Subdivision Review Comments
All Subdivision Review Comments for Case # 06TS0161




For VDOT’s comments please contact Virginia Department of Transportation at (804) 674-2814 or send e-mail to Boris.Solomonov@VDOT.Virginia.gov

For Tentative Subdivision resubmittals:

1. Please note that submittal fees include the original submittal and two (2) additional reviews.

2. A letter of transmittal is required to accompany each submittal.

3. Please verify that Environmental Engineering, Fire, CDOT, VDOT, and Planning have reviewed the submittal before resubmitting. A resubmittal tendered, prior to receiving all the required departments’ review, will be counted as an additional submittal. Go to Case Selection Form or Go to Project List


 
CASE NO: 06TS0161 STATUS: PENDING APPROVAL
PROJECT NAME: HARPERS MILL SOUTH P - LAST INTERNET UPDATE: 11/21/17
SUBMITTAL TYPE: TENTATIVE SUBDIVISION
DEPARTMENT...REV..ROUTED..RESPONSE..STATUS....DATE...RVW..PHONE
ENVIR.ENGR.-: 09 09/21/17 09/28/17 COMPLETE 09/25/17 RPW 748-1028
FIRE DEPT.--: 09 09/21/17 09/28/17 ******** 09/22/17 JPJ 717-6128
HOUSE NUMBER: 08 06/22/16 07/13/16 ******** ********
MAPPING/GIS-: 08 06/22/16 07/13/16 ******** ********
PLANNING----: 09 09/21/17 09/28/17 ******** 04/25/16 ABS 751-4321
PARKS & REC.: 08 06/22/16 07/13/16 ******** ********
SCHOOL BOARD: 08 06/22/16 07/13/16 ******** ********
SOILS-------: 08 06/22/16 07/13/16 ******** ********
TRANSPORT.--: 09 09/21/17 09/28/17 COMPLETE 09/26/17 SES 751-4912
UTIL.PLAN.--: 09 09/21/17 09/28/17 ******** 06/23/16 TVM 751-4435
UTILITIES---: 09 09/21/17 09/28/17 COMPLETE 09/26/17 TVM 751-4435
UTIL.R.O.W.-: 09 09/21/17 09/28/17 ******** ********
VDOT--------: 09 09/21/17 09/28/17 ******** ********
REVIEW DEPARTMENT: UTILITIES
REVIEWER / PHONE # : TERRY MAPLES 751-4435
PLAN NAME : HARPER'S MILL SOUTH PH. TECH. CORRECTION
PLAN NUMBER: 06TS0161
ORIGINAL PLAN DATE: 5/05/04
REVIEW DATE: 9/26/17
LATEST SUBMISSION DATE: 9/20/17
SUBMITTAL NUMBER:
STATUS: APPROVED
TABLE REVIEW:
.
.
.
1. THIS OFFICE MAY REQUIRE REDESIGN OR MODIFICATIONS TO
THE PROPOSED SEWER LAYOUT, AS SHOWN ON THE LATEST
PRELIMINARY PLAN, ONCE THE FIELD WORK, GRADING PLAN
AND SEWER DESIGN HAS BEEN COMPLETED BY THE
ENGINEER AND SHOWN ON INITIAL CONSTRUCTION PLAN
SUBMITTAL FOR REVIEW AND APPROVAL. (U)
.
2. IT WILL BE THE RESPONSIBILITY OF THE SUB DIVIDER TO
MAKE CERTAIN, BY WHATEVER MEANS NECESSARY,
(I.E., ON-SITE WATER LINE LOOPING OR OFF-SITE
WATER LINE EXTENSIONS, ETC.) THAT THE DEMANDS
GENERATED BY THE PROPOSED PROJECT DO NOT
ADVERSELY AFFECT ANY PORTION OF THE PRESSURE
ZONE THE PROJECT IS LOCATED WITHIN AND THAT
THE ADDITION OF THIS PROJECT WILL NOT CAUSE ANY
AREA WITHIN THE PRESSURE ZONE TO FAIL TO COMPLY
WITH THE CHESTERFIELD COUNTY FIRE DEPARTMENT'S
REQUIRED FIRE FLOW OF 1000 GPM AT 20 PSI
RESIDUAL. (U)
REVIEW DEPARTMENT: UTILITIES
REVIEWER / PHONE # : TERRY MAPLES 751-4435
PLAN NAME: HARPER'S MILL SOUTH PHASE
PLAN NUMBER: 06TS0161
ORIGINAL PLAN DATE: 7/2/14
REVIEW DATE: 6/23/16
LATEST SUBMISSION DATE: 5/20/16
SUBMITTAL NUMBER: 9
STATUS: APPROVED
TABLE REVIEW:
NOTES:
1.THIS OFFICE MAY REQUIRE REDESIGN OR MODIFICATIONS TO
THE PROPOSED SEWER LAYOUT, AS SHOWN ON THE LATEST
TENTATIVE PLAN, ONCE THE FIELD WORK, GRADING PLAN
AND SEWER DESIGN HAS BEEN COMPLETED BY THE
ENGINEER AND SHOWN ON INITIAL CONSTRUCTION PLAN
SUBMITTAL FOR REVIEW AND APPROVAL. (U)
2.IT WILL BE THE RESPONSIBILITY OF THE SUB DIVIDER TO
MAKE CERTAIN, BY WHATEVER MEANS NECESSARY,
(I.E., ON-SITE WATER LINE LOOPING OR OFF-SITE
WATER LINE EXTENSIONS, ETC.) THAT THE DEMANDS
GENERATED BY THE PROPOSED PROJECT DO NOT
ADVERSELY AFFECT ANY PORTION OF THE PRESSURE
ZONE THE PROJECT IS LOCATED WITHIN AND THAT
THE ADDITION OF THIS PROJECT WILL NOT CAUSE ANY
AREA WITHIN THE PRESSURE ZONE TO FAIL TO COMPLY
WITH THE CHESTERFIELD COUNTY FIRE DEPARTMENT'S
REQUIRED FIRE FLOW OF 1000 GPM AT 20 PSI
RESIDUAL. (U)
GRAPHICALLY SHOW THE WATER LINE SIZE ALONG AVINGTON
DRIVE. (U)
APPROVAL OF THE TENTATIVE SUBDIVISION IS NOT AN
APPROVAL OF THE WATER AND/OR SEWER LAYOUT AS SHOWN
ON THE SUBDIVIDER'S TENTATIVE SUBDIVISION PLAT. THE
REVIEW OF THE TENTATIVE WATER AND/OR SEWER LAYOUT IS
BEING PERFORMED TO IDENTIFY ANY POTENTIAL
CONTROVERSIAL PROBLEMS. THE SUBDIVIDER
UNDERSTANDS THAT AS THE FINAL DETAILS OF THE PROPOSED
DEVELOPMENT ARE REVIEWED, THE UTILITIES DEPARTMENT
MAY REQUIRE CHANGES TO THE ORIGINAL LAYOUT AS
DEEMED IN THE BEST INTEREST OF THE COUNTY, WHICH
ULTIMATELY BENEFITS THE DEPARTMENT'S CUSTOMERS AS
USERS OF THE PUBLIC WATER/SEWER SYSTEMS. (U)
JUNE 19, 2006 MAY 30, 2006
TENTATIVE NAME: HARPERS MILL SOUTH PHASE
CASE #: 06TS0161
THE TRANSPORTATION DEPARTMENT HAS THE FOLLOWING COMMENTS ON
THE TENTATIVE PLAN RECEIVED IN THE PLANNING DEPT. ON
MAY 30, 2006:
SAME COMMENTS AS 04TS0359.
REVIEW DEPARTMENT: TRANSPORTATION
REVIEWER/PHONE #: LOUIS CORDE / 768-7386
PLAN NAME: HARPERS MILL - SOUTH PHASE
PLAN NUMBER: 06TS0161
ORIGINAL PLAN DATE: 05/05/04
REVIEW DATE: 07/18/09 06/29/09
LATEST SUBMISSION DATE: 06/26/09
SUBMITTAL NUMBER: 2
STATUS: APPROVED WITH CONDITIONS
THE TRANSPORTATION DEPARTMENT HAS THE FOLLOWING COMMENTS:
1. A PHASING PLAN FOR REQUIRED ROAD IMPROVEMENTS SHALL BE
SUBMITTED TO AND APPROVED BY TRANSPORTATION PRIOR TO ROAD
CONSTRUCTION PLAN APPROVAL FOR THE FIRST SECTION OF THIS
TENTATIVE.
2. ROAD CONSTRUCTION PLANS FOR HARPERS MILL PARKWAY SHALL
INCLUDE A PRELIMINARY DESIGN FOR HARPERS MILL PARKWAY FROM
THE WESTERN PROPERTY LINE TO BALDWIN CREEK ROAD AND FROM THE
EASTERN PROPERTY LINE TO WINTERPOCK ROAD. THIS PRELIMINARY
DESIGN SHALL AT A MINIMUM INCLUDE CENTERLINE PROFILE,
HORIZONTAL AND VERTICAL CURVE DATA, THE LIMITS OF CUT AND
FILL AND A STRUCTURE SIZE FOR ALL CREEK CROSSINGS.
3. ANY PRIVATE SIDEWALKS ALONG OTTERDALE ROAD AND HARPERS
MILL PARKWAY SHALL BE CONSTRUCTED TO VDOT STANDARDS. A
METHOD AND MEANS OF MAINTAINING ALL PRIVATE SIDEWALKS SHALL
BE SUBMITTED TO AND APPROVED BY THE TRANSPORTATION
DEPARTMENT PRIOR TO RECORDATION OF THE FIRST SECTION OF THIS
TENTATIVE.
4. ADDITIONAL PAVEMENT SHALL BE CONSTRUCTED ALONG OTTERDALE
ROAD TO PROVIDE LEFT AND RIGHT TURN LANES AT
A. LONGLANDS ROAD AND FORGE GATE DRIVE
B. BEYER DRIVE
C. ACCESS FOR SCHOOL SITE
D. WHOLEWAY ROAD AND AVINGTON DRIVE
E. NIDDERDALE DRIVE
F. VERNEHAM DRIVE
5. ADDITIONAL PAVEMENT SHALL BE CONSTRUCTED ON HARPERS MILL
PARKWAY TO PROVIDE LEFT AND RIGHT TURN LANES AT:
A. VERNEHAM DRIVE
B. TALLAND DRIVE
C. LYFORD LANE AND BELLHANGER DRIVE
D. CENTERLINE DRIVE AND RECREATIONAL AREA
E. DEELEY LANE AND CHAPEL SOUND LANE
F. ACCESS FOR SCHOOL SITE
6. ADDITIONAL PAVEMENT SHALL BE CONSTRUCTED ON HARPERS MILL
PARKWAY TO PROVIDE A LEFT TURN LANE AT GRAPHAL ROAD TO THE
SOUTH, EASINDWOLD LANE TO THE SOUTH AND THRISK LANE.
7. ADDITIONAL PAVEMENT SHALL BE CONSTRUCTED ON HARPERS MILL
PARKWAY TO PROVIDE A RIGHT TURN LANE AT:
A. PULLMAN LANE
B. HERTON CROSS ROAD
C. HIGHMAKER COURT TO THE NORTH
D. PETERWIN LANE
E. SAWPER ROAD
F. CROWLET DRIVE
PLEASE NOTE THAT TOTAL NUMBER OF LOTS SHOWN ON THIS OVERALL
TENTATIVE EQUALLS THE ALOWABLE DENSITIES AS DEFINED IN
PROFFERED CONDITION #11 OF ZONING RELATIVE TO ALLOWABLE
TRANSPORTATION DENSITIES. THE REVISED OVERALL PEDESTRIAN
ACCESS AND TRAFFIC DENSITY PLAN DATED AUGUST 12, 2005 SHALL
BE MADE PART OF THE APPROVAL FOR THIS TENTATIVE. THIS
REVISED OVERALL PEDESTRIAN ACCESS AND TRAFFIC DENSITY PLAN
HAS AN APPROVED DENSITIES TABLE IN THE BOTTOM LEFT CORNER OF
THE PLAN AND AS SINGLE FAMILY AND AGE RESTRICTED NUMBERS
ASSIGNED TO THE FIVE PHASES SHOWN ON THIS PLAN. THIS OVERALL
PLAN CAN BE REVISED AND APPROVED ADMINISTRATIVELY BY CDOT
FOR ANY CHANGES THAT MAY BE NECESSARY ON OTHER TENTATIVES
WITHIN THE PROJECT WITHOUT THIS TENTATIVE PLAN HAVING TO BE
RESUBMITTED FOR APPROVAL SO LONG AS THERE ARE NO MAJOR
REVISIONS MADE TO THIS TENTATIVE THAT AFFECT THE OVERALL
DENSITY OR PEDESTRIAN PLAN.
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: HARPER'S MILL SOUTH, MAJOR CHANGE
CASE NUMBER: 06TS0161
LATEST PLAN DATE: 07/02/14
DEPT. REC'D. DATE: 07/16/14
SUBMITTAL NUMBER: FOUR
REVIEW DATE: 08/05/14
RECOMMENDATION: NOT APPROVED
TABLE REVIEW: YES
1. SIDEWALK SHOULD BE CONTINUED ALONG BOTH SIDES OF
AVINGTON DRIVE BETWEEN EMBERTAN ROAD AND OTTERDALE ROAD.
2. THE "TRANSPORTATION IMPROVEMENTS PHASING PLAN" DATED
JANUARY 6, 2006 SHALL BE REVISED AND SUBMITTED TO AND
APPROVED BY CDOT PRIOR TO ROAD CONSTRUCTION PLAN APPROVAL
FOR ANY SECTIONS OF THIS TENTATIVE.
. ADDITIONAL PAVEMENT SHALL BE CONSTRUCTED ALONG THE
EXTENSION OF OTTERDALE ROAD TO PROVIDE LEFT AND RIGHT TURN
LANES AT AVINGTON DRIVE AND VERNEHAM DRIVE.
4. ADDITIONAL PAVEMENT SHALL BE CONSTRUCTED ALONG HARPER'S
MILL PARKWAY TO PROVIDE LEFT AND RIGHT TURN LANES AT
VERNEHAM DRIVE.
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: HARPER'S MILL SOUTH, MAJOR CHANGE
CASE NUMBER: 06TS0161
LATEST PLAN DATE: 12/15/14
DEPT. REC'D. DATE: 12/18/14
SUBMITTAL NUMBER: FIVE
REVIEW DATE: 01/12/15
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
NOTE: THE "TRANSPORTATION IMPROVEMENTS PHASING PLAN" DATED
JANUARY 6, 2006 SHALL BE REVISED AND SUBMITTED TO AND
APPROVED BY CDOT PRIOR TO ROAD CONSTRUCTION PLAN APPROVAL
FOR ANY SECTIONS OF THIS TENTATIVE.
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: HARPER'S MILL SOUTH, MAJOR CHANGE
CASE NUMBER: 06TS0161
LATEST PLAN DATE: 03/05/15
DEPT. REC'D. DATE: 03/25/15
SUBMITTAL NUMBER: SIX
REVIEW DATE: 04/21/15
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
NOTE: THE "TRANSPORTATION IMPROVEMENTS PHASING PLAN" DATED
JANUARY 6, 2006 SHALL BE REVISED AND SUBMITTED TO AND
APPROVED BY CDOT PRIOR TO ROAD CONSTRUCTION PLAN APPROVAL
FOR ANY SECTIONS OF THIS TENTATIVE.
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: HARPER'S MILL SOUTH, MAJOR CHANGE
CASE NUMBER: 06TS0161
LATEST PLAN DATE: 03/03/2016
DEPT. REC'D. DATE: 03/29/2016
SUBMITTAL NUMBER: SEVEN
REVIEW DATE: 03/29/2016
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: HARPER'S MILL SOUTH, MAJOR CHANGE
CASE NUMBER: 06TS0161
LATEST PLAN DATE: 03/30/2016
DEPT. REC'D. DATE: 04/05/2016
SUBMITTAL NUMBER: EIGHT
REVIEW DATE: 04/13/2016
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: HARPER'S MILL SOUTH, MAJOR CHANGE
CASE NUMBER: 06TS0161
LATEST PLAN DATE: 05/20/2016
DEPT. REC'D. DATE: 06/22/2016
SUBMITTAL NUMBER: NINE
REVIEW DATE: 07/12/2016
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
REVIEW DEPARTMENT: CHESTERFIELD TRANSPORTATION DEPARTMENT
REVIEWER/PHONE#: STEVEN E. SIMONSON, P.E. (804)748-1037
NAME OF PLAN: HARPER'S MILL SOUTH, TECH CORRECTION
CASE NUMBER: 06TS0161
LATEST PLAN DATE: 09/20/2017
DEPT. REC'D. DATE: 09/25/2017
SUBMITTAL NUMBER: TEN
REVIEW DATE: 09/26/2017
RECOMMENDATION: APPROVED
TABLE REVIEW: YES
.
1. PROVIDE A REVISION DATE.
2. RESUBMIT PLAT AT 1 INCH EQUALS 100 FEET AND PROVIDE DI-
MENSIONS OF ALL LOTS, OPEN SPACE AND BUFFERS.
THIS HAS BEEN A CURSORY REVIEW.
REVIEW DEPARTMENT : PLANNING
REVIEWER / PHONE # : SUSAN BLOCHER/768-7592
PLAN NAME & NUMBER : HARPER'S MILL-06TS0161
ADDRESS :
ORIGINAL PLAN DATE : MAY 5, 2004
REVISION DATE : MARCH 30, 2006
LATEST SUBMISSION DATE : MAY 26, 2006
STATUS : NOT APPROVED
1. PROVIDE A REVISION DATE.
2. PARK AND RIDE LOTS ARE PERMITTED IN TRACT H. A 50 FOOT
BUFFER IS REQUIRED AROUND THE PERIMETER OF ANY PARK AND RIDE
LOT EXCEPT WHERE ADJACENT TO OFFICE OR COMMERCIAL USES. THE
BUFFER SHALL CONFORM TO THE ZONING ORDIANCE FOR 50 FOOT BUFF
ERS UNLESS MODIFIED BY THE PLANNING COMMISSION. NO PARK AND
RIDE LOTS SHALL CONTAIN MORE THAN 250 PARKING SPACES UNLESS
MODIFIED AT TIME OF SCHEMATIC PLAN APPROVAL.
