIS
RESPONSIBILITY PRIOR TO STATE ACCEPTANCE OF THE STREETS AND
FOR A PERIOD OF ONE YEAR AFTER THE STREETS ARE TAKEN INTO TH
STATE SYSTEM.
5. PRIOR TO RECORDATION, THE ENVIRONMENTAL ENGINEERING
DEPARTMENT MUST HAVE RECEIVED NOTIFICATION FROM VDOT
THAT IMPROVEMENTS TO THE STATE ROAD(S) INTO WHICH THIS
PROJECT INTERSECTS AND WHICH, HAVE BEEN AUTHORIZED BY AN
ISSUED LAND USE PERMIT, HAVE BEEN SATISFACTORILY
COMPLETED.
6. THE TOPOGRAPHY CONTOUR INTERVAL IN THE CONSTRUCTION
PLANS SHALL BE NO GREATER THAN ONE FOOT. SIX INCHES WOULD
BE PREFERABLE SO AS TO REVEAL THE SUBTLE TOPOGRAPHIC
DEPRESSIONS THAT EXIST ON THE PROPERTY.
7. TO PROVIDE FOR ADEQUATE DRAINAGE AND PROTECTION OF
HOME SITES, THE FOLLOWING SHALL BE ACCOMPLISHED:
A. CRAWLSPACE ELEVATIONS SHALL BE CONSTRUCTED A
MINIMUM OF 1' ABOVE ORIGINAL GROUND UNLESS A
QUALIFIED PROFESSIONAL DETERMINES THAT ADEQUATE
DRAINAGE CAN BE OBTAINED BY OTHER METHODS. LOTS
REQUIRED TO HAVE ELEVATED CRAWLSPACES SHALL BE
SHOWN ON THE CONSTRUCTION PLANS AND SO NOTED ON
FINAL CHECK AND RECORD PLATS.
B. UNLESS OTHERWISE APPROVED BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT, ALL LOTS
WILL FUNCTION INDEPENDENTLY IN THE PROVISION OF A
SURFACE DRAINAGE DESIGN FOR THE LOTS.
8. CBPA COMPLIANCE DOCUMENTATION ON THE SUBDIVISION
RECORD PLAT SHALL BE IN ACCORDANCE WITH THAT WHICH IS
SHOWN ON THE APPROVED TENTATIVE PLAT.
9. THERE IS A DRAINAGE INLET AT THE INTERSECTION OF JAMES AN
SECOND STREETS AND AN INLET IN THE PARKING LOT OF 795-612-
3636 INTO WHICH THIS PROJECT WILL DRAIN. CONSTRUCTION PLANS
SHALL INCLUDE AN ANALYSIS OF THE INLET CAPACITY AND AN
ACCOUNTING OF THE STORM SEWER ADEQUACY AND CONDITION
DOWN TO EACH STORM SEWER'S ADEQUATE RECEIVING CHANNEL.
10. OVERLAID ON THE EXISTING CONTOURS WILL BE A FILLING,
GRADING AND DRAINAGE PLAN WHICH WILL SHOW THE REQUIRED
NEW CONTOURS WHICH WILL ACHIEVE PROPER SURFACE DRAINAGE.
THIS SHALL INCLUDE CRAWL SPACE ELEVATIONS OF AT LEAST A
FOOT ABOVE SURROUNDING GROUND WITH A SPECIFICATION OF
MINIMUM CRAWL SPACE ELEVATIONS.
(PLEASE PLACE ON DEVELOPER LETTERHEAD)
(DATE)
KIRKLAND A. TURNER, DIRECTOR
CHESTERFIELD COUNTY PLANNING DEPARTMENT
P. O. BOX 40
CHESTERFIELD, VIRGINIA 23832
RE: ENTRANCE EMBELLISHMENTS (____________ TENTATIVE)
DEAR MR. TURNER:
AS DEVELOPER OF THE PROPOSED __________________
SUBDIVISION, I AM AWARE THAT THE FOLLOWING NOTE IS NOW
REQUIRED NOT ONLY ON TENTATIVES BUT ALSO ON RECORD PLATS.
"NO STRUCTURE EMBELLISHMENTS WILL BE ALLOWED ON VDOT
RIGHT-OF-WAY WITHOUT THE COMMITMENT OF, OR THE ISSUANCE OF,
A VDOT LAND USE PERMIT. WITHIN THE 10' CLEAR ZONE
(MEASURED FROM THE EDGE OF THE ROADWAY'S PAVEMENT OUT
10'), NO STRUCTURE EMBELLISHMENT WILL BE PERMITTED THAT IS
CLOSER THAN 3' FROM THE EDGE OF PAVEMENT OF THE PUBLIC
STREET OR HIGHER THAN 6" ABOVE THE SURFACE OF THE DRIVE."
I WILL DO ALL POSSIBLE TO PROVIDE THE CORRECT INFORMATION FO
BUILDERS OR CITIZENS CONSTRUCTING ENTRANCE EMBELLISHMENTS.
I AM ALSO AWARE THAT, PRIOR TO STATE ACCEPTANCE OF THE
ROADS, I AM RESPONSIBLE FOR REMOVING EMBELLISHMENTS THAT
DO NOT MEET STATE STANDARDS.
SINCERELY,
DEVELOPER NAME (PRINTED)
DEVELOPER SIGNATURE (DATE
**********************************