Thanksgiving Holiday Closings... MORE

Hover here for Site Tools
Modular - Manufactured Home
 
FacebookTwitterYouTubeMedia CenterRSS
Contact Us

Building Inspection Director
Richard C. Witt

Phone/Fax
(804) 748-1057
(804) 751-4713 Fax

Get complete contact info 

Email us with questions about
Permits and Fees
Residential code requirements
Commercial code requirements
Residential inspection requirements
Commercial inspection requirements 


Hours
Office - M-F, 8:30 a.m. - 5 p.m.
Inspectors M-F, 8 a.m. - 4:30 p.m.

Mailing Address
Chesterfield County Department of Building Inspection
P.O. Box 40
Chesterfield, VA 23832-0040

Street Address
9800 Government Center Parkway
Chesterfield, VA 23832
Map this 

 
Construction Project Types
Modular - Manufactured Home

Permits required: 

  1. Building permit
  2. Auxiliary permits: One or more of the permit types listed below depending on the scope of work being performed:
    • Electrical permit
    • Plumbing permit
    • Gas permit
    • Mechanical permit
     

Application Submittal Requirements: 

  1. One (1) copy of Client Registration Form – if the contractor has never performed work in Chesterfield County before.
  2. One (1) copy of the Residential Building Permit Application.
  3. One (1) copy of the plot plan showing setbacks from existing and proposed improvements. Acceptable plot plans contain the following:
    1. Entire property, showing all property line dimensions
    2. Existing dwelling, any other existing structures and location of proposed structure (all dimensions of proposed structure clearly indicated. For proposed accessory structures, indicate the overall height).
    3. Setbacks from the closest point of the proposed structure to property lines in each direction. Label the measurements from each property line to the closest point on the structure. Be as exact as possible and label the name of road clearly.
    4. All buffers, easements or floodplains located on your property (no structure may be located in these areas).
     
  4. Two (2) copies of the construction plans – One set will be returned to the applicant with the issued permit. (For more detail on exactly what the construction plans require, see Construction Plan Requirements listed below.)
  5. Two (2) copies of the engineered soil reports – Required to be prepared by a soil scientist or geotechnical engineer and submitted with each set of construction plans for all new houses. For more information see the Requirements for Soil Reports and Footings.
  6. One (1) copy of the Agreement in Lieu of Erosion and Sediment Control Plan 
  7. One (1) copy of the Residential Plans Review Delivery form – This form indicates whether you would like the permit and forms mailed to you or held for three days at the Building Inspection office for you to pick up.
  8. Payment of permit and other related fees – Residential Fee Schedule. Cash, checks, MasterCard, Visa, Discover and American Express cards are accepted. 

Construction Plan Requirements: Minimum of two copies 

  1. Shrink/swell soil report
  2. Installation and set up instructions from the manufacturer, including floor plans, roof plan, elevations, cross sections and mating wall details (these plans must be sealed by the compliance (inspection) agency)
  3. Footing and Foundation plan

Return to Obtaining a Permit/Design Criteria – Residential