PER CONDITION 10 OF ZONING CASE 02SN0209, THE BUFFERS REQUIR
ED BY SECTION 17-70 OF THE SUBDIVISION ORDINANCE ALONG ROADS
SHALL BE LOCATED WITHIN RECORDED OPEN SPACE.
REVIEW DEPARTMENT : PLANNING
REVIEWER / PHONE # : AMY SOMERVELL / 751-4321
PLAN NAME : ADJUSTED HAPER'S MILL SOUTH
PLAN NUMBER : 06TS0161
ORIGINAL PLAN DATE : 5-5-04
REVIEW DATE : 7-16-09
LATEST SUBMISSION DATE : 6-26-09
SUBMITTAL NUMBER : 1
STATUS : CORRECTIONS REQUIRED
PLEASE PROVIDE AN OVERALL DENSITY SHEET SHOWING THE NUMBER
OF LOTS TENTATIVELY APPROVED AND THE TOTAL COMERCIAL/OFFICE
USES AS THIS REDUCES THE PERMITTED DWELLING PER ACRE
CLUSTER DEVELOPMENT ALLOWS A MINIMUM OF 6,000 SQ FT AND A
MAXIMUM OF 12,000 SQ FT WITH LOT SIZES DIFFERING NO MORE
THAN 2,000 SQ FT.UNLESS A CONCEPTUAL PLAN ADDRSSING THE
TRANSITION IS APPROVED. THERE ARE SEVERAL LOTS ADJACENT TO
EACH OTHER WITH A GREATER DIFFERENCE OF 2,000 SQ FT.
PLEASE ADJUST THE LOT AREA TO BE MORE COMPATIBLE.
WHERE LOTS ARE REDUCED BELOW THE MINIMUM 12,000 SQ FT THE
ORDINANCE REQUIRES THE COMPARABLE AMOUNT OF OPEN SPACE TO
BE PROVIDED FOR THE BENEFIT OF THE CLUSTER DEVELOPMENT.
PLEASE PROVIDE REQUIRED CALCULATION WITH THE CLUSTER AREA
AND GRAPHICALLY SHOW THE OPEN SPACE FOR THE BENEFIT OF THE
CLUSTER DEVELOPMENT.
PROVIDE THE ACREAGE OF THE REQUIRED FOCAL POINT. REQUIRED
TO BE A MINIMUM OF .75 EXCLUSIVE OF THE REQUIRED OPEN SPACE
FOR THE REDUCED LOTS.ALSO PROVIDE A FOCAL POINT PLAN SHOWING
PROPOSED AMENITIES AND LANDSCAPING. FOCAL POINT SHOULD BE
LOCATED AT THE ENTRANCE OF THE CLUSTER. CURRENT LOCATION
IS NOT AT THE ENTRANCE. SHOULD BE REVISED.
PROVIDE STREET TREE, STREET LIGHTING AND UNIT LANDSCAPING
PLAN FOR PROPOSED CLUSTER AREA. VERIFY PROPOSED MATERIALS
FOR INDIVIDUAL LOT DRIVEWAY 'HARDSCAPED' PLAN
SEVERAL LOTS DO NOT HAVE A MINIMUM OF 50' OF ROAD FRONTAGE
ALONG A LOCAL STREET OR 30' ON THE BULB OF THE CUL DE SAC.
PLEASE ADJUST THE LOTS ACCORDINGLY.
NOTE: PERCENTAGE OF LOT COVERAGE IS 50% FOR CLUSTER LOTS
THIS PLAT INDICATES ALL 248 LOTS ARE AGE RESTRICTED. IS THIS
CORRECT OR JUST THE CLUSTER?
ALL PREVIOUS STANDARD CONDITIONS OF THE APPROVED TENTATIVE
SUCH AS BUFFER REQUIREMENTS, HOA REQUIREMENTS ETC.....STILL
APPLY TO THIS REVIEW.
REVIEW DEPARTMENT : PLANNING
REVIEWER / PHONE # : AMY SOMERVELL / 751-4321
PLAN NAME : HARPERS MILL SOUTH MAJOR CHANGE
PLAN NUMBER : 06TS0161
ORIGINAL PLAN DATE : 7-2-14
REVIEW DATE : 7-30-14
LATEST SUBMISSION DATE : 7-14-14
SUBMITTAL NUMBER : 1
STATUS : CORRECTIONS REQUIRED
TABLE REVIEW : NO
1.IN THE GENERAL NOTES - PROVIDE THE TRACT(S) THAT RELATE
TO THIS PORTION OF HARPERS MILL. SHOW THE TRACT BOUNDARY
IF MORE THAN ONE APPLY.
2.VERIFY THE USE - IS THIS A MIX OF SF AND CLUSTER LOTS?
3.NOTE TEXTUAL STATEMENT #2 WHICH RESTRICTS INCOMPATIBLE
LOT SIZES BEING ADJACENT TO ONE ANOTHER. THERE ARE
SEVERAL LOCATIONS WITHIN THIS PLAN WHERE THE LOT AREA
EXCEEDS 2,000 SQ FT BETWEEN LOT SIZES WITHOUT AN ACCEPTABLE
TRANSITION. TRADITIONAL SF AND CLUSTER SHALL HAVE ADEQUATE
TRANSITIONS BETWEEN THE USE. REVISE
4. GRAPHICALLY SHOW THE 100' BUFFER ALONG THE ARTERIAL
STREETS.
5. PER THE SIDEWALK POLICY, SIDEWALKS ARE REQUIRED ALONG
OTTERDALE, HARPERS MILL PARKWAY AND VERNEHAM DRIVE.
6.PROVIDE STREET TREE AND LIGHTING PLAN
7. PROVIDE A TREE CANOPY PLAN
8. PROVIDE A UNIT LANDSCAPE PLAN AND DRIVEWAY MATERIALS PLAN
9. PROVIDE FOCAL POINT PLAN FOR EACH ENTRANCE.
10. IS A FOCAL POINT PLANNED FOR THE EMBERTAN ROAD ENT?
TENTATIVE CONDITION:
1. FOCAL POINT SHALL BE INSTALLED CONCURRENT WITH EACH
SECTION RECORDED.
NOTES:
1. HOA DOCUMENTS REQUIRED AND SHALL MEET NEW ORDINANCE
STANDARDS OF 19-559.
2. A SECOND PUBLIC STREET ACCESS IS REQUIRED FOR THIS
DEVELOPMENT.
REVIEW DEPARTMENT : PLANNING
REVIEWER / PHONE # : AMY SOMERVELL / 751-4321
PLAN NAME : HARPERS MILL SOUTH PHASE
PLAN NUMBER : 06TS0161
ORIGINAL PLAN DATE : 5/5/04
REVIEW DATE : 1-20-15
LATEST SUBMISSION DATE : 12-17-14
SUBMITTAL NUMBER :4
STATUS :PENDING
TABLE REVIEW : NO
1. THIS PLAN SHOWS A 50' BUFFER WHERE A 100' BUFFER IS
REQUIRED. AS INDICATED ON THE RESPONSE COMMENTS VESTING
DETERMINATION WILL BE SUBMITTED. THIS PLAN IS PENDING A
VESTING DETERMINATION OR RESUBMITTAL TO CONFORM WITH
ORDINANCE REQUIREMENTS.
2. THE FOCAL POINT/AMENITY AREAS ONLY APPEARS TO HAVE
TRAILS AND BENCHES. PER THE ZONING CASE THE
FOCAL POINTS SHALL HAVE HARDSCAPED AREAS WITH BENCHES
AND OTHER AMENITIES THAT ACCCOMMODATE OUTDOOR GATHERING.
PLAN SUBMITTED DOES NOT REFLECT A HARDSCAPED AREA OR ANY
GATHERING AREAS OTHER THAN BENCHES. ADDITIONALLY THE.76
FOCAL POINT AREA ALONG AVINGTON DRIVE DOES NOT APPEAR TO BE
PART OF THE REVIEW. SUBMIT AN APPROVABLE PLAN WHICH CAN BE
RE-VISITED AT A LATER DATE.
ONCE THE ABOVE HAS BEEN ADDRESSED, THE FOLLOWING WILL BE
PART OF THE PRELIMINARY CONDITIONS:
1. AT TIME OF CONSTRUCTION PLAN SUBMITTAL THE FOLLOWING
SHALL BE PROVIDED:
A. STREET TREE PLAN
B. LIGHTING PLAN
C. TREE CANOPY PLAN
D. UNIT LANDSCAPING PLAN TO INCLUDE DRIVEWAY MATERIALS
REVIEW DEPARTMENT : PLANNING
REVIEWER / PHONE # : AMY SOMERVELL / 751-4321
PLAN NAME : HARPERS MILL SOUTH MAJOR CHANGE
PLAN NUMBER : 06TS0161
ORIGINAL PLAN DATE : 5-5-04
REVIEW DATE : 5-13-15
LATEST SUBMISSION DATE : 3-23-15
SUBMITTAL NUMBER : 7
STATUS : ADDITIONAL INFORMATION REQUIRED
F
1. AT TIME OF CONSTRUCTION PLAN SUBMITTAL THE FOLLOWING
SHALL BE PROVIDED:
A. THE FOCAL POINT PLAN SHALL BE DETAILED IN THE CP AND
SHALL BE BUILT CONCURRENT WITH EACH SECTION.
B. STREET TREE PLAN
C. LIGHTING PLAN
D. UNIT LANDSCAPING PLAN TO INCLUDE DRIVEWAY MATERIALS
NOTES:
1. FOCAL POINT SHALL BE INSTALLED CONCURRENT WITH EACH
SECTION RECORDED.
2. HOA DOCUMENTS REQUIRED AND SHALL MEET NEW ORDINANCE
STANDARDS OF 19-559.
3. A SECOND PUBLIC STREET ACCESS IS REQUIRED FOR THIS
DEVELOPMENT.
4. PER THE SIDEWALK POLICY, SIDEWALKS ARE REQUIRED ALONG
OTTERDALE, HARPERS MILL PARKWAY AND VERNEHAM DRIVE
IS THE VESTING DETERMINATION STILL PENDING OR HAS THIS BEEN
IF WITHDRAWN THEN THE NOTE REGARDING THE BUFFER AS ITRELATES
VESTING NEEDS TO BE REMOVED.
-----------------------------------------------------------
REVIEW DEPARTMENT : PLANNING
REVIEWER / PHONE # :WHIT KIRTLEY /706-7691
PLAN NAME : HARPERS MILL SOUTH PH TECH CORR
(ROAD NAME CHANGES)
PLAN NUMBER : 06TS0161 TECHNICAL CORRECTION
ORIGINAL PLAN DATE : 5-5-04
REVIEW DATE : 4-25-16
LATEST SUBMISSION DATE : 3-31-16
SUBMITTAL NUMBER : 1 - TECHNICAL CORRECTION
STATUS : APPROVED
NOTE:
THIS APPROVAL IS SOLELY FOR ROAD NAME CHANGES PROPOSED IN
LETTER DATED 3/29/16.
REVIEW DEPARTMENT: FIRE
REVIEWER / PHONE#: JOHN PAUL JONES / 717-6128
NAME OF PLAN: HARPERS MILL SOUTH
SUBDIVISION PLAN NUMBER: 06TS0161
LATEST PLAN DATE: 03/04/05 (05/22/06)
DEPARTMENT RECEIVED DATE: 05/31/06
SUBMITTAL NUMBER: 2ND REVIEW
REVIEW DATE: 06/08/06
RECOMMENDATION: APPROVED
COMMENTS:
THE PLAN IS ACCEPTABLE AS SUBMITTED.
NOTE: HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE
TENTATIVE PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S) REQUIRED
AND THEIR LOCATION WILL BE EVALUATED AT THE TIME OF
CONSTRUCTION PLAN REVIEW.
NOTE: COMPLIANCE WITH 17-76 OF THE SUBDIVISION ORDINANCE
IN THE CHESTERFIELD COUNTY CODE SHALL BE MAINTAINED
AT ALL TIMES.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE DEPARTMENT
REVIEWER / PHONE#: KIM LESTERS / 748-1489
NAME OF PLAN: HARPERS MILL SOUTH
SUBDIVISION PLAN NUMBER: 06TS0161
LATEST PLAN DATE: 06/15/09
DEPARTMENT RECEIVED DATE: 006/29/09
SUBMITTAL NUMBER: 3RD REVIEW
REVIEW DATE: 07/09/09
COMMENTS:
NOTE: HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE
TENTATIVE PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S) REQUIRED
AND THEIR LOCATION WILL BE EVALUATED AT THE TIME OF
CONSTRUCTION PLAN REVIEW.
NOTE: COMPLIANCE WITH 17-76 OF THE SUBDIVISION ORDINANCE
IN THE CHESTERFIELD COUNTY CODE SHALL BE MAINTAINED
AT ALL TIMES.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE DEPARTMENT
REVIEWER / PHONE#: KIM LESTERS / 748-1489
NAME OF PLAN: HARPERS MILL SOUTH
SUBDIVISION PLAN NUMBER: 06TS0161
LATEST PLAN DATE: 7/02/14
DEPARTMENT RECEIVED DATE: 7/17/14
SUBMITTAL NUMBER: 4TH REVIEW
REVIEW DATE: 7/21/14
COMMENTS:
NOTE: HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE
TENTATIVE PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S) REQUIRED
AND THEIR LOCATION WILL BE EVALUATED AT THE TIME OF
CONSTRUCTION PLAN REVIEW.
NOTE: COMPLIANCE WITH 17-76 OF THE SUBDIVISION ORDINANCE
IN THE CHESTERFIELD COUNTY CODE SHALL BE MAINTAINED
AT ALL TIMES.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE DEPARTMENT
REVIEWER / PHONE#: KIM LESTERS / 748-1489
NAME OF PLAN: HARPERS MILL SOUTH
SUBDIVISION PLAN NUMBER: 06TS0161
LATEST PLAN DATE: 12/15/14
DEPARTMENT RECEIVED DATE: 12/22/14
SUBMITTAL NUMBER: 5TH REVIEW
REVIEW DATE: 12/30/14
COMMENTS:
NOTE: COMPLIANCE WITH 17-76 OF THE SUBDIVISION ORDINANCE
IN THE CHESTERFIELD COUNTY CODE SHALL BE MAINTAINED QUIRED
AT ALL TIMES.ATION WILL BE EVALUATED AT THE TIME OF
CONSTRUCTION PLAN REVIEW.
NOTE: COMPLIANCE WITH 17-76 OF THE SUBDIVISION ORDINANCE
IN THE CHESTERFIELD COUNTY CODE SHALL BE MAINTAINED
AT ALL TIMES.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE DEPARTMENT
REVIEWER / PHONE#: KIM LESTERS / 748-1489
NAME OF PLAN: HARPERS MILL SOUTH
SUBDIVISION PLAN NUMBER: 06TS0161
LATEST PLAN DATE: 3/5/15
DEPARTMENT RECEIVED DATE: 3/25/15
SUBMITTAL NUMBER: 6TH REVIEW
REVIEW DATE: 4/2/15
COMMENTS:
NOTE: HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE
TENTATIVE PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S) REQUIRED
AND THEIR LOCATION WILL BE EVALUATED AT THE TIME OF
CONSTRUCTION PLAN REVIEW.
NOTE: COMPLIANCE WITH 17-76 OF THE SUBDIVISION ORDINANCE
IN THE CHESTERFIELD COUNTY CODE SHALL BE MAINTAINED AT ALL
TIMES.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE DEPARTMENT
REVIEWER / PHONE#: KIM LESTER / 748-1489
NAME OF PLAN: HARPERS MILL SOUTH TECH. CORRECTION
SUBDIVISION PLAN NUMBER: 06TS0161
LATEST PLAN DATE: 3/3/16
DEPARTMENT RECEIVED DATE: 3/29/16
SUBMITTAL NUMBER: 7TH REVIEW
REVIEW DATE: 3/29/16
COMMENTS: APPROVED
NOTE: HYDRANT REQUIREMENTS AND LOCATIONS SHOWN ON THE
TENTATIVE PLAN MAY NOT BE ACCEPTABLE. HYDRANT(S) REQUIRED
AND THEIR LOCATION WILL BE EVALUATED AT THE TIME OF
CONSTRUCTION PLAN REVIEW.
NOTE: COMPLIANCE WITH 17-76 OF THE SUBDIVISION ORDINANCE
IN THE CHESTERFIELD COUNTY CODE SHALL BE MAINTAINED
AT ALL TIMES.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE DEPARTMENT
REVIEWER / PHONE#: KIM LESTER / 748-1489
NAME OF PLAN: HARPERS MILL SOUTH TECH. CORRECTION
SUBDIVISION PLAN NUMBER: 06TS0161
LATEST PLAN DATE: 3/30/16
DEPARTMENT RECEIVED DATE: 4/4/16
SUBMITTAL NUMBER: 8TH REVIEW
REVIEW DATE: 4/7/16
COMMENTS: APPROVED
THIS SUBMITTAL IS A SUBSTITUTE FOR CHANGING STREET NAMES.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE DEPARTMENT
REVIEWER / PHONE#: KIM LESTER / 748-1489
NAME OF PLAN: HARPERS MILL SOUTH TECH. CORRECTION
SUBDIVISION PLAN NUMBER: 06TS0161
LATEST PLAN DATE: 5/20/16
DEPARTMENT RECEIVED DATE: 6/22/16
SUBMITTAL NUMBER: 9TH REVIEW
REVIEW DATE: 6/23/16
COMMENTS: APPROVED
THE FIRE DEPARTMENT HAS NO ISSUES WITH THE ROAD NAME CHANGES
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
REVIEW DEPARTMENT: FIRE DEPARTMENT
REVIEWER / PHONE#: KIM LESTER - (804) 748-1489
NAME OF PLAN: HARPERS MILL SOUTH - TECHNICAL CORRECTION
SUBDIVISION PLAN NUMBER: 06TS0161
LATEST PLAN DATE: 9/20/17
DEPARTMENT RECEIVED DATE: 9/22/17
SUBMITTAL NUMBER: 1ST REVIEW
REVIEW DATE: 9/22/17
RECOMMENDATION: APPROVED
COMMENTS:
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PLAN NAME: HARPERS MILL SOUTH PHASE V (AMENDED)
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: L. D. PRITCHARD, JR. / 748-1028
PLAN NUMBER: 06TS0161
ORIGINAL PLAN DATE: MARCH 4, 2005
LATEST SUBMISSION DATE: MARCH 4, 2005
UPDATED: JUNE 15, 2009
REVIEW DATE: JULY 27, 2006
SUBMITTAL NUMBER: 1
STATUS: REVISIONS REQUESTED
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS THE
FOLLOWING PRELIMINARY COMMENTS AND OBSERVATIONS
PERTAINING TO THE ABOVE REFERENCED TENTATIVE PLAT REVISED
DATED JUNE 15, 2009, RECEIVED ON JUNE 26, 2009 AND BY THE
PLANNING DEPARTMENT AND ON JUNE 29, 2009 BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT.
WITH RESPECT TO ROAD NAMES, RICHMOND REGIONAL
PLANNING DISTRICT COMMISSION ROAD NAME APPROVAL
EXPIRES AFTER 24 MONTHS. THAT IS THE CASE FOR THIS
TENTATIVE PLAT. PLEASE PROVIDE UPDATED RRPDC ROAD
NAME APPROVALS FOR THE ROADS WITHIN THIS TENTATIVE PLAT.
ALSO, THE ROAD NAME SUTCOMB PLACE IS A ROAD NAME
DUPLICATION WITH SUTCOMB ROAD. PLEASE BE REMINDED
THAT ROAD NAME DUPLICATIONS CAN ONLY OCCUR WHEN IT IS A
NON LINKING CUL DE SAC. SUTCOMB PLACE WILL NEED A NEW
ROAD NAME APPROVED BY RRPDC AND SHOULD BE ROAD,
AVENUE, DRIVE, STREET, ETC.
WITH RESPECT TO CBPA COMPLIANCE, NOTE #7 IS NO LONGER
ACCURATE IN LIGHT OF THE ENDING OF THE UPPER SWIFT CREEK
REGIONAL STORMWATER MASTER PLAN. PLEASE ADDRESS.
ALSO, THE OVERALL PROJECT CBPA MASTER PLAN BY JORDAN
CONSULTING ENGINEERS MUST BE REVISED AND APPROVED BY
THIS DEPARTMENT PRIOR TO TENTATIVE PLAT APPROVAL. THERE
IS A CONSIDERABLE UPGRADE IN THE LEVEL OF IMPERVIOUSNESS
BROUGHT ABOUT BY THIS PROPOSAL. THE CBPA COMPLIANCE
PLAN MUST BE REVISED ACCORDINGLY AND SUBMITTED TO
ADAM MARSHALL FOR APPROVAL.
IN ACCORDANCE WITH THE SETTLEMENT AGREEMENT BETWEEN
CHESTERFIELD COUNTY AND THE STATE ATTORNEY GENERAL'S
OFFICE, PLEASE HAVE A PERENNIALITY DETERMINATION
PERFORMED AND PROVIDE RESOURCE PROTECTION AREAS TO THE
MAXIMUM EXTENT PRACTICABLE WITHOUT LOSING DENSITY.
THE PERENNIALITY DETERMINATIONS CAN BE PERFORMED AT NO
CHARGE BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT,
OFFICE OF WATER QUALITY. THERE IS A REQUEST FORM THAT
CAN BE DOWNLOADED FROM THE ENVIRONMENTAL
ENGINEERING WEB SITE. THE RPA INFORMATION SHOULD ALSO
BE LAYERED ONTO THE JORDAN CONSULTING ENGINEERING
CHESAPEAKE BAY WATER QUALITY COMPLIANCE PLAN SO
THAT IT CAN BE INSURED THAT NO RPA DETERMINATION WILL
ALTER THE PRESENTLY PROPOSED PLACEMENT OF STORMWATER
BMPS.
PLEASE PROVIDE A COPY OF THE OFFICE OF WATER QUALITY'S
CONFIRMATION OF THE PERENNIALITY SO THAT THE EXTENT TO
WHICH THE RPAS ARE SHOWN ON THE TENTATIVE PLAT CAN BE
CORRELATED WITH WHAT HAS BEEN CONFIRMED TO BE
PERENNIAL STREAMS.
THE GPS COORDINATE VALUES FOR THE POINT OF PERENNIAL
FLOW SHALL BE SHOWN ON THE TENTATIVE PLAT, IF APPLICABLE.
THE LOCATION OF ANY STORMWATER BMPS THAT ARE SHOWN
ON THE JORDAN CONSULTING ENGINEERS OVERALL CBPA PLAN
WHICH ARE SITUATED WITHIN THE LIMITS OF THIS TENTATIVE PLAT
SHOULD BE SHOWN.
PLEASE CLARIFY THE SIDEWALK MATERIAL OUTSIDE OF THE RIGHTS
OF WAY.
PLEASE PROVIDE A LETTER FROM THE RECOGNIZED WETLAND
EXPERT REGARDING THE ACCURACY OF THE WETLANDS
DELINEATION PORTRAYED ON THE TENTATIVE PLAT THAT IS THE
BASIS FOR THE RPA-LIMITS ESTABLISHMENT. SUGGESTED
WORDING IS, "I HAVE VIEWED THE TENTATIVE PLAT FOR
HARPERS MILL SUBDIVISION SOUTH, PHASE V, REVISED DATED
JUNE 15, 2009 BY TIMMONS GROUP AND FIND THAT IT
PORTRAYS AN ACCURATE REPRESENTATION OF MY FIELD
DELINEATION OF THE WETLANDS LOCATED ADJACENT TO
PERENNIAL STREAMS.
PLEASE DARKEN THE TOPOGRAPHY CONTOUR LINES AND MAKE
SURE THAT THERE ARE ENOUGH ANNOTATIONS OF ELEVATION ON
THE NEXT SUBMITTAL.
THE TOTAL AREA OF HARPERS MILL SOUTH ON THE PREVIOUSLY
APPROVED TENTATIVE PLAT WAS 111.64 ACRES. THE TOTAL
DEVELOPMENT ACREAGE IS NOW 113.09 ACRES. PLEASE
ADDRESS THIS DISCREPANCY. DOES IT AFFECT THE OVERALL
PROJECT ACREAGE?
TENTATIVE CONDITIONS:
1. AN OVERALL FILLING, GRADING AND DRAINAGE PLAN.
SHALL BE PROVIDED IN THE CONSTRUCTION PLANS TO ASSURE
THAT THE LOTS WHICH ARE WITHIN THE EXISTING VEHICULAR
ACCESS WAYS HAVE GROUND CONFIGURATIONS AND STORM
DRAINAGE COORDINATION WITH THE MAJORITY OF THE
PROJECT WHICH IS OUTSIDE OF THE FORMER RAILROAD
CORRIDOR. THIS IS NOT AN ISSUE TO BE ADDRESSED BY
INDIVIDUAL BUILDERS BUT SHALL BE MADE A PART OF THE
ENGINEERING OF THE CONSTRUCTION PLANS. AFFECTED
LOTS WILL BE DESIGNATED WITH AN NBP.
2. PER SECTION 8-4 OF THE EROSION CONTROL
ORDINANCE, PRIOR TO THE ISSUANCE OF A LAND
DISTURBANCE PERMIT, THE ENVIRONMENTAL ENGINEERING
DEPARTMENT SHALL REQUIRE COPIES OF APPLICABLE
CORRESPONDENCE FROM THE USACOE SO THAT IT MAY
BE DETERMINED THAT ALL WETLAND PERMITS HAVE BEEN
RECEIVED.
3. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS
SHOWN ON THE TENTATIVE SHALL BE INCLUDED IN THE
ROAD AND DRAINAGE PLANS THAT MUST BE APPROVED
BY CDOT,VDOT AND THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROAD RIGHT-OF-WAY OR
EASEMENTS SHALL BE WIDE ENOUGH TO ENCOMPASS
THE PEDESTRIAN-ACCESS FACILITIES FOR AREAS THAT WILL
BE STATE MAINTAINED.
4. ANY TIMBERING THAT IS TO OCCUR AS THE FIRST
PHASE OF INFRASTRUCTURE CONSTRUCTION WILL BE
INCORPORATED INTO THE PROJECT'S EROSION-AND-
SEDIMENT CONTROL PLAN NARRATIVE AND WILL NOT
COMMENCE UNTIL THE ISSUANCE OF A LAND DISTURBANCE
PERMIT FOR SUBDIVISION CONSTRUCTION AND PROPER
INSTALLATION OF EROSION CONTROL MEASURES. TIMBER
MANAGEMENT (THINNING, ETC.) WILL BE ALLOWED UPON
THE SUBMISSION AND APPROVAL OF THE APPROPRIATE
MANAGEMENT PLAN TO INCLUDE EROSION CONTROL AND
THE ISSUANCE OF A LAND DISTURBANCE PERMIT BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT.
5. THE USACOE JURISDICTIONAL WETLANDS
SHALL BE SHOWN ON THE CONSTRUCTION PLANS AND
SUBDIVISION PLAT.
6. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE
ENVIRONMENTAL ENGINEERING DEPARTMENT MUST
HAVE RECEIVED DOCUMENTATION THAT THE SUB-DIVIDER
OR HIS REPRESENTATIVE HAS NOTIFIED CERTAIN PROPERTY
OWNERS DETERMINED BY THE DEPARTMENT OF THE
PROPOSED ADJACENT CONSTRUCTION.
7. THE EROSION AND SEDIMENT CONTROL PLAN FOR
THE PROJECT SHALL CALL FOR THE PLACEMENT OF
POLYETHYLENE FENCE OR ITS EQUIVALENT IN ACCORDANCE
WITH STD & SPEC 3.01 OF THE VIRGINIA EROSION
AND SEDIMENT CONTROL HANDBOOK ALONG THE NON
RPA RIPARIAN CORRIDOR MANAGEMENT AREA PRIOR TO
THE ISSUANCE OF A LAND DISTURBANCE PERMIT.
8. BUILDING ENVELOPES AS SHOWN ON THE
TENTATIVE PLAN ALONG WITH ANY OTHER DIRECTED BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT SHALL BE
PLACED ON THE CONSTRUCTION PLANS AND SUBDIVISION
PLAT.
9. SPECIAL UPPER SWIFT CREEK WATERSHED
END TREATMENT AS DIRECTED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT WILL BE PLACED IN THE
VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS.
10. THE ENVIRONMENTAL ENGINEERING DEPARTMENT
MAY IMPOSE A REASONABLE, MORE RIGOROUS EROSION
AND SEDIMENT CONTROL PROGRAM THEN THAT WHICH IS
PROVIDED BY MINIMUM STANDARDS FOUND IN THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
11. PRIOR TO RECORDATION, THE ENVIRONMENTAL
ENGINEERING DEPARTMENT MUST HAVE RECEIVED
NOTIFICATION FROM VDOT THAT IMPROVEMENTS TO
THE STATE ROAD(S) INTO WHICH THIS PROJECT INTERSECTS
AND WHICH, HAVE BEEN AUTHORIZED BY AN ISSUED
LAND USE PERMIT, HAVE BEEN SATISFACTORILY
COMPLETED.
12. THE ACHIEVEMENT OF ADEQUATE SURFACE
DRAINAGE ON LOTS WILL BE THE RESPONSIBILITY OF THE
SUBDIVIDER. THE SALE OF LOTS DOES NOT ABSOLVE THE
SUBDIVIDER FROM THIS RESPONSIBILITY PRIOR TO STATE
ACCEPTANCE OF THE STREETS AND FOR A PERIOD OF ONE
YEAR AFTER THE STREETS ARE TAKEN INTO THE STATE
SYSTEM. IF THE HOMEOWNER CHANGES THE LOT OR
DRIVEWAY GRADING BY ADDITIONAL CONSTRUCTION
WITHOUT A PERMIT FROM THE COUNTY TO DO SO, THE
DEVELOPER WILL BE RELIEVED OF THIS RESPONSIBILITY
FOR THAT LOT.
13. THE FOLLOWING AREAS OF STORM-WATER RUNOFF
CONCENTRATION ILL BE FIELD LOCATED AND SHOWN ON THE
PLANS. THE CONSTRUCTION PLANS SHALL DESIGNATE THE
AFFECTED LOTS WITH AN NBP, AND AN ENGINEERED
STORM SEWER, FILLING, GRADING, AND DRAINAGE PLAN
SHALL BE INCLUDED IN THE CONSTRUCTION PLANS.
A. THE DRAINAGE CORRIDOR THAT BEGINS IN LOT 31
PASSING THROUGH LOT 33, THEN THROUGH THE BUILDING
SITE ON LOT 36 AND 37.
B. THE DRAINAGE CORRIDOR THAT BEGINS IN LOT 1
ACCUMULATES THROUGH LOTS 2 AND 3 AND CONCENTRATES
THROUGH THE BUILDING SITE OF LOT 5 AND 6.
C. THE DRAINAGE CORRIDOR THAT BEGINS AT LOT 47 AND
PASSES THROUGH LOT 104.
14. BASED ON THE FINDINGS OF A QUALIFIED GEO-
TECHNICAL PROFESSIONAL, THE CONSTRUCTION PLANS SHALL
SHOW THE LOCATION OF ALL AREAS OF FORMER MINING
ACTIVITY. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS CONTAINS NO FORMER MINING ACTIVITY, A STATEMENT
TO THAT EFFECT WILL BE INCLUDED ON THE CONSTRUCTION
PLANS. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS DOES HAVE MINING ACTIVITY, A STATEMENT WILL BE
INCLUDED WHICH INDICATES THAT THE FORMER MINING
ACTIVITY AS SHOWN ON THE CONSTRUCTION PLANS IS THE
FULL EXTENT OF MINING ACTIVITY WITHIN THE AREA COVERED
BY THE CONSTRUCTION PLANS. THE QUALIFIED PROFESSIONAL
WILL ALSO INDICATE THOSE LOTS WHERE GEO-TECHNICAL
BORINGS MUST BE PERFORMED IN ORDER TO INSURE NO
HOUSE IS BUILT OVER AREAS AFFECTED BY FORMER MINING
ACTIVITY. IF APPLICABLE, RECOMMENDED SETBACK
DISTANCES FROM AREAS OF FORMER MINING ACTIVITY SHALL
BE SPECIFIED.
15. PRIOR TO RECORDATION THE ENVIRONMENTAL
ENGINEERING DEPARTMENT MUST HAVE RECEIVED
DOCUMENTATION FROM THE GEO-TECHNICAL EXPERT THAT
ALL AREAS OF FORMER MINING ACTIVITY AS SHOWN ON THE
APPROVED CONSTRUCTION PLAN HAVE BEEN RECLAIMED IN
A MANNER CONSISTENT WITH EITHER DEPARTMENT OF
MINES, MINERALS AND ENERGY RECLAMATION CRITERIA
OR CRITERIA RECOMMENDED BY THE GEOTECHNICAL
ENGINEER AS BEING APPROPRIATE AND IN COMPLIANCE
WITH GENERALLY ACCEPTED GEOTECHNICAL ENGINEERING
PRACTICE FOR SUCH SITUATIONS AS MAY BE ENCOUNTERED.
ALL AREAS OF FORMER MINING ACTIVITY SHALL BE
PORTRAYED ON THE RECORD PLAT.
16. THE COST FOR CLEANOUT OF SEDIMENT DEPOSITS
FROM A CERTIFIED UPPER SWIFT CREEK REGIONAL
BMP FACILITY WILL BE BORNE SOLELY BY THE PARTIES
DEVELOPING LAND WITHIN THE WATERSHED OF THE
BMP FROM WHICH THE EROSION WHICH PRODUCED
THE SEDIMENT OCCURRED UNTIL SUCH TIME AS ALL OF
THE AREAS OF THIS DEVELOPMENT THAT DRAIN TO THE
FACILITY ARE COMPLETED AND ACCEPTED INTO THE STATE
SYSTEM.
17. UNLESS OTHERWISE APPROVED THE EASEMENTS
SHOWN ON THE TENTATIVE PLAT AS PEDESTRIAN EASEMENT
WHICH ARE CONNECTING THE OPEN SPACE TO THE RIGHT OF
WAY SHALL BE CALLED ACCESS EASEMENTS ON THE
CONSTRUCTION PLANS AND RECORD PLAT.
18. OPEN SPACES SHALL BE CONNECTED TO ROAD
RIGHTS-OF-WAY VIA ACCESS EASEMENT OR ADDITIONAL
OPEN SPACE IN LOCATIONS WHERE ACCESS IS NOT
IMPEDED BY DRAINAGE COURSE OR OTHER NATURAL
FEATURES.
19. POLLUTANT REMOVAL WILL AT ALL TIMES BE CONSISTENT
WITH THE .45 STANDARD. IF IN MAINTAINING THAT
STANDARD, THE PROJECT IS AT A POINT WHERE
MATHEMATICALLY THE .22 STANDARD IS NOT REACHED,
THE POUNDAGE SHORTFALL WILL BE CONVERTED TO ACRES
OF IMPERVIOUSNESS AND ADDITIONAL PAYMENTS
CONSISTENT WITH THE FORMER UPPER SWIFT CREEK
REGIONAL BMP SYSTEM SHALL BE PAID AS
COMPENSATION FOR THIS MATHEMATICAL SHORTAGE.
20. THE POINTS OF PERENNIAL FLOW ALONG WITH THEIR
GPS COORDINATE VALUES WILL BE SHOWN ON THE
CONSTRUCTION PLAN AND RECORD PLAT.
NOTE: FROM PROFFERED CONDITION #17 OF REZONING CASE 02SN02
DEVELOPER SHALL LEAVE IN PLACE THE TEMPORARY SEDIMENT CONTRO
AND/OR CONSTRUCT NEW BMPS OR COMBINATIONS OF BMPS WHICH WOUL
ACHIEVE A MAXIMUM PHOSPHOROUS RUNOFF LIMITS REQUIRED BY THE
SWIFT CREEK WATERSHED ORDINANCE SECTION 19-23(D)(1)A. UNTIL
COUNTY OBTAINS ITS INITIAL PERMIT FOR THE IMPLEMENTATION OF
CREEK WATERSHED PLAN. WITH THE ISSUANCE OF THE PERMIT FOR B
IN THE FOXCREEK SUBDIVISION, COMPLIANCE WITH THIS PROFFER HA
ACHIEVED.
*******************************************
PLAN NAME: HARPERS MILL SOUTH PHASE V (AMENDED)
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: L. D. PRITCHARD, JR. / 748-1028
PLAN NUMBER: 06TS0161
CONSULTANT: STEVE WORTHINGTON/TIMMONS
PLANNER: AMY SOMERVELL
ORIGINAL PLAN DATE: JUNE 21, 2006
LATEST SUBMISSION DATE: JULY 14, 2014
REVIEW DATE: JULY 30, 2014
SUBMITTAL NUMBER: 1
STATUS: REVISIONS REQUESTED
TABLE REVIEW: NO
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS THE
FOLLOWING PRELIMINARY COMMENTS AND OBSERVATIONS
PERTAINING TO THE ABOVE REFERENCED TENTATIVE PLAT DATED JULY
2, 2014, RECEIVED ON JULY 14, 2014 BY THE PLANNING
DEPARTMENT AND ON JULY 15, 2014 BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT.
….
THE TENTATIVE PLAT DOES NOT CONTAIN THE INDEX SHEET
REFERENCED IN SUBDIVISION ORDINANCE SECTION 17-41B.4.
PERHAPS A SCALE OF 1:150 WILL FIT ON THE 24 X 36 INCH SHEET.
PLEASE ADDRESS.
THE TOPOGRAPHY CONTOUR INFORMATION IS ONE SHADE DARKER
THAN INVISIBLE. REVISED PLATS MUST PROVIDE A SIGNIFICANTLY
CLEARER VISIBILITY OF THE ONSITE TOPOGRAPHY. PLEASE ADDRESS.
ALSO, PLEASE DARKEN THE WETLAND AREAS TO STAND OUT MORE
VIVIDLY.
WITH RESPECT TO ROAD NAMES, WE NOTE THE UPDATED RICHMOND
REGIONAL PLANNING DISTRICT COMMISSION APPROVAL SHEETS,
HOWEVER, PLESLER RUN SHOULD BE CHANGED TO PLESLER COURT,
PLACE, TERRACE, MEWS, COMMONS, CRESCENT, GREEN,
LANDING, MANOR, POINT, SUMMIT, TRACE, VIEW OR VISTA.
ALSO, SINCE VERNEHAM DRIVE WILL NEED TO BE RECORDED AND
BUILT TO PROVIDE ACCESS INTO HARPERS MILL SOUTH PLEASE
PROVIDE AN UPDATED RRPDC ROAD NAME APPROVAL FOR THIS
ROAD AS WELL.
WITH RESPECT TO WETLANDS NOTE NUMBER 1 ON SHEET 1 "THERE
ARE NO ANTICIPATED WETLAND IMPACTS ASSOCIATED WITH THIS
TENTATIVE" THIS STATEMENT APPEARS TO BE INADEQUATE IN LIGHT
THE PLACEMENT OF BMP #3. OUR EXPERIENCE HAS BEEN STRONG
AND CONSISTENT RESISTANCE FROM THE CORPS AGAINST THE
IMPACTION OF WETLANDS FOR THE PURPOSE OF BMP
IMPLEMENTATION. A TENTATIVE CONDITION WILL BE IMPOSED TO
ADDRESS THIS CIRCUMSTANCE.
PLEASE PROVIDE ON THE TENTATIVE PLAT THE SPECIFIC NAME OF TH
INDIVIDUAL WHO PERFORMED THE WETLANDS DELINEATION SO THAT
IT MAY BE CONFIRMED THAT HE OR SHE IS ON THE APPROVED
WETLANDS DELINEATOR LIST OR IN VIEW OF THE INDICATED
CONFIRMATION BY THE CORPS OF ENGINEERS A COPY OF THAT
CONFIRMATION LETTER AND THE ACCOMPANYING MAP WILL DO.
AN ASSESSMENT OF THE TOPOGRAPHY IN RELATION TO THE LOT
LAYOUT HAS REVEALED SEVERAL AREAS OF STORM WATER
CONCENTRATION WHICH ARE IN POTENTIAL CONFLICT WITH THE
DESIRE NOT TO HAVE STORM DRAINAGE PROBLEMS RELATED TO THE
DEVELOPMENT OF THE HOUSE AND LOT. THESE ARE ENGINEERING
ISSUES WHICH SHOULD BE ADDRESSED BY THE CONSTRUCTION
PLANS AND NOT LEFT TO THE INDIVIDUAL BUILDERS TO DEAL WITH.
THE PHYSICAL "LOW" OF THESE DRAINAGE CORRIDORS SHOULD BE
FIELD LOCATED AND APPROPRIATE ENGINEERING PROPOSALS WITH
RESPECT TO FILLING, GRADING, DRAINAGE STORM SEWERING AND
BUILDING ENVELOPE LOCATIONS SHOULD BE MADE A PART OF THE
CONSTRUCTION PLANS. THESE AREAS ARE AS FOLLOWS:
A. THE ACCUMULATION OF STORM DRAINAGE OCCURRING FROM LOT 1,
PASSING THROUGH THE HOME SITES DOWN THROUGH LOT 7.
B. THE DRAINAGE CORRIDOR BEGINNING IN LOT 13 PASSING
THROUGH LOTS 16 AND 17 BEFORE REACHING THE WETLANDS.
C. THE DRAINAGE CORRIDOR FROM THE RIDGE LINE IN LOT 34
PASSING THROUGH LOTS 36 AND 37.
D. THE DRAINAGE CORRIDOR BEGINNING IN LOT 156 TERMINATING AT
THE FLOOD PLAIN IN LOT 159.
E. THE DRAINAGE CORRIDOR BEGINNING IN LOT 155 PASSING
THROUGH THE CENTER LOT OF 153 BEFORE REACHING BMP #4.
F. THE DRAINAGE CORRIDOR BEGINNING IN LOT 117 AND PASSING
THROUGH LOT 120 BEFORE REACHING THE FLOOD PLAIN.
G. THE DRAINAGE CORRIDOR BEGINNING AT THE SUMMIT IN LOT 204
ACCUMULATING DOWN THROUGH LOT 218 BEFORE ENTERING
EMBERTAN ROAD.
H. THE TWO LEGS, ONE STARTING IN LOT 195, ONE STARTING IN LO
193, PASSING THROUGH LOT 232 AND CONVERGING IN LOT 230,
BEFORE PASSING DIAGONALLY THROUGH LOT 226.
I. THE DRAINAGE CORRIDOR BEGINNING AT THE RIDGE LINE IN LOT
241 PASSING DIAGONALLY THROUGH LOT 237.
J. THE ACCUMULATION OF STORM DRAINAGE ACCUMULATING
STARTING IN LOT 323 DOWN THROUGH LOT 327.
PLEASE IDENTIFY THE RECTANGLE LOCATED IN PORTIONS OF LOTS 12
AND 128 AND INDICATE ITS INTENDED DISPOSITION.
WITH RESPECT TO CBPA OUR ASSESSMENT OF WORKSHEET A
CALCULATION GOES AS FOLLOWS:
THERE ARE 54.35 ACRES IN LOT AND 43.02 ACRES IN OPEN SPACE.
ADDED TOGETHER, THIS GIVES 97.37 ACRES TO BE DIVIDED INTO BY
THE 337 LOTS. THIS YIELDS AN EQUIVALENT AVERAGE LOT SIZE OF
.29 ACRES WHICH CORRESPONDS TO A 27.5% DEFAULT LEVEL OF
IMPERVIOUSNESS. THE 2.7 ACRES OF SIDEWALK ADDS 2.5 %
IMPERVIOUSNESS, TO A TOTAL LEVEL OF IMPERVIOUSNESS OF 30%.
30% IMPERVIOUSNESS CORRESPONDS TO AN F POST OF .75.
113.54 ACRES TIMES .75 YIELDS A POST DEVELOPMENT POLLUTANT
PRODUCTION OF 85.16 LBS. THE RESULTING REQUIRED POLLUTANT
REMOVAL RATE FOR THE .45 STANDARD BECOMES 34.07 LBS AND FOR
THE .22 STANDARD BECOMES 60.18 LBS.
PLEASE PROVIDE THE CALCULATED BASIS FOR THE 2.7 ACRES OF
SIDEWALK.
FOR POST DEVELOPMENT POLLUTANT DETERMINATION PURPOSES, THE
SITE ACREAGE OF SIDEWALKS NEEDS TO BE BROKEN DOWN INTO THE
ACREAGE OF SIDEWALK WITHIN THE WATER SHEDS OF THE 4 BMP'S.
THE METHODOLOGY FOR THE ESTABLISHMENT OF POST
DEVELOPMENT PERCENT OF IMPERVIOUSNESS NEEDS TO BE
CLARIFIED. FOR INSTANCE ON SUB AREA #2, HOW DOES .64 ACRES
OF OPEN SPACE, 2.08 ACRES OF OPEN SIDEWALK AND 4.02 OF LOT
RESULT IN A 47% LEVEL OF IMPERVIOUSNESS? BY THE METHODS
USED BY THIS OFFICE, THE BEST WE COULD DO FOR SUB AREA 2 IS
35% LEVEL OF IMPERVIOUSNESS, RENDERING.85LBS PER ACRE F
POST. THIS THEN CALCULATES TO 5.73 LBS BEING TREATED BY BMP
#2, AS OPPOSED TO THE 7.41LBS SHOWN ON THE SUBMITTED TABLE.
IN GENERAL IT COULD BE SAID THE OVERALL POST DEVELOPMENT
POLLUTANT PRODUCTION HAS BEEN FOUND TO BE CONSIDERABLY
HIGHER THAN THAT SHOWN IN THE CBPA PLAN AND THE POLLUTANT
BEING TREATED BY THE BMP'S IS SIGNIFICANTLY LOWER THAN WHAT
THE SUBMITTED CBPA PLAN INDICATES. THESE TWO FACTORS
RESULT IN THE REQUIRED WATER QUALITY COMPLIANCE NOT YET
HAVING BEEN ACHIEVED. PLEASE ADDRESS.
THE FEMA FLOOD PLAIN INFORMATION NEEDS TO BE UPDATED TO
THE NOMENCLATURE THAT WENT INTO EFFECT ON DECEMBER 18,
2012. THIS LOCATION IS NOW ZONE X, UNDER FIRM ND THE
COMMUNITY PANEL NUMBER 51041CO115D. PLEASE ADDRESS.
PLEASE INDICATE THE 50 FOOT PERIMETER YARD AROUND THE
BMPS.
TENTATIVE CONDITIONS
1. THE STREAMS WHICH WILL BE CROSSED BY THE 4 FOOT
ASPHALT SIDEWALK WILL BE BRIDGED IN A WAY WHICH CREATES NO
HYDRAULIC IMPACT ON THE FLOOD PLAIN LIMITS.
2. ROOF GUTTERS AND DOWNSPOUTS SHALL BE INSTALLED ON THE
DWELLINGS AS DESIGNATED BY THE ENVIRONMENTAL ENGINEERING
DEPARTMENT. ROOF DRAINAGE LEADERS WILL BE TIED DIRECTLY
INTO MINIMUM 12" ONSITE STORM SEWERS OR OTHER STABLE
CONVEYANCE SYSTEMS DEEMED APPROPRIATE BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT.
3. THE DESIGN AND CONSTRUCTION OF THE WET BMP'S THAT
WILL BE A COUNTY MAINTAINED FACILITY SHALL BE SUBJECT TO
DOCUMENTED GEOTECHNICAL APPROVAL. THE SERVICES THAT
MUST BE PROVIDED BY THE GEOTECHNICAL ENGINEER SHALL
INCLUDE FULL-TIME GEOTECHNICAL INSPECTION PAID FOR BY
THE DEVELOPER. THAT FULL-TIME INSPECTION SHALL INCLUDE BUT
NOT BE LIMITED TO THE FOLLOWING:
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS
NECESSARY TO FACILITATE THE APPROVAL PROCESS OF THE
INDEPENDENT GEOTECHNICAL CONSULTANT. OBSERVATION,
TESTING, AND DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED STRUCTURAL
FILL FOR EARTH DAM CONSTRUCTION.
II. THE CUT-OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE, AND CONCRETE CHUTE SPILLWAY SUB-GRADES
APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS PRESENT
BEARING GRADE TO VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
4. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL ON THE DAM WILL
BE FURNISHED PRIOR TO THE ISSUANCE OF THE LAND DISTURBANCE
PERMIT.
5. SPECIAL UPPER SWIFT CREEK WATERSHED END TREATMENT AS
DIRECTED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL
BE PLACED IN THE VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS.
6. THE ENVIRONMENTAL ENGINEERING DEPARTMENT MAY
IMPOSE A MORE RIGOROUS EROSION AND SEDIMENT CONTROL PROGRAM
STANDARDS FOUND IN THE VIRGINIA EROSION AND SEDIMENT
CONTROL HANDBOOK. THIS WOULD INCLUDE THE UTILIZATION OF
SUPER SILT FENCE AND PAM.
7. THE DESIGN AND CONSTRUCTION OF THE DRY SWM/BMP
THAT WILL BE A COUNTY MAINTAINED FACILITY SHALL BE SUBJECT
TO INDEPENDENTLY DOCUMENTED GEOTECHNICAL APPROVAL. THE
SERVICES THAT MUST BE PROVIDED BY THE INDEPENDENT
GEOTECHNICAL ENGINEERING FIRM SHALL INCLUDE GEOTECHNICAL
INSPECTION PAID FOR BY THE DEVELOPER THAT DOCUMENTS THE
ACHIEVEMENT OF ALL SPECIFICATIONS GENERALLY REGARDED TO
PERTAIN TO STRUCTURAL FILL.
8. PRIOR TO THE SUBMISSION OF THE CONSTRUCTION PLANS THE
ENVIRONMENTAL ENGINEERING DEPARTMENT MUST BE PROVIDED
WITH DOCUMENTATION FROM THE CORP AND DEQ THAT THE
CONSTRUCTION OF BMP #3 IN THE WETLANDS/WATERS WILL BE
PERMITTED.
9. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE WETLANDS MAP
WHICH ACCOMPANIES THE CORPS WETLANDS CONFIRMATION SHALL
BE PROVIDED TO THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
10. AN OVERALL FILLING, GRADING AND DRAINAGE PLAN. SHALL BE
CONSTRUCTION PLANS TO ASSURE THAT THE LOTS WHICH ARE WITHIN
VEHICULAR ACCESS WAYS HAVE GROUND CONFIGURATIONS AND STORM
COORDINATION WITH THE MAJORITY OF THE PROJECT WHICH IS OUTS
THE FORMER RAILROAD CORRIDOR. THIS IS NOT AN ISSUE TO BE A
BY INDIVIDUAL BUILDERS BUT SHALL BE MADE A PART OF THE
ENGINEERING OF THE CONSTRUCTION PLANS. AFFECTED LOTS WILL
DESIGNATED WITH AN NBP.
11. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS SHOWN ON THE
TENTATIVE SHALL BE INCLUDED IN THE ROAD AND DRAINAGE PLANS
THAT MUST BE APPROVED BY CDOT,VDOT AND THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROAD RIGHT-OF-WAY OR EASEMENTS
SHALL BE WIDE ENOUGH TO ENCOMPASS THE PEDESTRIAN-ACCESS
FACILITIES FOR AREAS THAT WILL BE STATE-MAINTAINED.
12. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE
ENVIRONMENTAL ENGINEERING DEPARTMENT MUST
HAVE RECEIVED DOCUMENTATION THAT THE SUB-DIVIDER
OR HIS REPRESENTATIVE HAS NOTIFIED CERTAIN PROPERTY
OWNERS DETERMINED BY THE DEPARTMENT OF THE
PROPOSED ADJACENT CONSTRUCTION.
13. SPECIAL UPPER SWIFT CREEK WATERSHED
END TREATMENT AS DIRECTED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT WILL BE PLACED IN THE
VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS.
14. THE ENVIRONMENTAL ENGINEERING DEPARTMENT
MAY IMPOSE A REASONABLE, MORE RIGOROUS EROSION
AND SEDIMENT CONTROL PROGRAM THEN THAT WHICH IS
PROVIDED BY MINIMUM STANDARDS FOUND IN THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
15. THE AREAS OF STORM-WATER RUNOFF CONCENTRATION AS
DISCUSSED IN THE ENVIRONMENTAL ENGINEERING DEPARTMENT
TENTATIVE REPORT DATED JULY 30, 2014 WILL BE FIELD LOCATED A
DESIGNATE THE AFFECTED LOTS WITH AN NBP, AND AN
ENGINEERED STORM SEWER, FILLING, GRADING, AND DRAINAGE
PLAN SHALL BE INCLUDED IN THE CONSTRUCTION PLANS.
16. BASED ON THE FINDINGS OF A QUALIFIED GEO-
TECHNICAL PROFESSIONAL, THE CONSTRUCTION PLANS SHALL
SHOW THE LOCATION OF ALL AREAS OF FORMER MINING
ACTIVITY. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS CONTAINS NO FORMER MINING ACTIVITY, A STATEMENT
TO THAT EFFECT WILL BE INCLUDED ON THE CONSTRUCTION
PLANS. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS DOES HAVE MINING ACTIVITY, A STATEMENT WILL BE
INCLUDED WHICH INDICATES THAT THE FORMER MINING
ACTIVITY AS SHOWN ON THE CONSTRUCTION PLANS IS THE
FULL EXTENT OF MINING ACTIVITY WITHIN THE AREA COVERED
BY THE CONSTRUCTION PLANS. THE QUALIFIED PROFESSIONAL
WILL ALSO INDICATE THOSE LOTS WHERE GEO-TECHNICAL
BORINGS MUST BE PERFORMED IN ORDER TO INSURE NO
HOUSE IS BUILT OVER AREAS AFFECTED BY FORMER MINING
ACTIVITY. IF APPLICABLE, RECOMMENDED SETBACK
DISTANCES FROM AREAS OF FORMER MINING ACTIVITY SHALL
BE SPECIFIED.
17. PRIOR TO RECORDATION THE ENVIRONMENTAL
ENGINEERING DEPARTMENT MUST HAVE RECEIVED
DOCUMENTATION FROM THE GEO-TECHNICAL EXPERT THAT
ALL AREAS OF FORMER MINING ACTIVITY AS SHOWN ON THE
APPROVED CONSTRUCTION PLAN HAVE BEEN RECLAIMED IN
A MANNER CONSISTENT WITH EITHER DEPARTMENT OF
MINES, MINERALS AND ENERGY RECLAMATION CRITERIA
OR CRITERIA RECOMMENDED BY THE GEOTECHNICAL
ENGINEER AS BEING APPROPRIATE AND IN COMPLIANCE
WITH GENERALLY ACCEPTED GEOTECHNICAL ENGINEERING
PRACTICE FOR SUCH SITUATIONS AS MAY BE ENCOUNTERED.
ALL AREAS OF FORMER MINING ACTIVITY SHALL BE
PORTRAYED ON THE RECORD PLAT.
18. THE COST FOR CLEANOUT OF SEDIMENT DEPOSITS
FROM A CERTIFIED UPPER SWIFT CREEK REGIONAL
BMP FACILITY WILL BE BORNE SOLELY BY THE PARTIES
DEVELOPING LAND WITHIN THE WATERSHED OF THE
BMP FROM WHICH THE EROSION WHICH PRODUCED
THE SEDIMENT OCCURRED UNTIL SUCH TIME AS ALL OF
THE AREAS OF THIS DEVELOPMENT THAT DRAIN TO THE
FACILITY ARE COMPLETED AND ACCEPTED INTO THE STATE
SYSTEM.
19. UNLESS OTHERWISE APPROVED THE EASEMENTS
SHOWN ON THE TENTATIVE PLAT AS PEDESTRIAN EASEMENT
WHICH ARE CONNECTING THE OPEN SPACE TO THE RIGHT OF
WAY SHALL BE CALLED ACCESS EASEMENTS ON THE
CONSTRUCTION PLANS AND RECORD PLAT.
20. OPEN SPACES SHALL BE CONNECTED TO ROAD
RIGHTS-OF-WAY VIA ACCESS EASEMENT OR ADDITIONAL
OPEN SPACE IN LOCATIONS WHERE ACCESS IS NOT
IMPEDED BY DRAINAGE COURSE OR OTHER NATURAL
FEATURES.
NOTE: FROM PROFFERED CONDITION #17 OF REZONING CASE
02SNO209 THE DEVELOPER SHALL LEAVE IN PLACE THE TEMPORARY
SEDIMENT CONTROL DEVICES AND/OR CONSTRUCT NEW BMPS OR
COMBINATIONS OF BMPS WHICH WOULD ACHIEVE A MAXIMUM
PHOSPHORUS RUNOFF LIMITS REQUIRED BY THE UPPER SWIFT CREEK
WATERSHED ORDINANCE SECTION 19-23(D)(1)A UNTIL CHESTERFIELD
COUNTY OBTAINS ITS INITIAL PERMIT FOR THE IMPLEMENTATION OF
THE UPPER SWIFT CREEK WATERSHED PLAN. WITH THE ISSUANCE OF
THE PERMIT FOR BMP WBC-10 IN THE FOXCREEK SUBDIVISION,
COMPLIANCE WITH THIS PROFFER HAS BEEN ACHIEVED.
PLAN NAME: HARPERS MILL SOUTH PHASE V (AMENDED)
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: L. D. PRITCHARD, JR. / 748-1028
PLAN NUMBER: 06TS0161
CONSULTANT: STEVE WORTHINGTON/TIMMONS
PLANNER: AMY SOMERVELL
ORIGINAL PLAN DATE: MAY 5, 2004
LATEST SUBMISSION DATE: DECEMBER 15, 2014
UPDATED: JULY 30, 2014
REVIEW DATE: JANUARY 20, 2015
SUBMITTAL NUMBER: 3
STATUS: ITEMS REQUESTED
TABLE REVIEW: NO
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS THE
FOLLOWING PRELIMINARY COMMENTS AND OBSERVATIONS
PERTAINING TO THE ABOVE REFERENCED TENTATIVE PLAT REVISED
DATED DECEMBER 15, 2014, RECEIVED ON DECEMBER 17, 2014
BY THE PLANNING DEPARTMENT AND ON DECEMBER 18, 2014 BY
THE ENVIRONMENTAL ENGINEERING DEPARTMENT.
….
SINCE VERNEHAM DRIVE WILL NEED TO BE RECORDED AND BUILT TO
PROVIDE ACCESS INTO HARPERS MILL SOUTH PLEASE PROVIDE AN
UPDATED RRPDC ROAD NAME APPROVAL FOR THIS ROAD.
….
UNDER WATER QUALITY REQUIREMENTS ON SHEET C1.0 A SECOND
PARAGRAPH SHOULD BE ADDED WHICH READS BMP STORMWATER
MANAGEMENT FACILITIES AS SHOWN ON THE HARPERS MILL
OVERALL MASTER BMP PLAN SHALL PROVIDE THE COMPLIANCE FOR
THE CONSTRUCTION OF VERNHAM DRIVE AND THE EXTENSION OF
OTTERDALE ROAD TO THE SOUTH OF HARPERS MILL PARKWAY.
….
A PHASING PLAN FOR OTTERDALE ROAD AND VERNHAM DRIVE
SHOWING THE TIMING AND EXTENT OF THEIR CONSTRUCTION IN
RELATION TO THE PROJECT IS NEEDED. THIS REQUIRES A
DISCUSSION
BETWEEN VDOT, CDOT, ENVIRONMENTAL ENGINEERING AND
PLANNING. PLEASE ADDRESS.
….
PLEASE PROVIDE ON THE TENTATIVE PLAT THE SPECIFIC NAME OF
THE
INDIVIDUAL WHO PERFORMED THE WETLANDS DELINEATION SO THAT
IT MAY BE CONFIRMED THAT HE OR SHE IS ON THE APPROVED
WETLANDS DELINEATOR LIST OR IN VIEW OF THE INDICATED
CONFIRMATION BY THE CORPS OF ENGINEERS A COPY OF THAT
CONFIRMATION LETTER AND THE ACCOMPANYING MAP WILL DO.
THE COPY OF THE USACOE CONFIRMATION LETTER TO BE
PROVIDED UNDER SEPARATE COVER HAS NOT YET BEEN RECEIVED
BY THIS OFFICE. PLEASE ADDRESS.
….
AN ASSESSMENT OF THE TOPOGRAPHY IN RELATION TO THE LOT
LAYOUT HAS REVEALED SEVERAL AREAS OF STORM WATER
CONCENTRATION WHICH ARE IN POTENTIAL CONFLICT WITH THE
DESIRE NOT TO HAVE STORM DRAINAGE PROBLEMS RELATED TO THE
DEVELOPMENT OF THE HOUSE AND LOT. THESE ARE ENGINEERING
ISSUES WHICH SHOULD BE ADDRESSED BY THE CONSTRUCTION
PLANS AND NOT LEFT TO THE INDIVIDUAL BUILDERS TO DEAL WITH.
THE PHYSICAL "LOW" OF THESE DRAINAGE CORRIDORS SHOULD BE
FIELD LOCATED AND APPROPRIATE ENGINEERING PROPOSALS WITH
RESPECT TO FILLING, GRADING, DRAINAGE STORM SEWERING AND
BUILDING ENVELOPE LOCATIONS SHOULD BE MADE A PART OF THE
CONSTRUCTION PLANS. THESE AREAS ARE AS FOLLOWS:
….
A. THE ACCUMULATION OF STORM DRAINAGE OCCURRING FROM LOT 1,
PASSING THROUGH THE HOME SITES DOWN THROUGH LOT 7.
….
B. THE DRAINAGE CORRIDOR BEGINNING IN LOT 13 PASSING
THROUGH LOTS 16 AND 17 BEFORE REACHING THE WETLANDS.
….
TABLE REVIEW: NO
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS THE
FOLLOWING PRELIMINARY COMMENTS AND OBSERVATIONS
PERTAINING TO THE ABOVE REFERENCED TENTATIVE PLAT REVISED
DATED DECEMBER 15, 2014, RECEIVED ON DECEMBER 17, 2014
BY THE PLANNING DEPARTMENT AND ON DECEMBER 18, 2014 BY
THE ENVIRONMENTAL ENGINEERING DEPARTMENT.
….
SINCE VERNEHAM DRIVE WILL NEED TO BE RECORDED AND BUILT TO
PROVIDE ACCESS INTO HARPERS MILL SOUTH PLEASE PROVIDE AN
UPDATED RRPDC ROAD NAME APPROVAL FOR THIS ROAD.
….
UNDER WATER QUALITY REQUIREMENTS ON SHEET C1.0 A SECOND
PARAGRAPH SHOULD BE ADDED WHICH READS BMP STORMWATER
MANAGEMENT FACILITIES AS SHOWN ON THE HARPERS MILL
OVERALL MASTER BMP PLAN SHALL PROVIDE THE COMPLIANCE FOR
THE CONSTRUCTION OF VERNHAM DRIVE AND THE EXTENSION OF
OTTERDALE ROAD TO THE SOUTH OF HARPERS MILL PARKWAY.
….
A PHASING PLAN FOR OTTERDALE ROAD AND VERNHAM DRIVE
SHOWING THE TIMING AND EXTENT OF THEIR CONSTRUCTION IN
RELATION TO THE PROJECT IS NEEDED. THIS REQUIRES A
DISCUSSION
BETWEEN VDOT, CDOT, ENVIRONMENTAL ENGINEERING AND
PLANNING. PLEASE ADDRESS.
….
PLEASE PROVIDE ON THE TENTATIVE PLAT THE SPECIFIC NAME OF
THE
INDIVIDUAL WHO PERFORMED THE WETLANDS DELINEATION SO THAT
IT MAY BE CONFIRMED THAT HE OR SHE IS ON THE APPROVED
WETLANDS DELINEATOR LIST OR IN VIEW OF THE INDICATED
CONFIRMATION BY THE CORPS OF ENGINEERS A COPY OF THAT
CONFIRMATION LETTER AND THE ACCOMPANYING MAP WILL DO.
THE COPY OF THE USACOE CONFIRMATION LETTER TO BE
PROVIDED UNDER SEPARATE COVER HAS NOT YET BEEN RECEIVED
BY THIS OFFICE. PLEASE ADDRESS.
….
AN ASSESSMENT OF THE TOPOGRAPHY IN RELATION TO THE LOT
LAYOUT HAS REVEALED SEVERAL AREAS OF STORM WATER
CONCENTRATION WHICH ARE IN POTENTIAL CONFLICT WITH THE
DESIRE NOT TO HAVE STORM DRAINAGE PROBLEMS RELATED TO THE
DEVELOPMENT OF THE HOUSE AND LOT. THESE ARE ENGINEERING
ISSUES WHICH SHOULD BE ADDRESSED BY THE CONSTRUCTION
PLANS AND NOT LEFT TO THE INDIVIDUAL BUILDERS TO DEAL
WITH.
THE PHYSICAL "LOW" OF THESE DRAINAGE CORRIDORS SHOULD BE
FIELD LOCATED AND APPROPRIATE ENGINEERING PROPOSALS WITH
RESPECT TO FILLING, GRADING, DRAINAGE STORM SEWERING AND
BUILDING ENVELOPE LOCATIONS SHOULD BE MADE A PART OF THE
CONSTRUCTION PLANS. THESE AREAS ARE AS FOLLOWS:
….
A. THE ACCUMULATION OF STORM DRAINAGE OCCURRING FROM LOT
1,
PASSING THROUGH THE HOME SITES DOWN THROUGH LOT 7.
….
B. THE DRAINAGE CORRIDOR BEGINNING IN LOT 13 PASSING
THROUGH LOTS 16 AND 17 BEFORE REACHING THE WETLANDS.
….
C. THE DRAINAGE CORRIDOR FROM THE RIDGE LINE IN LOT 34
PASSING THROUGH LOTS 36 AND 37.
….
D. THE DRAINAGE CORRIDOR BEGINNING IN LOT 156 TERMINATING
AT
THE FLOOD PLAIN IN LOT 159.
….
E. THE DRAINAGE CORRIDOR BEGINNING IN LOT 155 PASSING
THROUGH THE CENTER LOT OF 153 BEFORE REACHING BMP #4.
….
F. THE DRAINAGE CORRIDOR BEGINNING IN LOT 117 AND PASSING
THROUGH LOT 120 BEFORE REACHING THE FLOOD PLAIN.
….
G. THE DRAINAGE CORRIDOR BEGINNING AT THE SUMMIT IN LOT
204
ACCUMULATING DOWN THROUGH LOT 218 BEFORE ENTERING
EMBERTAN ROAD.
….
H. THE TWO LEGS, ONE STARTING IN LOT 195, ONE STARTING IN
LOT
193, PASSING THROUGH LOT 232 AND CONVERGING IN LOT 230,
BEFORE PASSING DIAGONALLY THROUGH LOT 227.
….
I. THE DRAINAGE CORRIDOR BEGINNING AT THE RIDGE LINE IN
LOT
243 PASSING DIAGONALLY THROUGH LOT 238.
….
J. THE ACCUMULATION OF STORM DRAINAGE ACCUMULATING
STARTING IN LOT 323 DOWN THROUGH LOT 327.
….
TENTATIVE CONDITIONS
….
1. THE STREAMS WHICH WILL BE CROSSED BY THE 4 FOOT
ASPHALT SIDEWALK WILL BE BRIDGED IN A WAY WHICH
CREATES NO HYDRAULIC IMPACT ON THE FLOOD PLAIN
LIMITS.
….
2. ROOF GUTTERS AND DOWNSPOUTS SHALL BE INSTALLED ON
THE DWELLINGS AS DESIGNATED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROOF DRAINAGE LEADERS
WILL BE TIED DIRECTLY INTO MINIMUM 12" ONSITE STORM
SEWERS OR OTHER STABLE CONVEYANCE SYSTEMS DEEMED
APPROPRIATE BY THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
….
3. THE DESIGN AND CONSTRUCTION OF THE WET BMP'S THAT
WILL BE A COUNTY MAINTAINED FACILITY SHALL BE SUBJECT TO
DOCUMENTED GEOTECHNICAL APPROVAL. THE SERVICES THAT
MUST BE PROVIDED BY THE GEOTECHNICAL ENGINEER SHALL
INCLUDE FULL-TIME GEOTECHNICAL INSPECTION PAID FOR BY
THE DEVELOPER. THAT FULL-TIME INSPECTION SHALL INCLUDE
BUT NOT BE LIMITED TO THE FOLLOWING:
….
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS
NECESSARY
TO FACILITATE THE APPROVAL PROCESS OF THE INDEPENDENT
GEOTECHNICAL CONSULTANT. OBSERVATION, TESTING AND
DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED STRUCTURAL
FILL FOR EARTH DAM CONSTRUCTION.
II. THE CUT-OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE, AND CONCRETE CHUTE SPILLWAY SUB-GRADES
AS
APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS PRESENT
AT
BEARING GRADE TO VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
….
4. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL ON THE DAM WILL BE
FURNISHED PRIOR TO THE ISSUANCE OF THE LAND DISTURBANCE
PERMIT.
….
5. SPECIAL UPPER SWIFT CREEK WATERSHED END TREATMENT AS
DIRECTED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT
WILL
BE PLACED IN THE VICINITY OF THE TERMINUS OF MANMADE
STORM
DRAINAGE OUTFALLS.
….
6. THE DESIGN AND CONSTRUCTION OF THE DRY SWM/BMP
THAT WILL BE A COUNTY MAINTAINED FACILITY SHALL BE
SUBJECT
TO INDEPENDENTLY DOCUMENTED GEOTECHNICAL APPROVAL. THE
SERVICES THAT MUST BE PROVIDED BY THE INDEPENDENT
GEOTECHNICAL ENGINEERING FIRM SHALL INCLUDE GEOTECHNICAL
INSPECTION PAID FOR BY THE DEVELOPER THAT DOCUMENTS THE
ACHIEVEMENT OF ALL SPECIFICATIONS GENERALLY REGARDED TO
PERTAIN TO STRUCTURAL FILL.
….
7. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE WETLANDS
MAP
WHICH ACCOMPANIES THE CORPS WETLANDS CONFIRMATION SHALL
BE PROVIDED TO THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
….
8. AN OVERALL FILLING, GRADING AND DRAINAGE PLAN. SHALL
BE PROVIDED IN THE
CONSTRUCTION PLANS TO ASSURE THAT THE LOTS WHICH ARE
WITHIN THE EXISTING
VEHICULAR ACCESS WAYS HAVE GROUND CONFIGURATIONS AND
STORM DRAINAGE
COORDINATION WITH THE MAJORITY OF THE PROJECT WHICH IS
OUTSIDE OF THE
FORMER RAILROAD CORRIDOR. THIS IS NOT AN ISSUE TO BE
ADDRESSED BY
INDIVIDUAL BUILDERS BUT SHALL BE MADE A PART OF THE
ENGINEERING
OF THE CONSTRUCTION PLANS. AFFECTED LOTS WILL BE
DESIGNATED WITH AN NBP.
9. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS
SHOWN ON THE TENTATIVE SHALL BE INCLUDED IN THE
ROAD AND DRAINAGE PLANS THAT MUST BE APPROVED
BY CDOT,VDOT AND THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROAD RIGHT-OF-WAY OR
EASEMENTS SHALL BE WIDE ENOUGH TO ENCOMPASS
THE PEDESTRIAN-ACCESS FACILITIES FOR AREAS THAT WILL
BE STATE MAINTAINED.
..
10. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE
ENVIRONMENTAL ENGINEERING DEPARTMENT MUST
HAVE RECEIVED DOCUMENTATION THAT THE SUB-DIVIDER
OR HIS REPRESENTATIVE HAS NOTIFIED CERTAIN PROPERTY
OWNERS DETERMINED BY THE DEPARTMENT OF THE
PROPOSED ADJACENT CONSTRUCTION.
11. SPECIAL UPPER SWIFT CREEK WATERSHED
END TREATMENT AS DIRECTED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT WILL BE PLACED IN THE
VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS.
12. THE ENVIRONMENTAL ENGINEERING DEPARTMENT
MAY IMPOSE A REASONABLE, MORE RIGOROUS EROSION
AND SEDIMENT CONTROL PROGRAM THEN THAT WHICH IS
PROVIDED BY MINIMUM STANDARDS FOUND IN THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
THIS WOULD INCLUDE THE UTILIZATION OF SUPER SILT FENCE
AND PAM
….
13. THE AREAS OF STORM-WATER RUNOFF CONCENTRATION AS
DISCUSSED IN THE ENVIRONMENTAL ENGINEERING DEPARTMENT
TENTATIVE REPORT DATED JANUARY 20, 2015 WILL BE FIELD
LOCATED AND SHOWN ON THE PLANS. THE CONSTRUCTION PLANS
SHALL DESIGNATE THE AFFECTED LOTS WITH AN NBP, AND AN
ENGINEERED STORM SEWER, FILLING, GRADING, AND DRAINAGE
PLAN SHALL BE INCLUDED IN THE CONSTRUCTION PLANS.
14. BASED ON THE FINDINGS OF A QUALIFIED GEO-
TECHNICAL PROFESSIONAL, THE CONSTRUCTION PLANS SHALL
SHOW THE LOCATION OF ALL AREAS OF FORMER MINING
ACTIVITY. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS CONTAINS NO FORMER MINING ACTIVITY, A STATEMENT
TO THAT EFFECT WILL BE INCLUDED ON THE CONSTRUCTION
PLANS. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS DOES HAVE MINING ACTIVITY, A STATEMENT WILL BE
INCLUDED WHICH INDICATES THAT THE FORMER MINING
ACTIVITY AS SHOWN ON THE CONSTRUCTION PLANS IS THE
FULL EXTENT OF MINING ACTIVITY WITHIN THE AREA COVERED
BY THE CONSTRUCTION PLANS. THE QUALIFIED PROFESSIONAL
WILL ALSO INDICATE THOSE LOTS WHERE GEO-TECHNICAL
BORINGS MUST BE PERFORMED IN ORDER TO INSURE NO
HOUSE IS BUILT OVER AREAS AFFECTED BY FORMER MINING
ACTIVITY. IF APPLICABLE, RECOMMENDED SETBACK
DISTANCES FROM AREAS OF FORMER MINING ACTIVITY SHALL
BE SPECIFIED.
15. PRIOR TO RECORDATION THE ENVIRONMENTAL
ENGINEERING DEPARTMENT MUST HAVE RECEIVED
DOCUMENTATION FROM THE GEO-TECHNICAL EXPERT THAT
ALL AREAS OF FORMER MINING ACTIVITY AS SHOWN ON THE
APPROVED CONSTRUCTION PLAN HAVE BEEN RECLAIMED IN
A MANNER CONSISTENT WITH EITHER DEPARTMENT OF
MINES, MINERALS AND ENERGY RECLAMATION CRITERIA
OR CRITERIA RECOMMENDED BY THE GEOTECHNICAL
ENGINEER AS BEING APPROPRIATE AND IN COMPLIANCE
WITH GENERALLY ACCEPTED GEOTECHNICAL ENGINEERING
PRACTICE FOR SUCH SITUATIONS AS MAY BE ENCOUNTERED.
ALL AREAS OF FORMER MINING ACTIVITY SHALL BE
PORTRAYED ON THE RECORD PLAT.
16. THE COST FOR CLEANOUT OF SEDIMENT DEPOSITS
FROM A CERTIFIED UPPER SWIFT CREEK REGIONAL
BMP FACILITY WILL BE BORNE SOLELY BY THE PARTIES
DEVELOPING LAND WITHIN THE WATERSHED OF THE
BMP FROM WHICH THE EROSION WHICH PRODUCED
THE SEDIMENT OCCURRED UNTIL SUCH TIME AS ALL OF
THE AREAS OF THIS DEVELOPMENT THAT DRAIN TO THE
FACILITY ARE COMPLETED AND ACCEPTED INTO THE STATE
SYSTEM.
17. UNLESS OTHERWISE APPROVED THE EASEMENTS
SHOWN ON THE TENTATIVE PLAT AS PEDESTRIAN EASEMENT
WHICH ARE CONNECTING THE OPEN SPACE TO THE RIGHT OF
WAY SHALL BE CALLED ACCESS EASEMENTS ON THE
CONSTRUCTION PLANS AND RECORD PLAT.
18. OPEN SPACES SHALL BE CONNECTED TO ROAD
RIGHTS-OF-WAY VIA ACCESS EASEMENT OR ADDITIONAL
OPEN SPACE IN LOCATIONS WHERE ACCESS IS NOT
IMPEDED BY DRAINAGE COURSE OR OTHER NATURAL
FEATURES.
CONTROL DEVICES
AND/OR CONSTRUCT NEW BMPS OR COMBINATIONS OF BMPS WHICH
WOULD
ACHIEVE A MAXIMUM PHOSPHOROUS RUNOFF LIMITS REQUIRED BY
THE UPPER
SWIFT CREEK WATERSHED ORDINANCE SECTION 19-23(D) (1) A.
UNTIL
CHESTERFIELD COUNTY OBTAINS ITS INITIAL PERMIT FOR THE
IMPLEMENTATION OF THE
UPPER SWIFT CREEK WATERSHED PLAN. WITH THE ISSUANCE OF
THE PERMIT FOR
BMP WBC-10 IN THE FOXCREEK SUBDIVISION, COMPLIANCE WITH
THIS PROFFER
HAS BEEN ACHIEVED.
***********************************************
AME: HARPERS MILL SOUTH PHASE V (AMENDED)
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: L. D. PRITCHARD, JR. / 748-1028
PLAN NUMBER: 06TS0161
CONSULTANT: STEVE WORTHINGTON/TIMMONS
PLANNER: AMY SOMERVELL
ORIGINAL PLAN DATE: MAY 5, 2004
LATEST SUBMISSION DATE: DECEMBER 15, 2014
UPDATED: JULY 30, 2014
UPDATED: JANUARY 20, 2015
REVIEW DATE: MARCH 27, 2015
SUBMITTAL NUMBER: 4
STATUS: ITEM REQUESTED
TABLE REVIEW: YES
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS THE
FOLLOWING PRELIMINARY COMMENTS AND OBSERVATIONS
PERTAINING TO THE ABOVE REFERENCED TENTATIVE PLAT
REVISED
DATED MARCH 5, 2015, RECEIVED ON MARCH 23, 2015 BY THE
PLANNING DEPARTMENT AND ON MARCH 25, 2015 BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT.
….
A PHASING PLAN FOR OTTERDALE ROAD AND VERNHAM DRIVE
SHOWING THE TIMING AND EXTENT OF THEIR CONSTRUCTION IN
RELATION TO THE PROJECT IS NEEDED. THIS REQUIRES A
DISCUSSION
BETWEEN VDOT, CDOT, ENVIRONMENTAL ENGINEERING AND
PLANNING. AWAITING THE PHASING PLAN TO BE PROVIDED
UNDER SEPARATE COVER. PLEASE ADDRESS.
….
TENTATIVE CONDITIONS
….
1. THE STREAMS WHICH WILL BE CROSSED BY THE 4 FOOT
ASPHALT SIDEWALK WILL BE BRIDGED IN A WAY WHICH CREATES
NO HYDRAULIC IMPACT ON THE FLOOD PLAIN LIMITS.
F
CONVEYANCE SYSTEMS DEEMED APPROPRIATE BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT.
….
3. THE DESIGN AND CONSTRUCTION OF THE WET BMP'S THAT
WILL BE A COUNTY MAINTAINED FACILITY SHALL BE SUBJECT TO
DOCUMENTED GEOTECHNICAL APPROVAL. THE SERVICES THAT
MUST BE PROVIDED BY THE GEOTECHNICAL ENGINEER SHALL
INCLUDE FULL-TIME GEOTECHNICAL INSPECTION PAID FOR BY
THE DEVELOPER. THAT FULL-TIME INSPECTION SHALL INCLUDE
BUT NOT BE LIMITED TO THE FOLLOWING:
….
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS
NECESSARY
TO FACILITATE THE APPROVAL PROCESS OF THE INDEPENDENT
GEOTECHNICAL CONSULTANT. OBSERVATION, TESTING AND
DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED STRUCTURAL
FILL FOR EARTH DAM CONSTRUCTION.
II. THE CUT-OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE, AND CONCRETE CHUTE SPILLWAY SUB-GRADES
AS
APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS PRESENT
AT
BEARING GRADE TO VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
6. THE DESIGN AND CONSTRUCTION OF THE DRY SWM/BMP
THAT WILL BE A COUNTY MAINTAINED FACILITY SHALL BE
SUBJECT
TO INDEPENDENTLY DOCUMENTED GEOTECHNICAL APPROVAL. THE
SERVICES THAT MUST BE PROVIDED BY THE INDEPENDENT
GEOTECHNICAL ENGINEERING FIRM SHALL INCLUDE GEOTECHNICAL
INSPECTION PAID FOR BY THE DEVELOPER THAT DOCUMENTS THE
ACHIEVEMENT OF ALL SPECIFICATIONS GENERALLY REGARDED TO
PERTAIN TO STRUCTURAL FILL.
MAP
WHICH ACCOMPANIES THE CORPS WETLANDS CONFIRMATION SHALL
BE PROVIDED TO THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
OF THE CONSTRUCTION PLANS. AFFECTED LOTS WILL BE
DESIGNATED WITH AN NBP.
9. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS
SHOWN ON THE TENTATIVE SHALL BE INCLUDED IN THE
ROAD AND DRAINAGE PLANS THAT MUST BE APPROVED
BY CDOT,VDOT AND THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROAD RIGHT-OF-WAY OR
EASEMENTS SHALL BE WIDE ENOUGH TO ENCOMPASS
THE PEDESTRIAN-ACCESS FACILITIES FOR AREAS THAT WILL
BE STATE MAINTAINED.
10. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE
ENVIRONMENTAL ENGINEERING DEPARTMENT MUST
HAVE RECEIVED DOCUMENTATION THAT THE SUB-DIVIDER
OR HIS REPRESENTATIVE HAS NOTIFIED CERTAIN PROPERTY
OWNERS DETERMINED BY THE DEPARTMENT OF THE
PROPOSED ADJACENT CONSTRUCTION.
11. SPECIAL UPPER SWIFT CREEK WATERSHED
END TREATMENT AS DIRECTED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT WILL BE PLACED IN THE
VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS.
12. THE ENVIRONMENTAL ENGINEERING DEPARTMENT
MAY IMPOSE A REASONABLE, MORE RIGOROUS EROSION
AND SEDIMENT CONTROL PROGRAM THEN THAT WHICH IS
PROVIDED BY MINIMUM STANDARDS FOUND IN THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
THIS WOULD INCLUDE THE UTILIZATION OF SUPER SILT FENCE
AND PAM
DISCUSSED IN THE ENVIRONMENTAL ENGINEERING DEPARTMENT
TENTATIVE REPORT DATED MARCH 27, 2015, AND APPEARING IN
THE APPROVED PRELIMINARY PLAT LETTER IN THE NOTES
SECTION,
WILL BE FIELD LOCATED AND SHOWN ON THE PLANS. THE
CONSTRUCTION PLANS SHALL DESIGNATE THE AFFECTED LOTS
WITH AN
NBP, AND AN ENGINEERED STORM SEWER, FILLING, GRADING,
AND
DRAINAGE PLAN SHALL BE INCLUDED IN THE CONSTRUCTION
PLANS.
14. BASED ON THE FINDINGS OF A QUALIFIED GEO-
TECHNICAL PROFESSIONAL, THE CONSTRUCTION PLANS SHALL
SHOW THE LOCATION OF ALL AREAS OF FORMER MINING
ACTIVITY. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS CONTAINS NO FORMER MINING ACTIVITY, A STATEMENT
TO THAT EFFECT WILL BE INCLUDED ON THE CONSTRUCTION
PLANS. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS DOES HAVE MINING ACTIVITY, A STATEMENT WILL BE
INCLUDED WHICH INDICATES THAT THE FORMER MINING
ACTIVITY AS SHOWN ON THE CONSTRUCTION PLANS IS THE
FULL EXTENT OF MINING ACTIVITY WITHIN THE AREA COVERED
BY THE CONSTRUCTION PLANS. THE QUALIFIED PROFESSIONAL
WILL ALSO INDICATE THOSE LOTS WHERE GEO-TECHNICAL
BORINGS MUST BE PERFORMED IN ORDER TO INSURE NO
HOUSE IS BUILT OVER AREAS AFFECTED BY FORMER MINING
ACTIVITY. IF APPLICABLE, RECOMMENDED SETBACK
DISTANCES FROM AREAS OF FORMER MINING ACTIVITY SHALL
BE SPECIFIED.
15. PRIOR TO RECORDATION THE ENVIRONMENTAL
ENGINEERING DEPARTMENT MUST HAVE RECEIVED
DOCUMENTATION FROM THE GEO-TECHNICAL EXPERT THAT
ALL AREAS OF FORMER MINING ACTIVITY AS SHOWN ON THE
APPROVED CONSTRUCTION PLAN HAVE BEEN RECLAIMED IN
A MANNER CONSISTENT WITH EITHER DEPARTMENT OF
MINES, MINERALS AND ENERGY RECLAMATION CRITERIA
OR CRITERIA RECOMMENDED BY THE GEOTECHNICAL
ENGINEER AS BEING APPROPRIATE AND IN COMPLIANCE
WITH GENERALLY ACCEPTED GEOTECHNICAL ENGINEERING
PRACTICE FOR SUCH SITUATIONS AS MAY BE ENCOUNTERED.
ALL AREAS OF FORMER MINING ACTIVITY SHALL BE
PORTRAYED ON THE RECORD PLAT.
16. THE COST FOR CLEANOUT OF SEDIMENT DEPOSITS
FROM A CERTIFIED UPPER SWIFT CREEK REGIONAL
BMP FACILITY WILL BE BORNE SOLELY BY THE PARTIES
DEVELOPING LAND WITHIN THE WATERSHED OF THE
BMP FROM WHICH THE EROSION WHICH PRODUCED
THE SEDIMENT OCCURRED UNTIL SUCH TIME AS ALL OF
THE AREAS OF THIS DEVELOPMENT THAT DRAIN TO THE
FACILITY ARE COMPLETED AND ACCEPTED INTO THE STATE
SYSTEM.
17. UNLESS OTHERWISE APPROVED THE EASEMENTS
SHOWN ON THE TENTATIVE PLAT AS PEDESTRIAN EASEMENT
WHICH ARE CONNECTING THE OPEN SPACE TO THE RIGHT OF
WAY SHALL BE CALLED ACCESS EASEMENTS ON THE
CONSTRUCTION PLANS AND RECORD PLAT.
18. OPEN SPACES SHALL BE CONNECTED TO ROAD
RIGHTS-OF-WAY VIA ACCESS EASEMENT OR ADDITIONAL
OPEN SPACE IN LOCATIONS WHERE ACCESS IS NOT
IMPEDED BY DRAINAGE COURSE OR OTHER NATURAL
FEATURES.
02SN0209: THE DEVELOPER SHALL LEAVE IN PLACE THE
TEMPORARY SEDIMENT CONTROL DEVICES AND/OR CONSTRUCT NEW
BMPS OR COMBINATIONS OF BMPS WHICH WOULD ACHIEVE A
MAXIMUM PHOSPHOROUS RUNOFF LIMITS REQUIRED BY THE UPPER
SWIFT CREEK WATERSHED ORDINANCE SECTION 19-23(D) (1) A.
UNTIL CHESTERFIELD COUNTY OBTAINS ITS INITIAL PERMIT FOR
THE IMPLEMENTATION OF THE UPPER SWIFT CREEK WATERSHED
PLAN. WITH THE ISSUANCE OF THE PERMIT FOR BMP WBC-10 IN
THE FOXCREEK SUBDIVISION, COMPLIANCE WITH THIS PROFFER
HAS BEEN ACHIEVED.
THE PHYSICAL "LOW" OF THESE DRAINAGE CORRIDORS SHOULD BE
FIELD LOCATED AND APPROPRIATE ENGINEERING PROPOSALS WITH
RESPECT TO FILLING, GRADING, DRAINAGE STORM SEWERING AND
BUILDING ENVELOPE LOCATIONS SHOULD BE MADE A PART OF THE
CONSTRUCTION PLANS. THESE AREAS ARE AS FOLLOWS:
THROUGH LOTS 16 AND 17 BEFORE REACHING THE WETLANDS.
D. THE DRAINAGE CORRIDOR BEGINNING IN LOT 156
TERMINATING AT THE FLOOD PLAIN IN LOT 159.
THROUGH THE CENTER LOT OF 153 BEFORE REACHING BMP #4.
F. THE DRAINAGE CORRIDOR BEGINNING IN LOT 117 AND
PASSING THROUGH LOT 120 BEFORE REACHING THE FLOOD
PLAIN.
LOT 243 PASSING DIAGONALLY THROUGH LOT 238.
PLAN NAME: HARPERS MILL SOUTH PHASE V (AMENDED)
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: L. D. PRITCHARD, JR. / 748-1028
PLAN NUMBER: 06TS0161
CONSULTANT: STEVE WORTHINGTON/TIMMONS
PLANNER: AMY SOMERVELL
ORIGINAL PLAN DATE: MAY 5, 2004
LATEST SUBMISSION DATE: DECEMBER 15, 2014
UPDATED: JULY 30, 2014
UPDATED: JANUARY 20, 2015
UPDATED: MARCH 27,2015
REVIEW DATE: MAY 14, 2015
SUBMITTAL NUMBER: 4
STATUS: READY FOR APPROVAL
TABLE REVIEW: YES
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS THE
FOLLOWING PRELIMINARY COMMENTS AND OBSERVATIONS
PERTAINING TO THE ABOVE REFERENCED TENTATIVE PLAT REVISED
DATED MARCH 5, 2015, RECEIVED ON MARCH 23, 2015 BY THE
PLANNING DEPARTMENT AND ON MARCH 25, 2015 BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT.
….
TENTATIVE CONDITIONS
….
1. THE STREAMS WHICH WILL BE CROSSED BY THE 4 FOOT
ASPHALT SIDEWALK WILL BE BRIDGED IN A WAY WHICH
CREATES NO HYDRAULIC IMPACT ON THE FLOOD PLAIN
LIMITS.
….
2. ROOF GUTTERS AND DOWNSPOUTS SHALL BE INSTALLED ON
THE DWELLINGS AS DESIGNATED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROOF DRAINAGE LEADERS
WILL BE TIED DIRECTLY INTO MINIMUM 12" ONSITE STORM
SEWERS OR OTHER STABLE CONVEYANCE SYSTEMS DEEMED
APPROPRIATE BY THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
….
3. THE DESIGN AND CONSTRUCTION OF THE WET BMP'S THAT
WILL BE A COUNTY MAINTAINED FACILITY SHALL BE SUBJECT TO
DOCUMENTED GEOTECHNICAL APPROVAL. THE SERVICES THAT
MUST BE PROVIDED BY THE GEOTECHNICAL ENGINEER SHALL
INCLUDE FULL-TIME GEOTECHNICAL INSPECTION PAID FOR BY
THE DEVELOPER. THAT FULL-TIME INSPECTION SHALL
INCLUDE
BUT NOT BE LIMITED TO THE FOLLOWING:
….
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS NECESSARY
TO FACILITATE THE APPROVAL PROCESS OF THE INDEPENDENT
GEOTECHNICAL CONSULTANT. OBSERVATION, TESTING AND
DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED STRUCTURAL
FILL FOR EARTH DAM CONSTRUCTION.
II. THE CUT-OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE, AND CONCRETE CHUTE SPILLWAY SUB-GRADES AS
APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS PRESENT AT
BEARING GRADE TO VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
...
4. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO
WILL
PROVIDE THE GEOTECHNICAL APPROVAL ON THE DAM WILL BE
FURNISHED PRIOR TO THE ISSUANCE OF THE LAND DISTURBANCE
PERMIT.
….
5. SPECIAL UPPER SWIFT CREEK WATERSHED END TREATMENT AS
DIRECTED BY THE ENVIRONMENTAL ENGINEERING DEPARTMENT WILL
BE PLACED IN THE VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS.
….
6. THE DESIGN AND CONSTRUCTION OF THE DRY SWM/BMP
THAT WILL BE A COUNTY MAINTAINED FACILITY SHALL BE SUBJECT
TO INDEPENDENTLY DOCUMENTED GEOTECHNICAL APPROVAL. THE
SERVICES THAT MUST BE PROVIDED BY THE INDEPENDENT
GEOTECHNICAL ENGINEERING FIRM SHALL INCLUDE GEOTECHNICAL
INSPECTION PAID FOR BY THE DEVELOPER THAT DOCUMENTS THE
ACHIEVEMENT OF ALL SPECIFICATIONS GENERALLY REGARDED TO
PERTAIN TO STRUCTURAL FILL.
7. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE WETLANDS MAP
WHICH ACCOMPANIES THE CORPS WETLANDS CONFIRMATION SHALL
BE PROVIDED TO THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
….
8. AN OVERALL FILLING, GRADING AND DRAINAGE PLAN. SHALL BE
PROVIDED IN THE
CONSTRUCTION PLANS TO ASSURE THAT THE LOTS WHICH ARE
WITHIN THE EXISTING
VEHICULAR ACCESS WAYS HAVE GROUND CONFIGURATIONS AND
STORM DRAINAGE
COORDINATION WITH THE MAJORITY OF THE PROJECT WHICH IS
OUTSIDE OF THE
FORMER RAILROAD CORRIDOR. THIS IS NOT AN ISSUE TO BE
ADDRESSED BY
INDIVIDUAL BUILDERS BUT SHALL BE MADE A PART OF THE
ENGINEERING
OF THE CONSTRUCTION PLANS. AFFECTED LOTS WILL BE
DESIGNATED WITH AN NBP.
9. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS
SHOWN ON THE TENTATIVE SHALL BE INCLUDED IN THE
ROAD AND DRAINAGE PLANS THAT MUST BE APPROVED
BY CDOT,VDOT AND THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROAD RIGHT-OF-WAY OR
EASEMENTS SHALL BE WIDE ENOUGH TO ENCOMPASS
THE PEDESTRIAN-ACCESS FACILITIES FOR AREAS THAT WILL
BE STATE MAINTAINED.
..
10. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE
ENVIRONMENTAL ENGINEERING DEPARTMENT MUST
HAVE RECEIVED DOCUMENTATION THAT THE SUB-DIVIDER
OR HIS REPRESENTATIVE HAS NOTIFIED CERTAIN PROPERTY
OWNERS DETERMINED BY THE DEPARTMENT OF THE
PROPOSED ADJACENT CONSTRUCTION.
….
11. SPECIAL UPPER SWIFT CREEK WATERSHED
END TREATMENT AS DIRECTED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT WILL BE PLACED IN THE
VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS.
12. THE ENVIRONMENTAL ENGINEERING DEPARTMENT
MAY IMPOSE A REASONABLE, MORE RIGOROUS EROSION
AND SEDIMENT CONTROL PROGRAM THEN THAT WHICH IS
PROVIDED BY MINIMUM STANDARDS FOUND IN THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
THIS WOULD INCLUDE THE UTILIZATION OF SUPER SILT FENCE
AND PAM
….
13. THE AREAS OF STORM-WATER RUNOFF CONCENTRATION AS
DISCUSSED IN THE ENVIRONMENTAL ENGINEERING DEPARTMENT
TENTATIVE REPORT DATED MARCH 27, 2015, AND APPEARING IN
THE APPROVED PRELIMINARY PLAT LETTER IN THE NOTES SECTION,
WILL BE FIELD LOCATED AND SHOWN ON THE PLANS. THE
CONSTRUCTION PLANS SHALL DESIGNATE THE AFFECTED LOTS WITH AN
NBP, AND AN ENGINEERED STORM SEWER, FILLING, GRADING, AND
DRAINAGE PLAN SHALL BE INCLUDED IN THE CONSTRUCTION PLANS.
14. BASED ON THE FINDINGS OF A QUALIFIED GEO-
TECHNICAL PROFESSIONAL, THE CONSTRUCTION PLANS SHALL
SHOW THE LOCATION OF ALL AREAS OF FORMER MINING
ACTIVITY. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS CONTAINS NO FORMER MINING ACTIVITY, A STATEMENT
TO THAT EFFECT WILL BE INCLUDED ON THE CONSTRUCTION
PLANS. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS DOES HAVE MINING ACTIVITY, A STATEMENT WILL BE
INCLUDED WHICH INDICATES THAT THE FORMER MINING
ACTIVITY AS SHOWN ON THE CONSTRUCTION PLANS IS THE
FULL EXTENT OF MINING ACTIVITY WITHIN THE AREA COVERED
BY THE CONSTRUCTION PLANS. THE QUALIFIED PROFESSIONAL
WILL ALSO INDICATE THOSE LOTS WHERE GEO-TECHNICAL
BORINGS MUST BE PERFORMED IN ORDER TO INSURE NO
HOUSE IS BUILT OVER AREAS AFFECTED BY FORMER MINING
ACTIVITY. IF APPLICABLE, RECOMMENDED SETBACK
DISTANCES FROM AREAS OF FORMER MINING ACTIVITY SHALL
BE SPECIFIED.
15. PRIOR TO RECORDATION THE ENVIRONMENTAL
ENGINEERING DEPARTMENT MUST HAVE RECEIVED
DOCUMENTATION FROM THE GEO-TECHNICAL EXPERT THAT
ALL AREAS OF FORMER MINING ACTIVITY AS SHOWN ON THE
APPROVED CONSTRUCTION PLAN HAVE BEEN RECLAIMED IN
A MANNER CONSISTENT WITH EITHER DEPARTMENT OF
MINES, MINERALS AND ENERGY RECLAMATION CRITERIA
OR CRITERIA RECOMMENDED BY THE GEOTECHNICAL
ENGINEER AS BEING APPROPRIATE AND IN COMPLIANCE
WITH GENERALLY ACCEPTED GEOTECHNICAL ENGINEERING
PRACTICE FOR SUCH SITUATIONS AS MAY BE ENCOUNTERED.
ALL AREAS OF FORMER MINING ACTIVITY SHALL BE
PORTRAYED ON THE RECORD PLAT.
16. THE COST FOR CLEANOUT OF SEDIMENT DEPOSITS
FROM A CERTIFIED UPPER SWIFT CREEK REGIONAL
BMP FACILITY WILL BE BORNE SOLELY BY THE PARTIES
DEVELOPING LAND WITHIN THE WATERSHED OF THE
BMP FROM WHICH THE EROSION WHICH PRODUCED
THE SEDIMENT OCCURRED UNTIL SUCH TIME AS ALL OF
THE AREAS OF THIS DEVELOPMENT THAT DRAIN TO THE
FACILITY ARE COMPLETED AND ACCEPTED INTO THE STATE
SYSTEM.
17. UNLESS OTHERWISE APPROVED THE EASEMENTS
SHOWN ON THE TENTATIVE PLAT AS PEDESTRIAN EASEMENT
WHICH ARE CONNECTING THE OPEN SPACE TO THE RIGHT OF
WAY SHALL BE CALLED ACCESS EASEMENTS ON THE
CONSTRUCTION PLANS AND RECORD PLAT.
18. OPEN SPACES SHALL BE CONNECTED TO ROAD
RIGHTS-OF-WAY VIA ACCESS EASEMENT OR ADDITIONAL
OPEN SPACE IN LOCATIONS WHERE ACCESS IS NOT
IMPEDED BY DRAINAGE COURSE OR OTHER NATURAL
FEATURES.
POLLUTANT UNLESS OTHERWISE MODIFIED AT THE TIME OF
CONSTRUCTION PLAN REVIEW
AND APPROVAL.
….
20. THE CONSTRUCTION PLANS WHICH BRING VERNEHAM TO ITS
INTERSECTION WITH
EMBERTAN ROAD SHALL INCLUDE THE ADDITIONAL LENGTH OF ROAD
CONSTRUCTION WHICH
WILL CREATE THE VERNEHAM DRIVE/OTTERDALE ROAD INTERSECTION.
(EE, PLANNING,
FIRE)
NOTES: FROM PROFFERED CONDITION #17 OF REZONING CASE
02SN0209: THE
DEVELOPER SHALL LEAVE IN PLACE THE TEMPORARY SEDIMENT
CONTROL DEVICES
AND/OR CONSTRUCT NEW BMPS OR COMBINATIONS OF BMPS WHICH
WOULD
ACHIEVE A MAXIMUM PHOSPHOROUS RUNOFF LIMITS REQUIRED BY THE
UPPER
SWIFT CREEK WATERSHED ORDINANCE SECTION 19-23(D) (1) A.
UNTIL
CHESTERFIELD COUNTY OBTAINS ITS INITIAL PERMIT FOR THE
IMPLEMENTATION OF THE
UPPER SWIFT CREEK WATERSHED PLAN. WITH THE ISSUANCE OF THE
PERMIT FOR
BMP WBC-10 IN THE FOXCREEK SUBDIVISION, COMPLIANCE WITH THIS
PROFFER
HAS BEEN ACHIEVED.
….
AN ASSESSMENT OF THE TOPOGRAPHY IN RELATION TO THE LOT
LAYOUT HAS REVEALED SEVERAL AREAS OF STORM WATER
CONCENTRATION WHICH ARE IN POTENTIAL CONFLICT WITH THE
DESIRE NOT TO HAVE STORM DRAINAGE PROBLEMS RELATED TO THE
DEVELOPMENT OF THE HOUSE AND LOT. THESE ARE ENGINEERING
ISSUES WHICH SHOULD BE ADDRESSED BY THE CONSTRUCTION
PLANS AND NOT LEFT TO THE INDIVIDUAL BUILDERS TO DEAL WITH.
THE PHYSICAL "LOW" OF THESE DRAINAGE CORRIDORS SHOULD BE
FIELD LOCATED AND APPROPRIATE ENGINEERING PROPOSALS WITH
RESPECT TO FILLING, GRADING, DRAINAGE STORM SEWERING AND
BUILDING ENVELOPE LOCATIONS SHOULD BE MADE A PART OF THE
CONSTRUCTION PLANS. THESE AREAS ARE AS FOLLOWS:
….
A. THE ACCUMULATION OF STORM DRAINAGE OCCURRING FROM LOT 1,
PASSING THROUGH THE HOME SITES DOWN THROUGH LOT 7.
….
B. THE DRAINAGE CORRIDOR BEGINNING IN LOT 13 PASSING
THROUGH LOTS 16 AND 17 BEFORE REACHING THE WETLANDS.
….
C. THE DRAINAGE CORRIDOR FROM THE RIDGE LINE IN LOT 34
PASSING THROUGH LOTS 36 AND 37.
….
D. THE DRAINAGE CORRIDOR BEGINNING IN LOT 156 TERMINATING
AT THE FLOOD PLAIN IN LOT 159.
….
E. THE DRAINAGE CORRIDOR BEGINNING IN LOT 155 PASSING
THROUGH THE CENTER LOT OF 153 BEFORE REACHING BMP #4.
….
F. THE DRAINAGE CORRIDOR BEGINNING IN LOT 117 AND PASSING
THROUGH LOT 120 BEFORE REACHING THE FLOOD PLAIN.
….
G. THE DRAINAGE CORRIDOR BEGINNING AT THE SUMMIT IN LOT
204 ACCUMULATING DOWN THROUGH LOT 218 BEFORE ENTERING
EMBERTAN ROAD.
…H. THE TWO LEGS, ONE STARTING IN LOT 195, ONE STARTING IN
LOT
193, PASSING THROUGH LOT 232 AND CONVERGING IN LOT 230,
BEFORE PASSING DIAGONALLY THROUGH LOT 227.
….
I. THE DRAINAGE CORRIDOR BEGINNING AT THE RIDGE LINE IN LOT
243 PASSING DIAGONALLY THROUGH LOT 238.
….
J. THE ACCUMULATION OF STORM DRAINAGE ACCUMULATING
STARTING IN LOT 323 DOWN THROUGH LOT 327.
….
*********************************************
PLAN NAME: HARPERS MILL SOUTH PHASE V (AMENDED)
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: L. D. PRITCHARD, JR. / 748-1028
PLAN NUMBER: 06TS0161
CONSULTANT: STEVE WORTHINGTON/TIMMONS
PLANNER: AMY SOMERVELL
ORIGINAL PLAN DATE: MAY 5, 2004
LATEST SUBMISSION DATE: DECEMBER 15, 2014
UPDATED: JULY 30, 2014
UPDATED: JANUARY 20, 2015
UPDATED: MARCH 27, 2015
UPDATED: MAY 14, 2015
REVIEW DATE: MAY 27, 2015
SUBMITTAL NUMBER: 4
STATUS: READY FOR APPROVAL
TABLE REVIEW: YES
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS THE
FOLLOWING PERTAINING TO THE ABOVE REFERENCED TENTATIVE PLAT
REVISED DATED MARCH 5, 2015, RECEIVED ON MARCH 23, 2015
BY THE PLANNING DEPARTMENT AND ON MARCH 25, 2015 BY THE
ENVIRONMENTAL ENGINEERING DEPARTMENT.
….
THIS VERSION REFLECTS CHANGES TO CONDITION #20 IN
ACCORDANCE WITH THE MEETING OF MAY 21, 2015, BETWEEN THE
SUBDIVISION TEAM AND MARK SOWERS ACCOMPANIED BY STEVE
WORHTINGTON.
….
TENTATIVE CONDITIONS
….
1. THE STREAMS WHICH WILL BE CROSSED BY THE 4 FOOT
ASPHALT SIDEWALK WILL BE BRIDGED IN A WAY WHICH
CREATES NO HYDRAULIC IMPACT ON THE FLOOD PLAIN
LIMITS.
….
2. ROOF GUTTERS AND DOWNSPOUTS SHALL BE INSTALLED ON
THE DWELLINGS AS DESIGNATED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROOF DRAINAGE LEADERS
WILL BE TIED DIRECTLY INTO MINIMUM 12" ONSITE STORM
SEWERS OR OTHER STABLE CONVEYANCE SYSTEMS DEEMED
APPROPRIATE BY THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
….
GEOTECHNICAL ENGINEER SHALL INCLUDE FULL-TIME
GEOTECHNICAL INSPECTION PAID FOR BY THE
DEVELOPER. THAT FULL-TIME INSPECTION SHALL INCLUDE
BUT NOT BE LIMITED TO THE FOLLOWING:
….
A. PARTICIPATION/INPUT INTO THE DESIGN PROCESS AS NECESSARY
TO FACILITATE THE APPROVAL PROCESS OF THE INDEPENDENT
GEOTECHNICAL CONSULTANT. OBSERVATION, TESTING AND
DOCUMENTATION OF:
I. SUITABLE SUB-GRADES TO RECEIVE COMPACTED STRUCTURAL
FILL FOR EARTH DAM CONSTRUCTION.
II. THE CUT-OFF TRENCH, SPILLWAY PIPE, DRAINAGE BLANKET,
RISER STRUCTURE, AND CONCRETE CHUTE SPILLWAY SUB-GRADES AS
APPLICABLE TO EVALUATE WHETHER SUITABLE SOIL IS PRESENT AT
BEARING GRADE TO VERIFY PROPER INSTALLATION.
III. REINFORCING STEEL, IF REQUIRED, TO EVALUATE ITS
CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS.
….
4. THE NAME OF THE GEOTECHNICAL PROFESSIONAL WHO WILL
PROVIDE THE GEOTECHNICAL APPROVAL ON THE DAM WILL
BE FURNISHED PRIOR TO THE ISSUANCE OF THE LAND
DISTURBANCE PERMIT.
….
5. SPECIAL UPPER SWIFT CREEK WATERSHED END TREATMENT
DIRECTED BY THE ENVIRONMENTAL ENGINEERING
DEPARTMENT WILL BE PLACED IN THE VICINITY OF THE
TERMINUS OF MANMADE STORM DRAINAGE OUTFALLS.
….
6. THE DESIGN AND CONSTRUCTION OF THE DRY SWM/BMP
THAT WILL BE A COUNTY MAINTAINED FACILITY SHALL BE SUBJECT
TO INDEPENDENTLY DOCUMENTED GEOTECHNICAL APPROVAL. THE
SERVICES THAT MUST BE PROVIDED BY THE INDEPENDENT
GEOTECHNICAL ENGINEERING FIRM SHALL INCLUDE GEOTECHNICAL
INSPECTION PAID FOR BY THE DEVELOPER THAT DOCUMENTS THE
ACHIEVEMENT OF ALL SPECIFICATIONS GENERALLY REGARDED TO
PERTAIN TO STRUCTURAL FILL.
….
7. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE WETLANDS MAP
WHICH ACCOMPANIES THE CORPS WETLANDS CONFIRMATION SHALL
BE PROVIDED TO THE ENVIRONMENTAL ENGINEERING
DEPARTMENT.
8. AN OVERALL FILLING, GRADING AND DRAINAGE PLAN. SHALL BE
PROVIDED IN THE
CONSTRUCTION PLANS TO ASSURE THAT THE LOTS WHICH ARE
WITHIN THE EXISTING
VEHICULAR ACCESS WAYS HAVE GROUND CONFIGURATIONS AND
STORM DRAINAGE
COORDINATION WITH THE MAJORITY OF THE PROJECT WHICH IS
OUTSIDE OF THE
FORMER RAILROAD CORRIDOR. THIS IS NOT AN ISSUE TO BE
ADDRESSED BY
INDIVIDUAL BUILDERS BUT SHALL BE MADE A PART OF THE
ENGINEERING
OF THE CONSTRUCTION PLANS. AFFECTED LOTS WILL BE
DESIGNATED WITH AN NBP.
9. THE PEDESTRIAN-ACCESS FACILITIES DESIGN AS
SHOWN ON THE TENTATIVE SHALL BE INCLUDED IN THE
ROAD AND DRAINAGE PLANS THAT MUST BE APPROVED
BY CDOT,VDOT AND THE ENVIRONMENTAL
ENGINEERING DEPARTMENT. ROAD RIGHT-OF-WAY OR
EASEMENTS SHALL BE WIDE ENOUGH TO ENCOMPASS
THE PEDESTRIAN-ACCESS FACILITIES FOR AREAS THAT WILL
BE STATE MAINTAINED.
..
10. PRIOR TO CONSTRUCTION PLAN APPROVAL, THE
ENVIRONMENTAL ENGINEERING DEPARTMENT MUST
HAVE RECEIVED DOCUMENTATION THAT THE SUB-DIVIDER
OR HIS REPRESENTATIVE HAS NOTIFIED CERTAIN PROPERTY
OWNERS DETERMINED BY THE DEPARTMENT OF THE
PROPOSED ADJACENT CONSTRUCTION.
….
11. SPECIAL UPPER SWIFT CREEK WATERSHED
END TREATMENT AS DIRECTED BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT WILL BE PLACED IN THE
VICINITY OF THE TERMINUS OF MANMADE STORM
DRAINAGE OUTFALLS.
12. THE ENVIRONMENTAL ENGINEERING DEPARTMENT
MAY IMPOSE A REASONABLE, MORE RIGOROUS EROSION
AND SEDIMENT CONTROL PROGRAM THEN THAT WHICH IS
PROVIDED BY MINIMUM STANDARDS FOUND IN THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK.
THIS WOULD INCLUDE THE UTILIZATION OF SUPER SILT FENCE
AND PAM
….
13. THE AREAS OF STORM-WATER RUNOFF CONCENTRATION AS
DISCUSSED IN THE ENVIRONMENTAL ENGINEERING DEPARTMENT
TENTATIVE REPORT DATED MARCH 27, 2015, AND APPEARING IN
THE APPROVED PRELIMINARY PLAT LETTER IN THE NOTES SECTION,
WILL BE FIELD LOCATED AND SHOWN ON THE PLANS. THE
CONSTRUCTION PLANS SHALL DESIGNATE THE AFFECTED LOTS WITH
AN
NBP, AND AN ENGINEERED STORM SEWER, FILLING, GRADING, AND
DRAINAGE PLAN SHALL BE INCLUDED IN THE CONSTRUCTION PLANS.
14. BASED ON THE FINDINGS OF A QUALIFIED GEO-
TECHNICAL PROFESSIONAL, THE CONSTRUCTION PLANS SHALL
SHOW THE LOCATION OF ALL AREAS OF FORMER MINING
ACTIVITY. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS CONTAINS NO FORMER MINING ACTIVITY, A STATEMENT
TO THAT EFFECT WILL BE INCLUDED ON THE CONSTRUCTION
PLANS. IF THE LAND AREA COVERED BY THE CONSTRUCTION
PLANS DOES HAVE MINING ACTIVITY, A STATEMENT WILL BE
INCLUDED WHICH INDICATES THAT THE FORMER MINING
ACTIVITY AS SHOWN ON THE CONSTRUCTION PLANS IS THE
FULL EXTENT OF MINING ACTIVITY WITHIN THE AREA COVERED
BY THE CONSTRUCTION PLANS. THE QUALIFIED PROFESSIONAL
WILL ALSO INDICATE THOSE LOTS WHERE GEO-TECHNICAL
BORINGS MUST BE PERFORMED IN ORDER TO INSURE NO
HOUSE IS BUILT OVER AREAS AFFECTED BY FORMER MINING
ACTIVITY. IF APPLICABLE, RECOMMENDED SETBACK
DISTANCES FROM AREAS OF FORMER MINING ACTIVITY SHALL
BE SPECIFIED.
15. PRIOR TO RECORDATION THE ENVIRONMENTAL
ENGINEERING DEPARTMENT MUST HAVE RECEIVED
DOCUMENTATION FROM THE GEO-TECHNICAL EXPERT THAT
ALL AREAS OF FORMER MINING ACTIVITY AS SHOWN ON THE
APPROVED CONSTRUCTION PLAN HAVE BEEN RECLAIMED IN
A MANNER CONSISTENT WITH EITHER DEPARTMENT OF
MINES, MINERALS AND ENERGY RECLAMATION CRITERIA
OR CRITERIA RECOMMENDED BY THE GEOTECHNICAL
ENGINEER AS BEING APPROPRIATE AND IN COMPLIANCE
WITH GENERALLY ACCEPTED GEOTECHNICAL ENGINEERING
PRACTICE FOR SUCH SITUATIONS AS MAY BE ENCOUNTERED.
ALL AREAS OF FORMER MINING ACTIVITY SHALL BE
PORTRAYED ON THE RECORD PLAT.
16. THE COST FOR CLEANOUT OF SEDIMENT DEPOSITS
FROM A CERTIFIED UPPER SWIFT CREEK REGIONAL
BMP FACILITY WILL BE BORNE SOLELY BY THE PARTIES
DEVELOPING LAND WITHIN THE WATERSHED OF THE
BMP FROM WHICH THE EROSION WHICH PRODUCED
THE SEDIMENT OCCURRED UNTIL SUCH TIME AS ALL OF
THE AREAS OF THIS DEVELOPMENT THAT DRAIN TO THE
FACILITY ARE COMPLETED AND ACCEPTED INTO THE STATE
SYSTEM.
17. UNLESS OTHERWISE APPROVED THE EASEMENTS
SHOWN ON THE TENTATIVE PLAT AS PEDESTRIAN EASEMENT
WHICH ARE CONNECTING THE OPEN SPACE TO THE RIGHT OF
WAY SHALL BE CALLED ACCESS EASEMENTS ON THE
CONSTRUCTION PLANS AND RECORD PLAT.
18. OPEN SPACES SHALL BE CONNECTED TO ROAD
RIGHTS-OF-WAY VIA ACCESS EASEMENT OR ADDITIONAL
OPEN SPACE IN LOCATIONS WHERE ACCESS IS NOT
IMPEDED BY DRAINAGE COURSE OR OTHER NATURAL
FEATURES.
….
19. COMPLIANCE WITH THE UPPER SWIFT CREEK WATER QUALITY
STANDARDS WILL BE
ACHIEVED BY THE PAYMENT INTO THE FUND OF AN AMOUNT
CORRELATED TO 26.11#S OF
POLLUTANT UNLESS OTHERWISE MODIFIED AT THE TIME OF
CONSTRUCTION PLAN REVIEW
AND APPROVAL.
….
20. THE REQUIREMENT FOR THE SECOND ACCESS FOR THE NORTHERN
TIER OF LOTS (1-115)
WILL BE ACHIEVED BY THE RECORDATION AND CONSTRUCTION OF
VERNEHAM DRIVE FROM
HARPERS MILL PARKWAY DOWN THROUGH ITS INTERSECTION WITH
SUTCOMB ROAD.
….
THE REQUIREMENT FOR THE SECOND ACCESS FOR THE
SOUTHERN TIER OF LOTS (116-
337) WILL BE ACHIEVED BY THE RECORDATION AND CONSTRUCTION
OF VERNEHAM DRIVE
FROM OTTERDALE ROAD EXTENDED NORTHWARDLY THROUGH ITS
INTERSECTION WITH
EMBERTAN ROAD.
….
THIS ALLOWS A TEMPORARY GAP IN THE CONSTRUCTION OF
VERNEHAM DRIVE
BETWEEN EMBERTAN ROAD AND SUTCOMB ROAD WHICH MUST BE
COMPLETED WITH
THE CONSTRUCTION OF BROOKWEED DRIVE LOCATED IN HARPERS MILL
SOUTHEAST
PHASE. (EE, PLANNING, FIRE)
NOTES: FROM PROFFERED CONDITION #17 OF REZONING CASE
02SN0209: THE
DEVELOPER SHALL LEAVE IN PLACE THE TEMPORARY SEDIMENT
CONTROL DEVICES
AND/OR CONSTRUCT NEW BMPS OR COMBINATIONS OF BMPS WHICH
WOULD
ACHIEVE A MAXIMUM PHOSPHOROUS RUNOFF LIMITS REQUIRED BY THE
UPPER
SWIFT CREEK WATERSHED ORDINANCE SECTION 19-23(D) (1) A.
UNTIL
CHESTERFIELD COUNTY OBTAINS ITS INITIAL PERMIT FOR THE
IMPLEMENTATION OF THE
UPPER SWIFT CREEK WATERSHED PLAN. WITH THE ISSUANCE OF THE
PERMIT FOR
BMP WBC-10 IN THE FOXCREEK SUBDIVISION, COMPLIANCE WITH
THIS PROFFER
HAS BEEN ACHIEVED.
….
AN ASSESSMENT OF THE TOPOGRAPHY IN RELATION TO THE LOT
LAYOUT HAS REVEALED SEVERAL AREAS OF STORM WATER
CONCENTRATION WHICH ARE IN POTENTIAL CONFLICT WITH THE
DESIRE NOT TO HAVE STORM DRAINAGE PROBLEMS RELATED TO THE
DEVELOPMENT OF THE HOUSE AND LOT. THESE ARE ENGINEERING
ISSUES WHICH SHOULD BE ADDRESSED BY THE CONSTRUCTION
PLANS AND NOT LEFT TO THE INDIVIDUAL BUILDERS TO DEAL WITH.
THE PHYSICAL "LOW" OF THESE DRAINAGE CORRIDORS SHOULD BE
FIELD LOCATED AND APPROPRIATE ENGINEERING PROPOSALS WITH
RESPECT TO FILLING, GRADING, DRAINAGE STORM SEWERING AND
BUILDING ENVELOPE LOCATIONS SHOULD BE MADE A PART OF THE
CONSTRUCTION PLANS. THESE AREAS ARE AS FOLLOWS:
….
A. THE ACCUMULATION OF STORM DRAINAGE OCCURRING FROM LOT 1,
PASSING THROUGH THE HOME SITES DOWN THROUGH LOT 7.
….
B. THE DRAINAGE CORRIDOR BEGINNING IN LOT 13 PASSING
THROUGH LOTS 16 AND 17 BEFORE REACHING THE WETLANDS.
….
C. THE DRAINAGE CORRIDOR FROM THE RIDGE LINE IN LOT 34
PASSING THROUGH LOTS 36 AND 37.
….
D. THE DRAINAGE CORRIDOR BEGINNING IN LOT 156 TERMINATING
AT THE FLOOD PLAIN IN LOT 159.
….
E. THE DRAINAGE CORRIDOR BEGINNING IN LOT 155 PASSING
THROUGH THE CENTER LOT OF 153 BEFORE REACHING BMP #4.
….
F. THE DRAINAGE CORRIDOR BEGINNING IN LOT 117 AND PASSING
THROUGH LOT 120 BEFORE REACHING THE FLOOD PLAIN.
….
G. THE DRAINAGE CORRIDOR BEGINNING AT THE SUMMIT IN LOT 204
ACCUMULATING DOWN THROUGH LOT 218 BEFORE ENTERING EMBERTAN
ROAD.
….
H. THE TWO LEGS, ONE STARTING IN LOT 195, ONE STARTING IN
LOT 193, PASSING THROUGH LOT 232 AND CONVERGING IN LOT 230,
BEFORE PASSING DIAGONALLY THROUGH LOT 227.
….
I. THE DRAINAGE CORRIDOR BEGINNING AT THE RIDGE LINE IN
II. LOT 243 PASSING DIAGONALLY THROUGH LOT 238.
….
J. THE ACCUMULATION OF STORM DRAINAGE ACCUMULATING
STARTING IN LOT 323 DOWN THROUGH LOT 327.
….
**********************************************************
**
PLAN NAME: HARPER'S MILL SOUTH PHASE TECHNICAL CORRECTION
PLAN NUMBER: 06TS0161
CONSULTANT: TIMMONS GROUP
PLANNER: GREGORY KIRTLEY
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: REBECCAH P. WARD / 748-1028
ORIGINAL PLAN DATE: MAY 5, 2004
LAST REVISION DATE: MARCH 3, 2016
REVIEW DATE: MARCH 29, 2016
SUBMITTAL NUMBER: 7
STATUS: READY FOR APPROVAL
NOTE:
ALL PREVIOUS TENTATIVE CONDITIONS STILL APPLY.
****************************************
PLAN NAME: HARPER'S MILL SOUTH PHASE TECHNICAL CORRECTION
PLAN NUMBER: 06TS0161
CONSULTANT: TIMMONS GROUP
PLANNER: GREGORY KIRTLEY
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: REBECCAH P. WARD / 748-1028
ORIGINAL PLAN DATE: MAY 5, 2004
LAST REVISION DATE: MARCH 30, 2016
REVIEW DATE: APRIL 22, 2016
SUBMITTAL NUMBER: 8
STATUS: REVISIONS REQUESTED
TABLE REVIEW: YES
THE ENVIRONMENTAL ENGINEERING DEPARTMENT PRESENTS THE
FOLLOWING OBSERVATIONS PERTAINING TO THE ABOVE REFERENCED
TENTATIVE PLAT DATED MAY 5, 2004, RECEIVED BY THE PLANNING
DEPARTMENT ON MARCH 31, 2016, AND BY THE ENVIRONMENTAL
ENGINEERING DEPARTMENT ON APRIL 4, 2016.
THE ROAD NAME TRUMPETER ROAD ALREADY EXISTS IN CHESTERFIELD
COUNTY; THEREFORE, IT CANNOT BE USED IN HARPERS MILL.
PLEASE REVISE THIS ROAD NAME TO ANOTHER NAME WHICH HAS BEEN
APPROVED BY THE RICHMOND REGIONAL PLANNING DISTRICT
COMMISSION.
NOTE:
ALL PREVIOUS TENTATIVE CONDITIONS STILL APPLY.
****************************************
PLAN NAME: HARPER'S MILL SOUTH PHASE TECHNICAL CORRECTION
PLAN NUMBER: 06TS0161
CONSULTANT: TIMMONS GROUP
PLANNER: WHIT KIRTLEY
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: REBECCAH P. WARD / 748-1028
ORIGINAL PLAN DATE: MAY 5, 2004
LAST REVISION DATE: MAY 20, 2016
REVIEW DATE: JULY 12, 2016
SUBMITTAL NUMBER: 9
STATUS: APPROVED
NOTE: THIS APPROVAL ONLY APPLIES TO THE TECHNICAL
CORRECTION TO CHANGE THIRTEEN (13) ROAD NAMES. ALL PREVIOUS
TENTATIVE CONDITIONS STILL APPLY.
****************************************
PLAN NAME: HARPERS MILL SOUTH PHASE - TECHNICAL CORRECTION
REVIEW DEPARTMENT: ENVIRONMENTAL ENGINEERING
REVIEWER/PHONE: ROBERT W. BOSWELL - 748-1035
PLAN NUMBER: 06TS0161
ORIGINAL PLAN DATE: 5/5/04
LATEST REVISION DATE: 9/20/17
REVIEW DATE: 9/25/17
SUBMITTAL NUMBER: 10
STATUS: APPROVED
THIS APPROVAL ONLY APPLIES TO THE TECHNICAL CORRECTION TO
REDUCE THE VERNEHAM DRIVE RIGHT-OF-WAY FROM 70 FEET TO 50
FEET.
************************************************

Go to Case Selection Form or Go to Project List